Syracuse University s Guidelines for Work Involving Materials Containing Trace Asbestos (Asbestos at a Concentration Less than 1%)



Similar documents
ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM

Miami University s Asbestos Operations & Maintenance Program Administered by

ASBESTOS AWARENESS TRAINING

SECTION ASBESTOS ABATEMENT

LEGAL REVIEW & UPDATE

Characteristics/Applications

ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS

Asbestos in Soil Who Knew? A Consulting Perspective 1 st Annual Southeast Brownfields Association

ASBESTOS MANAGEMENT INTRODUCTION

North Carolina State University. Asbestos Management Plan

Wellesley College Asbestos Management Program

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

DIVISION 248 ASBESTOS REQUIREMENTS. Asbestos Emission Standards and Procedural Requirements Asbestos Abatement Project Exemptions

ASBESTOS MANAGEMENT PROGRAM RISK MANAGEMENT AND SAFETY 2014 Page 1

The Richard Stockton University ASBESTOS MANAGEMENT PLAN

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015

University of Pittsburgh Safety Manual. EH&S Guideline Number: ASBESTOS

SPECIFICATION DIVISION 2 NUMBER SECTION DESCRIPTION DIVISION 02 EXISTING CONDITIONS SECTION ASBESTOS REMEDIATION FLOOR TILE AND MASTIC

ASBESTOS. CSEA / Local 1000 AFSCME / AFL-CIO. 143 Washington Avenue, Albany, New York Danny Donohue, President

UI Procedures for Asbestos Management

How To Deal With Asbestos

Asbestos Management & Abatement

How To Deal With Asbestos In Minster Of Minsteria

BOSTON COLLEGE OFFICE OF ENVIRONMENTAL HEALTH & SAFETY ASBESTOS MANAGEMENT PROGRAM

Standards for Asbestos Abatement

OCCUPATIONAL HEALTH AND SAFETY AUTHORITY ACT (CAP. 424) Protection of Workers from the Risks related to Exposure to Asbestos at Work Regulations, 2006

100 North Senate Avenue, Indianapolis, IN Phone: (317) Toll Free: (800)

Asbestos Inspection Project Procedure

The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials.

Lead Management. Presented by: Gary Chinn (815) President, Best Technology Systems

ASBESTOS MANAGEMENT PLAN

ASBESTOS AWARENESS TRAINING. Title 8, GISO Section 5208

ASBESTOS OPERATIONS AND MAINTENANCE PLAN

Primary reason asbestos is used, is its special resistance to heat. Asbestos fibers are also virtually indestructible.

How to Safely Remove Asbestos

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material

NDSU TABLE OF CONTENTS

Lead Exposure Management Plan

Washington University Asbestos Operations and Maintenance Plan

BLR s Safety Training Presentations

San Antonio Water System Standard Specifications for Construction ITEM NO HANDLING ASBESTOS CEMENT PIPE

Asbestos Control Programs

Lead Monitoring / Removal

(A) All asbestos-containing waste material shall be deposited as soon as is practical by the waste generator at:

Asbestos: Guidelines for Managing Asbestos in Buildings

Asbestos Standard for the Construction Industry. OSHA (Revised)

The Management of Asbestos containing Materials

CHEMICAL CONTROL ORDER FOR ASBESTOS

Asbestos Management Program and Procedures. Northern Illinois University

Asbestos Management Program (EHS Program Manager 7.5)

HOW TO SAFELY REMOVE ASBESTOS

LEAD MANAGEMENT PROGRAM

ASBESTOS AWARENESS. Slide #1

EVERYONE'S RESPONSIBILITY

Asbestos Management Plan EC 45 Page 1

ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW

OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION REQUIREMENTS APPLICABLE TO PALM BEACH STATE COLLEGE

Prepared by: Environmental Protection Services Alberta Environment August, Guidelines for the Disposal of Asbestos Waste

GUIDELINE TITLE: ASBESTOS DISPOSAL AT WASTE DISPOSAL GROUNDS. BRANCH/DIVISION: Environmental Approvals / Environmental Stewardship

Asbestos Management Plan. Keesler AFB

ASBESTOS AWARENESS TRAINING. For workers and building occupants

Fact Sheet on Asbestos

40 CFR, Chapter 61, Subpart M National Emission Standard for Asbestos

IAC 7/16/08 Labor Services[875] Ch 155, p.1. CHAPTER 155 ASBESTOS REMOVAL AND ENCAPSULATION [Prior to 10/18/00, see 875 Chs 81 and 82]

C162 Asbestos Convention, 1986

Asbestos Hazards and Controls

University of Tennessee Safety Program

Safety & Risk Management Policies and Procedures

TECHNICAL ABATEMENT SPECIFICATIONS FOR THE REMOVAL OF ASBESTOS-CONTAINING MATERIALS FROM THE POWER HOUSE BUILDING

Sandblasting & Silica Exposure Control Plan

EPA MODEL ASBESTOS WORKER TRAINING MANUAL (Revised by State Employees Asbestos Program)

Administrative Procedure. Asbestos

Environment, Health & Safety Services Policy

ASBESTOS AWARENESS IN THE WORKPLACE. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.

ASBESTOS REGULATIONS Government Notice No 155 Gazette No dated 10 February 2002

Transcription:

Syracuse University s Guidelines for Work Involving Materials Containing Trace Asbestos (Asbestos at a Concentration Less than 1%) I. Asbestos Survey Requirements Prior to performing any construction, alteration, repair, maintenance, renovation or demolition of structures, substrates, or portions thereof, a determination of the asbestos content of the building materials to be impacted or potentially impacted by the project must be made. This determination requires that an asbestos survey be performed by a NYS certified Asbestos Inspector in accordance with 12 NYCRR 56 (CR56). If any of the materials that may potentially be impacted by the planned disturbance project (project) are found to contain asbestos at a concentration greater than 1%, those materials are deemed asbestos containing materials (ACM) and must be handled in accordance with NYS Department of Labor Code Asbestos Regulations (12 NYCRR 56), the US EPA s NESHAP for Asbestos (40 CFR 61, subpart M), and OSHA s Asbestos Construction Standard (29 CFR 1926.1101). All handling of ACM at Syracuse University (SU) must be performed by a NYS Certified Asbestos Handler(s) approved by the SU Physical Plant Environmental Shop. The SU Environmental Shop will approve and oversee all projects involving ACM. If the materials to be impacted by the planned disturbance project are found to contain asbestos but at concentration of less than 1% by weight, these materials are classified as containing trace asbestos. NYS DOL s Asbestos regulations (CR 56) and the US EPA s Asbestos NESHAPs do not apply to materials containing <1% asbestos. However, OSHA s Asbestos Construction Standard (Standard) applies regardless of the amount of asbestos present. Some of the requirements of the OSHA Asbestos Construction Standard are summarized below. For complete details on OSHA s Asbestos Construction Standard please refer directly 29 CFR 1926.1101. II. OSHA Asbestos Construction Standard: Applicability and Definitions A. Applicability: OSHA s Asbestos Construction Standard, 29 CFR 1926.1101, regulates exposure to asbestos in all construction work as defined in 29 CFR 1910.12(b), including but not limited to the following: Demolition or salvage of structures where asbestos is present; Removal or encapsulation of materials containing asbestos; Construction, alteration, repair, maintenance, or renovation of structures, substrates, or portions thereof, that contain asbestos; Installation of products containing asbestos; Asbestos spill/emergency cleanup; and Transportation, disposal, storage, containment of and housekeeping activities involving asbestos or products containing asbestos, on the site or location at which construction activities are performed. 1 P age

B. OSHA Construction Standard Asbestos Definitions (CFR 1926.1101) Asbestos: Asbestos includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos, and any of these minerals that has been chemically treated and/or altered Note: the definition of Asbestos in the OSHA standard does not provide a de minimis quantity. Asbestos-containing material (ACM): Asbestos containing material means any material containing more than one percent asbestos. Note: Sections of the Standard that reference ACM, only apply to materials containing >1% asbestos. C. Permissible Exposure Limits (PELs) (CFR 1926.1101(c)(1) & (2)) Time-weighted average PEL: 0.1 fiber per cm 3 of air as an eight (8) hour TWA. Excursion limit PEL: 1.0 fiber per cm 3 of air as averaged over thirty (30) minutes. III. OSHA Construction Standard s Requirements for Trace (<1%) Asbestos Many of the engineering controls and work practices required by the OSHA Asbestos Construction Standard (29 CFR 1926.1101) ( Standard ) are applicable only to installed building materials that contain >1% asbestos and OSHA has assigned the term Asbestos Containing Materials to those materials. However, the Standard does stipulate required work practices and prohibitions applicable if asbestos in any quantity is present in the impacted materials. The Standard also contains requirements that apply whenever worker exposure(s) exceed either (or both) of the PELs, regardless of the amount of asbestos contained in the materials involved. If a material to be impacted by a disturbance project contains asbestos at a concentration of less than 1% (trace asbestos) the following actions must be taken: An Asbestos Exposure Assessment must be made specific to the work to be performed. (This assessment must be written and retained and available at all times during the project. Retention should be at least 30 years.) All applicable work practices in the OSHA Standard must be implemented. All applicable prohibitions in the OSHA Standard must be adhered to. If either PEL is exceeded (or a negative exposure assessment is not available), all applicable requirements of the Standard must be adhered to. All other applicable laws, rules, and regulations must be followed. A. Asbestos Exposure Assessment (29 CFR 1926.1101(f)(2)) For projects involving the disturbance of trace asbestos, the employer must conduct an exposure assessment immediately before or at the initiation of the operation to ascertain expected exposures during that operation or workplace. The assessment must be completed in time to comply with requirements which are triggered by exposure data or the lack of a negative exposure assessment, and to provide information necessary to assure that all control systems planned are appropriate for that operation and will work properly ( 1926.1101(f)(2)). There are three potential approaches provided under 29 CFR 1926.1101(f)(2) for producing a negative exposure assessment. They are the use of objective data, previous 2 P age

air monitoring results, or current air monitoring results. If objective data is to be used for the negative exposure assessment, it must clearly demonstrate that employees will not be exposed to asbestos at levels above the asbestos PELs for the particular conditions and work to be performed. If a negative exposure assessment is to be used for trace asbestos work performed at Syracuse University, a negative exposure assessment must be documented and available for immediate review by Syracuse University and/or OSHA representatives upon request and retained with project files for a period of 30 years. Until the employer is able to produce a negative exposure assessment specific to the trace asbestos project to be performed, the employer must comply with the elements of the Standard that are applicable when either asbestos PEL is exceeded 1. B. Work Practices and Prohibitions for Activities involving Trace (<1%) Asbestos If a material contains less than 1% Asbestos then only certain sections of the Standard apply. The work practice requirements and prohibitions that must be observed regardless of the exposure levels and of the percentage of asbestos in the installed construction materials are: Engineering controls and work practices 1926.1101(g)(1)(ii) - Wet methods, or wetting agents, to control employee exposures during asbestos handling, mixing, removal, cutting, application, and cleanup, except where employers demonstrate that the use of wet methods is infeasible due to, for example, the creation of electrical hazards, equipment malfunction, and, in roofing, except as provide in paragraph (g)(8)(ii) of this standard; and 1926.1101(g)(1)(iii) - Prompt clean-up and disposal of wastes and debris contaminated with asbestos in leak-tight containers except in roofing operations, where the procedures specified in paragraph (g)(8)(ii) of this section apply. SU Best Management Practice If a vacuum cleaner is to be used to clean up materials and debris containing trace asbestos, the vacuum cleaner must be equipped with a HEPA filter(s). Prohibitions 1926.1101(g)(3)(i) - High-speed abrasive disc saws that are not equipped with point of cut ventilator or enclosures with HEPA filtered exhaust air. 1926.1101(g)(3)(ii) - Compressed air used to remove asbestos, or materials containing asbestos, unless the compressed air is used in conjunction with an enclosed ventilation system designed to capture the dust cloud created by the compressed air. 1926.1101(g)(3)(iv) - Employee rotation as a means of reducing employee exposure to asbestos. 1 Per OSHA Standard Interpretation Letter dated August 13, 1999 to Mr. Walter Chun 3 P age

C. Additional Work Practices and Prohibitions for Activities where an Asbestos PEL May Be Exceeded or if a Negative Exposure Assessment is not Available. There are numerous provisions in the Standard that apply to work activities involving installed construction material if at least one of the asbestos PEL s is exceeded, even where the material does not contain >1% asbestos. These include, but are not limited to, establishing a regulated work area, providing regulatory compliant respiratory protection, providing asbestos awareness training, etc. If the employees' asbestos exposures will exceed an asbestos PEL (TWA or excursion) or if the employer has not produced a negative exposure assessment, the employer must comply with all of the elements of the Standard that are applicable when either asbestos PEL is exceeded. The OSHA construction Standard should be referenced for a complete list of these requirements. IV. Monitoring Any individual(s) who may be potentially exposed to asbestos as a result of a project involving the disturbance of materials containing trace asbestos must have a negative exposure assessment available indicating that their exposure will not exceed a PEL. This includes individuals directly involved in the trace asbestos disturbance as well as individuals who may not be performing work associated with the disturbance but may potentially be exposed as a result of the disturbance. If a negative exposure assessment is not available, it must be assumed that a PEL could potentially be exceeded and the applicable provisions of the Standard implemented. A. Monitoring Requirements Employee exposure monitoring must be performed in accordance with applicable Standard requirements. The following citations provide the requirements for employee exposure monitoring: 1926.1101(c)(1) Time-weighted average limit (TWA) states, The employer shall ensure that no employee is exposed to an airborne concentration of asbestos in excess of 0.1 fiber per cubic centimeter of air as an eight (8) hour time-weighted average (TWA), as determined by the method prescribed in Appendix A to this section, or by an equivalent method. 1926.1101(c)(2) Excursion limit states, The employer shall ensure that no employee is exposed to an airborne concentration of asbestos in excess of 1.0 fiber per cubic centimeter of air (1 f/cc) as averaged over a sampling period of thirty (30) minutes, as determined by the method prescribed in Appendix A to this section, or by an equivalent method. 1926.1101(f)(1)(i) General monitoring criteria states, Each employer who has a workplace or work operation where exposure monitoring is required under this section shall perform monitoring to determine accurately the airborne concentrations of asbestos to which employees may be exposed. 1926.1101(f)(1)(ii) states, Determinations of employee exposure shall be made from breathing zone air samples that are representative of the 8-hour TWA and 30-minute short-term exposures of each employee. 1926.1101(f)(1)(iii) states, Representative 8-hour TWA employee exposure shall be determined on the basis of one or more samples representing full-shift exposure for employees in each work area. Representative 30-minute short-term employee exposures shall be determined on the basis of one or more samples representing 30 minute exposures associated with operations that are most likely to produce exposures above the excursion limit for employees in each work area. 4 P age

V. Syracuse University Disposal Requirement for Trace (<1%) Asbestos All disturbed materials and debris containing trace asbestos must be promptly cleaned up and disposed of in leak-tight containers or bags. The containers/bags must be labeled with a waste generator s label indicating the date, location and waste generator (i.e. Syracuse University). Trace asbestos waste may only be disposed of at a disposal facility approved by the Syracuse University Environmental Shop and/or the Syracuse University Environmental Health Office and authorized to accept trace asbestos waste. The University project manager overseeing the trace asbestos disturbance project is responsible for ensuring that trace asbestos waste is properly disposed of and all associated disposal documentation is maintained. VI. Multi-Employer Workplace A Multi-Employer Workplace Program has been established to provide the exchange of pertinent hazard communication information in a multi-employer setting at the University. University contracting personnel who hire outside employers must provide a multi-employer packet to all contractors and sub-contractors, advising them of their obligations. Any outside (non-university) employer who produces, uses, or stores hazardous materials at a University-operated workplace in such a way that employees of the University or other onsite employers (i.e. contractor s employees) may be exposed, whether during normal work or during reasonably foreseeable accidents or other incidents, shall ensure that they provide, develop and implement the applicable requirements set forth in the University s Multi- Employee Workplace Program as provided by the University contracting personnel. For work activities where an asbestos PEL may be exceeded or if a negative exposure assessment is not available, it is emphasized that work practices/procedures must be developed and implemented to ensure that University employees and property are adequately protected during a planned or unplanned disturbance of such building materials. 5 P age