EASEE-gas. Common Business Practice



Similar documents
Common Business Practice

EASEE-gas. Common Business Practice

Implementation progress of the EASEE-gas Common Business Practices (CBP's)

ACCESS CODE FOR TRANSMISSION. Attachment C.1: Operating Procedures

Business Requirements Specification for the. Nomination and Matching Procedures

Network Code Interoperability and Data Exchange Rules. Data Exchange Workshop

PROPOSAL FOR THE OVERSUBSCRIPTION AND BUY-BACK SCHEME. -EDP comments-

Appendix A OPERATING PROCEDURES UNDER THE HUB SERVICES AGREEMENT TERMS AND CONDITIONS HSA

Frequently Asked Questions. (FAQs)

EFET 1 Guide on the Features of a Successful Virtual Trading Point

ACER scoping document for Rules for Trading

Business model for the upcoming Rules for Gas Transport (RfG), Version 12.0

Pilot Framework Guidelines on Electricity Grid Connection Ref: E10-ENM December 2010

Network Access Conditions

DPM. Acquiring and terminating programme responsibility & financial consequences

GRTgaz and TIGF create the TRADING REGION SOUTH.

Vision Paper LT UIOLI

EFET. European Federation of Energy Traders. Amstelveenseweg 998 / 1081 JS Amsterdam Tel: /Fax:

June Position Paper Contribution to the debate on electricity market design and capacity markets

Guidance Notes for the Austrian VTP Appendix Version 2.0 to the EFET General Agreement concerning the Delivery and Acceptance of Natural Gas 2.

How To Make A Successful Energy Community

Setting Up an AS4 System

Operational Security Network Code

REPORT On the work of the Croatian Energy Regulatory Agency For the year 2005

EBA FINAL draft Regulatory Technical Standards

Final report Technical advice on third country regulatory equivalence under EMIR Canada

Specific amendments to the Capacity Allocation and Congestion Management Network Code

REDUCTION OF BUREAUCRATIC BARRIERS FOR SUCCESSFUL PV DEPLOYMENT IN THE EU KEY RECOMMENDATIONS

COMMISSION REGULATION (EU) No /.. of XXX

DATRET/EXPGRP (2009) 6 FINAL Document 6

RE: GreenPower Program Review Consultation Paper. About ERM Business Energy. GreenPower Program Review. 24 March 2015

Forward Risk-Hedging Products PC_2012_E_13

INDICATIVE TERMINALLING PROGRAMME OF THE ZEEBRUGGE LNG TERMINAL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. on the voluntary ecodesign scheme for games consoles

SIMONE Capacity Tools and Gas Transport Commercial Management System Integration

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

The Electricity and Gas (Internal Markets) Regulations 2011

Council of the European Union Brussels, 30 June 2016 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union

Investing in the Infrastructure for Energy Markets

CALL FOR PROPOSALS FOR BASREC PROJECT ACTIVITY: THE STUDY ON THE DEVELOPMENT OF REGIONAL GAS MARKET IN THE EASTERN BALTIC SEA REGION

Market Standards for Corporate Actions Processing

Results of the Expert Group on e-invoicing. Bo Harald Chair EC Expert Group on e-invoicing

BNXS03: Framework Directive for the Eco-design of Energy related Products (ErP Directive)

CCBE RECOMMENDATIONS FOR THE IMPLEMENTATION OF THE DATA RETENTION DIRECTIVE

Date and time of 12 February 2014 at 14:15pm Location Ofgem s offices, 9 Millbank, London SW1P 3GE

-1- AMENDED AND RESTATED CERTIFICATE OF INCORPORATION OF THE NORTH AMERICAN ENERGY STANDARDS BOARD, INC.

ECB-PUBLIC OPINION OF THE EUROPEAN CENTRAL BANK. of 16 October on the central register of bank accounts (CON/2015/36)

1 TABLE OF CONTENTS DEFINITIONS AND UNITS Definitions Units applied GENERAL PROVISIONS Introduction...

The Calibration Chain: Role of BIPM,

ACCOUNTING STANDARDS BOARD OCTOBER 1998 FRS 14 FINANCIAL REPORTING STANDARD EARNINGS ACCOUNTING STANDARDS BOARD

Business Plan in 2015 of Organization for Cross-regional Coordination of Transmission Operators, Japan

EBA-GL July Guidelines. on the minimum list of qualitative and quantitative recovery plan indicators

Gas Transmission Charging Methodology Statement. Gas Year 2015/16

ENTSO-E Working Draft Network Code on Emergency and Restoration

Publication of Vacancy Notice Programme Manager Legal Background Ref.: TA-LEGAL-AD6-2013

EBA FINAL draft Regulatory Technical Standards

CLP regulation & 2015 deadline for mixtures

COMMITTEE ON STANDARDS AND TECHNICAL REGULATIONS (98/34 COMMITTEE)

HOW TO BECOME A CEGH MEMBER and A VIRTUAL TRADER. Version 1.3 CEGH AB B-VHP

Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014

BOARD CHARTER. Its objectives are to: provide strategic guidance for the Company and effective oversight of management;

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. Accompanying document to the. Proposal for a

Final Draft Framework Guidelines on Capacity Allocation and Congestion Management for Electricity Ref: E10-ENM February 2011

Graz University of Technology

EBA/CP/2013/ Consultation Paper

Consultation Paper. Draft Regulatory Technical Standards on the content of resolution plans and the assessment of resolvability EBA/CP/2014/16

Basic user manual for online trading application»vtp«

Licensing Options for Internet Service Providers June 23, 2001 Updated September 25, 2002

Vacancy Notice Personal Assistant Ref. n : CA-PERSA-FGII-2010

European best practice regarding to the licensing in the energy sector

for CONSUMERS Information on the SINGLE EURO PAYMENTS AREA

REGULATORY IMPACT ANALYSIS (RIA)

Transcription:

CBP 2003-002/02 1 EASEE-gas European Association for the Streamlining of Energy Exchange - gas Common Business Practice Number: 2003-002/02 Subject: Harmonisation of the Nomination and Matching Process Approved: 18 th February 2009 EASEE-gas CBP 2003-002/02 was approved by the EASEE-gas Executive Committee on 18 th February 2009 and formally ratified according to EASEE-gas Rule 9.6 on XXX XX th 200X. Summary This Common Business Practice describes a first set of recommendations for the part of the process which relates specifically to transportation nominations and involves shippers and Infrastructure Operators. For reasons of consistency, it should also serve as the core for the communication processes between all other relevant parties involved in the gas chain.

CBP 2003-002/02 2 About EASEE-gas The European Association for the Streamlining of Energy Exchange-gas (EASEE-gas) was created by six founding members on March 14 th, 2002. EASEE-gas's aim is to support the creation of an efficient and effective European gas market through the development and promotion of common business practices (CBPs) that intend to simplify and streamline business processes between the stakeholders. The creation of EASEE-gas is a project that is fully supported by the European Commission and by the European Regulators through the so-called Madrid Forum. It was achieved through the work of a dedicated Task Force supported by EFET, Eurogas, Eurelectric, GEODE, GTE, OGP and the Edigas group. The association is fundamentally based on company membership and voluntary contribution towards the development of common business practices. Full membership in EASEE-gas is open to all companies, European or other, that are involved in the European gas business, from producers to end users, and to companies that are their service providers. Companies can subscribe to full membership in one or more of the eight gas industry segments. Associate membership in EASEE-gas is open to government agencies, e.g. regulators, through to organisations such as gas business trade associations and to individuals that may contribute to the benefit of EASEE-gas. Associate members do not pay annual fees, nor do they have voting rights. The development of common business practices within EASEE-gas is organised through working groups under the supervision of an executive committee that is representative of the various gas industry segments. Participation in the working groups is limited to members only.

CBP 2003-002/02 3 Common Business Practice 2003-002/02 Harmonisation of the Nomination and Matching Process This following Common Business Practice CBP has been approved by EASEE-gas for use in gas business transactions across interface points 1 and constitutes a first set of recommendations for the part of the process which relates specifically to transportation nominations and involves shippers on one hand, TSOs, LNG Terminal Operatorss, Storage System Operators and producers (together Infrastructure Operators IOs) on the other hand; relevant processes used by all other parties involved in the gas chain should be consistent herewith. This CBP reflects minimum requirements and does not exclude additional provisions between individual parties. Gas Day A Gas Day starts at 06:00 Local Time and ends at 06:00 Local Time on the next day within a given time zone. This reflects the current practice in most of the contractual agreements between the members of EASEE-gas. For interface points at the intersection of two time zones, specific provisions have to be agreed between the involved parties in order to solve the one-hour shift in time between the beginning and the end of the Gas Day at the two sides of the interface. Nomination scheme General remarks Nomination deadlines mentioned in this CBP document imply the use of electronic communication between all involved parties. As far as communication between shippers and IOs is concerned, at present the most commonly used way is by using the EDIG@S communication protocol as it is already being used by a large number of EASEE-gas members. However, back-up provisions have to be foreseen in case of communication problems. It is also agreed that nominations can be sent at all times. However, only the last applicable nomination that was sent before a nomination deadline will be taken into account. This principle of buffering nominations will be used throughout the whole process. The time reference used in the nomination scheme is Coordinated Universal Time (UTC 2 ), as defined and recommended by the International Radio Consultative Committee (IRCC), a predecessor organization of the ITU-T, and maintained by the Bureau International des Poids et Mesures (BIPM). (CCIR Recommendation 460-4, or ITU-T Recommendation X.680 (7/94), contains the full definition.) Handling mismatches - Lesser rule principle Flow is required to be calculated at both sides of an interconnection point on an identical basis. Therefore, during the process of validating and confirming nominations, the IO called lesser rule principle will be applied, meaning that in case of different positions 1 For the purpose of this CBP, interface points are defined as the physical points where gas sale/purchase/trade/transfer may be taking place. 2 UTC is equivalent to mean solar time at the prime meridian (0 longitude), formerly expressed in GMT.

CBP 2003-002/02 4 between a delivering and a receiving shipper at the two sides of an interconnection, and in case neither of the shippers adjusts its position, the higher of the two values will be reduced by the IO to the lower value in order to avoid a discontinuity over the intersection. Initial nomination scheme deadlines First Shipper Deadline = 13:00 UTC, 12:00 UTC during Summer-time period 3 (Gas Day D-1) Deadline for shippers to submit transport nominations to their respective IOs for transportation on Gas Day D. All nominations arriving after said deadline will be buffered until the next nomination deadline for shippers. First IO Deadline = 14:00 UTC, 13:00 UTC during Summer-time period (Gas Day D-1) Deadline for IOs to send a matching notice to their respective shippers having submitted a nomination before the First Shipper Deadline. This implies that between the First Shipper Deadline and the First IO Deadline adjacent IOs exchange information with regard to the nominations as received from their respective shippers. Second Shipper Deadline = 15:00 UTC, 14:00 UTC during Summer time period (Gas Day D-1) Deadline for shippers to submit revised transport nominations to their respective IOs for transportation on Gas Day D. This deadline has been added in order to allow shippers to correct or revise their nominations. Nominations arriving after the First Shipper Deadline will be considered as nominations for the Second Shipper Deadline. Second IO Deadline = 17:00 UTC, 16:00 UTC during Summer time period (Gas Day D-1) Deadline for IOs to send a confirmation notice to their respective shippers having submitted nominations before the First or Second Shipper Deadline. The confirmation notice will confirm to the shipper the (hourly or daily) quantities of gas that will be scheduled to flow on Gas Day D. The confirmed quantities will take into account the shipper s nomination, contractual provisions between the shipper and the IO, constraints (if any) and the lesser rule. The calculation of the confirmed quantities will be done by the IOs between Second Shipper Deadline and Second IO Deadline. Renominations General principles As a general principle and as a minimum requirement, renominations should be received at the latest two (2) full hours before the relevant hour bar before becoming effective. Furthermore, the number of messages should be limited to the necessary information to be exchanged. As long as there is no new information, no additional message should be sent. However, in order to get a confirmation that a message has been received by the counterparty, an electronic acknowledgement should be foreseen. 3 Summer-time period as defined by Directive 2000/84/EC of the European Parliament and of the Council of 19 January 2001 on summer-time arrangements, and as amended by the European Parliament or the Council from time to time.

CBP 2003-002/02 5 Renominations before Gas Day D After the initial nomination process, which ends at the Second IO Deadline, IOs should allow for re-nominations in order to handle new nominations or re-nominations that arrived after the Second Shipper Deadline. However, as there is no real need to have a continuous process before the Gas Day and in order to limit the number of nominations, IOs should allow for at least two additional re-nomination deadlines on Gas Day D-1: Third Shipper Deadline = 19:00 UTC, 18:00 UTC during Summer time period (Gas Day D-1) Deadline for shippers to submit revised or new transport nominations to their respective IOs for transportation on Gas Day D. Nominations arriving after the Second Shipper Deadline will be considered as nominations for the Third Shipper Deadline. Third IO Deadline = 21:00 UTC, 20:00 UTC during Summer time period (Gas Day D-1) Deadline for IOs to send a confirmation notice to their respective shippers having submitted nominations before the 3 rd Shipper Deadline. The confirmation notice will confirm to the shipper the quantities of gas that will be scheduled to flow on Gas Day D. Fourth Shipper Deadline = 23:00 UTC, 22:00 UTC during Summer time period (Gas Day D-1). Deadline for shippers to submit revised or new transport nominations to their respective IOs for transportation on Gas Day D. Nominations arriving after the Third Shipper Deadline will be considered as nominations for the Fourth Shipper Deadline. Fourth IO Deadline = 01:00 UTC, 00:00 UTC during Summer time period (Gas Day D- 1). Deadline for IOs to send a confirmation notice to their respective shippers having submitted nominations before the Fourth Shipper Deadline. The confirmation notice will confirm to the shipper the quantities of gas that will be scheduled to flow on Gas Day D. Within Day renominations As from two (2) hours before the start of Gas Day D until three (3) hours before the end of Gas Day D, IOs will allow for a continuous re-nomination process, taking into account a two (2) full hour lead time as from the hour bar. At the end of this period, IOs will issue a confirmation notice to confirm the rescheduled quantities of gas for Gas Day D. Message content All notices from the shippers shall include information with regard to the receiving or delivering shippers in the adjacent transmission system in order to allow for a matching process. Information with regard to shippers in an adjacent transmission system can be submitted in a coded way in order to hide the name of these shippers. Issuing of codes will be administered by the relevant IO. All notices, being issued by the IOs, shall have the same structure and shall be composed of two basic sets of information: 1) A first block of information relates to the shipper in relationship with its IO - for a Matching Notice, issued by the IO, it will repeat the nomination of the shipper as received by its IO

CBP 2003-002/02 6 - for a Confirmation Notice it will give the confirmed quantities of gas, including the delivering or receiving shippers in the adjacent transmission system, that will be scheduled to flow by the IO 2) A second block of information relates to information in relation to the shipper, as received by the IO from the adjacent IO in relationship with its delivering or receiving shippers towards said shipper. - for a Matching Notice, issued by the IO, it will give the accepted nomination of the delivering or receiving shippers as received by the adjacent IO in relation to the shipper - for a Confirmation Notice it will give the quantities of gas, for each delivering or receiving shipper, that the adjacent IO is able or requesting to flow towards or from the shipper. Timing This CBP should be implemented at the earliest technically and contractually possible date, but not later than 1 April 2009.