Pre-budget 2016 Consultations

Similar documents
Planning Railway Safety in Canada

Canadian Manufacturers and Exporters

Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas

The case for rail transportation of hazardous materials

Responses to the Review of the Third Party Liability Insurance Regulations

Rapid Transit Backgrounder

How To Help The Region Of Peel

PRESIDENT S YEAR-END REPORT

Asia-Pacific Gateway and Corridor Transportation Infrastructure Fund. Applicant Guide

Transport Canada s Departmental Sustainable Development Strategy Reporting Update

Canadian Rail: Gearing Up in the West

His Worship Jim Watson Mayor of the City of Ottawa 110 Laurier Avenue West Ottawa, Ontario K1P 1J1 Dear Mr. Mayor,

2012 FEDERAL BUDGET PRIORITIES

Victoria City 2010 Community Energy and Emissions Inventory Monitoring and reporting on progress towards greenhouse gas emissions reduction targets

Opportunities. Railway Transportation (Engineering and Operations) Areas of Study. University of Kentucky

ATLANTIC GATEWAY INTERNATIONAL MARKETING:

Office of Safety and Compliance

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI (608) Fax: (608)

Canadian Automotive Fuel Economy Policy Regulatory Policies Economic Instruments Labeling References

Rail 2030: Preparing Today for Tomorrow s Challenges

Liability and Compensation Regime for Railways. Lenore Duff Director General, Surface Transportation Policy Transport Canada March 4, 2015

Comments of the Truck Renting and Leasing Association On Tax Reform Submitted to the Senate Finance Committee

Statement of Mandate. March 29, 2010

Backgrounder. Canada s Steel Speedway THE CN KINGSTON SUBDIVISION ABOUT THE PROJECT: July 16, 2009

STATEMENT OF PETER M. ROGOFF ACTING UNDER SECRETARY FOR POLICY U.S. DEPARTMENT OF TRANSPORTATION

12MAP-21, a funding and authorization bill to govern U.S. federal surface MONITORING IMPLEMENTATION AND PERFORMANCE

Performance Goals and Objectives:

Informal meeting of EU ministers for Transport Luxembourg, October 7th, Declaration on Cycling as a climate friendly Transport Mode

SAFETY IN NUMBERS: EVALUATING CANADIAN RAIL SAFETY DATA

Evergreen Line Rapid Transit Project Business Case Executive Summary. February Reviewed by

CANADIAN NORTHERN ECONOMIC DEVELOPMENT AGENCY. Statement of Management Responsibility

2016 Federal Budget. Submission. on the. to the. House of Commons Standing Committee on Finance. by the

Class I Railroad Statistics

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007

Policies and progress on transport access, including access for the rural population and low-income households

usage of these types of fuels with production price far higher then diesel and petrol, is also a measure. We can say that in Bulgaria there are

SYSTEMWIDE REQUIREMENTS

POLICY ACTIONS INVESTING IN INNOVATION

DLA THESIS HIGH-SPEED INTERCITY PASSENGER RAIL CARRIAGES FOR MÁV BALÁZS LENKEI SUPESRVISOR: PROF. JÓZSEF SCHERER

Introduction. Why Focus on Heavy Trucks?

Study of Transportation Long-Range Funding Solutions. Report to the Legislature

Multi-year Expert Meeting on Transport, Trade Logistics and Trade Facilitation

The California Environmental Protection Agency works to restore, protect,

1. Transport challenges in subnational entities and related GHG emissions

Roadmap for the Energy Union

Electrical infrastructure serving the city of London CITY OF LONDON Corporate Energy Consumption Report

STATEMENT OF LINDA BAUER DARR PRESIDENT AMERICAN SHORT LINE & REGIONAL RAILROAD ASSOCIATION

Technical Report Documentation Page. 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-13/

Principal risks and uncertainties

ETIHAD RAIL. Corporate Presentation

The Coos Bay Rail Line Preserving Rail as an Intermodal Link for Marine and Industrial Sites in Southwest Oregon

GTA Cordon Count Program

Service Alberta BUSINESS PLAN ACCOUNTABILITY STATEMENT THE MINISTRY

GUIDELINES FOR VOLUNTARY USE OF THE SHIP ENERGY EFFICIENCY OPERATIONAL INDICATOR (EEOI)

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

Submission to the Standing Committee on Finance and Economic Affairs Pre-Budget Consultations -

REPUBLIC OF TURKEY INTENDED NATIONALLY DETERMINED CONTRIBUTION

CANADA TRANSPORTATION ACT REVIEW

Railway Reform: Toolkit for Improving Rail Sector Performance. Chapter 11: Creating Commercial Railway Structures

Commercial vehicles and CO 2

Office of Climate Change, Energy Efficiency and Emissions Trading. Business Plan

Planning and Design for Sustainable Urban Mobility

Passenger & Freight Rail = Less Energy & More Choices. NATIONAL CONFERENCE of STATE LEGISLATURES

Universal Program Review

City Manager, Deputy City Manager and Chief Financial Officer, Interim Chief General Manager, Toronto Transit Commission

Questions and Answers for the Multi-Source Facility Demonstration Project Solicitation Applicant Teleconference

Why profits are important & higher corporate tax rates are a bad idea

SUPPORTING INNOVATION AND RESILIENCY IN THE CHARITABLE AND NON-PROFIT SECTOR

Enhancing Railroad Hazardous Materials Transportation Safety Rail Routing

Chemistry Industry Association of Canada. Submission to the Canada Transportation Act Review

SIMPLIFYING LOGISTICS: THE BENEFITS OF RAIL IN A MULTIMODAL SHIPPING SYSTEM

Summary of the Corporate Plan. and Operating and Capital Budgets

PRRIA PASSENGER RAIL REFORM AND INVESTMENT ACT OF 2014 TRANSPORTATION & INFRASTRUCTURE COMMITTEE

ILLINOIS DEPARTMENT OF TRANSPORTATION. Economic Development Program

ELECTRIC VEHICLES: THE PORTLAND WAY

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

Crude-by-Rail: Regulatory Developments in Canada

Shipping, World Trade and the Reduction of

Highway Motor Transportation

Capital allowances for business cars

BUSINESS PLAN

While these requirements are mandated only for communities of 50,000 or more, the Town has chosen to address them as optional elements.

18.1 million people 1 billion tons of goods moved 2.5 billion dollars of trucking congestion costs

GHG Accounting in a Construction Project: The Case of Montréal's Turcot Project. Sylvie Tanguay Research Officer, Ministère des Transports du Québec

Transport planning in the Stockholm Region

GOVERNMENT POLICY STATEMENT ON LAND TRANSPORT 2015/ /25

Connecticut s Bold Vision for a Transportation Future

Proof Positive. In 2008, British Columbia announced a bold new climate policy: North America s first revenue-neutral tax on carbon pollution.

Why NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs

The Journal of Science Policy & Governance

Consideration of application from Dublin Bus for a Fares Increase

Department of Transportation, Rail Division Records Retention Schedule Effective Date: June 2003 Table of Contents. Rail Safety...

World Bank Transport Forum, April 2009

THE UK CLIMATE CHANGE PROGRAMME AND EXAMPLES OF BEST PRACTICE. Gabrielle Edwards United Kingdom

FREIGHT RAILROAD PRESERVATION PROGRAM SFY 2017 PART I - APPLICATION INSTRUCTIONS

communication tower means a tower or structure built to support equipment used to transmit communication signals;

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

State of Good Repair Roundtable Chicago, Illinois. Asset Management Systems MBTA Approach and Lessons Learned

Department of Community Services and Development (CSD) Low-Income Weatherization Program (LIWP)

EDUCATION AND CULTURE - REGULATION OF PRIVATE TRADE SCHOOLS

Transcription:

Consultations A submission by the Railway Association of Canada February 9, 2016

Table of Contents 1.0 Introduction... 4 2.0 How the rail industry can support Canada s economic s objectives... 4 3.0 Investments in rail can support multiple government objectives... 4 Reduced emissions... 4 Improved transportation safety... 4 Improving the movement of people while leveraging the environmental benefits of rail... 5 4.0 Our recommendations... 5 Capital cost allowance... 6 Shortline funding... 7 Passenger rail funding... 8 5.0 Closing... 8 2

Acronym Table CCA GHG HFR ITA RAC TC U.S. Capital Cost Allowance Greenhouse Gases High Frequency Rail Income Tax Act Railway Association of Canada Transport Canada United States of America 3

1.0 Introduction The Railway Association of Canada (RAC) welcomes the opportunity to participate in the 2016 pre-budget consultation. 2.0 How the rail industry can support Canada s economic s objectives Railways are the lifeblood of the Canadian economy, allowing businesses to compete across North America and internationally. Railways move $280 B of goods in Canada each year, which equals 50% of the goods destined for export and 70% of all intercity-freight traffic. Moreover, 75 M Canadians use passenger rail each year. Railways invest record amounts into their infrastructure. Class 1 railways, namely CN and CP, invest 20% of their revenues per annum while the country s 50 plus shortline railways invest approximately 12%. However railways compete directly against a subsidized trucking sector. Truckers have access to publicly funded infrastructure, while railways build, maintain, and expand their private infrastructure. This fundamental difference creates an unfair playing field for moving freight, and discourages Canadians from using passenger rail. Furthermore, government investment in road infrastructure creates an everlasting need for public funding to maintain existing and build new road infrastructure. 3.0 Investments in rail can support multiple government objectives Reduced emissions Railways can support the government s objectives to reduce emissions by 30% below 2005 levels by 2030. With dedicated programs and strategies to manage greenhouse gas emissions (GHG), rail is a fuel efficient and emission-friendly mode of transportation 1. Railways move one tonne of freight more than 200 kilometres on a litre of fuel. They produce five times fewer emissions than trucking, and a single freight train can replace several hundred trucks from the country s congested highway and road network. While transportation-related GHGs hover around 30%, railways continue to improve their performance. Since 1990, railways have reduced their GHG intensity by more than a third, and despite moving substantive volumes of freight and passengers each year, they produce just 3% of Canada s transportation-related GHGs. Improved transportation safety Canada s railways are the safest railways in North America. Since 2005, the freight sector s accident rate has dropped by 41.4% and in 2014 the accident rate fell to 2.11 accidents per billion gross ton-miles - the second-lowest accident rate ever recorded. 1 Since 1995, Canada s railways have maintained a series of Memorandum of Understanding with the Federal Minister of Transport to establish voluntary emission reduction requirements. Additional information is available at:: http://www.railcan.ca/publications/emissions 4

However, since the terrible rail accident of July 6, 2013 in Lac-Mégantic, the rail safety regulatory environment has changed and new measures have come into play: The new Grade Crossings Regulations will require railways to invest more than $350 M between 2015 and 2021, with an additional cost of approximately $29 M each year, to meet new crossing standards dealing with signage, crossing surface specifications, system upgrades, etc. These requirements are not likely to be eligible for funding under the existing Grade Crossing Improvement Program. The Railway Safety Management System Regulations, 2015 will impose significant administrative costs to federally regulated railways and to any railway operating over federal track. Some shortlines estimate that the regulatory requirements will cost between $100,000 and $200,000 per year. Also, recent amendments to the Transportation of Dangerous Goods Regulations introduced specifications for a new class of tank car for flammable liquid dangerous goods service (to be built after October 2015), and require older tank cars to be phased-out over a detailed schedule. These cars are owned by shippers and leasing companies, and according to TC, the total costs of the regulations are estimated to be $1,005 M over 20 years. 2 The RAC believes that federal funding programs and competitive fiscal measures need to be in place to ensure that regulatory compliance costs are kept to a minimum and rail safety can continue to improve. Improving the movement of people while leveraging the environmental benefits of rail In 1977, the federal government created VIA Rail with the exclusive mission to organize and provide all intercity passenger train services in Canada underscoring that passenger rail is an essential service. At present, VIA Rail only owns two per cent of the tracks that it uses with the remainder owned by Canada s freight railways. Increased congestion on these tracks often leads to speed restrictions and the inability to scheduling more trains hurdles that prevent VIA Rail from fulfilling its mandate to Canadians. This situation is also far from ideal for the freight railways, as VIA occupies time slots during the day that impede freight movements. VIA Rail has proposed a High-Frequency Rail (HFR) project that aims to develop a new dedicated passenger rail network between Montreal, Ottawa and Toronto. The HFR would be built using abandoned or available railway rights-of-way and would take approximately four years to complete. 4.0 Our recommendations The following recommendations will allow the government to leverage the sector s ability to invest, and in doing so, realize objectives related to climate change, supporting small-to-medium sized business, and building sustainable infrastructure. 2 Source: www.gazette.gc.ca/rp-pr/p2/2015/2015-05-20/html/sor-dors100-eng.php (see costs) 5

Capital cost allowance Investment in infrastructure represents the largest component of annual spending for railways, with CN and CP investing nearly $2 B in 2014 and 2015 on their tracks and signals. These investments reflect 55 to 60% of the railways annual capital expenditures (Figure 1) 3. Figure 1: Class 1 freight railway capital expenditures for track and signals (2004 2014) The railway track and property in question are captured under Class 1 of the Income Tax Act (ITA) regulations and are described in subsection 1101(5e.1). They include railway track and grading including components such as rails, ballast, ties and other track material; railway traffic control or signaling equipment; and a bridge, culvert, subway or tunnel that is ancillary to railway track and grading. These assets have a capital cost allowance (CCA) rate of 10% on a declining balance basis. Similarly, tank cars are captured in Class 7 and have a CCA rate of 15% on a declining balance basis. Under the United States (U.S.) Modified Accelerated Cost Recovery System, the above-mentioned assets are completely depreciated at the end of year 8. This tax depreciation allows for approximately 69% of the asset cost to be written-off in the first 4 years, and the remainder in the last 4 years. Moreover, since 2001 the U.S. system has provided for a tax bonus depreciation ranging from 30% to 100% of annual rail infrastructure spending. This tax measure has been very successful in enticing U.S. railways to improve their network and their customer service. The bonus depreciation legislation was extended to 2019. Changes to CCA and classes have been introduced to support economic policy initiatives. For example, the Government of Canada provided incentive for Manufacturing and Processing machinery and equipment by introducing new Class 53 (50% CCA, declining-basis) which allows for a faster write-off and cost recovery. Recommendation 1 3 Source: Railway Association of Canada, 2016. Rail Trends Database. 6

The RAC recommends that in order to foster further contribution by the rail sector to the Canadian economy, and to soften the regulatory cost to railways and car owners in meeting new rail safety requirements as well as improve the Canadian CCA tax depreciation regime to become more competitive with the U.S. tax system, the Government of Canada should: Introduce an accelerated capital cost allowance measure to encourage railways to invest in track and related property as defined under Class 1, in subsection 1101(5e.1) of the ITA regulations, and car owners (including shippers or leasing companies) to invest in tank cars as defined under Class 7 of these regulations. This measure would provide a 50% capital cost allowance rate for assets classified under Class 1 and acquired over a 7-year period starting effective in 2016 and ending in 2022, and over a 10 year period (2016-2026) for acquisitions under Class 7. This measure will maintain and improve railway safety and support infrastructure spending to improve rail fluidity, economic prosperity and job growth. Shortline funding Shortlines are an integral part of the Canadian rail network, providing vital services to regional and remote communities. They operate on low density rail lines, feeding traffic to Class 1 railways, and providing shippers with a seamless rail link to the marketplace. These smaller railways need to upgrade their infrastructure to capitalize on growth opportunities, while facing financial constraints. The 12 % of the revenue investment that shortlines make each year is mostly made to maintain current infrastructure and not upgrade or expand infrastructure. Infrastructure projects require both public and private sector funding. To date the New Building Canada Plan and its predecessor have not been a significant source of funding to shortlines. Municipal and provincial public sector infrastructure projects are typically selected over shortline projects. Comparatively in the U.S., shortlines have access to a variety of funding programs at the Federal and State levels. These programs are innovative and include grants, low interest rate loans and tax credits. Recommendation 2 The RAC recommends that in order to reduce the regulatory cost for shortline railways in meeting the federal government s objectives related to transportation safety, and to foster investment in infrastructure that generates multiple public benefits, the Government of Canada should: Create a capital funding program of $300 M over 7 years starting effective in 2016 and ending in 2022 which would be aimed at helping shortlines invest in their infrastructure. The funds would be accessible through a refundable tax credit mechanism (limited to the lesser of 50 % of the eligible investment in the infrastructure or $15,000 per mile of track of the network during the first two years, and to $5,000 per mile for the following five years). This fixed funding amount per track mile would be similar to the existing U.S. program for shortlines, but would accelerate it for the first two years to foster shovel-ready projects. Investments in shortline railways will also support the government s objectives to strengthen transportation safety as described in Section 3. Shifting traffic from road to rail will leverage private sector investment 7

into rail infrastructure, free up road capacity, reduce congestion and lead to lower road maintenance costs for governments and tax payers. Passenger rail funding A reliable, frequent, fast and cost-effective passenger intercity rail service requires a dedicated passenger network that would allow VIA Rail to run its trains at their full potential speed of 160 km/h, and to increase its ridership from 2 M to 7 M passengers a year. The expected financial returns would cover the project s costs, which are estimated to be approximately $3 B. VIA Rail s current fleet is over 40 years old making these aging assets increasingly expensive to maintain. The renewal of VIA Rail s rolling stock, presently estimated at $1 B, would be a wise investment that would significantly reduce operating and maintenance expenses; increase passenger volume and revenues; and could be leveraged by the Crown Corporation to secure $3 B of funding for its dedicated track project, from financial markets. Recommendation 3 The RAC recommends that given the incredible potential of VIA Rail s dedicated inter-city passenger railway service proposal and noting that investments in passenger rail can support government objectives related to job creation, emission reduction, improving transportation safety, and optimizing Canada s railway network, the Government of Canada allocate $1 B to VIA Rail's Quebec-Windsor Corridor fleetrenewal project, and in doing so, allow the railway to leverage this investment to secure an additional $3 B from financial markets that can be invested in its shovel-ready and job-creating dedicated track project. 5.0 Closing If you have additional questions or comments, please contact Michael Gullo at mgullo@rail.ca or 613-564- 8103. 8