Workshop: The nitty gritty of risk assessment - decontamination processes



Similar documents
Risk Assessment Tool and Guidance (Including guidance on application)

Risk Management in the HSE; An Information Handbook

HSE HR Circular 004/ th January 2010.

Hazard Identification, Risk Assessment and Management Procedure. Documentation Control

RISK MANAGEMENT POLICY. Version 3

Best Practice Guidance. For. Developing a Site Specific Safety Statement

Version: 3.0. Effective From: 19/06/2014

Risk Register Policy and Procedure

Health, Security, Safety and Environment (HSE)

Business Continuity Management Policy

Risk Management: Coordinated activities to direct and control an organisation with regard to risk.

POLICY. Number: Title: Enterprise Risk Management. Authorization

A Guide to Accident Investigations

Manchester Metropolitan University. Policy for the Reporting and Investigation of Accidents and Incidents

City of London Supported Housing. Incident Reporting Procedure

RISK MANAGEMENT TOOLKIT

PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA

Healthcare risk assessment made easy

Shell s Health, Safety and Environment (HSE) management system (see Figure 11-1) provides the framework for managing all aspects of the development.

DIT HEALTH AND SAFETY OFFICE

Bedford Group of Drainage Boards

EVENT RISK ASSESSMENT EXAMPLE / 04

Policy for Preventing and Managing Critical Incident Stress

Guidance on Risk Assessment and Control

RISK MANAGEMENT REPORTING GUIDELINES AND MANUAL 2013/14. For North Simcoe Muskoka LHIN Health Service Providers

Guide to Developing Risk Management Plans for Sport & Active Recreation Clubs

The Risk Management strategy sets out the framework that the Council has established.

Complaints Policy. Controlled Document Number: Version Number: 6 Controlled Document Sponsor: Controlled Document Lead: Approved By:

OHS INCIDENT REPORTING & INVESTIGATION - SOP 104

INCIDENT POLICY Page 1 of 13 November 2015

University of New England Compliance Management Framework and Procedures

POLICY : CORPORATE RISK MANAGEMENT

6. Risk management plans for high risk activities and special events

Risk Management Policy and Framework

Business Continuity Management; Guidance for Policy Implementation

HEALTH, SAFETY, ENVIRONMENT AND COMMUNITY MANAGEMENT STANDARDS. OCTOBER ISSUE No 01. Doc No: HSEC MS 001

Risk Management Guide

Risk Management. Policy

AFTRS Health and Safety Risk Management Policy

Bridgend County Borough Council. Corporate Risk Management Policy

A Guide for Managers Managing Planned and Unplanned Absences/Non-Attendance

Stress Management Policy

STRESS POLICY. Stress Policy. Head of Valuation Services. Review History

RISK MANAGEMENT IN THE NATIONAL SYSTEM A PRACTICAL GUIDE

Statutory duty of candour with criminal sanctions Briefing paper on existing accountability mechanisms

South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy

IASW Submission to TUSLA Corporate Plan September How will you judge the success of TUSLA in three years time?

Consultation Paper: Standards for Effectively Managing Mental Health Complaints

Incident / Accident Report Form

Incident Reporting Procedure

MISSION STATEMENT (YOUR COMPANY) Safety Committee Charter

MANAGEMENT OF STRESS AT WORK POLICY

Elements of an Occupational Health and Safety Program

SOMERSET PARTNERSHIP NHS FOUNDATION TRUST RECORDS MANAGEMENT STRATEGY. Report to the Trust Board 22 September Information Governance Manager

F36D 04 (LMC B1) Lead and manage provision of care services that respects, protects and

POL ENTERPRISE RISK MANAGEMENT SC51. Executive Services Department BUSINESS UNIT: Executive Support Services SERVICE UNIT:

How to investigate an Accident and Incident.

Risk Management Policy

AUSTRALIAN COLLEGE OF THEOLOGY

HOUSE OF COMMONS HEALTH COMMITTEE INQUIRY INTO COMPLAINTS AND LITIGATION

Hazard/Risk Identification and Control Procedure

Warrington Safeguarding Children Board Neglect Strategy

Safety Management Systems (SMS) guidance for organisations

Policy: Accident & Injury Reporting Category: Operations. Authorized by: Joan Arruda, CEO

RISK MANAGEMENT POLICY

Policy on the reporting of accidents, dangerous occurrences and occupational ill health

Laboratory Work Risk Assessment

County of Orange Department of Fire & EMS Employee Performance Evaluation Company Officer. Hire Date: Period Covered:

Guide to Intervention for Federally Regulated Life Insurance Companies

Step 4. Monitor / Review Control Measures

Waveney Lower Yare & Lothingland Internal Drainage Board Risk Management Strategy and Policy

SAFETY and HEALTH MANAGEMENT STANDARDS

Board of Directors Meeting 12/04/2010. Operational Risk Management Charter

River Stour (Kent) Internal Drainage Board Risk Management Strategy and Policy

CORP RISK MANAGEMENT POLICY & METHODOLOGY

Incident reporting policy National Chlamydia Screening Programme

OUT-OF-COURT RESTRUCTURING GUIDELINES FOR MAURITIUS

RESOLVE AT WORK. An early intervention model in the. Supporting individuals, Supporting managers, Supportive workplaces WHSQ WHSQ

REQUIREMENTS OF SAFETY MANAGEMENT SYSTEM

Integrated Risk Management Policy

Work Health and Safety (WHS) Policy

TRANSPORT FOR LONDON SAFETY, HEALTH AND ENVIRONMENT ASSURANCE COMMITTEE

WHS Risk Assessment and Control Form

INCIDENT MANAGEMENT POLICY and PROCEDURES

SCDLMCB3 Lead and manage the provision of care services that deals effectively with transitions and significant life events

OH&S Management Systems Audit Checklist (NAT, E3)

NZ Transport Agency Page 1 of 23

Master of Counselling. Practicum & Supervision Handbook

CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT

Year 1 Aims and Learning Outcomes Placement 1 Orientation to placement

The Lowitja Institute Risk Management Plan

Employer s Guide to. Best Practice Return to Work for a Stress Injury

Transcription:

Workshop: The nitty gritty of risk assessment - decontamination processes IDI Managers Study Day April 12 th 2012 Paschal Kent Decontamination Coordinator CUHG Cork University Hospital

Aim & Objectives Gain greater clarity, a deeper understanding and insight into the risk assessment process for decontamination RIMD Demystify risk assessment process Build on own experience Focus on the practicalities of risk assessment (how is it done and how often is it done)

Risk management Proactive Risk Management Risk Register Reactive Risk Management Incident Management

What is Proactive Risk Management? Work out what can go wrong and plan for the eventuality spot a problem in the making and do something about it in advance

What is a risk register? A risk register is a database of risks that face an organisation its staff and service users at any time. Always changing to reflect the dynamic nature of risks and the organization's management of them.

Supporting Resources to Assist Risk Assessment Process HSE Decontamination Standards & Recommended Practices 2011 HSE Risk Management in the HSE :An information Handbook Oct 2011 HSE Risk Assessment Tool & Guidance (including guidance on application Oct 2011 HSE Developing & populating a Risk Register- Best Practice Guidance Feb 2008

Resources where to get them HSE Risk Assessments Docs via http://hsenet.hse.ie/hse_central/quali typatientsafety/?importurl=http://local host:82/eng/about/who/quality_and_c linical_care/riskmanagement/ HSE Decontamination RIMD Best Practice Guidance www.hse.ie/eng/publications/services/ Hospitals/

Importance of Professional Judgement o Risk assessment and analysis can be a subjective process relying on the knowledge and experience of the person making the analysis. o Stakeholders & Team should have clearly defined roles

Completing the Risk Assessment Form Section 1 Administrative Area: Location: Section/Ward/Dept: Date of Assessment: Source of Risk: Unique ID No: Primary Risk Category: Secondary Risk Category: Tertiary Risk Category: Name Risk Owner: (BLOCKS) Signature of Risk Owner:

Completing the Risk Assessment Form Section 2 RISK DESCRIPTION IMPACTS/VUNERABIL ITIES EXISTING CONTROL MEASURES ADDITIONAL CONTROLS REQUIRED PERSON RESPONSIBLE FOR ACTION DUE DATE

Describe the Risk ICC approach Describe the primary area of Impact if the risk were to materialise. Describe the Causal Factors that could result in the risk materialising. Ensure that the Context of the risk is clear is the risk target well defined (e.g. staff, patient, department, hospital, etc.) and is the nature of the risk clear (e.g. financial, safety, physical loss, perception, etc.)

Example of ICC Approach Potential injury to service users and staff (impact) due to old, unreliable & not fit for purpose steam sterilzer (causal factor) in the CDU (context)

Impacts & Vulnerabilities o What is the likely harm that will occur if it does happen? o HSE classified impacts into eight types of Harm

Completing the Risk Assessment Form Section 2 continued Existing Controls RISK DESCRIPTION IMPACTS/VUNERABIL ITIES EXISTING CONTROL MEASURES ADDITIONAL CONTROLS REQUIRED PERSON RESPONSIBLE FOR ACTION DUE DATE

Existing Controls Need to consider Adequacy Method of implementation Effectiveness in minimizing risk to low as is reasonably practicable level LRPL - in a safety context it is often required to make the adverse impacts of a risk as low as is reasonably practicable level

As low as is reasonably practicable (ALARP) Principle

Additional Controls Required Work through hierarchy of controls higher up the more reliable Elimination Substitution Engineering Controls Administrative Procedure and safe work practices PPE last control measure to be considered

Completing the Risk Assessment Form Section 3 Risk Analysis INITIAL RISK RESIDUAL RISK STATUS Likelihood Impact Initial Risk Rating Likelihood Impact Residual Risk Rating

HSE s Risk Assessment Tool o To reduce subjective biases as far as possible and make the process more objective the HSE s Risk Assessment Tool should be used when analysing risk.

Analysing the risk Six? If this risk was to be managed effectively what controls would be required to be in place? What are the existing controls? How effective are they? Given the controls that are in place how would you rate this risk? Are additional controls required? Y/N Is it actual or potential risk?

Rating the Risk o Risk is analysed and rated in terms of Likelihood (how likely is it to happen?) & Impact (what is the likely harm that will occur if it does happen?)

Rating the Impact 1. IMPACT TABLE Negligible Minor Moderate Major Extreme Injury Adverse event leading to minor injury not requiring first aid. Minor injury or illness, first aid treatment required <3 days absence < 3 days extended hospital stay Emotional Distress Significant injury requiring medical treatment e.g. Fracture and/or counselling. Agency reportable, e.g. HSA, Gardaí (violent and aggressive acts). >3 Days absence 3-8 Days extended hospital Stay Emotional Trauma Major injuries/long term incapacity or disability (loss of limb) requiring medical treatment and/or counselling Physical /emotional disability Incident leading to death or major permanent incapacity. Event which impacts on large number of patients or member of the public (Emotional / Physical trauma) Service User Experience Reduced quality of service user experience related to inadequate provision of information Unsatisfactory service user experience related to less than optimal treatment and/or inadequate information, not being to talked to & treated as an equal; or not being treated with honesty, dignity & respect - readily resolvable Unsatisfactory service user experience related to less than optimal treatment resulting in short term effects (less than 1 week) Unsatisfactory service user experience related to poor treatment resulting in long term effects Totally unsatisfactory service user outcome resulting in long term effects, or extremely poor experience of care provision Compliance with Standards (Statutory, Clinical, Professional & Management) Minor non compliance with internal standards. Small number of minor issues requiring improvement Single failure to meet internal standards or follow protocol. Minor recommendations which can be easily addressed by local management Repeated failure to meet internal standards or follow protocols. Important recommendations that can be addressed with an appropriate management action plan. Repeated failure to meet external standards. Failure to meet national norms and standards / Regulations (e.g. Mental Health, Child Care Act etc). Critical report or substantial number of significant findings and/or lack of adherence to regulations. Gross failure to meet external standards Repeated failure to meet national norms and standards / regulations. Severely critical report with possible major reputational or financial implications. Objectives/Projects Barely noticeable reduction in scope, quality or schedule. Minor reduction in scope, quality or schedule. Reduction in scope or quality of project; project objectives or schedule. Significant project over run. Inability to meet project objectives. Reputation of the organisation seriously damaged. Business Continuity Interruption in a service which does not impact on the delivery of service user care or the ability to continue to provide service. Short term disruption to service with minor impact on service user care. Some disruption in service with unacceptable impact on service user care. Temporary loss of ability to provide service Sustained loss of service which has serious impact on delivery of service user care or service resulting in major contingency plans being involved Permanent loss of core service or facility. Disruption to facility leading to significant knock on effect Adverse publicity/ Reputation Rumours, no media coverage. No public concerns voiced. Little effect on staff morale. No review/investigation necessary. Local media coverage short term. Some public concern. Minor effect on staff morale / public attitudes. Internal review necessary. Local media adverse publicity. Significant effect on staff morale & public perception of the organisation. Public calls (at local level) for specific remedial actions. Comprehensive review/investigation necessary. National media/ adverse publicity, less than 3 days. News stories & features in national papers. Local media long term adverse publicity. Public confidence in the organisation undermined. HSE use of resources questioned. Minister may make comment. Possible questions in Daíl. Public calls (at national level) for specific remedial actions to be taken possible HSE review/investigation National/International media/ adverse publicity, > than 3 days. Editorial follows days of news stories & features in National papers. Public confidence in the organisation undermined. HSE use of resources questioned. CEO s performance questioned. Calls for individual HSE officials to be sanctioned. Taoiseach/Minister forced to comment or intervene. Questions in the Daíl. Public calls (at national level) for specific remedial actions to be taken. Court action. Public (independent) Inquiry. Financial Loss (per local Contact) < 1k 1k 10k 10 100k 100k 1m > 1m Environment Nuisance Release. On site release contained by organisation. On site release contained by organisation. Release affecting minimal off-site area requiring external assistance (fire brigade, radiation, protection service etc.) Toxic release affecting off-site with detrimental effect requiring outside assistance.

Likelihood Scoring

HSE Risk Matrix

Evaluating Risk in Decontamination of RIMD Easy to identify what is definitely unsafe or definitely safe In between there is significant gray area which is dependent on the organism, the type of instrument and the immune statue of the patient/ service user e.g. patient & tissue TSE/CJD risk category; dried out organic debris; final rinse water quality; site endoscope procedure; universal versus choose framework approach to decontamination standards

Evaluate the Risk Depending on the risk rating and the adequacy of the current controls in place an evaluation must be made on whether to accept the risk, treat the risk by: i) Avoiding the risk, ii) Transferring the risk or iii) Controlling the risk. ALARP Principle

Completing Risk Assessment Form Section 3 Risk Analysis & Evaluation Existing control measurers Additional control measures required INITIAL RISK RESIDUAL RISK STATUS Likelihood Impact Initial Risk Rating Likelihood Impact Residual Risk Rating

Break Out Group Session Risk Assessment Exercise Feedback 30 minutes Followed by Discussion

Treat Risks / Improvement Action Plan Aim of the Plan: Reduce the Level of Risk or Eliminate Risk if possible 1. Specific cost effective actions 2. Resource Requirements 3. Person Responsible 4. Time Frame 5. Performance measures 6. Reporting & monitoring Requirements

PDSA Tool it is vital that risks identified are addressed. a simple yet powerful the Plan-Do-Study-Act (PDSA) cycle tool for accelerating improvement. The model has two parts: Three fundamental questions, which can be addressed in any order The PDSA cycle is used to test and implement changes in real work settings guides the test of a change to determine if the change is an improvement.

The Plan, Do, Study, Act (PDSA) Cycle.

Monitor & Review Risks Monitor & Review effectiveness of all steps of the risk management process Document & use Process Records of all stages, steps taken & decisions made Evidence of continual improvement & learning

Monitor & Review

Additional Controls (Actions) Update Form Action Owner: Unique Risk ID No: Date of Update: * Attach this form to original Risk Assessment Form ACTION NUMBER ADDITIONAL CONTROL (ACTION) SUMMARY UPDATE PERSON RESPONSIBLE FOR ACTION (if changed) Action STATUS {Behind Schedule On Schedule Complete} NEW REVIEW DATE

EXAMPLE Additional Controls (Actions) Update Form * original Risk Assessment Form attached Action Owner: Dr ---- Chair Endoscopy Users Group / Director Internal Medicine Unique Risk ID No: INM -4 Date of Update: 28th June 2011 ACTION NUMBER ADDITIONAL CONTROL (ACTION) SUMMARY UPDATE PERSON RESPONSIBLE FOR ACTION (if changed) Action STATUS {Behind Schedule On Schedule Complete} NEW REVIEW DATE 1. In progress due completion December 2012. The planning process for the development of the a new Endoscopy Reprocessing Unit (ERU) commenced in May 2011.The capital funding for the project has been approved. CEO & ERU Steering Group On schedule Jan 2013

Management Procedures Departmental Level Service Delivery / Directorate Level Risk Management Dept Risk Register Organization Senior Management Regional Level Corporate Level Quality & Safety & Risk

Reactive Risk Management Incident Management Identifying actual accident or near miss Reporting Investigating Implementing recommendations Sharing the learning

Serious Incident Any incident which involved or is likely to cause extreme harm or is likely to become a matter of significant concern to service users, employees or the public

Procedure for managing incidents Complete Local Incident Form to Line Manager & Risk Manager Consider Risk Assessment and or System Analysis/ Case Review Complete Regional Incident Report Form immediately following an incident; kept locally for local follow up and management

Failure to adequately decontaminate RIMD Will increase the risk of transmission of crossinfection between patients Compromised the integrity of biopsy specimens Expose the patient to adverse consequences of non-sterile contaminants Damage RIMD and impede their effective function Increase costs unnecessarily

Summary Questions & Discussion