SECTION 1 GENERAL REQUIREMENTS



Similar documents
LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

High Strain Dynamic Load Testing of Drilled Shafts

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

The Stabilizer TM. Benefits. Supplemental support system for sagging beams and floor joists within a crawl space

System. Stability. Security. Integrity. 150 Helical Anchor

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

Stability. Security. Integrity.

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

Lighthouse Engineering, L.L.C.

C. Section TESTING LABORATORY SERVICE.

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

DIVISION 4300 STORM DRAINAGE

Designed and Engineered to Perform

Wastewater Capital Projects Management Standard Construction Specification

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION EARTH MOVING

ATLAS RESISTANCE Pier Foundation Systems

COLORADO MODEL. 35 x 65 SPECIFICATIONS

A Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN.

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

Section 2100-Trenching and Tunneling

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

SECTION 4Aggegate Subbase

DENVER MODEL 30 X 30 SPECIFICATIONS

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

SECTION PRECAST CONCRETE UTILITY STRUCTURES

SECTION SHEETING, SHORING AND BRACING

Section 402. STORM SEWERS

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

SECTION STORM DRAIN SYSTEM

Chapter 3 Pre-Installation, Foundations and Piers

ATLANTA MODEL SPECIFICATIONS

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

SECTION GRAVITY SANITARY SEWERS

SECTION COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex

Section SEWER PIPE INSTALLATION AND TESTING

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma

SECTION GUARDRAILS

SECTION SITE PREPARATION

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

Proposed Minimum Subterranean Termite Treatment Standards

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

METHOD OF STATEMENT FOR STATIC LOADING TEST

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 724 PIPE CULVERTS

Construction Specifications for Keyhole Pavement Coring and Reinstatement

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

SANITARY SEWER SPECIFICATIONS

SECTION SUPPORT OF EXCAVATION

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION PRECAST CONCRETE STRUCTURES

Texas Building Pros Foundation Repair Services

Section Installation of pipe and casing for sanitary sewer by methods of augering.

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

SECTION ABANDONMENT OF SEWER MAINS

CLEANING, INSPECTION, AND TESTING OF SEWERS

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

BLADDER SURGE CONTROL SYSTEM

GLOSSARY OF TERMINOLOGY

Specification Guidelines: Allan Block Modular Retaining Wall Systems

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

SECTION STORM DRAINAGE SYSTEM

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

Residential Deck Safety, Construction, and Repair

Page B-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 LOAD TESTS

Sports and High Mast Lighting Poles Phone: (866) Fax: (817)

Code of Standard Practice for Timber Frame Structures

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

SECTION UNDERGROUND ELECTRIC SERVICE

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

Auxiliary Rams USERS MANUAL

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

SECTION PLAYGROUND SURFACING TILES

RAM JACK INTRODUCTION

Design and Construction of Cantilevered Reinforced Concrete Structures

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

symptoms of a faulty foundation

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT SUBMITTAL OF CONVEYANCE INSTALLATION/ALTERATION PLANS

EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309

SECTION WINDOW WASHING SYSTEMS

SECTION GROUND WATER STORAGE TANKS

Transcription:

Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials, tools, supervision and other services required for foundation repair, including design layout and installation of the Foundation Supportworks Push Pier System, exterior slab removal, soil excavation, and backfilling. Work does not include. 2. MEASUREMENTS AND LAYOUTS: The drawings are copies of the original blueprints for the intended buildings requiring underpinning. Current elevation readings and calculated line loads are recorded and provided to cover the layout and design of the work needed and are not scaled for exact measurements. Where specific detail and dimension for work not show on the Drawings, the Contractor shall take measurements and make layouts as required for proper installation of work. 3. DISPOSAL: All debris and refuse generated by the construction work and all equipment and materials which have to be removed, and are not required in the work, shall be removed from the jobsite by the Contractor and legally disposed of by the Contractor. 4. CONTRACTOR S SUBMITTALS: The Contractor shall furnish to the or s Agent four copies of all submittal data. If the Contractor desires more than one copy returned he should furnish extra copies. 4.1 The Contractor shall certify in writing that he has reviewed, checked and approved the submittal data and that it is in conformance with the requirements on the Contract Documents before he submits it to the or s Agent. 4.2 Approval must be obtained from the or s Agent of any items requiring submittals before delivery of said item to the job site or commencing work on or with any such item. 4.3 A warranty of the work and against further appreciable structural settlement shall be provided for a period of no less than 10 years from the date of completion (see Section 2, Subsection 11). 4.4 Items requiring submittals are as follows: Submittal Specification Section Underpinning/Pier System 2

Page 2 of 6 4.5 If the Contractor wishes to use an or equal item in lieu of any item shown on the Drawings or designated in the Specifications, he shall submit data for approval. 5. QUALIFICATIONS OF CONTRACTOR: The Contractor shall be a qualified Contractor with a 10-year (minimum) history of successful performance in the type of work and project scheduled (no exceptions) and found acceptable to the or s Agent. Work history to be local contractor s own and not any contractor affiliates, dealers, manufacturer, etc. The Contractor shall be a manufacturer-trained and certified installer of Foundation Supportworks Push Piers, which are manufactured by Foundation Supportworks, Inc. in Omaha, Nebraska. 5.1 Labor and Workmanship: All labor for the installation of material and equipment furnished under this Contract shall be done by experienced personnel. All workmanship shall be first class and in compliance with the specific requirements of the Drawings and Specifications. 5.2 Insurance: Contractor shall carry a minimum of $2 million in general liability and a minimum of $2 million in umbrella insurance coverage. A copy of a current insurance certificate shall be included with the Contractor s submittal information. 6. QUALIFICATIONS OF MANUFACTURER: Products used in the work of this specification shall be produced by Foundation Supportworks, Inc. 7. SAFETY: All equipment, methodologies, assessments, controls, enforcement, signage, etc. as necessary for site work, traffic ability, construction, and personal safety shall be, and shall remain for the project duration, the sole responsibility of the Contractor. Project duration refers to the length of time, from start to finish, necessary for the specialty Contractor to complete their portion of the project. Specialty Contractors are not responsible for on-site safety items or precautions following successful completion of the work and sign-off by the or s Agent. End of Section 1

Page 3 of 6 SECTION 2 FOUNDATION REPAIRS UNDERPINNING and LEVELING SYSTEM 1. SCOPE OF WORK: The work performed under this Section consists of designing the layout and installation of an underpinning pier system to stabilize and level the existing foundations of the building. The building in question has current elevation readings for the main foundation and interior center walls. 2. REPAIR METHODS: Underpinning the foundation shall be performed using Foundation Supportworks Push Piers. 3. SETTLEMENT: Relative settlements for the building are shown on the Drawing. These settlements were measured as accurately as possible under the existing conditions. The Contractor shall expose the foundation at the proposed pier locations and notify the or s Agent if settlement varies from the trend or magnitude of movement shown on the Drawing. Contractor shall also notify the or s Agent if the exposed foundations are significantly damaged to warrant additional consultation by the project structural engineer. 4. SOIL BEARING: No soil testing has been performed. The Contractor shall determine system pressures and capacities as required for the successful installation, lift and re-leveling, and long-term performance of the proposed system. 5. SYSTEM DESIGN: 5.1. General The Contractor and/or the Manufacturer shall design the proposed system based on the existing, exposed conditions at the site as determined by the Contractor. Spacing requirements for the pier system have been determined by the Project Structural Engineer (see Section 2, Subsection 5.6, below). The pier system (combined bracket and pier sections) shall have an allowable capacity of at least 30 kips (30,000 pounds). 5.2. Typical Specifications Provide typical specifications, schematics, and installation procedures for the proposed system. Calculations and/or test performance data showing the capacities of the proposed system in the working position shall be submitted for review by or s Engineer or representative. All tests shall consist of testing the pile in the actual working position with no substitution of any of the pile components. Currently there are no established criteria that set minimum design and testing standards for hydraulically-driven, steel-component push pier systems. Therefore, because of the similar design methodologies and loading conditions, the push pier system shall be designed and/or tested in general accordance with the applicable sections of AC358, Acceptance Criteria for Helical Foundation Systems and Devices, by the ICC Evaluation Service, Inc.

Page 4 of 6 Applicable sections are those that pertain to the design and/or testing of foundation support piers in a Side Load condition. The Contractor shall provide test results from an International Code Council (ICC)-accredited lab or a letter signed and sealed by a licensed engineer employed by the manufacturer, either stating that the design and/or testing was completed in general accordance with AC358. 5.3. Materials All steel components that are to remain, as a permanent part of the structure, including the pier sections and foundation support bracket, must be of new material. Bars, angles, and plates must meet the requirements of ASTM A36, A53, and A572. The bracket bearing plate must have a minimum bearing surface against the bottom of the footing of at least 60 square inches. Pier sections shall consist of round mechanical steel tube with an ultimate tensile strength of at least 55,000 psi and a yield tensile strength of at least 50,000 psi. Pier sections shall have an outside diameter of at least 2.875 inches and a nominal wall thickness of at least 0.165 inch. See Section 5.5 below for corrosion protection. 5.4. Weldments All welded connections shall conform to the requirements of the American Welding Society, Structural Welding Code AWS D1.1, and applicable revisions. 5.5. Cathodic Protection - All pier system components shall be galvanized for corrosion protection (Optional not typically done for brackets). At a minimum, thin-walled pier sections shall be hot-dip galvanized for corrosion protection. Triple-Coated In-Line Galvanizing, consisting of hot-dip galvanizing, a conversion coat and a clear coat, is preferred. 5.6. Pier Spacing Pier spacing shall not exceed four (4) feet, center to center. The pier spacing is based on the ability of the footing/foundation wall to span between piers. 6. UTILITIES: Contractor shall contact a one-call utility locate service to have public utilities located prior to initiating work at the site. Private utilities and drainage systems, if present within the work area, shall be located by the owner. The Contractor is not responsible for removing and replacing such systems, unless specifically addressed in the contract. 7. EXCAVATION: 7.1. Hand or machine excavate immediately adjacent to the building foundation at each pier location to expose the footing or the bottom of the grade beam to an appropriate working width and depth. After installation is complete, replace soil in exposed areas in 6 lifts and mechanically compact into place. 7.2. Where pier installation is required through pavement or slabs, saw cut access openings to provide for neat removal and appearance. Contractor is not responsible for replacement of concrete unless specifically addressed in the contract.

Page 5 of 6 7.3. Uniformly grade disturbed areas to ready the area for seed and straw, or landscaping by others. Contractor is not responsible for removing and replacing landscaping unless specifically addressed in the contract. 8. POSITIONING OF FOUNDATION SUPPORT BRACKET: The exposed footing surfaces should be cleaned of all soil. A chipping hammer shall be used to smooth and prepare the bottom and vertical face of the footing to provide for the proper fit of the bracket and to bring the concrete surfaces in full contact with the bracket. Spread footings are typically notched to allow bracket placement as close as possible beneath the structural load of the foundation wall. The bottom and vertical faces, to the extent possible, should be at right angles to each other and the bracket positioned as close to vertical as possible. Foundation Supportworks Push Pier brackets have been designed with either a vertical orientation or an angle of two (2) degrees from vertical. The brackets may be used interchangeably, selection depending upon structure details and ease of installation. 9. PIER INSTALLATION: 9.1. Foundation Supportworks Push Piers Attach hydraulic assemblies and drive equipment necessary for the advancement of the piers. All hydraulicallydriven piers are to be installed individually, using the maximum weight of the structure and surrounding soil to advance the pier, until the maximum operating pressure of the hydraulic cylinder is reached, the pressure meets the safe-rated capacity of the pier, or until lift of the structure is achieved, whichever comes first. Installation of more than one hydraulically driven pier at a time is not allowed unless the piers are separated by at least three pier spacings, but no less than 18 feet. Installed capacity should be measured by multiplying the hydraulic fluid pressure times the effective area of the drive cylinder(s). The Contractor shall have calibrated gauges on their pumps and provide the or s Representative with technical documentation that verifies the drive cylinder s effective area and the hydraulic pump s rated capacity. 9.2. Pier sections shall be coupled so as to form a continuous pier column. Hydraulically driven piers shall have a coupler that extends a minimum of three inches into each section and are integral with the pier section. 9.3. The completed piers shall be filled with concrete following installation and prior to lifting. The concrete shall be a sand mix to prevent material segregation and allow flow down the pier center. The concrete mix design shall have a compressive strength of at least 2,500 psi. (Optional) 10. LIFTING AND LEVELING: 10.1. The lifting and holding operation is completed by simultaneously lifting at each pier location using hydraulic rams connected by hydraulic lines and then to a pump with a pressure gauge. Lifting shall be controlled at each pier location by opening and closing valves located at each pier.

Page 6 of 6 10.2. Contractor shall continuously monitor the structure s elevations to ensure that no pier rises more than ¼ vertically ahead of the adjacent piers. 10.3. Contractor shall use calibrated pressure gauge(s), to determine the force applied to each pier and monitor any change in force required to lift the building s weight. The contractor shall be experienced in lifting structures (see Section 1, Subsection 5). The Contractor shall determine system pressures and capacities as required for the successful installation, lift and re-leveling, and long-term performance of the proposed system. 11. GUARANTEE: The work performed under this section shall be guaranteed for a minimum of ten (10) years against all defects in material and workmanship. If appreciable movement occurs in the foundation for any reason other than earthquake, severe wind, extreme change in water table, or any other Act of God or similar manmade condition, the Contractor shall correct any defect in workmanship and materials that may have occurred in order to stabilize the structure and bring it back to the required position. End of Section 2