BUILDING PERMIT PROCESS

Similar documents
The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

Basic Requirements for Residential Plan Review _

Sample Drawing Package for One and Two Family Dwelling Applications

17 East Main Street Cuba,NewYork Code Enforcement

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

Building Information Packet

Residential Plan Routing Information

BUILDING PERMIT SPECIFICATIONS

Residential Building Permits

Additions and Alterations

City of St. Charles Basement Finish or Remodel

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

Single Family Residential Building Permit Questions & Answers

INFORMATION BULLETIN NO.

Residential Building Permit Process

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

Name of course: Residential Construction Site Management (RCSM) Level 1

Homeowner s Guide to Residential Building Permits

Certification: Building Plans Examiner. Exam ID: B3

Residential Deck Safety, Construction, and Repair

Uncovered Decks & Porches

A Homeowner s Guide to Building Permits

INFORMATION BULLETIN NO.

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

City of Olean Fire, Buildings, and Emergency Services Code Enforcement Division Olean Municipal Building, Rm 212 It's the law!

POST AND FRAME STRUCTURES (Pole Barns)

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

Requirement checklist to obtain a building permit for a: RESIDENTIAL RE-ROOF

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY (518) /

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Uniform Construction Code (UCC) Building Permit Application Package

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

TOWN OF SPENCER Office of Development & Inspectional Services

Patio Covers / Carports

A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS

BUILDING SAFETY UNIT

Botetourt County, Virginia. Frequently Asked Questions

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

Building Permit, Fire Inspection and Operating Permit Fee Schedule

Zoning Department DECK PERMITS. Checklist

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings

Requirement checklist to obtain a building permit for a: NEW SINGLE FAMILY DWELLING RESIDENTIAL ADDITION

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

C I T Y O F P E A R S A L L

HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES

A HOMEOWNERS GUIDE TO BUILDING PERMITS

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

How To Build A Basement House

2014 FLORIDA BUILDING CODE

Pre-Drywall Inspection Report

Estimating Database Checklist

RESIDENTIAL WOOD DECKS

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

Time/Date Stamp when received:

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Building Department John Fiedler Construction Official Ext SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Does Wall Township require an inspection by the building department on resale of a home?

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Vision Home Inspection

Frequently Asked Questions

CHARLOTTE COUNTY Community Development Department

Concord Building Department Frequently Asked Questions

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

Mobile Home Pre-Inspection Checklist

Applications for building permits will not be reviewed until all of the required information has been submitted.

TOWN OF OHIO BUILDING PERMIT APPLICATION

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

A Homeowners Guide To Code Enforcement

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

Commercial Construction Permit Application

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

Residential Decks. Planning and Development Services Department

PDmB, Inc. Definitions

Fill out all sections or mark with N/A (not applicable)

Custom 30 x 20-8 Garage Plan Plan #g233 By SDS-CAD Specialized Design Systems

Building Construction and Development in Norristown: A User s Guide to the Land Development and Building Permit Process 1/25/11

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

Self-Home Inspection Checklist

Residential Adjustments. Overview 4.1

TOWN OF TRURO BUILDING PERMIT APPLICATION

PLAN SUBMITTAL INFORMATION

Permits and Compliance. A reference guide for applying for Electrical, Plumbing, Gas, Private Sewage and Building Permits

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

NAVAJO COUNTY ADDENDA & ADDITIONS TO THE INTERNATIONAL BUILDING CODES. Public Works/Planning & Zoning Building & Safety AMENDED ( )

Bureau Veritas Contact Information

Attached/Detached Patio Cover/Carport

St. Louis County Department of Public Works Division of Code Enforcement. When is a Building Permit required for Residential Projects?

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

Estimated Cost of Repair

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Washoe County PLAN SUBMITTAL

Footing and Temporary Power Inspection

Transcription:

TOWN OF THERESA Building & Zoning Officer Terry McKeever PO Box 692, 215 Riverside Ave Theresa, NY 13691 (315) 778-5831 (cell phone) TOWN OF THERESA OFFICE OF CODE ENFORCEMENT 215 Riverside Ave. Theresa, New York 13691 BUILDING PERMIT PROCESS A Building Permit is required in the Town Of Theresa for: Most types of residential and commercial construction including alterations, conversions, and renovations to existing structures. Installation of all mobile homes, modular homes and home packages, all wood stoves, fireplace inserts, heating units, pools, all electrical work, installation of septic and leach field systems. Decks, garages, storage sheds, barns and most demolition projects. All work done that must conform to the New York State Uniform Code (19 NYCRR Part 444) requires a building permit. All new construction, some alterations and renovations must comply with the New York State Energy Conservation Construction Code. Business and Commercial construction must comply with the American with Disabilities Act. Some projects will require an Architect's or Engineer's Stamp on plans submitted, including all homes 1500 square feet or larger. All new construction will require a set of plans and specifications. All Septic Systems must meet current code requirements. Also, most other projects will require plans and specifications that meet code requirements. Floor plans will be required with application for all mobile homes and modular homes. New York State Law and the Town of Theresa Local Law require proof of Insurance and Workman's Compensation by either the Homeowner or Contractor on all issued permits. Permit fees are required upon submittal of all applications. See enclosed FEE SCHEDULE. In figuring permit fee required, do not include the cost of the property. SOIL PERCOLATION TESTS are the requirements of the homeowner and must be submitted with application. Tests done without the Enforcement Officer's visual observation shall not hold the Town of Theresa liable for any mistakes, incorrect test results or future problems with septic system and leach fields. Any question on the above, please do not hesitate to call Terry McKeever.

Building Permit Application Parcel # Date: Applicant s Name: Address: Phone #: 1. Location of Project: 2. Circle One: New Building; Addition; Alteration; Mobile Home; Modular Home; Swimming Pool; Septic System; Heating Unit; Deck; Other 3. Name Of Contractor: Address: Phone #: 4. Name of Compensation Insurance Carrier: Policy #: Expiration date: 5. Electrical Inspection Agency: 6. New Structure Dimensions: Length: 7. Specify nature and intent of use: Width: Height: 8. Does well, septic system and leach field have proper setback distance? ( ) yes ( ) no 9. Has perk test been done and documented? ( ) yes ( ) no ( ) NA 10. Construction Value $ Permit Fee $ Paid By Check #: cash ******************************************************************* (for office use only) Permit: accepted ( ) denied ( ) due to Permit # Expires Zoning Permit # Terry McKeever, Code Officer

Pitch: on 12 Cover: Metal: x Panels; Grounded: (Y) (N) Shingles: Type: Flame Class: Felt Paper: # Sheathing: Attic Insul.: R- Type: Vapor Barrier: (Y) (N) Mils: Ceiling Finish: Rafters: (Y) (N) Top Chord: x ; o.c. Span: Bttm. Chord: x ; o.c. Preengineered Trusses: (Y) (N) Span: Certified by: Soffit Vents: x End Vents: x WALL SYSTEM Top Plate: 2 @ x Studs: x ; o.c. Ext. Cover: Ext. Sheathing: V.B.: Mils Type: Insul. R- Type: Int. Wall: Wall Shoe: x FLOOR SYSTEM, WOOD Finish: Sub Floor: Joists: x ; o.c. Center Beam: x with: ; o.c. Sill Plate: x w/insul.: (Y) (N) Anchor Bolts: x Type: ; o.c. FOUNDATION SYSTEM Poured: (Y) (N); PSI Size: x Rebar: Block: x Courses: ; Lath: (Y) (N) Insulation: Ext. R- ; Type: Int. R- ; Type: Waterproofing: (Y) (N) Footer: x Rebar Size: ; o.c.

BUILDING CONSTRUCTION QUESTIONNAIRE Name: Application #: Town / Village of: Please answer the following questions by explanation or detailed drawing. 1. Have you included a copy of the Town / Village Zoning Permit? 2. Has your perk test been done and have you completed a Detailed Septic Plan? Have you included the perk test document with your application? 3. Have you included plot plan showing property lines, well location, septic location? (must give dimensions). 4. Foundation information required: a) Detailed drawing of the footing including depth below grade, size, materials, reinforcement. b) Detailed information relating to the type of foundation wall system, size, damp proofing, reinforcement, and exterior drain tile system to be installed. c) Will the foundation walls be insulated and if so, include information. d) Explain the use of the cellar / basement. (example: to be used for storage, etc.) e) Explain how the foundation system is to be ventilated. 5. Floor frame information required: a) What size floor joist are used? Joist spacing? b) What sill board is to be used? c) What is the JOIST SPAN? d) Detail girder construction-type of support posts and spacing of posts (use diagram and dimension). e) Is bridging to be installed? f) What type & size floor deck is to be installed? g) Will the floor frame be insulated? * NOTE: If 2-story detail 2 nd floor.

6. Wall Frame information required: a) Explain stud size and spacing: b) What type and size wall sheathing is to be used? c) Detail the insulation package to be used. d) List the header sizes to be used for the window and door units to be installed. e) What type of vapor barrier is to be used in the walls? f) What type of siding is to be used? g) What type of interior wall finishes are to be used? 7. Roof Frame information required. a) Detail frame to be used. Include rated snow load, spacing. b) Indicate: Sheathing for roof deck: Type of roof covering: Type of attic ventilation: Type of insulation and rating: 8. Detail heating systems to be used, include chimney construction, furnace base support and specific information on woodstove and fireplaces to be installed. 9. Plumbing information required: Supply line-size materials: Drain-waste-vent materials, sizes: 10. What type of fire protection equipment is to be installed? Location? 11. Detail the stairs: Riser hgt. Tread width Headroom Handrail location Is there 1 1/8 nosing on treads? Are all the stairs more than three risers protected with handrails? Are platforms or landings above 18 from grade protected with guard rails? 12. Window information required: Is insulated glass to be used? Is high-tec or Low E glass to be used? In bedrooms, is there one window that has clear open width of 18 and a total of at least 4 s.f. of opening? Is the finish window sill no more than 42 from the floor?

13. Door information: Is there at least one main entrance to the house with a door width of 36? If there is a door entering from an attached garage, is this door 3/4 hr. fire rated and set in a metal frame with a door closure? 14. If there is an attached garage, detail the wall construction and materials that make up the wall between the house and garage. Detail garage construction. 15. Remember to include a floor plan showing room sizes, and ceiling heights. All information requested relating to your project must be provided before a permit can be issued and before any work can begin. If you have any questions please call 778-5831. Feel free to use any drawings and extra sheets for detailing your information.

BUILDING PERMIT NUMBER: FOR: OWNER/CONTRACTOR: LOCATED AT: CONSTRUCTION AT THIS SITE SHALL BE IN COMPLIANCE WITH NYS UNIFORM FIRE PREVENTION AND BUILDING CODE AN ALL OTHER APPLICABLE CODES IN EFFECT AT THE TIME OF ISSUANCE OF THIS PERMIT. ADDITION INSPECTIONS MAY BE REQUIRED OTHER THAN THOSE LISTED BELOW: FOOTING BEFORE POURING CONCRETE FRAMING BEFORE ENCLOSING PLUMBING BEFORE ENCLOSING INSULATION INSPECTION SAFETY INSPECTIONS PROPER SET BACKS CHECKED ENERGY CONSTRUCTION CODE FINAL INSPECTION FOUNDATION BEFORE BACKFILLING ELECTRICAL BEFORE ENCLOSING H.V.A.C BEFORE ENCLOSING CONCRETE WORK SEWER AND WATER HOOK UP FIRE PREVENTION INSURANCE CERTIFICATION WORKMEN S COMPENSATION CERTIFICATION IT IS THE OWNER S RESPONSIBILITY TO CALL FOR ALL INSPECTIONS AT THE PROPER TIMES WITH ADVANCE NOTICE GIVE TO INSPECTOR FOR SCHEDULING: *** THIS PERMIT IS VALID FOR ONE YEAR AND EXPIRES ON: * ELECTRICAL INPECTIONS ARE THE OWNER S RESPONSIBILITY TO HAVE DONE AND CERTIFIED! PLEASE POST IN A CONSPICUOUS POSITION SO AS CLEARLY VISIBLE FROM STREET OR ROAD! Terry McKeever, Enforcement Officer Not Valid Without Signature Dated