Pipeline Coatings AUCSC Fundamentals Session. Jeff Didas Matcor, Inc. Mechanicsville, VA

Similar documents
Specification for Pipe Coating Repairs Offshore

Section Four: Linings and Coatings

COATING & WRAPPING OF UNDERGROUND PIPING

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM

FIELD COATING OF STEEL PIPE AND FITTINGS INSTALLED UNDERGROUND AND IN SUBSURFACE STRUCTURES

Specification for Fusion Bonded Epoxy for External Pipeline Coating

Good Boards = Results

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

GAS INSTALLERS MANUAL CINERGY AND SUBSIDIARY COMPANIES CUSTOMER PROCEDURE FOR INSTALLING 3", 4", 6", AND 8" IPS PLASTIC GAS SERVICE PIPING

A comprehensive range

How to Build a Printed Circuit Board. Advanced Circuits Inc 2004

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

SECTION FIRE HYDRANTS

List of Frequently Utilized Storage Tank Standards and Practices

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

PIPELINE INSPECTION COMPANY LTD. Portable Holiday Detectors. OPERATING INSTRUCTIONS SPY PORTABLE HOLIDAY DETECTORS Models 780, 785, & 790

GB Tubulars RECOMMENDED PRACTICE For CASING on LOCATION

Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants

CATHODIC PROTECTION SYSTEM DESIGN

NCCER Progress Blvd., Alachua, FL Tel: (888) Task Number Item Date(s) Recorded By

PRODUCT DATA SHEET DESCRIPTION:

OPERATING INSTRUCTIONS

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

CORROSION PROTECTION BY COATINGS FOR WATER AND WASTEWATER PIPELINES

TABLE OF CONTENT

A World Class Manufacturer of Induction Bends

PROTECTO 401 CERAMIC EPOXY LINED DUCTILE IRON PIPE AND FITTINGS

STANDARD SPECIFICATION SECTION STEEL PIPE, FUSION-BONDED EPOXY LINED AND COATED

District Cooling Best Practices Piping Systems

SECTION DUCTILE IRON PIPE AND FITTINGS

James M. Pleasants Company

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

NACE Standards. Chinese Translation Product Number. Spanish Translation Product Number. Visual Aid/ Related Product Number. Product Number 21105

Oil and Gas Pipeline Design, Maintenance and Repair

Coating inspection work is available in abundance for those who are willing to travel to project locations,

SECTION DUCTILE IRON PIPE AND FITTINGS

CHAPTER 5. OVERVIEW OF THE MANUFACTURING PROCESS

Standard For Lining Ductile Iron Pipe and Fittings For Sewer Service

15/06/ Test procedure Current 3mA +/- 0.02mA. Section Cathodic Disbondment of the Coating

INDEX. Sec. No. Items Page Nos.

SECTION 560 COATING NEW STRUCTURAL STEEL

2005 China International Oil & Gas Pipeline Technology (Integrity) Conference & Expo

General Guidelines for Repairing Buried PE Potable Water Pressure Pipes

Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method F (100 C) calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Portable Holiday Detectors

Heat Exchanger Thin Film Foul Release Applications Corrosion Resistant Protective Coatings Grit Blast Surface Prep of Tubular Equipment

Peel & Seal Self-Stick Roofing Solutions

SECTION 15 AIR RELEASE VALVE ASSEMBLIES General

SCREEN PRINTING INSTRUCTIONS

Solid-Cast Versus Resin-Encapsulated Transformers

KALPANA INDUSTRIES LTD. TECHNICAL DATA SHEET

Impregnating Machine

Joint Surface Preparation Standard. NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

the runnerless types of molds are explained post molding operations are described the basic methods of applied decoration methods are examined

Pressure Vessel Assessment Report

SSPC-SP 6/NACE NO. 3

NW Natural & Pipeline Safety

TEXAS A&M CENTRAL ACADEMIC BUILDIING & PATRIOT S CASA SUBMITTAL Pre-Insulated Piping

WATERPROOFING FOR CONCRETE STRUCTURES

Crevice Corrosion on Stainless Steel Propeller Shafts

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Acceptance Codes APPENDIX - A. Acceptance Criteria

3M Scotchkote Urethane Coating 165HB

Health Care for Pipelines From Cradle to Grave

Environmental Cracking of Carbon Steel Weldments in Corrosive Petroleum Refining Environments. of Impressed Current Deep Groundbeds

FLEXIBLE CIRCUITS MANUFACTURING

Specifications for Programs: 737, 747, 757, 767, 777, 787

Pipe Protection Tape System

External Visual Inspection Form

WATER & SEWER CORROSIVE RESISTANT PRODUCTS

RAUFOSS EXPLOSIVE COMPRESSION FITTINGS

SECTION DUCTILE-IRON PIPE AND FITTINGS

TECHNICAL REQUIREMENTS AND SPECIFICATIONS

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

ASSET MANAGEMENT STRATEGIES FOR METALLIC MUNICIPAL TRANSMISSION PIPELINES

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin Anode Rods, Cathodic Protection and the Porcelain (glass) Lining

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 28 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

SMOOTHMOVE INSTRUCTIONS FURNITURE VAN EPOXY FLOOR FINISH KIT VOC-FREE - NO SOLVENT GENERAL INFORMATION KEY 87269AB

PIPELINE FIELD JOINT COATING AND FIELD REPAIR OF LINEPIPE COATING

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS

This will also provide you with the knowledge to insure long life for your Investment

See photo below showing this product being applied to a badly corroded floor.

PROCEDURES PREVENTION OF ACCIDENTAL IGNITION

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

Minor Cracks in Horizontal Surfaces

MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

Pipeline Basics & Specifics About Natural Gas Pipelines


MAP COFFEE MIA CAPSULE COFFEE MACHINE INSTRUCTION MANUAL MODEL: CM4725. Read this manual thoroughly before using and save it for future reference

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL

Plastics Engineering SYSTEM BEKAPLAST. Mechanically anchored thermoplastic lining for extreme conditions

Protection. Count On. You Can. 3M Scotchkote Infrastructure Protection Products. Meeting your coating needs for more than 50 years.

Meeting the Challenge of Pipeline Emergency Repair

BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013)

Procedures for Preventative Maintenance Treatment of Pipeline Ball Valves in Natural Gas Pipelines

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION

SECTION HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS

The Comprehensive Coatings Service Provider to Industry

Transcription:

Pipeline Coatings 2012 AUCSC Fundamentals Session Jeff Didas Matcor, Inc. Mechanicsville, VA

Remember This! Coatings are the #1 defense against corrosion. This is true for underground, transition and above ground service.

Coating Types Underground buried or immersion service Transition area coatings Atmospheric coatings Internal coatings & linings

Underground Pipeline Coatings Mill or Plant Applied Field Applied Line Coatings Repair Coatings Coating Discussion Coating Cost Coating Quality

Mill or Plant Applied Most economical method to apply coatings Highest level of quality and quality control Plant/Mill conditions allow use of higher performing coatings Normally, high quality storage, handling and shipping Normally allows for some coated pipe storage

Field Applied Costly method either over the ditch or in the ditch Hard to manage quality control due to environmental conditions Normally lower performing coatings Newer field coatings do allow higher productivity

Line Coatings Coal Tar Enamel Asphalt Enamel Extruded Polyethylene Fusion Bonded Epoxy Somastic Pritec Liquid Epoxy 3 Layer

Repair Coatings Tapes Wax Shrink Sleeves Two - Part Epoxy Mastic Misc.

Coatings Discussion Most important component of a pipeline High quality holiday free coating requires almost no cathodic protection current Coatings need to be specified Coatings need to be tested Every coating has a use, but most coatings are used improperly follow procedures

Coating Cost Cost of material Cost of application Cost to repair Handling Expected life Dielectric strength

Coating Quality Quality determines price Quality is normally dependent upon surface preparation & application methods Quality is assured with competent inspection Quality is determined by good procedures and good specifications

Transition Area Coatings Used where piping transitions from buried service to atmospheric service Used to protect from mechanical damage freeze/thaw cycle, weed whackers, gravel, etc. Used to protect buried service coatings from Ultraviolet light when used above ground

Atmospheric Coatings Various types, quality and expected life Primary purpose is corrosion prevention, secondary purpose is appearance Problem areas, flanges, nuts, bolts, hold down clamps, high temperature service, beneath insulation, through walls/foundations, etc.

Perfect Coating Ease of Application - It can be applied with a mop on any surface or from above ground. Cost Effective - Cost $1.00/Gallon or less! Environmentally Safe and Friendly OK to Drink it. Performance - Lasts forever.

In Reality a Perfect Coating Requires a quality standard Requires a quality specification Requires a quality coating mill Requires a quality material or materials Requires a quality inspector or inspectors

Line Pipe Coating Process

INTRODUCTION This slideshow steps you through the process of Mill-Applied external thin film (FBE) coating. The guideline for this process is set forth in NACE Specification RP0394-94.

The pipe enters the mill and is ready for the abrasive blasting procedure.

The pipe enters the pre-heat oven where its temperature is raised to approximately 130 degrees. It then enters the abrasive blasting booth.

The pipe exits the blasting booth with a near-white surface finish and the required anchor profile.

At this stage, the blasted pipe surface is checked for raised slivers, scabs, laminations, or bristles which are removed by file or abrasive sanders. A coupler is then inserted into the end of each joint of pipe.

The coupler is used to connect and seal two joints of pipe together, so one pushes the other through the rest of the process.

Two pipe joints joined with coupler.

The pipe then enters an acid bath to remove surface contaminants.

After the acid bath and rinse, the pipe enters a series of ovens that raise the temperature of the pipe to approximately 475 degrees before application of the coating.

Pipe entering last oven before coating.

The joint between pipes is covered, so that the ends of each joint are left free of coating. This is done to allow welding in the field.

The pipe exits the coating booth where jets have applied a coating to the hot pipe with an average coating thickness of 15 mils.

The tape around the joint is now removed and pipe continues to the quenching chamber.

In the next step of this process, the pipe enters a quenching chamber and is water cooled to around 250 degrees.

Pipe coming out of quenching chamber.

Stencil being added to pipe stating the company name, API information and size and wall thickness of pipe.

Company Inspector verifying that the coating thickness is acceptable.

Ropes are put around pipe to keep joints of pipe separated and to prevent coating damage.

A 2,000 volt, nonpulsating, low ripple DC dry-type holiday detector is then used to detect any holidays that may exist in the coating.

Repair of a pinhole size holiday in the coating. Patching with these touch up sticks is only allowed in the mill while the pipe is still hot. Preheating the pipe properly is the limiting factor for field application.

Holiday repair using touch-up sticks.

Each pipe is measured and given a number.

The pipe is then carried into the yard. The forklift has protective padding on the jaws.

The pipe is stacked with padded boards between them to prevent damage to the coating.

The joints of pipe are unloaded on to the padded boards and the ropes separate the joints and protect them from damage when striking other pipes.

Questions? The End!