For personal use only



Similar documents
ADX ENERGY. Sidi Dhaher Well test Briefing Live Webcast, 4 July Wolfgang Zimmer, Paul Fink

ASX Release. Romania Exploration Update. 2 October 2014

PRESIDENT ENERGY PLC. ( President or the Company ) OIL DISCOVERY IN PARAGUAYAN CHACO

PRESIDENT ENERGY PLC. ( President or the Company ) PARAGUAY UPDATE

October Guatemalan Oil Production and Exploration

ADX Energy. Originally Published Wednesday, 16 November 2011 MOVES TO TESTING & APPRAISAL/PRODUCTION MODE AT SIDI DHAHER.

For personal use only

VAALCO ENERGY ANNOUNCES FIRST QUARTER 2015 RESULTS

6 Cavendish Square, London W1G 0PD, England,UK

INTERIM MANAGEMENT STATEMENT THIRD QUARTER 2015

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

December 2015 Quarterly Report & Appendix 5B

29 May Eden signs Conditional Heads of Terms to Sell UK Gas and Petroleum Assets for 10million

MPG Energy Resources, Corp. Executive Summary

Gran Tierra Energy Inc. Announces 2015 Year-End Reserves and Combined Pro Forma Reserves and Resources

Melbourne Mining Club Presentation

RAGING RIVER EXPLORATION INC. ANNOUNCES 2015 YEAR END RESERVES AND UPDATED 2016 GUIDANCE

ASX & Media Release MEO DIRECTORS CONTINUE TO RECOMMEND YOU REJECT THE REVISED MOSMAN OFFER

Norwest Energy NL. Northern Perth Basin Farm-In Opportunities. PESA Deal Day Brisbane Shelley Robertson Asset Manager.

INDEPENDENT REPORTS CONFIRM SIGNIFICANT POTENTIAL FOR LINC ENERGY S SHALE OIL IN THE ARCKARINGA BASIN

Building a well-funded, full-cycle, exploration led E&P company

Annual General Meeting

Collecting and Analyzing Big Data for O&G Exploration and Production Applications October 15, 2013 G&G Technology Seminar

March 2015 Quarterly Activity Report and Appendix 5B

BAYOU BEND PETROLEUM LTD.

PO VALLEY ENERGY LIMITED A.B.N

Reserve Definitions Total Petroleum-initially-in-place Discovered Petroleum-initially-in- place

PRESS RELEASE. November 12, 2013

Commenting on the third quarter results and subsequent events, WesternZagros s Chief Executive Officer Simon Hatfield said:

NEWS RELEASE CHINOOK ENERGY INC. ANNOUNCES ITS DECEMBER 31, 2015 RESERVES AND PROVIDES OPERATIONS UPDATE

Certificate Programs in. Program Requirements

Summary. December 2015 Quarterly Report. Contact. Norwest Energy NL. 29 January 2016 ASX: NWE

CENTURY ENERGY LTD. (the "Company") FORM F1 STATEMENT OF RESERVES DATA AND OTHER OIL AND GAS INFORMATION

NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E

TD Securities Calgary Energy Conference July 2014

For personal use only

WHL ENERGY SEPTEMBER 2011 QUARTERLY ACTIVITIES REPORT

QUARTERLY ACTIVITIES REPORT

EGAS. Ministry of Petroleum

UPSTREAM OIL AND GAS INDUSTRY IN KENYA

Important Notice Disclaimer

RANGE REPORTS 2015 EARNINGS, ANNOUNCES 2016 CAPITAL PLANS

SPARTAN ENERGY CORP. ANNOUNCES TWO CONSOLIDATING SOUTHEAST SASKATCHEWAN LIGHT OIL ACQUISITIONS AND BANK LINE REDETERMINATION

2014 RESERVES CONFERENCE CALL MARCH A Unique Opportunity to Invest in the China Energy Growth Story

TOUCHSTONE ANNOUNCES 2015 THIRD QUARTER RESULTS AND ELIMINATION OF NET DEBT; UPDATES TRINIDAD ACQUISITION

Canacol Energy Ltd. Reports Record Adjusted Funds from Operations of US $37 Million in Fiscal Q1 2015

PANHANDLE OIL AND GAS INC. REPORTS SECOND QUARTER AND SIX MONTHS 2009 RESULTS. Second Quarter Production Increases 38%

For personal use only

London STOCK EXCHANGE

Runnels County, Texas

THE HRT OIL & GAS / TNK-BRASIL CONSORTIUM

LAREDO PETROLEUM ANNOUNCES 2015 SECOND-QUARTER FINANCIAL AND OPERATING RESULTS

Moesia Oil and Gas plc Review

Cooper Energy Limited Oil Field Appraisal Opportunity

Value focused Methodical delivery

2015 Annual General Meeting. 25 November 2015

Report for the Quarter Ended 30 September 2015

AGM Presentation. 24 June 2013

QUARTERLY REPORT. PERIOD ENDING 31 December power earth. from the

Range Resources Corporation Company Presentation April 2013

Highlights. Completion of farm-out in Tanzania. Drill support contract awarded in Tanzania. Competent Person s Report commissioned

Introduction to Oil & Gas Industry, Accounting & Financial Statement Analysis. Copyright by Wall Street Prep, Inc. All rights reserved 1

NOVEMBER 2015 UPDATE

Press Release November 12, 2015

Energy Data and Information

Corporate Presentation February 2016

OFFSHORE FIELD DEVELOPMENT

SWIFT ENERGY ANNOUNCES FIRST QUARTER 2015 RESULTS

CHIEF EXECUTIVE S MESSAGE

Announces Second Quarter 2004 Results

Quarterly Oil Equivalent Production (boe) ASX & Media Release Solimar Energy Limited Quarterly Activities Report and Appendix 5B

Karpinsky Oil & Gas Company AS

Oil and Gas Terms. Anticline: An arch of stratified rock layers that may form a trap for hydrocarbons.

Proposed Acquisition of Licence Interests in Tanzania - Heads of Terms Signed. Kiliwani North Development Licence and Ruvuma PSA, Tanzania

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

Acrim Resources Argentina - A Case Study

ande ande lumut oil project

Presentation To: Houston Energy Finance Group. Ryder Scott Company, L.P.

March 2015 MEGATRENDS IN THE OIL AND GAS INDUSTRY

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

For personal use only. HPR AGM PRESENTATION November 2015

Light Oil Exploration Williston Basin Saskatchewan, Canada. Corporate Presentation Q1 2015

Report for the Quarter Ended 31 December 2015

April 17, The Directors Frontera Resources Corporation 3040 Post Oak Boulevard, Suite 1100 Houston, Texas Ladies and Gentlemen:

Trilogy completed the sale of its Dunvegan oil assets in the Kaybob area for net proceeds of $45 million.

SOUTH BLOCK A ( SBA ) PEAK S JV PARTNER KRX ENERGY SECURES ADDITIONAL FUNDING

OIL AND GAS RESERVES AND NET PRESENT VALUE OF FUTURE NET REVENUE

Transcription:

COMPANY INFORMATION Verus Investments Limited ABN 59 009 575 035 INVESTMENTS Tunisia Chorbane Block Project (10% Working Interest) USA (72% Working Interest) Bullseye Project (10% Working Interest) ACTIVITIES REPORT 9 May 2012 The Board of Verus Investments Limited ( Verus Company ) is pleased to provide the following activities update. INVESTMENT HIGHLIGHTS Chorbane Block Project COMPANY DIRECTORS Sam Russotti Non-executive Chairman Greg Lee Executive Director Mark Freeman Non-executive Director SECRETARY Craig Nelmes Company Secretary STOCK EXCHANGE LISTING Australian Securities Exchange Ordinary shares ASX Code: VIL Sidi Dhaher well currently suspended, preparations have been underway to test the well to determine if discovery is commercial - mean oil in place estimate of 51 million barrels of oil. Rig and associated equipment expected to be mobilised to site shortly Verus technical team and partners have completed final review of the prospect. AFE and drilling program currently being prepared for submission to partners for approval. Potential of 16 Billion cubic ft of gas and 164,000 barrels of condensate recoverable. Corporate Private placement completed to raise $983,000 (before costs). CAPITAL STRUCTURE Ordinary shares on issue: 1,885,158,563 Non-listed Class options on issue: 68,000,000 MARKET CAPITALISATION As at 8 May 2012 and based on a share price of $0.005 Cash balance as at 31 March 2012 was AUD$901,000. Production for the Quarter Total Production VIL Share Well Oil BBL Gas MCF Oil BBL Gas MCF Jumonville #1 791 2,248 79 225 Jumonville #2 2,735 3,582 274 358 AUD$9.4 million ENERGY PRICES WTI $98.50 (BBL) Henry Hub $2.31 (MMBTU) www.verus.com.au

Chorbane Investment Sidi Dhaher Well - Oil Discovery 10% Working Interest (WI) Operator: ADX Energy Limited (ASX code: ADX) During the drilling of the Sidi Dhaher discovery, several potentially productive formations were encountered. Reservoir fluid samples recovered confirmed the presence of oil in the deeper Bireno formation. Detailed interpretation and analysis indicated a good quality Bireno carbonate reservoir with an estimated 30m oil column. The Bireno formation in several nearby fields has proven very productive. Log analysis also indicated potential pay in the Cherahil formation. In the event the Bireno test results are unfavourable VIL expects to test the Cherahil formation. Incorporating the well information, the operator revised the prospect structure map and determined by using probabilistic methods the following estimates of the Original Oil in place (OOIP). P90 OOIP 13 million barrels P50 OOIP 37 million barrels P10 OOIP 110 million barrels Statistical Mean OOIP 51 million barrels Well Testing Progress ADX announced 26 March 2012 that the testing rig had been contracted and that initial test results were expected by mid April 2012. Due to local issues and rig equipment and services delays that the mobilisation to site and subsequent testing activities had been delayed. A progress update will be available shortly. Confirmation of recoverable reserves and a resource estimate in the Bireno is contingent on the success of the planned well test. Should Sidi Dhaher be declared commercial, the prospectivity and potential of the 2,428 km 2 Chorbane block will be considerably enhanced. In addition, subject to declaration of commerciality it is likely the operatorship of the block will be transferred to Gulfsands Petroleum Plc. Page 2

Figure 1 Sidi Dhaher discovery and prospects on the Chorbane Block Figure 2: Sidi Dhaher Simple Structure Map Review of prospects and leads in the block is ongoing and additional prospectivity will be determined from the test results from Sidi Dhaher. The Sidi Dhaher discovery is located in close proximity to producing oil and gas fields, extensive oil and gas facilities and service providers which should facilitate early development. Outlook over the 2nd quarter Mobilisation of the rig and testing equipment to site Testing of Sidi Dhaher Possible extended well test (if not enough information is gained in initial test). Results of test (if well test is positive) to be incorporated into a reserve assessment and possible field development. Ongoing Geological and Geophysical review of prospects on Chorbane Block 72% (WI) Operator: Golden Gate Petroleum Ltd (ASX Code: GGP) Sidetrack TGR#1 Verus have completed its Fausse point final review and workshops. The final workshop was conducted with the operator, all other partners, drilling consultants and other technical consultants. The technical work was considerably enhanced from the efforts of the G&G team utilising the seismic reprocessing, imaging and interpretation in conjunction with as much available information from local geological and analogue well data. The results of the workshop are as follows: 1 Reprocessing and seismic interpretation indicate the well did not reach the key 32A sands. 2 Seismic indicates there are potentially additional sands below the 32A sands. 3 The 32A sands in the region are extensive and can be extremely productive. 4 There is high risk in getting to the sands due to having to drill a smaller diameter hole, potential high pressures, gas and the presence of salt. 5 Sand, trap and seal continue to be major risks 6 The partners are of the opinion that if the primary sands we are targeting are present below the current TD and extend to the edge of the salt dome that the best way to determine the presence of the sands and potential hydrocarbons is to deepen the well. 7 If the deepening is successful and proves the sands are productive, then to access the structure effectively to enable good effective drainage and to potentially access the deeper sands, a second location will be required which will incur significant cost but should allow structure drainage. 8 The shallower lead requires additional work before any contemplation of drilling the shallow play is contemplated. Page 3

Current Status 1 The surface facilities including the pipeline are still in place. 2 Additional leasing to cover the possible structure has been completed?? 3 A budgetary AFE to deepen the well from a competent drilling consultant is under final review. 4 The initial AFE is higher than expectations. Verus (in consultation with the operator) is in talks with the drilling consultant to seek reduction of AFE costs. 5 Once AFE has been agreed the detailed drilling program will be completed and submitted with the AFE to all partners for approval. 6 Analogue well production data on the 32A sands indicates multiple sand potential with more than 100ft thick and flow test IP s of 158 barrels of oil & 6.4 million cubic feet of gas per day. 7 The mapped primary interval and interpretation indicates that there is a potential recoverable resource of up to 16 billion cubic ft of gas and 164,000 barrels of condensate on an unrisked basis. There are additional prospective sands Latest Structure map showing Deeper Prospect outline Forward Plan 1 Finalise AFE and drilling program and submit to partners for review. 2 Depending on total AFE costs, farm out WI as required 3 Select drilling contractor 4 Submit final AFE and program to all partners for approval 5 Mobilise rig and deepen the well 6 evaluate the results and determine the forward plan Page 4

Bullseye Project 10% WI Operator: Golden Gate Petroleum Ltd (ASX Code: GGP) Producing Wells Jumonville #1 (J1) and Jumonville #2 (J2) Both wells are rapidly reaching the end of their commercial production life. J1 production was temporarily suspended from 14 th of January to the 2 nd of March and then placed back on production. It is anticipated that both wells will reach their economic limit by midyear. Once J1 is declared non-commercial the partners plan to abandon the lower perforated interval and perforate higher up the well in the Camerina interval. The Camerina will then be tested to determine the commercial viability of this interval. The Camerina is estimated to contain 2.2 to 7.1 million barrels of oil and 2 to 7 Bcf of gas. Reservoir extent and productivity is unknown at the moment. Forward Plan Monitor production of J1 and J2. Planning and AFE to abandon lower perforations in J1 and test the Camerina. Corporate On 14 February 2012, Verus completed a private placement of 245.75 million shares (at 0.4 cents each) raising a total of $983,000 (before costs). The Cash balance as at 31 March 2012 was AUD$901,000. Page 5