UI Procedures for Asbestos Management



Similar documents
ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM

University of Pittsburgh Safety Manual. EH&S Guideline Number: ASBESTOS

North Carolina State University. Asbestos Management Plan

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

ASBESTOS MANAGEMENT INTRODUCTION

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015

NDSU TABLE OF CONTENTS

ASBESTOS AWARENESS IN THE WORKPLACE. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.

Asbestos Management Plan EC 45 Page 1

Building Owners Responsibilities for Asbestos

Miami University s Asbestos Operations & Maintenance Program Administered by

EVERYONE'S RESPONSIBILITY

Today s topic is Asbestos Safety. This training is a part of OSHA s Asbestos Standard (29 CFR ).

ASBESTOS. CSEA / Local 1000 AFSCME / AFL-CIO. 143 Washington Avenue, Albany, New York Danny Donohue, President

SECTION 16 ASBESTOS MANAGEMENT

UNVERSITY HIGH SCHOOL U W. Gregory St. Normal, IL School Asbestos Management Plan. Supplemental.

ASBESTOS AWARENESS TRAINING. Title 8, GISO Section 5208

Asbestos Hazards and Controls

The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials.

Asbestos Management. 2. Introduction. Contents

Asbestos Work Permit Procedures

The Richard Stockton University ASBESTOS MANAGEMENT PLAN

ASBESTOS CONTROL PLAN

Asbestos in the Home MISAWA AB, JAPAN

ASBESTOS MANAGEMENT PLAN

Asbestos Inspection Project Procedure

ASBESTOS in DEPARTMENT OF ADMINISTRATION FACILITIES Frequently Asked Questions

ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS

ASBESTOS OPERATIONS AND MAINTENANCE PLAN

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:

ASBESTOS in state and local government

Administrative Procedure. Asbestos

DESERT RESEARCH INSTITUTE MOLD ASSESSMENT AND REMEDIATEION PROCEDURE

Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project

STANDARD OPERATING PROCEDURES FOR MOLD REMEDIATION

ENVIRONMENTAL OPERATIONS & MAINTENANCE GUIDANCE MANUAL BACKGROUND INFORMATION ON ASBESTOS AND LEAD BASED PAINT

Approved by: UBC ACT Committee

Guidelines for Mold Remediation (Removal)

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material

CONTROL METHODS. There are five ways to control the release of asbestos fibers:

Asbestos Awareness Training Handout For Custodial/Housekeeping Workers and Class IV Asbestos Workers

ASBESTOS AWARENESS TRAINING. For workers and building occupants

Primary reason asbestos is used, is its special resistance to heat. Asbestos fibers are also virtually indestructible.

Washington University Asbestos Operations and Maintenance Plan

Asbestos: Guidelines for Managing Asbestos in Buildings

Wellesley College Asbestos Management Program

Loss Control TIPS Technical Information Paper Series

Asbestos Awareness Training

ASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos

Asbestos Management POLICY

Fact Sheet on Asbestos

Asbestos in Your Home

Asbestos Awareness at the University of Toronto

THE UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL ENVIRONMENT, HEALTH AND SAFETY 1120 Estes Drive Extension Chapel Hill, North Carolina CB#1650

ASBESTOS AWARENESS. For workers and building occupants

Asbestos Management & Abatement

IDENTIFICATION OF ASBESTOS You can t identify asbestos-containing materials with the naked eye. Experienced employees can identify suspected

Standards for Asbestos Abatement

SPECIFICATION DIVISION 2 NUMBER SECTION DESCRIPTION DIVISION 02 EXISTING CONDITIONS SECTION ASBESTOS REMEDIATION FLOOR TILE AND MASTIC

ASBESTOS CONTROL PROGRAM

LEGAL REVIEW & UPDATE

Removing asbestos in workplaces

ASBESTOS / LEAD PAINT MANAGEMENT PLAN

LRI Hidden Valley Acceptance Criteria for Asbestos and Asbestos Contaminate Waste Material

Characteristics/Applications

Asbestos in Your Home

EXHIBIT A SCOPE OF SERVICES

UBC Plant Operations Asbestos Work Procedures April 2004

ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

BLR s Safety Training Presentations

ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA

have been provided with information on whether they do or do not contain asbestos before starting work;

University of Michigan Dearborn The Department of Environmental Health and Safety & Emergency Management Asbestos Management Program General

Asbestos frequently asked questions

Syracuse University s Guidelines for Work Involving Materials Containing Trace Asbestos (Asbestos at a Concentration Less than 1%)

Occupational Asbestos Exposure Control Plan

Asbestos Operations and Maintenance Program. San José State University

Asbestos Awareness. What is Asbestos?

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS AWARENESS TRAINING

This presentation is for information purposes ONLY.

Transcription:

UI Procedures for Asbestos Management The University of Iowa Rev.12/12/2012 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing materials. TABLE OF CONTENTS 1.0 SUMMARY. 1 2.0 SCOPE. 2 3.0 REGULATIONS AND POLICIES.. 2 4.0 DEFINITIONS... 2 5.0 RESPONSIBILITIES... 2 6.0 PROCEDURES 3 Appendix A.. 4 Procedures for Class IV Housekeeping and Maintenance Appendix B.. 5 Procedures for Unplanned Asbestos Disturbance 1

1.0 Summary Asbestos is the common name for a mineral fiber that was added to building materials prior to the 1980 s. Damaged materials may release fibers into the air and inhaling elevated fiber concentrations increases risk of several serious chronic illnesses. Regulatory agencies have strict laws on asbestos that apply to private and public buildings to prevent hazardous exposures to workers and the public. 2.0 Scope These procedures apply to employees and contracted work involving the identification, work on, removal, or repair of asbestos-containing materials. Materials not tested for the presence of asbestos must be presumed to contain asbestos (excluding glass, metal, plastic, and wood). 3.0 Regulations and Policies University of Iowa Operations Manual, Part III Human Resources, Division II Standards and Ethics, Chapter 16.4.d Policy on Ethics and Responsibilities for University of Iowa Staff. Iowa Occupational Safety and Health Administration, 29 CFR 1910.1001 and 1926.1101 administered by Iowa Department of Labor. Environmental Protection Agency NESHAPS regulations administered by Iowa Department of Natural Resources. 4.0 Definitions Asbestos A common term for a naturally occurring fiber often added to building materials prior to the 1908 s for the purpose of strength and resistance to heat or corrosion. By regulatory definition, asbestos-containing materials have equal to or greater than 1% of asbestos fibers in the material matrix. Asbestos Fiber Release Episode Unplanned disturbance or accidental damage of asbestos containing materials that may release asbestos fibers into the air. Friable asbestos Dry asbestos containing material that can be crumbled, crushed, or pulverized to powder by hand pressure. Examples are pipe insulation and sprayed on materials. Non-friable asbestos Dry asbestos containing material that can not be crumbled, crushed, or pulverized to powder by hand pressure. Examples are floor tile and cement-like materials. 5.0 Responsibilities 5.1 Deans, Directors and Department Heads are responsible to: Provide oversight of department activities to ensure compliance with procedures applicable to activities by employees or contractors they hire. 5.2 Supervisors are responsible to: Implement awareness information and training for University employees whose activities contact asbestos-containing materials such as in housekeeping and maintenance operations. 5.3 Employees are responsible to: Comply with these procedures and any further requirements set by the supervisor. 2

5.4 Environmental Services is responsible to: Provide administrative oversight of departments involved in asbestos-related activities or work; perform centralized University reporting to regulatory agencies; and provide remediation and repair services within their service capabilities. 5.5 EHS is responsible to: Conduct administrative reviews of departments with asbestos awareness level requirements. 6.0 Procedures 6.1 See Appendix A for University employees who contact but do not disturb asbestos materials during housekeeping and maintenance activities. 6.2 See Appendix B for an unplanned disturbance of asbestos containing materials. 6.3 Contact Environmental Services for the identification or remediation of asbestos materials. 3

Appendix A: Procedures for Class IV Housekeeping and Maintenance These procedures (Class IV) are for maintenance and custodial activities during which employees contact but do not disturb asbestos (ACM or PACM). General Practices Approved initial 2 hour minimum asbestos training course required with annual refresher training. Maintain employee training records for at least one (1) year beyond the last date of employment. All surfaces shall be maintained as free as practicable of ACM waste, debris, and accompanying dust. HEPA-filtered equipment shall be used for vacuuming asbestos containing waste and debris. The equipment shall be used and emptied in a manner, which minimizes the reentry of asbestos into the workplace. Wet cleaning methods must be used when HEPA vacuuming is not done. Waste, scrap, debris, bags, containers, equipment, and clothing contaminated with asbestos shall be collected, recycled and disposed of in sealed impermeable bags, or other closed, impermeable containers. General Prohibitions Surfaces contaminated with asbestos may not be cleaned using compressed air. Do not drill holes, hammer nails into, hang objects from, disturb when replacing light bulbs, touch with curtains, drapes, or dividers, or move furniture that damages ACM or PACM. Waste, debris and accompanying surface dust in areas containing accessible ACM and/or PACM or visibly deteriorated ACM, shall not be dusted, swept, shoveled dry, or vacuumed without using a HEPA filter. Non-Construction (Class IV) specific procedures Mist ventilation air filters with water before removal; do not shake and dispose of properly. Care of asbestos-containing flooring material Sanding of asbestos-containing floor material is prohibited. Stripping finishes shall be done using low abrasion pads at speeds lower than 300 rpm and wet methods. Burnishing or dry buffing may be performed only on asbestos-containing flooring which has sufficient finish so that the pad cannot contact the asbestos-containing material. Construction (Class IV) specific procedures Class IV work in regulated area requires respirator and other appropriate personal protective equipment use when other asbestos work is being performed in area. 4

Appendix B: Procedures for an Unplanned Disturbance For Individuals Discovering an Unplanned Disturbance 1. Immediately evacuate the damaged area. 2. Notify the appropriate University office (based on the amount of damaged area). Major Disturbance (three square feet or more of damage) Environmental Services 319-335-6477 or Cell Phone 319-631-0611 (from 8:00am-4:30pm) Environmental Health & Safety 319-335-8501 (from 8:00am-5:00pm) Public Safety 319-335-5022 (24 hours a day or when other contacts not available) Minor Disturbance (less than three square feet of damage) Athletics 319-335-9410 Business Services 310-335-0082 Facility Management 319-335-5071 Iowa Memorial Union 319-335-3138 UIHC 319-356-3526 University Housing 319-335-9970 For University Personnel Responding to a Major Unplanned Disturbance Note: University personnel responding to an unplanned disturbance or asbestos fiber release episode must be trained and equipped in compliance with state regulations. 1. Confirm the presence or absence of asbestos in released material. First check the Facilities Management bulk sampling database. If the bulk sample database does not document that the material tested negative for asbestos content, or if the database is not available, report to the site to oversee initial response. As needed, conduct laboratory analysis of suspect material. 2. Evacuate and isolate a known or suspect contaminated area including any construction activity in progress. 3. Facilities Management personnel shall perform initial protective measures: Shut down HVAC system using precautions to avoid exposure Place site under negative pressure using a HEPA-filtered negative air machine. Wet suspect material with water, without disturbing released material 5

Restrict site access until remediation is completed or until released material is confirmed as non-asbestos-containing by posting restricted access signs, using barricade tape, or locking entrances with warning signs 4. Determine remedial action needed. Collect air samples and wipe sample of settled dust as needed to determine extent of site contamination. 5. If a fiber release episode is confirmed, notify building occupants. 6. If the release involves over three square or linear feet, Facilities Management must notify the following two agencies: Iowa Division of Labor Services (telephone Jeff Ellis at 515-281-5557) Department of Natural Resources (telephone Tom Wuehr at 515-281-7212) 7. Site remediation shall be performed by licensed asbestos abatement workers and overseen by a licensed project manager. 8. Upon remediation completion, the site may be reoccupied with project manager approval. 6