PRE APPLICATION CONFERENCE - INTRODUCTION



Similar documents
City of Douglas Commercial Building Permit Site Application

Development Variance Permit Application Package

NEVADA BUSINESS REGISTRATION FORM INSTRUCTIONS

Checklist top portion completed and *Note* initialed. Owner s Authorization signed by both owner and agent

COMP PLAN SUBMITTAL CHECKLIST

Electronic Signature and Fee Payment Confirmation

City of Yakima. Home Occupation. Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

PROPERTY LINE ADJUSTMENT APPLICATION

DEVLOPMENT APPLICATION PROCEDURES

d. Building permits may only be approved if consistent with the approved development plan and land division for all units with common walls.

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

PLANNED UNIT DEVELOPMENT (P.U.D.), REZONING, and COMPREHENSIVE PLAN AMENDMENT APPLICATION PACKET VILLAGE OF HANOVER PARK DEVELOPMENT COMMISSION

Planning and Zoning Commission Johnston, Iowa June 29, 2015

CERTIFICATE OF APPROVAL OF LOCATION (CAL) APPLICATION Page 2

Preliminary Plan Application and Checklist

APPLICATION FOR TENTATIVE MAPS

CONCEPT PLAN APPLICATION

APPLICATION FOR A FILL, EXCAVATION AND SITE GRADING PERMIT

City of Valdosta Land Development Regulations. Table of Contents

NEW CONSTRUCTION FINANCING PROGRAM

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

CITY OF ESCONDIDO Planning Division 201 North Broadway Escondido, CA (760) Fax: (760) ARTS AND CRAFTS SHOW PERMIT

Kittitas County Interim Water Mitigation Certificate Application Guidelines

TOWN OF MILFORD ZONING BOARD OF ADJUSTMENT APPLICATION FOR SPECIAL EXCEPTION. Name of applicant: Phone #: Address: Address:

EASTTOWN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA APPLICATION FOR ZONING PERMIT

dpd Seattle Permits Tip Small Business: Getting Your Use and Building Permit from DPD RESEARCH RESOURCES

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

BUSINESS USE PERMIT APPLICATION

VACANT BUILDING REGISTRATION FORM (Please complete and return ONE form per property within twenty (20) days Must be typed or legibly printed.

New Water/Sewer Connection Application Packet Residential. City of Plummer P.O. Box B, Plummer, ID (208)

APPLICATION FOR CONDITIONAL USE PERMIT PROPOSED USES WITHIN EXISTING BUILDING

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

PRELIMINARY PROJECT REVIEW PROCESS

NEVADA BUSINESS REGISTRATION FORM INSTRUCTIONS

dpd Seattle Permits CAM Establishing an Accessory Dwelling Unit (ADU) What is an ADU?

South Phase Land Offering of 54 Lots

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

Minor Accommodation Planning Review Application

Chapter 2 PLAN AND PLAT REVIEW PROCESS

New Electric Connection Application Packet Commercial and Industrial. City of Plummer P.O. Box B, Plummer, ID (208)

FILE NO.: Z LOCATION: Located on the Northeast and Southeast corners of West 12 th Street and Dennison Street

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

Ferry County Out Building Application

BUILDING PERMIT APPLICATION FOR NON-COMPLEX BUILDINGS

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

APPLICATION FOR SPECIAL EXCEPTION USE

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF

Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet

SUBDIVISION APPLICATION GUIDE

Moving a House in Pasadena

Lincoln County Floodplain Development Permit Application

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1

Washington City Subdivision Development Application Checklist

SITE PLAN REVIEW APPLICATION

Zoning Most Frequently Asked Questions

Teller County, Colorado Floodplain Development Permit Application

Department of Community Development, P. O. Box 427, Herndon, Virginia

SPECIAL EXCEPTION PROCESS

APPLICATION FOR NEW CONSTRUCTION

County of San Diego, Planning & Development Services SECOND DWELLING UNIT

Section 801 Driveway Access Onto Public Right-of-Ways

THE TOWN OF COLONIAL BEACH, VIRGINIA DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

Warwick Township. Office of Code Compliance. Residential Building Permit Application. Plan Submittal Guide Our Goal is a Safe Environment

EXETER TOWNSHIP SKETCH PLAN APPLICATION CHECKLIST

Application Package for License for Sidewalk Dining Adjacent to Eating Establishment

dpd Seattle Permits CAM Establishing an Attached Accessory Dwelling Unit (ADU) What is an ADU?

HATFIELD TOWNSHIP. FLAMMABLE and COMBUSTIBLE LIQUIDS PERMIT APPLICATION PROCEDURES

NEVADA COUNTY COMMUNITY DEVELOPMENT AGENCY

LAND USE PLANNING FEES EFFECTIVE July 1, 2014 Adopted May 20, 2014 by Council Resolution No. 66,598-N.S.

KERN COUNTY PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT INSTRUCTIONS TO APPLICANT FILING MINISTERIAL OIL AND GAS CONFORMITY REVIEW

Residential Turf Removal Program Application Part 1 - Rebate Reservation (Limited to one (1) rebate per property)

REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING APPLICATION PACKET

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Yuma County Land Use Code

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

NOTICE OF A TYPE Ix DECISION ON A PROPOSAL IN YOUR NEIGHBORHOOD

CHURCH LOAN APPLICATION QUESTIONNAIRE

City of Calimesa 908 Park Avenue Calimesa, California Phone (909) Fax (909)

LONG TERM RENTAL REGISTRATION APPLICATION All sections are required to be completed. Please print, type, or apply through portal.

Commercial Building Permit Application & Submittal Guidelines

I. Project Initiation Sheet (if any information changed since Concept Plan submittal)

Transcription:

CITY OF AUBURN Planning & Development Department Auburn City Hall Annex, 2 nd Floor 1 East Main Street Auburn, WA 98001 Tel: 253.931.3090 Fax: 253.804.3114 permitcenter@auburnwa.gov www.auburnwa.gov PRE-APPLICATION CONFERENCE APPLICATION PACKET PRE APPLICATION CONFERENCE - INTRODUCTION When is a Pre-Application Conference Required? Applicants for a building permit, rezone, conditional use permit, SEPA review, subdivision, variance, comprehensive plan amendment or other land use action, permit or approval may find it useful to request a pre-application meeting. The meeting provides you with an opportunity to discuss your proposal with City staff prior to making an actual application. The meeting is optional and voluntary for most City land use applications, but is required for the following: Multi-family development in the R-10, R-16, R-20 zones subject to the Multi-Family/Mixed Use Design Standards of ACC 18.31.200 (Multi-Family Development & Mixed Use Development Design Standards and Procedures); Mixed use development containing residential living units located within R-10, R-16 and R-20 zones, and all current commercial zones; and, Retirement apartments, congregate living facilities and senior housing complexes located within R-10, R-16 and R-20 zones, and all current commercial zones. What is the Purpose of a Pre-Application Conference? To acquaint City staff with a potential applicant and application; To acquaint the potential applicant with the requirements of the City Codes, the Comprehensive Plan, and other relevant criteria and procedures; and Provide a potential applicant with an early opportunity to identify potential major issues and discuss the City s review processes to help expedite permit processing and approvals. Scheduling of a Pre-Application Conference Meeting: Pre-Application meetings are typically held on Wednesday mornings at 10:00 a.m. and 11:00 a.m. and are scheduled on a first-come/first-served basis. The City may arrange for a separate meeting, at an alternate day and time for projects that require attention to a limited number of issues or involve fewer Departments than are typically represented. What does a Pre-Application Conference not do? A pre-application conference does not: 1. Vest an applicant under the existing rules and regulations adopted by the City in effect at the time of the pre-application conference meeting; 2. Provide an exhaustive review of all potential issues; 1

PRE-APPLICATION CONFERENCE 3. Bind or preclude the City from enforcing all applicable regulations or from applying regulations in a manner differently than may have been indicated in the pre-application conference; and, 4. Constitute an approval in any manner of a proposal. The pre-application conference is intended to be informational only. What is the Application Procedure? 1. Submit a complete Pre-Application Conference application form, together with the required the written and plan information identified in the Pre-Application Conference Submittal Checklist form, and the required fee. 2. Pre-application meetings are scheduled through the City of Auburn Permit Center. You will need to submit the requested materials a minimum nine (9) business days prior to the regularly scheduled meeting. You will be notified, within two (2) business days of your submittal, of the time and date of your preapplication conference meeting. 3. At the conference you will meet with staff representatives from the City s Planning Division, Building Division, Engineering Division and the Valley Regional Fire Authority who will discuss your proposed project with you. 4. Prior to or during the Pre-Application Conference or shortly thereafter, staff will present you with a preapplication conference meeting summary responding to your proposal and identify applicable Development Code regulations, Comprehensive policies, engineering regulations and key issues, and requirements for special studies and information including but not limited to traffic studies and soil studies. If you bring up additional or new information at the pre-application conference, staff may revise the pre-application conference meeting summary, and mail it to you within 14 days of the meeting date. Some Key Things to Remember: As you prepare for the pre-application conference, keep in mind the following key things: The property you are investigating may have private obligations, such as covenants, conditions and restrictions (CC&R s) to which the City is not a party, may not be aware of at the time of the pre-application conference meeting and does not consider in its review; and, You are required to submit the pre-application conference meeting summary provided by City staff as part of your formal land use application. QUESTIONS? PHONE 253.931.3090 or E-MAIL permitcenter@auburnwa.gov 2

CITY OF AUBURN Planning & Development Department Auburn City Hall Annex, 2 nd Floor 1 East Main Street Auburn, WA 98001 Tel: 253.931.3090 Fax: 253.804.3114 permitcenter@auburnwa.gov www.auburnwa.gov FILE #: FILE NAME: TYPE: FEE PAID: SUBMITTAL DATE: LAND USE DESIG: O F F I C E U S E O N L Y RECEIVED BY: CHECK/CASH: PRE-APPLICATION CONFERENCE APPLICATION APPLICANT: Use mailing address for meeting notification. Check box if Primary Contact COMPANY: ADDRESS: (CITY, STATE, ZIP) PHONE: FAX: E-MAIL: SIGNATURE: (Signature Required) PRINTED NAME: APPLICANT S REPRESENTATIVE: Check box if Primary Contact COMPANY: ADDRESS: (CITY, STATE, ZIP) PHONE: FAX: E-MAIL: SIGNATURE: (Signature Required) PRINTED NAME: PROPERTY OWNER(S): Attach separate sheet if needed. Check box if Primary Contact COMPANY: ADDRESS: (CITY, STATE, ZIP) PHONE: FAX: E-MAIL: SIGNATURE: PRINTED NAME: (Signature Required) Note: Applicant or representative must have property owner s consent to file this application form in order for it to be accepted SITE ADDRESS: PROPERTY INFORMATION (REQUIRED) ASSESSOR S PARCEL ID# LOT SIZE ZONING DISTRICT AREA TO BE DEVELOPED (s.f.): EXISTING USE OF SITE: PROPOSED USE OF SITE: 3

CITY OF AUBURN Planning & Development Department Auburn City Hall Annex, 2 nd Floor 1 East Main Street Auburn, WA 98001 Tel: 253.931.3090 Fax: 253.804.3114 permitcenter@auburnwa.gov www.auburnwa.gov PRE-APPLICATION CONFERENCE PRE APPLICATION CONFERENCE AUTHORIZATION (A copy of this letter must be submitted for each property owner involved) I, declare under penalty of perjury under the laws of the State of Washington as follows; 1. I am the owner of the property that is the subject of the application. 2. I [ ] have not appointed anyone, or [ ] have appointed, to act as my agent regarding this application. 3. All statements, answers, and information submitted with this application are true and correct to the best of my knowledge and belief. 4. I agree to hold the City of Auburn harmless as to any claim (including costs, expenses and attorney s fees incurred in the investigation of such claim) which may be made by any person, including the undersigned, and filed against the City of Auburn, but only where such claim arises out of the reliance of the City, including its officers and employees, upon the accuracy of the information provided to the City as part of this application. 5. I hereby grant permission for representatives of the City of Auburn and any other Federal, State, or local unit of government with regulatory authority over the project to enter onto my property to inspect the property, take photographs, and post public notices as required in connection with review of this application and for compliance with the terms and conditions of permits and approvals issued for the project. Signature Printed Name Date City and State where signed Address 5

CITY OF AUBURN Planning & Development Department Auburn City Hall Annex, 2 nd Floor 1 East Main Street Auburn, WA 98001 Tel: 253.931.3090 Fax: 253.804.3114 permitcenter@auburnwa.gov www.auburnwa.gov PRE-APPLICATION CONFERENCE PRE APPLICATION CONFERENCE SUBMITTAL CHECKLIST SITE AND USE INFORMATION please answer the following: How many access points to the public street does the site have now and how many are proposed under the current application? (Note: An approved deviation is required from the City Engineer to allow more than one access point.) Existing: Proposed: For non-single family residential applications only, please identify: The proposed type of construction (i.e., VN, IIIN): The proposed size of the largest building: The proposed occupancy of the structures (i.e., S, F, H ), if known: Any manufacturing processes proposed: Will you will be utilizing fire sprinkler systems: ഠ Yes ഠ No ഠ Do not know, but possible Will you will be storing or using hazardous material: ഠ Yes ഠ No ഠ Do not know, but possible If yes, type of material to be stored: Please file attached Owner s Statement of Intended Use WRITTEN MATERIALS Total of ten (10) copies A. APPLICATION FORM. Provide a completed application form signed by the property owner(s) and/or applicant inclusive of the completed Application Submittal Checklist. B. WRITTEN STATEMENT. Provide a detailed description of the proposed project or proposal including, but not limited to: the changes to the site, structure, landscaping, parking and land use. 6

APPLICATION FEES - Make checks payable to the City of Auburn PRE-APPLICATION CONFERENCE All application fees, including, but not limited to: Pre-Application Meeting Fee. Some fees will not be invoiced until actual costs are known. Current fee schedule can be found @ http://www.auburnwa.gov/community/about/forms.asp under 2010 Fee Schedule. PLANS & GRAPHICS Total of ten (10) copies All plans, except architectural elevations, should be to scale (engineering scale) and should have a maximum sheet size of 24 x 36 and a minimum sheet size of 11 x 17. Architectural elevations may be drawn to an architectural scale and should have a maximum sheet size of 24 x 36 and a minimum sheet size of 11 x 17. All plans should be folded to fit a legal size file jacket. A. VICINITY MAP showing parcels, streets, and key physical features (e.g. streams, lakes) within 500 feet on all sides of the proposed development site. B. PROPOSED CONCEPTUAL SITE PLAN: Applicants are encouraged to provide as much information and detail as available. Below is a list of recommended items to be shown on the Proposed Conceptual Site Plan: Proposed name of project (e.g., subdivision or business). Area of the site (acres or square feet). Location of existing public and private utilities, easements, and 100-year floodplain (if known) Environmentally sensitive areas, as defined by Chapter 16.10 (Critical Areas) of the Auburn City Code. Location of on-site wetlands, upland wooded areas, riparian areas, rock out-croppings, and streams (if known). Configuration and dimensions of all existing and proposed lots and tracts, including proposed park, open space, and or drainage tracts or easements. Location and dimensions of existing and proposed buildings, structures. Internal circulation system, name and location of existing and proposed roadways and roadway easements (private and public). Location of existing and proposed on-site driveways and off-street parking Location of existing off-site driveways across the street. Location and width of existing and proposed on-site pedestrian and bicycle facilities on-site. Location and width of existing and proposed easement for access, drainage, etc. Location of existing and proposed trees and other landscaping to be planted at the site. C. PROPOSED ARCHITECTURAL ELEVATIONS (if applicable and available) Building height, direction each elevation will face, material elements (if known) and other features. 7

PRE-APPLICATION CONFERENCE SPECIFIC QUESTIONS AND ISSUES YOU WISH TO HAVE DISCUSSED AT THE PRE-APPLICATION CONFERENCE: (Attach separate sheet if necessary) 1. 2. 3. 4. PLEASE NOTE BELOW THE NAMES OF CITY STAFF WITH WHOM YOU HAVE ALREADY DISCUSSED THIS PROPOSAL, ESPECIALLY IN RELATION TO THE ABOVE QUESTIONS AND ISSUES: 1. 2. 3. STAFF PERSON NAME DEPARTMENT 8

HIGH-PILED COMBUSTIBLE STORAGE OWNER S STATEMENT OF INTENDED USE Address: Tenant: Owner: Address: Permit Number: Telephone: Telephone: Gross Building Area: sq. ft. Designated Storage Area: sq. ft. Will this storage area be accessible to the public? Yes No The Valley Regional Fire Authorities review of this project indicates there is the potential for it to be used for highpiled combustible storage as defined by the International Fire Code. If this is the case, special fire protection features may be required above and beyond those specified in the regular building permit plan review. Please check the appropriate box below, sign and return this form to the Valley Regional Fire Authority at the address listed above. If you have questions, please contact us at (253) 931-3060. If additional fire protection features are required, you will be notified. This building will not be used for high-piled combustible storage as defined by the International Fire Code: Storage in piles or on pallets, shelves or racks where the commodity exceeds twelve (12) feet in height, or, Tires, Group A plastics, flammable/combustible liquids, idle pallets or similar high-hazard commodities stacked or stored more than six (6) feet above the floor. This building will be used for high-piled combustible storage, and will be designed to conform to International Fire Code requirements. A Fire Authority Permit is required for all storage areas more than 500 sq. ft. NOTE: If you checked this box, the Valley Regional Fire Authority will ask you to provide additional information on the material(s) stored and the method(s) in which they are stored. This building has no identified tenant at this time. I will notify the tenant that there may be special Fire Authority requirements for high-piled combustible storage, and the tenant will be advised to contact the fire authority for permits prior to occupancy. Owner s Signature Date 9