WVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 32 EXTERIOR IMPROVEMENTS SECTION LAWNS AND GRASSES PART 1: GENERAL

Similar documents
SECTION 13 REPLACEMENT AND CLEANUP SCOPE OF WORK

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION EARTH MOVING

Virginia s Turfgrass Industry

Retail Lawn Seed Mixtures for Western Oregon and Western Washington

INDEX TO SECTION CHAIN LINK FENCES AND GATES. Paragraph Title Page

Maintaining a Healthy Lawn

PREVENTING PEST DAMAGE IN HOME LAWNS

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Erosion and Storm Water Management Unit Mail Stop John Ireland Blvd. St. Paul, MN 55155

Erosion and Storm Water Management Unit Mail Stop John Ireland Blvd. St. Paul, MN 55155

COVER CROPS FOR RASPBERRY PLANTINGS

SOIL-LIME TESTING. Test Procedure for. TxDOT Designation: Tex-121-E 1. SCOPE 2. APPARATUS 3. MATERIALS TXDOT DESIGNATION: TEX-121-E

Turfgrass Management of Bermudagrass Football Fields

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Asparagus (Asparagus officinalis) is a

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER

ennessee is one of the top livestock producing states in the country. Much of the livestock in Tennessee is raised by smaller-scale, parttime

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

Hydroseed Care Guide

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Phone: x 304 Caro MI URL: aslagh@tisd.k12.mi.us

Flooding on Sports Fields

LANDSCAPING & GROUNDS CARE BIDDING CHECKLIST

Information for Bidders Cover Sheet

INDEX DESCRIPTION MATERIALS APPROVAL OF SUBBASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Potting Mix Choices and Recommendations

Waterwise Landscaping: Designing a Drought-tolerant (and deer-resistant) Landscape and Garden

SAMPLE INTEGRATED PEST MANAGEMENT (IPM) BID SPECIFICATIONS FOR COMMERCIAL PEST CONTROL SERVICES

Installation PowerPoint for Grasscrete Formers

BMP 6.7.3: Soil Amendment & Restoration

Appendix C. Municipal Planning and Site Restoration Considerations

Fertility Guidelines for Hops in the Northeast Dr. Heather Darby, University of Vermont Extension Agronomist

Strawberry Production Basics: Matted Row

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils

MDWASD 8/1999 SECTION TRENCHING AND BACKFILLING FOR PIPING SYSTEMS

1 yard per sq. 2 Depth. Color is a personal choice. Dye fades due to sunlight. Although color remains, fading begins to occur

Fertilizer, Weed Control, Grubs, and General Application Questions

Stormwater/Wetland Pond Construction Inspection Checklist

Onion & Leek Planting Guide

Investigating What's In Soil

SECTION 4Aggegate Subbase

PUTTING FORAGES TOGETHER FOR YEAR ROUND GRAZING

SOIL FERTILITY MANAGEMENT BASICS. Organic Soil Amendments and Fertilizers

Understanding Erosion. Revised Universal Soil Loss Equation

C. Section TESTING LABORATORY SERVICE.

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

DYNAMIX COMPACT DISC HARROWS FOR TRACTORS FROM 100 TO 200 HP

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

agrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed.

COMPOST A USER'S GUIDE TO. The Beauty of Your Lawn & Garden Blossoms from the Soil

Agro-One Soil Analysis

UTAH CERTIFIED NURSEY PROFESSIONAL UCNP TEST SYLLABUS

For all turfgrass areas. Now you can test soil reaction at different levels in the soil profile. Check Soil ph on:

N-P-K FERTILIZERS. by M.L. Vitosh Extension Specialist, Crop and Soil Sciences

SECTION SITE PREPARATION

Oak Trees BASIC GROWING REQUIREMENTS FOR YOUR

Seeding a Lawn in Arkansas

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN

Estimated Costs of Crop. Production in Iowa File A1-20 The estimated costs of corn, corn silage, Ag Decision Maker

Name: PLSOIL 105 & 106 First Hour Exam February 27, Part A. Place answers on bubble sheet. 2 pts. each.

Summer Stress Arrives Early on Cool Season Lawns

Ecologically based weed management! Chuck Mohler! Cornell University!

Division 2 Section Section 02795

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

WHAT IS WRONG WITH MY LAWN?

How To Plan A Buffer Zone

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

Plants need an adequate level of nutrients

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

WHAT IS IN FERTILIZER OTHER THAN NUTRIENTS?

NO-TILL AND NITROGEN FIXING INOCULANTS

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

Production and Marketing of Organic Fertilizer and Compost Manufactured at the Çamli Besicilik Composting and Pelletizing Facility

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

REQUEST FOR PROPOSAL LANDSCAPING AND LAWN MAINTENANCE FIRE DISTRICT NO. 3 TOWNSHIP OF HAMILTON MERCER COUNTY

SOIL TEST NOTES. NOTE 17: Managing Lead Contaminated Soils

2014 Product Catalogue

Self-Certification Checklist

CULLINAN IRRIGATION & LAWN CARE CULLINANIRRIGATION.COM

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

NITROGEN IN SOIL AND FERTILIZERS James J. Camberato

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT

Testing Water for Gardening and Lawn Irrigation

Cover crops as a soil improvement strategy

Soil Sampling for Nutrient Management

Selection and Establishment of Creeping Bentgrass On a Golf Course in the Twenty-First Century

Compost Specifications for the Landscape Industry. In association with. British Association of Landscape Industries NBS

SELECTED IMPLEMENTS FOR HORSE RANCHES sales@gearmore.com

BioDrill for many. Calibration takes a few minutes. The test bag is pushed up under the Fenix housing through a springloaded

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Maize is a major cereal grown and consumed in Uganda and in the countries of Kenya, Sudan, Democratic Republic of Congo and Rwanda

LID-01 Permeable Paving Systems

Nutrient and Fertilizer Value of Dairy Manure

Transcription:

WVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 32 EXTERIOR IMPROVEMENTS SECTION 329200 - LAWNS AND GRASSES PART 1: GENERAL 1.1. Scope of Standard A. This standard provides general guidance concerning the specific preferences of the West Virginia University for lawns and grasses. B. Project conditions and requirements vary, thus precluding the absolute adherence to the items identified herein in all cases. However unless adequate written justification is provided, then it is expected that these guidelines will govern the design and specifications. C. Pre-installation Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Management and Coordination." 1.2. Submittals A. Product Data: For each type of product indicated. B. Material Test Reports: For existing surface soil and imported topsoil. C. Maintenance Instructions: Recommended procedures to be approved by Owner for maintenance of lawns during a calendar year. Submit before expiration of required maintenance periods. 1.3. Quality Assurance A. The Project Representative shall determine the acceptable level of quality by usual inspection. Generally, any area larger than 36 square inches devoid of established grass shall be considered unacceptable. 1.4. Scheduling A. Planting Restrictions: Coordinate planting periods with maintenance periods to provide required maintenance from date of Substantial Completion. Plant during one of the following periods: 1. Spring Planting: March 15-June 15. 2. Fall Planting: August 15-November 15. PART 2: PRODUCTS 2.1. Seed A. Grass Seed: Use WVU Eclipse seed mix or approved equal. [Rev - 1] 04/13 329200-1

2.2. Mulch WVU Eclipse Mix Seed % Variety Germ % 29.42 Arrowhead Kentucky Bluegrass 85 29.38 Bluenote Kentucky Bluegrass 85 19.62 Homerun Perennial Ryegrass 90 19.58 Apple GL Perennial Ryegrass 90 00.25 Other Crop Seed 01.70 Inert Matter 00.05 Weed Seed A. WVU prefers the following mulches: 1. Cereal grain straw 2. Excelsior or cellulose fiber B. Hay shall not be used as mulch on lawn areas. C. Netting that does not rapidly decompose shall not be used. D. All plastic netting materials shall not be used. E. Netting shall be only used for sloping areas. 2.3. Turfgrass Sod A. Turfgrass Sod: Certified Number 1 Quality/Premium, including limitations on thatch, weeds, diseases, nematodes, and insects, complying with TPI's "Specifications for Turfgrass Sod Materials" in its "Guideline Specifications to Turfgrass Sodding." Furnish viable sod of uniform density, color, and texture, strongly rooted, and capable of vigorous growth and development when planted. B. Turfgrass Species: Sod of grass species as follows, with not less than 95 percent germination, not less than 85 percent pure seed, and not more than 0.5 percent weed seed: 1. Full Sun: Kentucky bluegrass (Poa pratensis), a minimum of three cultivars. 2. Sun and Partial Shade: Proportioned by weight as follows: a. 50 percent Kentucky bluegrass (Poa pratensis). b. 30 percent chewings red fescue (Festuca rubra variety). c. 10 percent perennial ryegrass (Lolium perenne). d. 10 percent redtop (Agrostis alba). 3. Shade: Proportioned by weight as follows: a. 50 percent chewings red fescue (Festuca rubra variety). b. 35 percent rough bluegrass (Poa trivialis). [Rev - 1] 04/13 329200-2

c. 15 percent redtop (Agrostis alba). 2.4. Topsoil A. Topsoil: ASTM D 5268, ph range of 5.5 to 7, a minimum of 6 percent organic material content; free of stones 1 inch or larger in any dimension and other extraneous materials harmful to plant growth. To be determined by the WVU project representative. B. Imported Topsoil: New topsoil to be hauled in from off-site shall be fertile, friable soil, containing a minimum of 2.5% and maximum of 12% of organic matter with not more than 50% clay and not more than 55% sand as determined in accordance with ASTM D-482, Particle-Size Analysis of Soils. At least 90% of the material shall pass the No. 10 sieve and shall be free of refuse or any material toxic to plant growth, free of subsoil and stumps, roots, brush, stones, or similar objects larger than one inch diameter. Ordinary sods and herbaceous growth, like grass, need not be removed, but thoroughly broken up and intermixed with soil during handling operations. Topsoil, unless otherwise specified or approved, shall contain an acidity range of 5.5 ph to 7 ph approved by project representative prior to delivery. 2.5. Inorganic Soil Amendments A. Lime: ASTM C 602, agricultural limestone containing a minimum 80 percent calcium carbonate equivalent and as follows: 1. Class: Class O, with a minimum 95 percent passing through No. 8 (2.36-mm) sieve and a minimum 55 percent passing through No. 60 (0.25-mm) sieve. B. Sulfur: Granular, biodegradable, containing a minimum of 90 percent sulfur, with a minimum 99 percent passing through No. 6 sieve and a maximum 10 percent passing through No. 40 sieve. 2.6. Organic Soil Amendments A. Compost: Well-composted, stable, and weed-free organic matter, ph range of 5.5 to 8; moisture content 35 to 55 percent by weight; 100 percent passing through 1/2-inch sieve; soluble salt content of 5 to 10 decisiemens/m; not exceeding 0.5 percent inert contaminants and free of substances toxic to plantings; and as follows: 1. Organic Matter Content: 50 to 60 percent of dry weight. 2.7. Planting Soil Mix A. Planting Soil Mix: Consult with WVU Roads & Grounds. PART 3: EXECUTION 3.1. Lawn Preparation A. Newly Graded Subgrades: Loosen subgrade to a minimum depth of 6 inches. Remove stones larger than 1 inch in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property. [Rev - 1] 04/13 329200-3

1. Soil Preparator or equivalent equipment shall be used to remove stones/rocks from the soil. 2. Spread planting soil mix to a depth of 6 inches but not less than required to meet finish grades after light rolling and natural settlement. 3. Spread approximately one-half the thickness of planting soil mix over loosened subgrade. Mix thoroughly into top 2 inches of subgrade. Spread remainder of planting soil mix. 4. Apply soil amendments and fertilizers according to soil test recommendations and mix thoroughly into top 6 inches of soil. B. Unchanged Subgrades: If lawns are to be planted in areas unaltered or undisturbed by excavating, grading, or surface soil stripping operations, prepare surface soil as follows: 3.2. Seeding 1. Loosen surface soil to a depth of at least of 6 inches. 2. Remove stones larger than 1 inch in any dimension and sticks, roots, trash, and other extraneous matter. A. Seed shall be sown while the soil is in a friable condition. Topsoil not in a friable condition just prior to seeding shall be reworked until acceptable to the Project Representative. B. Seeds shall not be sown through mulch. The seed mixture shall be sown 2 directions at a total rate of 5 to 6 lbs / 1000 square feet. C. Areas sown with broadcast type equipment shall be floated and lightly compacted to incorporate the seed with the soil. 3.3. Sodding A. Lay sod within 24 hours of harvesting. 3.4. Satisfactory Lawns A. Satisfactory Seeded Lawn: At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities. B. Reestablish lawns that do not comply with requirements and continue maintenance until lawns are satisfactory. 3.5. Soil Preparation A. Topsoil Analysis 1. Furnish soil analysis by a qualified soil-testing laboratory stating percentages of organic matter; gradation of sand, silt, and clay content; cation exchange capacity; deleterious material; ph; and mineral and plant-nutrient content of topsoil. 2. Preparator or equivalent equipment shall be used to remove stones/rocks from the soil. [Rev - 1] 04/13 329200-4

3. Report suitability of topsoil for lawn growth. State recommended quantities of nitrogen, phosphorus, and potash nutrients and soil amendments to be added to produce satisfactory topsoil. 3.6. Lawn Maintenance A. Begin maintenance immediately after each area is planted and continues until acceptable lawn is established, but for not less than the following periods: 1. Seeded Lawns: 60 days from date of Substantial Completion. a. When full maintenance period has not elapsed before end of planting season, or if lawn is not fully established, continue maintenance during next planting season. 2. Sodded Lawns: 60 days from date of Substantial Completion. B. Mow lawn as soon as top growth is tall enough to cut (max 4 ). Schedule initial and subsequent mowing to maintain the following grass height: 3.7. Fertilizer 1. Mow grass 11/4 to 3 inches high. A. Granular, chemical fertilizer shall be evenly applied on the prepared seed bed at the rate of 10 lbs/1000 square feet by broadcast method. B. Fertilizer shall be harrowed or raked into the soil to a depth not greater than one inch. C. Shall have a chemical analysis of 10/20/20 or equivalent proportion. 3.8. Mulch A. Mulch shall be immediately watered or sprayed with some type of adhesive. Contractor is responsible to assure a sufficient layer of mulch is maintained until grass is established. B. One of the following methods shall be used for mulching: 3.9. Topsoil 1. Hydromulching: Contractor shall apply an approved organic fibrous material with standard hydromulching equipment at the rate of 1,000 lbs/acre. Contractor shall apply this material to the entire area that has received seed completely and as evenly as possible. Care shall be taken so that adjacent roads, walks, and light poles do not receive the mulch material. 2. Straw-mulching: Contractor shall provide and place clean straw free from noxious weeds and seeds over the entire area that has received seed. Spreading the straw shall be thorough and as even as possible. Straw mulch shall be applied at the rate of 1.5 to 2 tons/acre. A. Prior to placing topsoil, the subgrade shall be brought to a friable condition to a depth of 6 inches minimum by scarifying, discing, or harrowing. Lumps and clods shall be thoroughly broken up [Rev - 1] 04/13 329200-5

and the subgrade shall be graded to the specified elevation and profile. Stones larger than one inch diameter shall be removed. B. Topsoil shall not be placed when topsoil or subgrade is frozen, excessively wet, or in condition that may otherwise be detrimental to proper grading. C. Spread topsoil uniformly to a depth of 4 inches or 8 inches, as required, blending out topsoil to meet existing grade. The topsoil shall be thoroughly manipulated by discing or harrowing to remove all lumps and clods greater than 1 inch and rough-graded in such a manner that fine grading can proceed with a minimum of preparation, tillage, and additional topsoil. END OF SECTION 329200 [Rev - 1] 04/13 329200-6