Building Permit Instructions ~ Please Detach and Save This Page ~

Similar documents
Bureau Veritas Contact Information

Commercial Construction Permit Application

Department of Community Development, P. O. Box 427, Herndon, Virginia

RESIDENTIAL WINDOW REPLACEMENT

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

Requirement checklist to obtain a building permit for a: RESIDENTIAL RE-ROOF

Zoning Department DECK PERMITS. Checklist

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Ferry County Out Building Application

City of Douglas Commercial Building Permit Site Application

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

City of Beacon Building Department

THE TOWN OF COLONIAL BEACH, VIRGINIA DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

Town of Surf City Community Development. General Permit Information

Residential Building Permit & Plan Review Application. Yes, I would like to contribute $75.00 to the Rio Rancho Economic Development Corporation.

Demolition of 50% or more of an above grade main structure requires a demolition permit.

Botetourt County, Virginia. Frequently Asked Questions

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

Minor Accommodation Planning Review Application

d. Building permits may only be approved if consistent with the approved development plan and land division for all units with common walls.

City Code of ANN ARBOR, MICHIGAN Chapter 55 Zoning

CERTIFICATE OF APPROVAL OF LOCATION (CAL) APPLICATION Page 2

CHAPTER 67.2 RESIDENTIAL BUILDING CODE

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

Time/Date Stamp when received:

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

Residential Plan Routing Information

PLUMBING PERMIT REQUIREMENTS AND CHECKLIST

C I T Y O F P E A R S A L L

SUMMIT TOWNSHIP SIGN PERMIT PROCESS

City of North Chicago Department of Building and Community Development 1850 Lewis Avenue North Chicago, IL (847) (847) Fax

Home Business Permit. City of Independence, Missouri APPLICANT (DEVELOPER): PROPERTY OWNER: Business Name (if any) Address of Home Business

Building Permits Permit Counter

BUSINESS USE PERMIT APPLICATION

Fill out all sections or mark with N/A (not applicable)

Requirement checklist to obtain a building permit for a: NEW SINGLE FAMILY DWELLING RESIDENTIAL ADDITION

Manufactured Home Application Packet

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Check Off (Below) Information That Is Submitted With Permit

Warwick Township. Office of Code Compliance. Residential Building Permit Application. Plan Submittal Guide Our Goal is a Safe Environment

SECTION 1 - BUILDING CODE

Homeowner s Guide to Residential Building Permits

Residential Building Permits

ORDINANCE NO AN ORDINANCE AMENDING AND ESTABLISHING THE FEE SCHEDULE FOR SERVICES PROVIDED BY THE ELKHART COUNTY BUILDING DEPARTMENT

PROPERTY LINE ADJUSTMENT APPLICATION

Single-Family Permit Handbook. City of Bellevue. Welcome! When is a permit required? Development Services Handout P-1

INCORPORATED VILLAGE OF OYSTER BAY COVE TOWN OF OYSTER BAY, NASSAU COUNTY, N.Y. OFFICE BUILDING INSPECTOR FEE SCHEDULE

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1

QUEEN ANNE'S COUNTY BUILDING CODE TECHNICAL ASSISTANCE BULLETIN

Section 801 Driveway Access Onto Public Right-of-Ways

Single Family Residential Building Permit Questions & Answers

DEPARTMENT OF BUILDINGS

VILLAGE OF SHOREHAM. Instructions for obtaining a building permit for a new home for all one-family dwellings (with required forms)

TENT AND STAGE CUSTOMER ASSISTANCE GUIDE

APPLICATION. Internal Use Only 1311 Chestnut Street TDLR# Bastrop, Texas Intake Date

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

APPLICATION FOR BUILDING PERMIT. Date of Birth: City: State: Zip: City: State: Zip: Asbestos Removal Vacant Non-Residential

FREQUENTLY ASKED QUESTIONS: 1) Q: When is a building permit required?

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

SWIMMING POOL / SPA PLAN REVIEW CHECKLIST

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

Placement of Manufactured Homes on Private Property

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

INC. VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4

SOLAR ENERGY PERMIT. 1. Two (2) page Building Permit Application (signed and notarized); 2. Disclosure Affidavit (signed and notarized);

dpd Seattle Permits CAM Establishing an Accessory Dwelling Unit (ADU) What is an ADU?

City of Hill Country Village Residential Construction/Development Packet

A Guide for the Homeowner/Builder

HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES

County of San Diego, Planning & Development Services SECOND DWELLING UNIT

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

PERMIT APPLICATION. PLEASE PRINT LEGIBLY INCLUDE STREET NUMBER/NAME, CITY & STATE 1 Job Name:

building_inspection_faqs

Quarryville Borough. 300 Saint Catherine Street Quarryville, PA Application for a Building/Zoning Permit

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS

CITY OF AVENTURA PERMIT APPLICATION W Country Club Drive 4 th Floor Aventura, FL Tel (305) Fax (305)

Schedule A. Residential and Seasonal Dwellings. for estimating value of construction in the Township of North Kawartha

City of St. Charles Basement Finish or Remodel

TOWN OF BRIDGEWATER INSPECTIONAL SERVICES DEPARTMENT Phone: (508) Fax: (508)

RELOCATION OF BUILDINGS

Application for Permit to Construct an Individual Sewage Treatment and Disposal System

2880 International Circle Colorado Springs, CO Telephone Executive Summary Pikes Peak Regional Building Code Revisions

A Homeowner s Guide to Building Permits

PREPARED DATE: SIGNATURE AND SEAL INSPECTION REPORT PREPARED BY: PRINT NAME: REGISTRATION NUMBER: MAILING ADDRESS:

REQUEST FOR ELECTRIC SERVICE Commercial

Floyd County Department of Inspections 120 West Oxford Street PO Box 218 Floyd, VA Phone: Fax:

CITY OF WEST PALM BEACH HISTORIC PRESERVATION AD VALOREM TAX EXEMPTION APPLICATION

REQUESTS FOR ANY INSPECTION MUST BE 24 HOURS IN ADVANCE.

Section I - General. Page 1 of 5

Retail Marijuana Establishment License Application

NEW OR ADDITIONS TO GARAGE/SHOP/STORAGE PERMIT REQUIREMENTS

ARTICLE 22: FEE SCHEDULE

REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING APPLICATION PACKET

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

Transcription:

DEKALB COUNTY PLANNING / ZONING / BUILDING DEPARTMENT 110 E. Sycamore St., 4 th Floor Sycamore, IL 60178-1497 (815) 895-7188 / Fax: (815) 895-1669 www.dekalbcounty.org Building Permit Instructions ~ Please Detach and Save This Page ~ Building Permit Submittal Checklist: Permit application filled out completely Site plan and/or Plat of Survey Complete set of building plans and specifications: (2) for residential, (3) for non-residential, submitted. (Note: all non-residential plans are to be Signed, Sealed and Dated by an Illinois Licensed Architect or Structural Engineer.) A copy of the approved well and septic permits or Site Verification Form issued by the DeKalb County Health Department (815-758-6673). A copy of the access permit from the appropriate road authority (if construction is to occur on a parcel possessing no driveway entrance or only an agricultural field entrance). Application fees (cash or check, due at time of application) What Happens Next? Your application and all submittals may be dropped off at the DeKalb County Planning, Zoning, and Building Department. A Zoning Review of the application, followed by a Site Inspection, will then be conducted. You are required to indicate the location of the proposed structure on the property; stakes, flags, spray paint, or any other marking is sufficient (if a Site Development Permit Application is required in conjunction with the application, the site inspection will not occur until after that application has been processed). Applications for residential construction will then be reviewed by the County Building Inspector. Commercial and Industrial projects will be sent to a thirdparty plan review service (additional review fees will be incurred). Depending on the complexity of your project, turnaround time will typically take between one (1) to three (3) weeks. Thoroughness and attention to detail in your application and submittals will help expedite the process. When your permit is ready, you will be contacted by DeKalb County Planning, Zoning, and Building Department. You will receive a permit card and a plan review relating to your specific project, and any additional fees will be collected at this time. You may not begin work until the permit is issued; doing so may incur fines. Your permit card must be displayed on the property. You should carefully read the plan review for important information regarding your project. Then, it is your responsibility to call for all required inspections as outlined in your permit package.

DEKALB COUNTY PLANNING / ZONING / BUILDING DEPARTMENT 110 E. Sycamore St., 4 th Floor Sycamore, IL 60178-1497 (815) 895-7188 / Fax: (815) 895-1669 www.dekalbcounty.org Application for a County Building Permit Note: If improvements are made by someone other than the homeowner, or if the structure is commercial, industrial, or multi-family structure, a licensed/registered plumber, roofing contractor and electrician are required to do the work. OFFICE USE ONLY Permit No. Fee Receipt No. Zoning District Site Development Permit (Y / N) Application is hereby made for a building permit involving premises described below. Date of Application Applicant Applicant s Address City Zip Applicant s Telephone Number Applicant s Interest in Property: Owner Contractor Other Owner of Record Address of Proposed Project Parcel Number Estimated Value of Improvement (Rounded to nearest $100). Primary Use of Property (Please Check): Residential 1 or 2 Family Dwelling Multi-Unit Dwelling Mobile Home Non-Residential Describe: Structure to be Affected (Please Check): Primary Structure / Residence Accessory Structure Describe: Type of Improvement (Please Check): New Structure Addition Alteration / Repair Moving / Relocating Describe Improvement: C:\Temporary Internet Files\Content.Outlook\JJ1F7L02\Building Permit (m) doc.docx Page 2 of 5

Please provide total square footage of each area to be constructed and/or altered. Basement sq. ft. Garage sq. ft. Other sq. ft. 1 st Floor sq. ft. Deck sq. ft. Determined by project at office: Plumbing 2 nd Floor sq. ft. Porch sq. ft. Electrical Mechanical Height (Accessory Structures Only): FEE AMOUNT (Rounded to nearest dollar) $ Please provide the names, addresses, and telephone numbers of all contractors. Incomplete information will delay permit: General Contractor Lead Cert # Architect / Engineer Framer / Carpenter _ Electrical Contractor License # Concrete Contractor _ HVAC / Mechanical Installer Roofing Contractor _ Also include copies of Roofing Contractor s: - State Roofing License - Signed Contract or Letter-of-Intent Plumbing License #058- Also include copy of State Plumbing License C:\Temporary Internet Files\Content.Outlook\JJ1F7L02\Building Permit (m) doc.docx Page 3 of 5

The authorized applicant / property owner s signature below attests: 1. All information contained in the application and on any accompanying documents is true and correct. 2. Proposed construction will not take place on any granted easement, public or private, nor violate and covenant or restriction applicable to the subject property. 3. Applicant / Owner and any contractors will conform to the regulations set forth in the DeKalb County Zoning and Building Ordinances. 4. All work performed under said permit will be in accordance with the plans and plat diagram which accompany this application, except for changes as may be authorized by the Building Officer. 5. Applicant / Owner is aware that inspections will be required and that all necessary inspections will be conducted in accordance with the Required Inspections procedure sheet. 6. The permit will become null and void if work or construction authorized is not commenced within 180 days. 7. The permit will become null and void if no inspections are scheduled or conducted at least every 180 days. 8. Work will not commence until after the permit has been picked up and signed for at the Planning, Zoning and Building Department Office. Per the DeKalb County Code, permit fees will be DOUBLED if work is started without first obtaining permit. / / Signature of Owner or Applicant Date Application Received By C:\Temporary Internet Files\Content.Outlook\JJ1F7L02\Building Permit (m) doc.docx Page 4 of 5

SITE PLAN FOR ACCESSORY STRUCUTRES (decks, sheds, fences, etc.) OR RESIDENTIAL ALTERATIONS OR ADDITIONS ONLY, THE FOLLOWING INFORMATION MUST BE INCLUDED ON THE SITE PLAN BELOW (OR ON AN OFFICAL PLAT OF SURVEY): 1. Lot size and dimensions 2. Name and location of all roads abutting property. 3. Structures on the property (existing and proposed). 4. Front, side, and rear yard setbacks (Distance between the lot line and structures). 5. Distance in feet between all structures on the lot. 6. Drive aisles and parking areas (existing and proposed). 7. Please indicate north by an arrow. STAKE OUT DATE NOTE: ALL SITE PLANS FOR COMMERCIAL CONSTRUCTION OR NEW PRIMARY RESIDENTIAL STRUCTURES MUST BE PROVIDED ON OFFICAL PLAT OF SURVEY. C:\Temporary Internet Files\Content.Outlook\JJ1F7L02\Building Permit (m) doc.docx Page 5 of 5