August 10, 2009 SUBJECT: SUMMARY OF JULY 16, 2009 MEETING REGARDING GROUNDWATER BIOREMEDIATION AT THE CIMARRON FACILITY IN CRESCENT, OKLAHOMA



Similar documents
Site-Summary of Telephone Call Held on March 9, 2007 to Discuss Site Safety Analysis Report (SSAR) Section 2.4

Tim Johnson, Mike Truex, Jason Greenwood, Chris Strickland, Dawn Wellman: Pacific Northwest National Laboratory

October 20, 2004 LOUISIANA ENERGY SERVICES - REQUEST FOR ADDITIONAL INFORMATION ON DECOMMISSIONING FUNDING PLAN

April 15, Dear Dr. Williams:

December 26, Docket No License No Control No

August 27, Docket No License No Control No

MATERIALS LICENSE. Docket or Reference Number Maximum Amount that Licensee May Possess at Any One Time Under This License: Source

March 6, 2013 BABCOCK AND WILCOX, LICENSEE PERFORMANCE REVIEW OF LICENSED ACTIVITIES (NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 70-27/ )

August 21, Dear Mr. Marcinowski:

July 31, Dear Dr. Biegalski:

March 5, 2015 NUCLEAR FUEL SERVICES, INC., LICENSEE PERFORMANCE REVIEW (NUCLEAR REGULATORY COMMISSION INSPECTION REPORT / )

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C July 7, 2015

August 15, Docket No License No Control No

SUMMARY OF FEBRUARY 24, 2014 MEETING WITH URANERZ ENERGY CORPORATION. On February 24, 2014, U.S. Nuclear Regulatory Commission (NRC) staff met with

Federal Remediation Technologies Roundtable Arlington, VA November 14, 2013 Jim Woolford, Director Office of Superfund Remediation and Technology

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C March 3, 2011

September 15, Docket No General License (10 CFR 31.5)

Evaluation of Site-Specific Criteria for Determining Potability

Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination

DATED: FEB 6, 1992; SIGNED BY CARLTON KAMMERER. Barbara DeBuono, M.D., M.P.H. Director Department of Health 3 Capitol Hill Providence, RI 02908

ATTACHMENT 8: Quality Assurance Hydrogeologic Characterization of the Eastern Turlock Subbasin

January 3, Docket No License No Control No

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION. December 10, 2008

August 31, 2007 REQUEST FOR COMMENTS CONCERNING THE VOGTLE ELECTRIC GENERATING PLANT UNITS, 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW

In Situ Biological Uranium Remediation within a Highly Contaminated Aquifer

CHAPTER 7: REMEDIATION TECHNOLOGIES FOR CONTAMINATED GROUNDWATER

Please find enclosed the Operational Unit 2 (OU2) Lincoln Park Water Use Survey plan for your review.

March 31, Dear Mr. Marion:

February 28, BMI Plant Sites and Common Areas Projects, Henderson, Nevada Water Level Electronic Data Deliverable (EDD) Format

U. S. Army Corps of Engineers Ground Water Extraction System Subsurface Performance Checklist

SUCCESSFUL FIELD-SCALE IN SITU THERMAL NAPL REMEDIATION AT THE YOUNG-RAINEY STAR CENTER

A MODEL OF IN SITU BIOREMEDIATION THAT INCLUDES THE EFFECT OF RATE- LIMITED SORPTION AND BIOAVAILABILITY

Alternatives Analysis for Long-Term Ground Water Remediation Moab Site, Located Near Moab, Utah

OWestinghouse. U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C

Guidance on Remediation of Petroleum-Contaminated Ground Water By Natural Attenuation

MINNESOTA DEPARTMENT OF HEALTH

April 11, Conversion, Deconversion and MOX Branch Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards

How To Monitor A Chlorinated Solvents Plume

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C November 13, 2012

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] Uranerz Energy Corporation; Nichols Ranch ISR Project

Subject: Draft Groundwater Sustainability Plan Emergency Regulations Public Comment

Texas Commission on Environmental Quality

May 23, 2006 MEMORANDUM TO: David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA

MATERIALS LICENSE. 1. Honeywell International, Inc. 3. License Number: SUB-526, Amendment 6-1

MATERIALS LICENSE. 1. American Centrifuge Operating, LLC 3. License Number: SNM-2011, Amendment 4

OCTOBER 23, Sincerely,

May 5, Mr. Brian Almon Public Utility Commission of Texas 1701 N. Congress Avenue P.O. Box Austin, Texas

RE: Docket # COE ; ZRIN 0710 ZA05 Submitted via to NWP2012@usace.army.mil and Rulemaking Portal at

September 11, 2013 ACCEPTANCE TO THE NRC MATERIALS CONTROL AND SECURITY SYSTEMS AND PRINCIPLES TRAINING COURSE (S-201) (FSME )

Activities at temporary job site utilizing U.S. NRC Radioactive Material License # Amendment (,

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C June 26, Palo Verde Nuclear Generating Station, Units 1, 2, and 3

Incoming Letter. 01/10/1994 Final No Comments 8/18/00. 01/01/1994 Final No Comments 10/25/ /15/1994 Final No Comments 08/18/2000

Chapter 1 Introduction

Key Factors for Successful DPVE Remediation at Hydrocarbon-Impacted Sites. by Wanda Sakura, John Agar & Tai Wong

Appendix B. Vol. 2 - River Corridor. Cost Information for Groundwater Remediation Systems

MEMORANDUM OF UNDERSTANDING BETWEEN THE ENVIRONMENTAL PROTECTION AGENCY AND THE NUCLEAR REGULATORY COMMISSION

Use of Alternate Concentration Limits (ACLs) to Determine Cleanup or Regulatory Levels Under RCRA and CERCLA

NRC s Uranium Recovery Inspection Program

U.S. Nuclear Regulatory Commission Public Meeting Summary. November 6, 2015

PROGRAM AT A GLANCE 12

Product 4 (Detailed Flood Risk) for: Sam Murray (Amey) Site: Land at Kingsnorth Reference: KSL KR79 Date: 30 th November 2015.

APPENDIX 5.6-C Conceptual Spill Contingency Plan

Water remediation: Passive Treatment Technologies

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C July 22, 2015

NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission

March 27, Massachusetts Institute of Technology Research Reactor

Section 4 General Strategies and Tools

In-situ Bioremediation of oily sediments and soil

FMC Environmental Solutions Peroxygen Talk January 2010 Use of Compound Specific Isotope Analysis to Enhance In Situ

Christopher Harto Argonne National Laboratory

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

State of California Health and Human Services Agency Department of Health Services HIV REPORTING REGULATIONS AND HIV-RELATED RESEARCH

Procedural Violations Related to the Aquifer Exemption

Matt Harris, Golder Associates (NZ) Ltd. The value of geophysics as a non-intrusive method for site characterisation

Disposal of Municipal Wastewater Treatment Plant Effluent by Indirect Discharge to Surface Water via Groundwater or Hyporheic Water

In-Situ Bioremediation Demonstration of Coal-Based Acid Mine Drainage. Tide Mine Site Indiana County, Pennsylvania

~ Joanna M. Livengood Manager

MATERIALS LICENSE. Delaware City, Delaware Docket No Reference No.

MATERIALS LICENSE. 3. License number SUC-1593 is amended in. 4. Expiration date: March 21, 2026

PREDICTIVE MODELLING AND MONITORING NATURAL ATTENUATION TO SAVE REMEDIAL COSTS

Microbial Uranium Reduc1on and Monitoring Tools

CITY CLERK MEMORANDUM 15-70

Hydrologic Data Program Overview. Rio Grande Estuary, and Lower Laguna Madre Basin and Bay Area Stakeholder Committee (BBASC)

OFFICIAL USE ONLY SECURITY-RELATED INFORMATION January 25, 2008 ENERCON SERVICES, INC. - NRC EVENT FOLLOWUP INSPECTION REPORT /

Part 51 Interpretated in a NRC audit Report

Installation Environmental Restoration Defense Logistics Agency, Defense Supply Center Richmond Narrative

ENTRY ORDER SUPREME COURT DOCKET NO JANUARY TERM, } Superior Court, v. } Environmental Division

March 20, On Wednesday, March 7, 2012, the U.S. Nuclear Regulatory Commission s staff held a public

AQUIFER STORAGE RECOVERY

How To Monitor Deep Co2

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C June 26, 2014

APPLICATION OF THE GEO-EMR METHOD IN HYDROGEOPHYSICS

Basements and Deep Building Construction Policy 2014

Regulatory updates and new technologies for the cost-effective assessment and remediation of

June 25, FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3

ACCEPTANCE TO THE ENVIRONMENTAL MONITORING COURSE (H-111) (FSME )

January 24, John E. Meyer, P.G. Texas Water Development Board Water Science and Conservation Innovative Water Technologies

CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN

Ifred M. P~aglia Manager, Nuclear Licensing. March 14, 2013 NND

Transcription:

August 10, 2009 Mr. Jeff Lux, Project Manager Tronox Worldwide, LLC Cimarron Corporation P.O. Box 268859 Oklahoma City, OK 73126-8859 SUBJECT: SUMMARY OF JULY 16, 2009 MEETING REGARDING GROUNDWATER BIOREMEDIATION AT THE CIMARRON FACILITY IN CRESCENT, OKLAHOMA Dear Mr. Lux: Enclosed is a summary of the subject meeting and the U.S. Nuclear Regulatory Commission staff s recommendations for a path forward. If you have any questions regarding this letter, please contact me at (301) 415-6664 or by e-mail at kenneth.kalman@nrc.gov. Sincerely, /RA/ Enclosure: Summary of 07/16/09 Meeting Docket No.: 70-925 License No.: SNM-928 cc: Cimarron distribution list Kenneth L. Kalman, Project Manager Materials Decommissioning Branch Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs

Mr. Jeff Lux, Project Manager Tronox Worldwide, LLC Cimarron Corporation P.O. Box 268859 Oklahoma City, OK 73126-8859 August 10, 2009 SUBJECT: SUMMARY OF JULY 16, 2009 MEETING REGARDING GROUNDWATER BIOREMEDIATION AT THE CIMARRON FACILITY IN CRESCENT, OKLAHOMA Dear Mr. Lux: Enclosed is a summary of the subject meeting and the U.S. Nuclear Regulatory Commission staff s recommendations for a path forward. If you have any questions regarding this letter, please contact me at (301) 415-6664 or by e-mail at kenneth.kalman@nrc.gov. Enclosure: Summary of 07/16/09 Meeting Docket No.: 70-925 License No.: SNM-928 cc: Cimarron distribution list Sincerely, /RA/ Kenneth L. Kalman, Project Manager Materials Decommissioning Branch Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs DISTRIBUTION: DURLD r/f RidsRgn4MailCenter J.Peckenpaugh L. Guo V. Kurian T.Nicholson J. Philip M. Fuhrman ML092090707 OFC: DWMEP DWMEP DWMEP DWMEP NAME: KKalman SMichonski RTadesse KKalman DATE: 7/27/09 8/3/09 8/ 10 /09 8/10 /09 OFFICIAL RECORD COPY

Cimarron Corporation Distribution List: Rick Callahan Cimarron Corporation P.O. Box 315 Crescent, OK 73028 Mike Broderick Radiation Management Section Waste Management Division Department of Environmental Quality 707 North Robinson Oklahoma City, OK 73102-6087

SUMMARY OF JULY 16, 2009 NRC/CIMARRON MEETING REGARDING GROUND-WATER BIOREMEDIATION AT THE CIMARRON FACILITY Attendees NRC Ken Kalman, DWMEP Varughese Kurian, DWMEP Tom Nicholson, RES Lifeng Guo, DWMEP Jon Peckenpaugh, DWMEP (via telephone) Mark Fuhrmann, RES Cimarron Jeff Lux (Tronox) Jim Crawford (Tronox) Roy Widman (Tronox) Jeff Gillow (Arcadis) Arthur Lucas (Lucas-Newman Science & Technology) Barbara Lucas (Lucas-Newman Science & Technology) Harry Newman (Lucas-Newman Science & Technology) Rick Callahan (Lucas-Newman Science & Technology) Larry Morgan (Lucas-Newman Science & Technology) Oklahoma Department of Environmental Quality David Cates Nolan Newkirk Paul Davis Michelle Varbel Tristate Motor Transport Company (member of the public) John B. Hauser Enclosure

2 Summary of Technical Discussions and Path Forward Background The Cimarron Corporation License Amendment Request (License No. SNM-928, Docket No. 70-925) dated March 26, 2009, is undergoing detailed technical review by the U.S. Nuclear Regulatory Commission (NRC) staff. On July 16, 2009, NRC and Cimarron Corporation met at the Cimarron site near Crescent, Oklahoma to discuss the amendment request proposing the use of in situ bioremediation at the Cimarron site. Meeting attendees included: Tronox staff and its contractors; NRC staff from the Office of Federal and State Materials and Environmental Management, and the Office of Nuclear Regulatory Research. State regulators from the Oklahoma Department of Environmental Quality (ODEQ) participated in the meeting. One member of the public participated in the morning site tour but did not stay for the afternoon technical discussions. Introductory remarks were made by Ken Kalman (NRC) and Jeff Lux (Tronox). Jeff Lux then provided an overview of the history of decommissioning activities at the site, and the current proposal to use in situ bioremediation. He then led the attendees on a tour of the site, focusing on areas where remediation is proposed. During the technical discussions, NRC staff raised questions stemming from its review of the March 26, 2009, document. The NRC staff noted that the purpose of discussing these questions was to clarify its understanding of the document and that these were not formal requests for additional information (RAIs). The staff noted that it anticipates transmitting its RAI s to Tronox in late September 2009 and completing its review in March 2010. The following narrative highlights the meeting discussions, and provides a recommended path forward by the NRC staff. Summary of Discussions During the site tour, and later during subsequent afternoon technical discussions, questions on the hydrologic site conceptual models were raised, particularly the role and effect of river and local flooding that may influence the re-oxidation of the treated plumes. In particular, the Spring 2007 flooding events and observed monitoring in ground-water wells were discussed in the field and later during the afternoon. Tronox emphasized that ground-water gradients did not appear to change, despite changes in the water table elevation and deeper ground-water potentiometric surfaces. Tronox considers its previous modeling in which the recharging ground water due to surface ponding or flooding which is saturated with oxygen, to be very conservative. Tronox will provide ground-water levels observed during the Spring 2007 flooding events, and also data on uranium (U) concentrations collected in 2009. NRC staff will review this ground-water data for consideration in re-calibrating the ground-water models presented in Appendix B of the Ground- Water Decommissioning Plan. NRC staff will also reconsider this information in reviewing the scenarios for re-oxidation of the sequestered U.

NRC staff asked the ODEQ staff about the Underground Injection Control (UIC) permitting process concerning the information and analysis needed by Tronox to comply with State of Oklahoma regulations. ODEQ staff will provide NRC staff with an Oklahoma State point of contact for further discussions. 3 Tronox indicated that information on vertical distributions of U in the plumes does not exist. NRC staff considers the 3-dimensional distribution U prior to, during and following sequestration activities as important to the demonstration of the effectiveness of in situ bioremediation. A critical aspect is the distribution of reduced iron created by the in situ bioremediation process. One suggestion was the use of geophysical surveys (i.e., electric resistivity tomography) to define the distribution of the reduced iron using time-lapse imagery as a monitoring tool. Tronox volunteered that they have used geophysical surveys at other decommissioning sites, and therefore have the equipment and knowledge to apply certain geophysical methods. The question appears to be the appropriate balance between the use of geophysical methods and ground-water monitoring over extended times and the number of samples to be collected. The use of geophysical methods could be part of a ground-water monitoring program to demonstrate the effectiveness of in situ bioremediation. ARCADIS also indicated that they have used induced polarization geophysical methods to monitor the presence and distribution of LNAPLs in the subsurface. Although ARCADIS has not used geophysical methods for in situ bioremediation, they would consider the feasibility of using it for monitoring at the Cimarron site. NRC staff discussed the evolution of geochemistry during the in situ bioremediation process. In particular, the staff noted that several dissolved calcium uranyl carbonate species were not considered in the geochemical modeling by ARCADIS. NRC staff thought that these species may contribute substantially to the dissolved fraction of U and should be considered in future modeling. ARCADIS believes that after reduction of U(VI) to U(IV) these calcium uranyl species may not be important. When the issue of possible pore-plugging during the in situ bioremediation process was raised by the NRC staff, ARCADIS indicated that it occurs locally around the well screen and can be readily treated to restore the injection flow. It was acknowledged that column studies using materials from the treated aquifer will provide important confirmation of processes occurring during and following in situ bioremediation activities. In addition, Jeff Lux also provided information regarding the status of activities pertaining to the Tronox filing for bankruptcy and ensuing legal actions. Recommendations for Path Forward The NRC staff anticipates transmitting RAIs to Tronox in late September 2009. The staff also recognized a need for additional discussion on certain technical topics such as geophysical surveys, ground-water modeling of transient events, recharge estimates, assessment of future scenarios, UIC permits required by ODEQ, and possible alternatives under the NRC s license termination rule.