1 CBP / EASEE-gas European Association for the Streamlining of Energy Exchange - gas Common Business Practice Number: /03 Subject: Approved: 22/11/2013 Summary Harmonisation of the Nomination and Matching Process EASEE-gas CBP /03 was approved by the EASEE-gas Executive Committee on 04/06/2013 and formally ratified according to EASEE-gas Rule 9.6 on 22/11/2013. This Common Business Practice describes recommendations for the part of the process which relates specifically to (re-)nominations and involves Shippers and System Operators.
2 CBP / About EASEE-gas The European Association for the Streamlining of Energy Exchange-gas (EASEE-gas) was created by six founding members on March 14th, EASEE-gas's aim is to support the creation of an efficient and effective European gas market through the development and promotion of common business practices (CBPs) that intend to simplify and streamline business processes between the stakeholders. The creation of EASEE-gas is a project that is fully supported by the European Commission and by the European Regulators through the so-called Madrid Forum. It was achieved through the work of a dedicated Task Force supported by EFET, Eurogas, Eurelectric, GEODE, GTE, OGP and the Edigas group. The association is fundamentally based on company membership and voluntary contribution towards the development of common business practices. Full membership in EASEE-gas is open to all companies, European or other, that are involved in the European gas business, from producers to end users, and to companies that are their service providers. Companies can subscribe to full membership in one or more of the eight gas industry segments. Associate membership in EASEE-gas is open to government agencies, e.g. regulators, through to organisations such as gas business trade associations and to individuals that may contribute to the benefit of EASEE-gas. Associate members do not pay annual fees, nor do they have voting rights. The development of common business practices within EASEE-gas is organised through working groups under the supervision of an executive committee that is representative of the various gas industry segments. Participation in the working groups is limited to members only
3 CBP / Common Business Practice /03 Harmonisation of the Nomination and Matching Process This following Common Business Practice CBP has been approved by EASEE-gas for use in gas business transactions across interface points 1 and constitutes recommendations for the part of the process which relates specifically to (re-)nominations and involves Shippers on one hand, and System Operators 2 SOs on the other hand. This CBP reflects minimum requirements in line with the Network Codes, in the areas referred to in Article 8(6) of the Regulation (EC) 715/ This CBP does not exclude additional provisions between individual parties. Gas Day Gas Day means the period from 5:00 to 5:00 UTC for winter time and from 4:00 to 4:00 UTC when daylight saving time is applied. 4 Nomination scheme General remarks Nomination deadlines mentioned in this CBP document imply the use of electronic communication between all involved parties. As far as communication between Shippers and SOs is concerned, at present the most commonly used way is by using the EDIG@S protocol (CBP ) based on a common data network (CBP ) and a message transmission protocol (CBP ). However, back-up provisions have to be foreseen in case of communication problems. For any given Gas Day, it is agreed that (re-)nominations can be sent at all times but not earlier than 6 months before the concerned Gas Day. However, only the last valid (re- )nomination that was received by the SO communication system before a (re-)nomination deadline will be taken into account. The time reference used in the nomination scheme is Coordinated Universal Time (UTC 5 ), as defined and recommended by the International Radio Consultative Committee (IRCC), a predecessor organization of the ITU-T, and maintained by the Bureau International des Poids et Mesures (BIPM). (CCIR Recommendation 460-4, or ITU-T Recommendation X.680 (7/94), contains the full definition.) The flow described in this document has to be understood as the quantity of gas in energy per hour or per day (CBP ) related to the Nomination and Matching Process. 1 For the purpose of this CBP, interface points are defined as the points where gas sale/purchase/trade/transfer may be taking place 2 For the purpose of this CBP, the System Operator includes, at least, Transmission System Operators, LNG Terminal Operators, Storage System Operators, and Interconnector Operators but excludes the Distribution System Operators NC CAM Article UTC is equivalent to mean solar time at the prime meridian (0 longitude), formerly expressed in GMT.
4 CBP / Initiating SO and Matching SO The Initiating SO is the System Operator initiating the matching process by sending relevant data to the Matching SO. The Matching SO is the System Operator performing the matching process and sending the result of such process to the Initiating SO. Handling mismatches - Lesser rule principle Flow shall be determined at both sides of an interface point on an identical basis. Therefore, during the process of validating and confirming (re-)nominations, the so called lesser rule principle is recommended to be applied, meaning that in case of different quantities but for a same flow direction between a delivering and a receiving Shipper at the two sides of an interface point, and in case neither of the Shippers adjusts its position, the higher of the two values will be reduced by the Matching SO to the lower value in order to avoid a discontinuity over the interface point. Nomination scheme deadlines Shipper Deadline = 13:00 UTC, 12:00 UTC when daylight saving time is applied (Gas Day D-1) Deadline for Shippers to submit nominations to their respective SOs for use on Gas Day D. SO Deadline = 15:00 UTC, 14:00 UTC when daylight saving time is applied (Gas Day D-1) Deadline for SOs to send a Confirmation Notice to their respective Shippers having submitted nominations before the Shipper Deadline. The Confirmation Notice will confirm to the Shipper the (hourly or daily) quantities of gas that will be scheduled to flow on Gas Day D. This implies that between the Shipper Deadline and the SO Deadline, the Initiating SO sends to the Matching SO information with regard to the processed quantities and to the nominated quantities when required. The processed quantities will take into account the Shipper s nominations, contractual provisions (including constraints) between the Shipper and the SO. The confirmed quantities will take into account the processed quantities and the lesser rule. The calculation of the confirmed quantities will be done by the Matching SO between the Shipper Deadline and the SO Deadline. The confirmed quantities as well as the processed quantities will be sent during this period by the Matching SO to the Initiating SO. There is only one unique nomination cycle D-1. After this cycle there s a continuous re-nomination cycle every hour until three (3) hours before the end of the Gas Day D. Re-nominations scheme As a general principle and as a minimum requirement, Shippers may submit renominations within the re-nomination period which starts immediately after the SO Deadline and ends not earlier than three (3) hours before the end of the Gas Day D. The SO shall start a re-nomination cycle at the start of every hour within the renomination period. Furthermore, the number of messages should be limited to the necessary information to be exchanged. As long as there is no new information, no additional message should be sent. However, in order to get a confirmation that a message has been received by the counterparty, an electronic acknowledgement should be foreseen. SOs shall send the Confirmation Notice to confirm the rescheduled quantities for the Gas Day D to the respective Shippers as soon as possible but not later than two (2) hours 149
5 CBP / from the start of each re-nomination cycle and before any gas flow change is due to come into effect. Message content and message rejection All messages exchanged between the Shippers and the SOs shall include, at least: - the identification of the sender and recipient, - the identification of the concerned interface point(s), - the identification of a nomination contract reference (optional), - the concerned period defined as a Gas Day, - the direction of the gas flow, - the identification of the start and end time of gas flow, - information with regard to the receiving or delivering Shippers in the adjacent system in order to allow for a matching process. Information with regard to Shippers in an adjacent system can be submitted in a coded way in order to ease the technical and operational processing of the Shippers information. Issuing of codes will be administered by the relevant SO. All messages, being issued by the Shippers to the SOs shall also include the requested quantity in energy per hour or per day. All messages, being issued by the SOs to the Shippers, shall be composed of two basic sets of information regarding the quantity in energy per hour or per day: A first block of information relates to the Shipper in relationship with its SO and will provide the confirmed quantities of gas that will be scheduled by the SO, including the delivering or receiving Shippers in the adjacent system. A second block of information relates to information in relation to the Shipper, as received by the SO from the adjacent SO in relationship with its delivering or receiving Shippers towards said Shipper. This block will provide the processed quantities of gas that the adjacent SO is able or requesting to flow towards or from the Shipper for each delivering or receiving Shipper. All messages exchanged between the SOs shall include, at least: - the identification of the sender and recipient, - the identification of the concerned interface point(s), - the identification of a interconnection agreement reference (optional), - the concerned period defined as a Gas Day, - the direction of the gas flow, - the identification of the start and end time of gas flow, - the processed quantity in energy per hour or per day that the SO is able to flow on its interface point side, - the nominated quantity in energy per hour or per day as requested by the Shippers on its interface point side (optional),
6 CBP / information with regard to the receiving or delivering Shippers in both systems in order to allow for a matching process. All messages sent by the Matching SO to the Initiating SO after the matching process shall also include the confirmed quantity in energy per hour or per day. A SO may reject a (re-)nomination as soon as reasonably possible and no later than 2 (two) hours after the (re-)nomination deadline: if the message does not comply with the requirements as to its content. A SO may either reject, or amend a (re-)nomination as soon as reasonably possible and no later than 2 (two) hours after the (re-)nomination deadline in the following cases: in the case of daily nominations it results in a negative implied nomination flow rate; and/or it exceeds the Shipper's allocated capacity; and/or in the case of hourly nominations it results in an expected gas flow change before the end of the (re-)nomination cycle; and/or in accordance with National Rules or legally binding agreements between the SO and the shipper. In case of rejection, the SO shall provide an electronic rejection message with rejection reason(s) Timing This CBP should be implemented at the earliest technically and contractually possible date, but not later than 1 st January
EASEE-gas. Common Business Practice
CBP 2003-002/02 1 EASEE-gas European Association for the Streamlining of Energy Exchange - gas Common Business Practice Number: 2003-002/02 Subject: Harmonisation of the Nomination and Matching Process
EASEE-gas. Common Business Practice
CBP 2014-001/01 1 EASEE-gas European Association for the Streamlining of Energy Exchange - gas Common Business Practice Number: 2014-001/01 Subject: Harmonisation of the Nomination and Matching Process
Implementation progress of the EASEE-gas Common Business Practices (CBP's)
1 Implementation progress of the EASEE-gas Common Business Practices (CBP's) 1. Introduction The European Association for the Streamlining of Energy Exchange-gas, or EASEE-gas, was established on March
Business Requirements Specification for the. Nomination and Matching Procedures
BAL453-13 27 February 2015 Rev12 1 2 3 4 Business Requirements Specification for the In Gas Transmission Systems (NOM BRS) 5 6 7 8 Draft Version 0 Revision 128 20153-025-272 Approved ENTSOG AISBL; Av.
ACCESS CODE FOR TRANSMISSION. Attachment C.1: Operating Procedures
ACCESS CODE FOR TRANSMISSION Attachment C.1: Operating Procedures Based on version approved by CREG on 1 of 32 Deleted: 4 Deleted: 94 Deleted: 4 Deleted: 94 Deleted: 4 Deleted: 94 Deleted: 4 Table of Contents
Network Code Interoperability and Data Exchange Rules. Data Exchange Workshop
Network Code Interoperability and Data Exchange Rules Data Exchange Workshop Brussels 23 April 2013 Agenda 2 Data Exchange - Agenda Part 1: 1. Introduction Cost-Benefit Assessment 2. CBA Process 3. CBA
Frequently Asked Questions. (FAQs)
Frequently Asked Questions (FAQs) on REMIT fundamental data and inside information collection 1 st Edition 31 March 2016 Version history Version Frequently Asked Questions (FAQs) on REMIT fundamental data
Appendix A OPERATING PROCEDURES UNDER THE HUB SERVICES AGREEMENT TERMS AND CONDITIONS HSA 2005 1
Appendix A OPERATING PROCEDURES UNDER THE HUB SERVICES AGREEMENT TERMS AND CONDITIONS HSA 2005 1 TABLE OF CONTENTS 1. GENERAL... 4 2. DISPATCHING PROCEDURE... 5 2.1 HUB CODE... 5 2.2 NOMINATIONS BY THE
PROPOSAL FOR THE OVERSUBSCRIPTION AND BUY-BACK SCHEME. -EDP comments-
PROPOSAL FOR THE OVERSUBSCRIPTION AND BUY-BACK SCHEME -EDP comments- General comments We consider that the coordination between TSOs of the South Gas Region in the development of this Draft is very important
ACER scoping document for Rules for Trading
ENTSOG response to ACER questionnaire on scoping for Rules for 12 May 2014 Final ACER scoping document for Rules for ENTSOG response to the ACER questionnaire Since some of the questions are addressed
EFET 1 Guide on the Features of a Successful Virtual Trading Point
EFET 1 Guide on the Features of a Successful Virtual Trading Point EFET Gas Committee 30 October 2013 1 The European Federation of Energy Traders (EFET) promotes and facilitates European energy trading
Date and time of 12 February 2014 at 14:15pm Location Ofgem s offices, 9 Millbank, London SW1P 3GE
Gas Day Change Hosted Meeting This meeting comprised a series of presentations by industry participants and representative groups on progress and thinking around the legislative requirement to change GB
Pilot Framework Guidelines on Electricity Grid Connection Ref: E10-ENM-18-04 7 December 2010
Pilot Framework Guidelines on Electricity Grid Connection Ref: E10-ENM-18-04 7 December 2010 European Regulators Group for Electricity and Gas Contact: Council of European Energy Regulators ASBL 28 rue
DATRET/EXPGRP (2009) 6 FINAL 11 10 2010. Document 6
DATRET/EXPGRP (2009) 6 FINAL 11 10 2010 EXPERTS GROUP "THE PLATFORM FOR ELECTRONIC DATA RETENTION FOR THE INVESTIGATION, DETECTION AND PROSECUTION OF SERIOUS CRIME" ESTABLISHED BY COMMISSION DECISION 2008/324/EC
Setting Up an AS4 System
INT0697_150625 Setting up an AS4 system V1r0 1 Setting Up an AS4 System 2 Version 1r0 ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel: +32 2 894 5100; Fax: +32 2 894 5101; [email protected], www.entsog.eu,
Network Access Conditions
Network Access Conditions of ONTRAS VNG Gastransport GmbH valid as of 1st June 2013 Network Access Conditions of ONTRAS VNG Gastransport GmbH dated: 28. March 2013 This English Translation of the Network
Business model for the upcoming Rules for Gas Transport (RfG), Version 12.0
Business model for the upcoming Rules for Gas Transport (RfG), Version 12.0 1 Table of Contents 1. Introduction...3 2. Commercial configuration...3 3. Contract structure...5 3.1 Contracts...5 3.2 Allocation
REPORT On the work of the Croatian Energy Regulatory Agency For the year 2005
Republic of Croatia Croatian Energy Regulatory Agency REPORT On the work of the Croatian Energy Regulatory Agency For the year 2005 Zagreb, July 2006 Croatian Energy Regulatory Agency CONTENT A. REPORT
SCHEDULE 8 Generalist Project Services Framework 2015
SCHEDULE 8 Generalist Project Services Framework 2015 Nominal Insurer And Schedule 8 (Project Services Framework) Page: 1 of 6 Schedule 8 Generalist Project Services Framework Contents Overview... 3 1.
Council of the European Union Brussels, 30 June 2016 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union
Council of the European Union Brussels, 30 June 2016 (OR. en) 10785/16 EF 215 ECOFIN 673 DELACT 136 COVER NOTE From: date of receipt: 29 June 2016 To: No. Cion doc.: Secretary-General of the European Commission,
GRTgaz and TIGF create the TRADING REGION SOUTH.
Shippers meeting on 16 December 2014 1 Shippers meeting on 16 December 2014 2 Shippers meeting on 16 December 2014 3 GRTgaz and TIGF create the TRADING REGION SOUTH. The TRADING REGION SOUTH includes The
Final report Technical advice on third country regulatory equivalence under EMIR Canada
Final report Technical advice on third country regulatory equivalence under EMIR Canada 01 October 2013 ESMA/2013/1375 Date: 01 October 2013 ESMA/2013/1375 Table of Contents Table of contents 2 Section
-1- AMENDED AND RESTATED CERTIFICATE OF INCORPORATION OF THE NORTH AMERICAN ENERGY STANDARDS BOARD, INC.
-1- AMENDED AND RESTATED CERTIFICATE OF INCORPORATION OF THE NORTH AMERICAN ENERGY STANDARDS BOARD, INC.. Article I Name, Duration, and Registered Agent Section 1. The name of the corporation is the NORTH
Basic user manual for online trading application»vtp«
Basic user manual for online trading application»vtp«introduction Online trading application»vtp«(further: web application VTP) consists of three main functional units: - Transactions where members of
The Electricity and Gas (Internal Markets) Regulations 2011
STATUTORY INSTRUMENTS 2011 No. 2704 ELECTRICITY GAS The Electricity and Gas (Internal Markets) Regulations 2011 Made - - - - 9th November 2011 Coming into force in accordance with regulation 1(1) 26.75
1 TABLE OF CONTENTS... 1 2 DEFINITIONS AND UNITS... 4. 2.1 Definitions... 4. 2.2 Units applied... 7 3 GENERAL PROVISIONS... 8. 3.1 Introduction...
1 TABLE OF CONTENTS 1 TABLE OF CONTENTS... 1 2 DEFINITIONS AND UNITS... 4 2.1 Definitions... 4 2.2 Units applied... 7 3 GENERAL PROVISIONS... 8 3.1 Introduction... 8 3.2 Rights and obligations of the Operator...
BOARD CHARTER. Its objectives are to: provide strategic guidance for the Company and effective oversight of management;
BOARD CHARTER Objectives The Board is ultimately responsible for the oversight and review of the management, operations and overall corporate governance of the Company. Its objectives are to: provide strategic
Vision Paper LT UIOLI
Vision Paper LT UIOLI 1 / 10 1 Introduction The CMP Guidelines 1 introduced new and more detailed obligations on transmission system operators (TSOs) and National Regulatory Authorities (NRAs) regarding
REDUCTION OF BUREAUCRATIC BARRIERS FOR SUCCESSFUL PV DEPLOYMENT IN THE EU KEY RECOMMENDATIONS
REDUCTION OF BUREAUCRATIC BARRIERS FOR SUCCESSFUL PV DEPLOYMENT IN THE EU KEY RECOMMENDATIONS September 2011 THE PV LEGAL PROJECT Many countries have already recognised the potential of solar energy and
EFET. European Federation of Energy Traders. Amstelveenseweg 998 / 1081 JS Amsterdam Tel: +31 20 5207970/Fax: +31 20 6464055
EFET European Federation of Energy Traders Amstelveenseweg 998 / 1081 JS Amsterdam Tel: +31 20 5207970/Fax: +31 20 6464055 E-mail: [email protected] Webpage: www.efet.org UK BEACH APPENDIX to the EFET
June 2015. Position Paper Contribution to the debate on electricity market design and capacity markets
June 2015 Position Paper Contribution to the debate on electricity market design and capacity markets Eurogas is the association representing the European gas wholesale, retail and distribution sectors.
Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014
Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014 Table of Contents 1- PREAMBLE - 1 2- OBJECTIVES - 1 3- OPERATIVE PERIOD - 1 4- IMPLEMENTATION PLAN - 2 5- ELIGIBLE ENTITIES - 2 6- TARGETS
COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 21.9.2005 COM(2005) 438 final 2005/0182 (COD) Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the retention of data processed
REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. on the voluntary ecodesign scheme for games consoles
EUROPEAN COMMISSION Brussels, 22.4.2015 COM(2015) 178 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the voluntary ecodesign scheme for games consoles {SWD(2015) 88 final}
Market Standards for Corporate Actions Processing
Revised version 2012 Prioritised standards marked Market Standards for Corporate Actions Processing 1 Table of contents Introduction 3 Glossary 6 Sequence of dates graphs 10 Distributions Cash Distributions
Standard conditions of electricity supply licence
Gas and Electricity Markets Authority ELECTRICITY ACT 1989 Standard conditions of electricity supply licence SECTION A: STANDARD CONDITIONS FOR ALL SUPPLIERS Standard conditions 1 to 6: General arrangements
Forward Risk-Hedging Products PC_2012_E_13
Answer to public consultation Petteri Haveri 26.10.2012 1(5) Agency for the cooperation of energy regulators [email protected] Forward Risk-Hedging Products PC_2012_E_13 The Finnish Energy
Advisory Guidelines of the Financial Supervision Authority. Requirements for Organising the Business Continuity Process of Supervised Entities
Advisory Guidelines of the Financial Supervision Authority Requirements for Organising the Business Continuity Process of Supervised Entities These advisory guidelines were established by Resolution No
SERIES A : GUIDANCE DOCUMENTS. Document Nr 3
DATRET/EXPGRP (2009) 3 - FINAL EXPERTS GROUP "THE PLATFORM FOR ELECTRONIC DATA RETENTION FOR THE INVESTIGATION, DETECTION AND PROSECUTION OF SERIOUS CRIME" ESTABLISHED BY COMMISSION DECISION 2008/324/EC
ARTICLE 29 Data Protection Working Party
ARTICLE 29 Data Protection Working Party 11601/EN WP 90 Opinion 5/2004 on unsolicited communications for marketing purposes under Article 13 of Directive 2002/58/EC Adopted on 27 February 2004 This Working
Guidance Notes for the Austrian VTP Appendix Version 2.0 to the EFET General Agreement concerning the Delivery and Acceptance of Natural Gas 2.
Guidance Notes for the Austrian VTP Appendix Version 2.0 to the EFET General Agreement concerning the Delivery and Acceptance of Natural Gas 2.0(a) Please note that the Austrian VTP Appendix is designed
Standard conditions of the Electricity Distribution Licence
Gas and Electricity Markets Authority ELECTRICITY ACT 1989 Standard conditions of the Electricity Distribution Licence Standard conditions of the Electricity Distribution Licence 30 October 2015 SECTION
DISCLAIMER. Any fact, assessment, analysis, forecasts, opinion and other information (collectively Information ) released by:
DISCLAIMER General This website can be accessed worldwide however the information on the website is related to Saxo Capital Markets CY Limited and is not specific to any other country. All clients will
SIMONE Capacity Tools and Gas Transport Commercial Management System Integration
SIMONE Capacity Tools and Gas Transport Commercial Management System Integration Zdravko Oklopčić, Končar KET Martin Stýblo, SIMONE Research Group Summary: Calculation of Available Capacity is very important
Act on Investment Firms 26.7.1996/579
Please note: This is an unofficial translation. Amendments up to 135/2007 included, May 2007. Act on Investment Firms 26.7.1996/579 CHAPTER 1 General provisions Section 1 Scope of application This Act
ERASMUS+ MASTER LOAN GUARANTEE FACILITY
ERASMUS+ MASTER LOAN GUARANTEE FACILITY OPEN CALL FOR EXPRESSION OF INTEREST TO SELECT FINANCIAL INTERMEDIARIES UNDER THE ERASMUS+ MASTER LOAN GUARANTEE FACILITY (Published on 13 February 2015) The objective
Information Security Policy. Chapter 12. Asset Management
Information Security Policy Chapter 12 Asset Management Author: Policy & Strategy Team Version: 0.5 Date: April 2008 Version 0.5 Page 1 of 7 Document Control Information Document ID Document title Sefton
Drafted by ENTSOE. NCs impact DSOs grid ooperation. Approved at EU level. Network Codes. Significant Costs for EU DSOs - billions
Network Codes NCs impact DSOs grid ooperation Significant Costs for EU DSOs - billions Approved at EU level Comitology - Binding legislation for MS Drafted by ENTSOE Network Codes Actors involved DSOs
White Paper The EU Clinical Trials Regulation Main Changes and Challenges
White Paper The EU Clinical Trials Regulation Main Changes and Challenges Table of Contents 1. Introduction... 3 2. Main Changes and Associated Challenges... 4 2.1 Procedure for Initial Authorisation...
Specific amendments to the Capacity Allocation and Congestion Management Network Code
Annex: Specific amendments to the Capacity Allocation and Congestion Management Network Code I. Amendments with respect to entry into force and application The Network Code defines deadlines for several
EBA FINAL draft Regulatory Technical Standards
EBA/RTS/2015/03 03 July 2015 EBA FINAL draft Regulatory Technical Standards on resolution colleges under Article 88(7) of Directive 2014/59/EU Contents 1. Executive summary 3 2. Background and rationale
ADVANCED DRAINAGE SYSTEMS, INC.
I. Purpose ADVANCED DRAINAGE SYSTEMS, INC. Approved by Compensation and Management Development Committee on May 7, 2014 Approved and Adopted by Board of Directors on May 7, 2014 Compensation and Management
Consumer Code. for Home Builders. This document contains the Rules that govern the behaviour of Home Builders and Home Warranty Bodies
Consumer Code for Home Builders This document contains the Rules that govern the behaviour of Home Builders and Home Warranty Bodies First Edition January 2010 Contents Meaning of words... 3 Introduction...
OLD MUTUAL S RESPONSIBLE INVESTMENT POLICY
OLD MUTUAL S RESPONSIBLE INVESTMENT POLICY >> CONTENTS 1 OLD MUTUAL S RESPONSIBLE INVESTMENT POLICY 01 Our understanding of responsible investment Responsible investment compared to investment in sustainability
EBA s regulatory work on payments. Geoffroy Goffinet PAYMENT SYSTEMS MARKET EXPERT GROUP 03/12/2015
EBA s regulatory work on payments Geoffroy Goffinet PAYMENT SYSTEMS MARKET EXPERT GROUP 03/12/2015 The role of the EBA The EBA was established by Regulation (EC) No. 1093/2010 of the European Parliament
RE: GreenPower Program Review Consultation Paper. About ERM Business Energy. GreenPower Program Review. 24 March 2015
24 March 2015 National GreenPower Program Steering Group GPO Box 3889 Sydney NSW 2001 RE: GreenPower Program Review Consultation Paper ERM Business Energy welcomes the opportunity to respond to the National
IMPROVING CORPORATE GOVERNANCE OF UNLISTED COMPANIES JANUARY 2006
IMPROVING CORPORATE GOVERNANCE OF UNLISTED COMPANIES JANUARY 2006 Introduction The Board of Directors of the Central Chamber of Commerce of Finland established on 18 October 2004 a working group for the
PRIOR NOTICE OF IMPORTED FOOD SHIPMENTS A
U.S. Food and Drug Administration Protecting the U.S. Food Supply U.S. Department of Health and Human Services What You Need to Know About PRIOR NOTICE OF IMPORTED FOOD SHIPMENTS A Small Entity Compliance
The original contract is the Hungarian version. No liability for translational mistakes.
The original contract is the Hungarian version. No liability for translational mistakes. CONTRACT FOR USING TITLE TRANSFER SERVICES This contract (hereinafter: the Contract) has been concluded by and between
Ensuring operational continuity
Certification of BCMS (Business Continuity Management Systems) Standard BS 25999-2 Certification of BCMS (Business Continuity Management System Ensuring operational continuity in the event of interruptions,
THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM FOR RESIDENTIAL CUSTOMERS
Sheet 1 1. Introduction This tariff ( Tariff ) describes the terms and conditions under which an Applicant for a solar electricity generating facility ( Residential Small-Scale Solar Project or Project
Papa John's International, Inc. Corporate Governance Guidelines
Papa John's International, Inc. Corporate Governance Guidelines Adopted by the Board of Directors on April 29, 2014 The Board of Directors ( Board ) of Papa John's International, Inc. (the "Company"),
JRI S STANDARD TERMS OF PURCHASE. Business Day: a day (other than a Saturday, Sunday or public holiday) when banks in London are open for business.
JRI S STANDARD TERMS OF PURCHASE 1. INTERPRETATION 1.1 Definitions. In these Conditions, the following definitions apply: Business Day: a day (other than a Saturday, Sunday or public holiday) when banks
Transmission Programme
Transmission Programme Service Offer Description 2012-2015 Based on Version approved by the CREG on 11 April 2013.[ ]. 1 CONTENTS CONTENTS... 2 DISCLAIMER... 3 1 INTRODUCTION... 4 2 TRANSMISSION IN BELGIUM...
Clinical trials regulation
Clinical trials regulation The Proposal for a Regulation of the European Parliament and of the Council on Clinical Trials on Medicinal Products for Human Use and Repealing Directive 2001/20/EC an update
INTERNET For noncommercial. Organisations
. SOPAC Franck Martin Consultant SOPAC Private Mail Bag, GPO Suva, Fiji Fax:+679 370 040 [email protected] INTERNET For noncommercial Organisations.......... Network Affiliate Membership Application
Business Plan in 2015 of Organization for Cross-regional Coordination of Transmission Operators, Japan
Business Plan in 2015 of Organization for Cross-regional Coordination of Transmission Operators, Japan Version 1.0: 2016/1/21 This Organization has received an approval of establishment on August 22, 2014,
HOW TO BECOME A CEGH MEMBER and A VIRTUAL TRADER. Version 1.3 CEGH AB B-VHP
HOW TO BECOME A CEGH MEMBER and A VIRTUAL TRADER Version 1.3 CEGH AB B-VHP PREAMBLE Central European Gas Hub AG (CEGH) is one of the most important natural gas trading hubs in Central Europe and additionally
Subchapter G. Electronic Medical Billing, Reimbursement, and Documentation 133.500 & 133.501
Page 1 of 22 pages Subchapter G. Electronic Medical Billing, Reimbursement, and Documentation 133.500 & 133.501 1. INTRODUCTION. The Commissioner of the Division of Workers' Compensation, Texas Department
INDICATIVE TERMINALLING PROGRAMME OF THE ZEEBRUGGE LNG TERMINAL
INDICATIVE TERMINALLING PROGRAMME OF THE ZEEBRUGGE LNG TERMINAL FOR THE PERIOD: 2005-2006 (PROPOSED ON THE BASIS OF ARTICLE 9 OF THE ROYAL DECREE OF 4 APRIL 2003 ON THE CODE OF CONDUCT FOR ACCESS TO THE
Overview of points that must be included to get a useful Guidelines for. Good TPA Practice
Overview of points that must be included to get a useful Guidelines for Good TPA Practice Statement of purpose to provide the quality of services needed by the TSO s customers systems and processes implemented
TELECOMUNICATION, TELEVISION & RADIO BROADCASTING AND ELECTRONICALLY SUPPLIED SERVICES JANUARY 2015
TELECOMUNICATION, TELEVISION & RADIO BROADCASTING AND ELECTRONICALLY SUPPLIED SERVICES JANUARY 2015 INTRODUCTION 1. REGULATION AND GENERAL CONSIDERATIONS 2. MAIN CHANGES 3. OPERATORS INVOLVED INTRODUCTION
Corporate Governance Code for Banks
Corporate Governance Code for Banks Foreword Further to issuing the Bank Director s Handbook of Corporate Governance in 2004, the Central Bank of Jordan is continuing in its efforts to enhance corporate
Review Report of the Residential Energy Efficiency Scheme (REES), Part 4 of the Electricity (General) Regulations 2012
Review Report of the Residential Energy Efficiency Scheme (REES), Part 4 of the Electricity (General) Regulations 2012, under the Electricity Act 1996, and Part 4 of the Gas Regulations 2012, under the
On behalf of the Board of Directors of GF and of the Compensation Committee, I am pleased to present the 2014 Compensation
Compensation Report Introduction by the Chairman of the Compensation Committee Dear shareholder On behalf of the Board of Directors of GF and of the Compensation Committee, I am pleased to present the
GL ON THE MINIMUM LIST OF SERVICES AND FACILITIES EBA/GL/2015/06 06.08.2015. Guidelines
EBA/GL/2015/06 06.08.2015 Guidelines on the minimum list of services or facilities that are necessary to enable a recipient to operate a business transferred to it under Article 65(5) of Directive 2014/59/EU