AMERICAN SAFETY TECHNOLOGIES GUIDE TO SUCCESSFUL PRODUCT APPLICATION SUMMARY OF TOPICS

Similar documents
SURFACE PREPARATION STANDARDS

Pictorial Surface Preparation Standards For Painting Steel Surfaces

SURFACE PREPARATION. High pressure fresh water cleaning.

SSPC-SP 6/NACE NO. 3

SC2000 CEMENT BONDING PROCEDURES

Joint Surface Preparation Standard. NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning

INDUSTRIAL FLOORING INSTALLATION CHALLENGES. James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

BLACK JACK ALL WEATHER ROOF COATING

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

RUST BULLET, LLC 300 Brinkby Avenue, Suite 200, Reno, NV

Tractor Painting Tips

A. Work on this project shall consist of, but is not limited to, the following:

SECTION POLISHED CONCRETE FINISHING

Property Test/Standard Description. semi gloss (35-70) Flash point ISO 3679 Method 1 34 C IED (2010/75/EU) (calculated)

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

PRODUCT DATA SHEET DESCRIPTION:

FIVE STAR PRODUCTS, INC. (800)

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 28 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method F (100 C) calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Epoxy Floor Coating Problem Solving Guide

SMOOTHMOVE INSTRUCTIONS FURNITURE VAN EPOXY FLOOR FINISH KIT VOC-FREE - NO SOLVENT GENERAL INFORMATION KEY 87269AB

Black epoxy paste adhesive system

Adhesive Bonding of Natural Stone

HVAC Super Pro FAQ. Can HVAC SUPER PRO be used on both hard and soft copper and aluminum tubing?

Acrylic Enamel Topcoat

Installation Instructions

Temperature C Cure time to reach hours LSS > 1MPa minutes

White rust on galvanized and galvanized pre-painted steel. Technical Information

Two component epoxy paste adhesive. Ideal for bonding GRP, SMC and dissimilar substrates

SECTION POLISHED CONCRETE FINISHING. InovaCrete Polished Concrete Floor Finish (GUIDE SPEC)

PAINTING OVER HOT DIP GALVANIZED STEEL

Wecryl Waterproofing System under surfacing supplied by others

GENERAL RUBBER LINING PRINCIPLES

Scotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, Product Description

Two component epoxy paste adhesive

Solvent Cementing Instructions For Plastic Pipe & Fittings

SECTION FIRE HYDRANTS

Technical Data Sheet February 2014

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 27 C calculated IED (2010/75/EU) (calculated)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

RAPTOR TRUCK BED LINER - BLACK

PRODUCT DATA SHEET Sika Cable System

SECTION 560 COATING NEW STRUCTURAL STEEL

Scotch-Weld TM. Acrylic Adhesives. DP8405NS Green. Product Data Sheet. Date: March 2014 Supersedes: August 2013

Installation System. Existing Resilient Sheet Floors

Amtico and Spacia Commercial Maintenance Guidelines

Metal Rescue Rust Remover Technical Data

Sikaflex Sealant Installation. Sika Corporation

Note: Minor color change may occur in exposed service, but corrosion protection will not be compromised

1. Initial Precautions 2. Technical Precautions and Suggestions 3. General Information and Cure Stages 4. Understanding and Controlling Cure Time

3M Scotchkote Urethane Coating 165HB

Araldite AV 170. Advanced Materials. One component epoxy adhesive. Structural Adhesives. Key properties. Description. Product data.

Vinyl Composition Tile Installation System

ApplicatorTrainingBulletin. The Galvanized Surface. Surface Preparation of New Galvanizing

( I ) GENERAL TECHNICAL TERMS SURFACE PREPARATION HEALTH & SAFETY PAINT APPLICATION AIRLESS SPRAY APPLICATION TROUBLE SHOOTING CHART CONVERSION TABLES

MARTIN TESTING LABORATORIES (MTL) PAINTS AND COATINGS TESTING CAPABILITIES

SECTION WATER STORAGE TANK PAINTING

expectation as hot dip galvanizing?

GALVANIZING NOTES MECHANICAL AND CAUSTIC CLEANING PROCESS AND DESIGN NOTES ON HOT DIP GALVANIZING BY CHRISTINE KLEEN AND THOMAS LANGILL, PH.D.

Division 9. SignaFlor Pad and Pour Flooring System

TECHNICAL DATA SHEET HAMMERITE METAL PAINT. Smooth Hammered Satin Aerosol

T R A N S F E R A B L E F U L LY

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

Stone Developments. Caring for Irish Blue Limestone Products. Irish Blue Limestone Maintenance Guide

RockSolid Deck Restoration Application

Material Product Data Sheet Sealers for Thermal Spray Coatings

Anodizing Reference Guide

3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data March, 2002

STERI-SOFT HIGH FOOT TRAFFIC, ULTRAVIOLET RESISTANT, URETHANE RESILIENT FLOORING SYSTEM, 1/8 GREEN BUILDING FEATURES TYPICAL APPLICATIONS

PREPARATION AND PROPERTIES OF A SOAP

General Surface Preparation

3M Scotch-Weld Epoxy Adhesive

Document Library TS Data Sheet

A Revolution in Floor Restoration Technology

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)

Summit Racing Equipment s Paint and Auto Refinishing System was developed specifically for the home enthusiast and small shop owner wanting a

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

Austin Peay State University Department of Chemistry CHEM Empirical Formula of a Compound

Additional Information. Paint Application

PREPARING HOT-DIP GALVANIZED STEEL SURFACES FOR PAINTING OR POWDER COATING: A PRIMER

SIGMACOVER 300. PRODUCT DATA SHEET December 12, 2014 (Revision of November 1, 2013) DESCRIPTION

The Owners Coated Coil, Cleaning and Maintenance Service Manual.

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

SIGMACOVER 280. PRODUCT DATA SHEET December 10, 2014 (Revision of March 1, 2014) DESCRIPTION

CHROME FX PUMP SYSTEM APPLICATION GUIDE

Scotch-Weld. Low-Odor Acrylic Adhesives DP810 DP810 NS. Technical Data June, 2004

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

DIVISION: PLUMBING SECTION: DOMESTIC WATER PIPING REPORT HOLDER: CURAFLO IP LLC 4035 E. OASIS STREET MESA, AZ 85215

Tips on Applying a Clear Finish

CA-48 TECHNICAL SPECIFICATION

Profiles for floors of same height Cerfix Projoint

You have just purchased the most portable and economical spray chrome system in the world!

TECHNICAL DATA RS European Clear EZ N. Webster Street Dayton, OH Phone Toll Free Fax

Slips, Trips and Falls Safety Meeting Handout

Intercoastal Paint Company

Panel Bonding Adhesive

3 Scotch-Weld TM. Epoxy Adhesive DP110 Translucent and Gray. Technical Data December, 2009

Minor Cracks in Horizontal Surfaces

Transcription:

AMERICAN SAFETY TECHNOLOGIES GUIDE TO SUCCESSFUL PRODUCT APPLICATION SUMMARY OF TOPICS CHEMISTRY OF EPOXY SYSTEMS ESSENTIALS OF EPOXY SYSTEMS THE EPOXY KIT POT LIFE STEEL STRUCTURE PREPARATION CONTAMINATION

Epoxy resins and hardeners are chemicals. AMERICAN SAFETY TECHNOLOGIES resins and hardeners are generally quite harmless to handle provided certain precautions normally taken when handling chemicals are observed. 1. Uncured materials should not come in contact with food or food utensils. 2. Barrier creams or rubber gloves are advised. 3. Measures should be taken to prevent contact of uncured materials with the skin, since people with particularly sensitive skin may be affected. 4. The skin should be washed thoroughly at the end of each work period using soap and warm water. The use of powerful solvents is to be avoided. 5. Contaminated clothing and rags should be washed before re-use. 6. Any empty containers must be discarded in accordance with local regulations. By following these few precautions, any chance of adverse affects that may be experienced by the workers will be reduced to a minimum. THE EPOXY KIT When working with any epoxy system, it is important to remember that an epoxy system is a balanced system. For complete cross-linking to be achieved, exact proportions of each component must be completely and thoroughly mixed. Our materials come in kit form consisting of a part A base component epoxy resin and a Part B amine hardener. The proportions are measured to exact weights for each product we produce. It is essential that all of part B material be added to the part A material when mixing a kit. At no time should a portion of a kit be mixed. The ratio of the base component and hardener component is very specific. Improper cure will result if the ratio is changed. Pre-mix the base component. Make sure all settlement is lifted off the bottom of the container and is uniformly dispersed in the material. This may take as much as three minutes depending on the material temperature. Pour entire contents of hardener can into base material. Mix hardener and base material with a mechanical mixer for approximately 3-5 minutes. WARNING: Inadequate mixing will result in soft spots in the application. It is important to remember that the epoxies begin to react (cross-link) as soon as they are mixed. The mixed epoxies therefore have a limited working life or

Pot Life. It is essential to know the pot life of the material being used and to plan the job accordingly. Always match the proper components for the product being used. Never use a part A of one product with part B component from another product. POT LIFE When part A resin is combined with part B hardener, a molecular reaction begins. The volume of both materials is considered the mass. The greater the mass, the greater the activity. The pot life or reactivity of materials is determined in the formulation. The pot life of our materials is established under controlled conditions and should be used as a guideline and should not be considered exact. External factors will change the pot life of the material. For example, over-mixing with a high-speed electric mixer will have a shorter pot life. Cold materials will have longer pot lives than warm material. Pot life of a material is a factor with which a contractor should be familiar. The working time of a material is much longer when it is on the deck in a puddle than when left in the can. It is important to know the pot life of the material when determining the proper size unit for the job. When a material reaches the gel stage or begins to thicken, it is no longer usable and must be discarded. It is important to remember that the applicator should use the material as soon as they are mixed. STEEL SURFACE PREPARATION Products can be applied to any clean, dry surface. All rust, mill scale, paint, dirt, grease, oil, etc. must be completely removed. Recommended methods of cleaning steel surfaces are as follows: Grit blasting to SA 2.5 (near white metal) or SSPC-SP10 method of cleaning which results in the best surface for adhesion. A 3-to 4.5-mil anchor tooth profile should be obtained for surfaces abrasively blasted. Where grit blasting is not feasible, power tool cleaning utilizing power sanders fitted with #16 grit aluminum oxide sanding discs produce a sufficiently clean surface provided cleaning and intensively done. Ultra High Pressure Water Jetting - NACE / SSPC - WJ-2

Surface shall be cleaned to a matte finish with at least 95% of the surface area free of all previously existing Visible residue and the remaining 5% containing only randomly dispersed stains of rust, coatings and foreign matter. If there is oil or grease on the surface, it must be removed prior to cleaning. The preferred method is to scrub with a strong detergent and flush area thoroughly while still wet. An alternative method is to remove the grease or oil with a solvent such as xylene. Solvents are flammable and must be handled with care. It is important that the solvents not be allowed to evaporate during the cleaning process and re-deposit grease or oil on the deck. It is recommended that MS-7CZ primer be applied on steel surfaces immediately after the surface has been cleaned and before rust or oxidation has a chance to form or surface becomes dirty or contaminated in any way. It is often said among craftsman that the job can be no better than the preparation for the work to be done. It is difficult to correct a mistake caused by poor workmanship or inadequate preparation once the epoxy is cured. CONTAMINATION Contamination is the greatest cause of deck failures and poor results when using epoxy systems. Every precaution should be taken to avoid contamination during an installation. The most common types of contamination are: Airborne dust and dirt Grease, oil and dirt from vehicle and foot traffic Soap or chemicals used to try and clean the affected area Water or condensation Stray steel shot Any time contamination is suspected, it is advisable to stop work and consult the manufacturers representative for the product being used. The wrong method of correcting contamination will only make the situation worse. An epoxy system is a balanced system. The chemicals you use to correct contamination may alter the reaction of the epoxies.

The best solution for contamination is to avoid contamination by proper management of the job. Always follow the AMERICAN SAFETY TECHNOLOGIES Technical Data Sheet for the product you are applying. Steel Preparation Standards National Association of Corrosion Engineers (NACE) Steel Structures Painting Council (SSPC) Swedish Standards (Sa,St) Ultra High Pressure Water Jetting - NACE / SSPC - WJ-2 National Association of Corrosion Engineers (NACE) NACE 1 White Metal Blast Cleaning NACE 2 Near-White Blast Cleaning NACE 3 Commercial Blast Cleaning NACE 4 Brush-Off Blast Cleaning Steel Structures Painting Council (SSPC) SP-1 Solvent Cleaning SP-2 Hand Tool Cleaning SP-3 Power Tool Cleaning SP-4 Flame Cleaning SP-5 White Metal Blast Cleaning SP-6 Commercial Blast Cleaning SP-7 Brush-Off Blast Cleaning SP-8 Pickling SP-9 Weathering Followed By Blast Cleaning SP-10 Near-White Blast Cleaning SSPC-SP 11, Power Tool Cleaning to Bare Metal Swedish Standard (St, Sa) St 2 Hand Tool Cleaning St 3 Power Tool Cleaning Sa 1 Brush-Off Blast Cleaning Sa 2 Commercial Blast Cleaning Sa 2 1/2 Near-White Blast Cleaning Sa 3 White Metal Blast Cleaning SSPC-SP-1 Solvent Cleaning - Removal of all detrimental foreign matter such as oil, grease, dirt, soil, salts, drawing and cutting compounds, and other contaminants from steel surfaces by the use of solvents, emulsions, cleaning compounds, steam or other similar materials and methods that involve a solvent or cleaning action. SSPC-SP-2 St 2

Hand Tool Cleaning - Removal of all rust scale, mill scale, loose rust and loose paint to the degree specified by hand wire brushing, hand sanding, hand scraping, hand chipping or other hand impact tools or by a combination of these methods. The substrate should have a faint metallic sheen and be free of oil, grease, dust, soil, salts and other contaminants. SSPC-SP-3 St 3 Power Tool Cleaning - Removal of all rust scale, mill scale, loose paint, and loose rust to the degree specified by power wire brushes, power impact tools, power grinders, power sanders or by combination of these methods. The substrate should have a pronounced metallic sheen and be free of oil, grease, dirt, soil, salts and other contaminants. Surface should not be buffed or polished smooth. SSPC-SP-4 Flame Cleaning - Removal of all loose scale, rust and other detrimental foreign matter by passing high temperature, high velocity oxy-acetylene flames over the entire surface, followed by wire brushing. Surface should also be free of oil, grease, dirt, soil, salts and other contaminants. SSPC-SP-5 Sa 3 NACE 1 White Metal Blast Cleaning - Removal of all mill scale, rust, rust scale, paint or foreign matter by the use of abrasives propelled through nozzles or by centrifugal wheels. A White Metal Blast Cleaned Surface Finish is defined as a surface with a gray-white, uniform metallic color, slightly roughened to form a suitable anchor pattern for coatings. The surface, when viewed without magnification, shall be free of all oil, grease, dirt, visible mill scale, rust, corrosion products, oxides, paint, or any other foreign matter. SSPC-SP6 Sa 2 NACE 3 Commercial Blast Cleaning - Removal of mill scale, rust, rust scale, paint or foreign matter by the use of abrasives propelled through nozzles or by centrifugal wheels, to the degree specified. A Commercial Blast Cleaned Surface Finish is defined as one from which all oil, grease, dirt, rust scale and foreign matter have been completely removed from the surface and all rust, mill scale and old paint have been completely removed except for slight shadows, streaks, or discolorations caused by rust stain, mill scale oxides or slight, tight residues of paint or coating that may remain; if the surface is pitted, slight residues of rust or paint may by found in the bottom of pits; at least two-thirds of each square inch of surface area shall be free of all visible residues and the remainder shall be

limited to the light discoloration, slight staining or tight residues mentioned above. SSPC-SP-7 NACE 4 Sa 1 Brush-Off Blast Cleaning - Removal of loose mill scale, loose rust, and loose paint, to the degree hereafter specified, by the impact of abrasives propelled through nozzles or by centrifugal wheels. It is not intended that the surface shall be free of all mill scale, rust, and paint. The remaining mill scale, rust, and paint should be tight and the surface should be sufficiently abraded to provide good adhesion and bonding of paint. A Brush-Off Blast Cleaned Surface Finish is defined as one from which all oil, grease, dirt, rust scale, loose mill scale, loose rust and loose paint or coatings are removed completely but tight mill scale and tightly adhered rust, paint and coatings are permitted to remain provided that all mill scale and rust have been exposed to the abrasive blast pattern sufficiently to expose numerous flecks of the underlying metal fairly uniformly distributed over the entire surface. SSPC-SP-8 Pickling - Removal of all mill scale, rust and rust scale by chemical reaction, or by electrolysis, or by both. It is intended that the pickled surface shall be completely free of all scale, rust, and foreign matter. Furthermore, the surface shall be free of unreacted or harmful acid, alkali, or smut. SSPC-SP-9 Weathering Followed By Blast Cleaning - Weathering to remove all or part of the mill scale followed by one of the blast cleaning standards. SSPC-SP-10 Sa 2-1/2 NACE 2 Near-White Blast Cleaning - Removal of nearly all mill scale, rust, rust scale, paint, or foreign matter by the use of abrasives propelled through nozzles or by centrifugal wheels, to the degree hereafter specified. A Near-White Blast Cleaned Surface Finish is defined as one from which all oil, grease, dirt, mill scale, rust, corrosion products, oxides, paint or other foreign matter have been completely removed from the surface except for very light shadows, very slight streaks or slight discolorations caused by rust stain, mill scale oxides, or light, tight residues of paint or coating that may remain. At least 95 percent of each square inch of surface area shall be free of all visible residues, and the remainder shall be limited to the light discoloration mentioned above. SSPC-SP 11, Power Tool Cleaning to Bare Metal

Specifies the use of power tools to produce a bare metal surface and to retain or produce a surface profile. This specification is suitable where a roughened, clean, bare metal surface is required, but where abrasive blasting is not feasible or permissible. Once cleaned, the surface will be free of visible oil, grease, dirt, dust, mill scale, rust, paint, oxide, corrosion products, and other foreign matter. Slight residue of rust and paint may be left in the lower portion of pits if the original surface is pitted. Surface shall have a degree of roughness (profile) of no less than 1 mil (25 microns). Ultra High Pressure Water Jetting - NACE / SSPC - WJ-2 Surface shall be cleaned to a matte finish with at least 95% of the surface area free of all previously existing Visible residue and the remaining 5% containing only randomly dispersed stains of rust, coatings and foreign matter.