Settlement of Capacity Based DR Changes to Market Manual. Demand Response Public Session September 12, 2014



Similar documents
Market Manual Changes for Settlement of Capacity Based DR. Demand Response Working Group August 6, 2014

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1

Chapter 7 System Operations and Physical Markets

2. DATA VALIDATION, ESTIMATION AND EDIT

Chapter 9 Settlements and Billing

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations

Demand Response Programs In Ontario. IESO Demand Response Working Group Public Session

1. Key Dates for Pool Settlement Where to find the Pool Statements On-going Reporting to Pool Participants 2

Piedmont Natural Gas Company, Inc. Tennessee Index of Tariff & Service Regulations

Market Rule Amendment Proposal

Market Procedure: Settlement VERSION 3. Market Procedure: Settlement V3 Page 1 of 24

PROCEDURE. Part 5.9: Settlement Payment Methods and Schedule PUBLIC. Market Manual 5: Settlements. Issue 17.0 MDP_PRO_0036

Overview of the IESO-Administered Markets. IESO Training. Updated: January, Public

PROCEDURE. Part 3.1: Metering Service Provider (MSP) Registration, Revocation, and Deregistration PUBLIC. Market Manual 3: Metering. Issue 14.

PROCEDURE. Part 3.2: Meter Point Registration and Maintenance PUBLIC. Market Manual 3: Metering. Issue 26.0 MDP_PRO_0013

Certification Fee Structure for Green-e Climate and Green-e Energy

Electricity Prices Panel

CMM GS NFGDC ( )

CURTAILABLE RATE PROGRAM FOR INDIVIDUAL CUSTOMER LOADS

SE-113 Updates to Meter Data Distribution. December 8, 2014

Notice/Billing Address City ST Zip. Utility Account No Street Address City State Zip

Operational Rules for Organized Power Exchange INDEPENDENT BULGARIAN ENERGY EXCHANGE

Demand Response FAQs

INSURANCE AGENCY AGREEMENT

ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA

Effective Separation of Market Operations and Procurement and Contract Activities

Business Requirements Specification

NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM

Smart Meters Programme Schedule 9.1. (TUPE) (CSP South version)

APPROVED AMENDED PRICING METHODOLOGY FOR PRESCRIBED SHARED TRANSMISSION SERVICES FOR 1 JULY 2014 TO 30 JUNE 2019.

SETTLEMENT AND BILLING PROTOCOL (SABP) OBJECTIVES, DEFINITIONS AND SCOPE

Technical Bulletin Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue

ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA

GENERAL INFORMATION. 8. LIMITATIONS OF SERVICE CLASSIFICATIONS (Continued)

RHODE ISLAND. Electronic Business Transactions (EBT) Standards. for Electronic Data Interchange (EDI) in a Restructured Electric Industry

Kiwi Energy NY LLC 144 North 7 th Street #417 Brooklyn, NY

Procedure for Nominating Renewable Energy Credit Offsets

APPENDIX A: SYSTEM OF ASSURANCE OF NET METERING ELIGIBILITY

Global Settlement the Residual Meter Volume Interval Proportion

ABERTAY UNIVERSITY DEBT MANAGEMENT POLICY: STUDENTS

Section A: Compensation on Termination for Board Default and Voluntary Termination

Standard Electricity Terms & Conditions for Industrial and Commercial Business Customers

Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement

Pricing Methodology 1. 1 July 2009 to 30 June April 2010

MSP Performance Measures. Revenue Meter Standing Committee October 8, 2009

2016 Santee Cooper Solar Home & Solar Share Home Program Manual

Consultants Services, Lump-Sum Remuneration

Day-Ahead Commitment Process Implementation Overview - Settlement. January 12, 2006 Edward Arlitt, DACP Project Team

Credit Management and the ERCOT Nodal Market

ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014

Emergency Demand Response Program Manual

CONSTELLATION ENERGY TERMS AND CONDITIONS

PROCEDURE. Part 4.3: Real-Time Scheduling of the Physical Markets PUBLIC. Market Manual 4: Market Operations. Issue 44.

B.9 Terms for Delivering Electricity to Power-intensive Users at Voltages below 132 kv 1

SCHEDULE FIT TIER 1 AND TIER 2

Standard Electricity Terms & Conditions for Industrial and Commercial Business Customers

Electricity Trading RULES

Load Response Program Agreement Real-Time Demand Response Program 30 Minute Notice

CRM Support Services Agreement

CONSOLIDATED BILLING BUSINESS PROCESSES (UTILITY RATE READY)

Most household services provide you with a fixed monthly bill: Broadband Internet service

REAL TIME PRICING - HOUR AHEAD SCHEDULE: RTP-HA-5

AGCS Gas Clearing and Settlement AG

SONI Limited. Intra-day Trading. Grid Code Amendments Consultation Paper. APPENDIX: Proposed Grid Code Modifications

New Brunswick Electricity Business Rules

Welcome to PSE&G s Third Party Supplier Electric Workshop

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

Patti Weiss Patti Weiss EDEWG EDC Co-chair Duquesne Light Company

Energy Efficiency Measurement & Verification

CERM NEGOTIATING FRAMEWORK NEGOTIATED DISTRIBUTION SERVICES. 1 July 2015

Market Contract Terms and Conditions

REASONS FOR COMMON RECOMMENDATION PROVISIONS RUSSELL BROWN, TRUSTEE

TOGAF Certification for People Training Course Accreditation Policy

Standard Conditions of Direct Contract On Purchase of Balance Electricity. (About the Commercial Operator Buying the Balance Electivity)

THE NARRAGANSETT ELECTRIC COMPANY Terms and Conditions for Nonregulated Power Producers

PERMANENT COURT OF ARBITRATION OPTIONAL RULES FOR ARBITRATING DISPUTES BETWEEN TWO STATES

RULES ON CREDIT RESOURCES CLEARING AND SETTLEMENT

PG&E Demand Response Programs SVLG DR Workshop December 10, Peter Chan Pacific Gas and Electric

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18

ELECTRICITY FINAL BUDGET AND FEES:

815 CMR 9.00: DEBT COLLECTION AND INTERCEPT. Section

Your guide to electricity pricing in Ontario

Customer Responsiveness Strategy

ENERGY ELECTRICITY. DRAFT MODIFICATIONS TO DOCUMENTS MAINTAINED UNDER LICENCES (EMR No. 1 of 2015)

ELECTRICITY PRICING INFORMATION. This list shows the terms that appear on electricity bills and what they mean:

815 CMR: COMPTROLLER'S DIVISION 815 CMR 9.00: DEBT COLLECTION AND INTERCEPT. Section

Small Business Tax Credit for Employee Health Expenses

This section has been included to provide a brief overview of MCP Medical Audit practices, policies, and procedures.

Lumous standard terms and conditions web design and development

Congestion Management Settlement Credits Dispatch Technical Working Group February 13, 2012

Market Operation s Report

Water Charges Plan Decision Paper (Executive Summary)

MERCHANT SERVICES, LEASING AND OPERATING AGREEMENT. ( Blackboard ). In this Agreement, the words; BbOne Card means a stored-value account

Introduction to Ontario's Physical Markets

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Balance Settlement. The following also applies to balance settlement: a) There must be a Balance Administrator for each trade in Dragör.

GENERALLY ACCEPTED ACCOUNTING PRINCIPLES

ANNEX QUESTIONS TO ODOT ON MATERIAL FINANCE ISSUES

ELECTRICITY MARKET ACT

The participation of non-generation activities in the GB Capacity Market. Department for Energy & Climate Change

Transcription:

Settlement of Capacity Based DR Changes to Market Manual Demand Response Public Session September 12, 2014

Overview Settlement of Capacity Based DR Measurement & Verification Plan Demand Response Measurement Data Capacity Based Demand Response Baseline Methodology Settlement and Payment Performance Set-Offs Performance Breach Settlement Statements Other Appendix: Equations for Payment & Performance Set- Offs 2

Settlement of Capacity Based DR New Section in Settlements Market Manual 5, Part 5.5 Settlement of Capacity Based Demand Response The Capacity Based Demand Response (CBDR) program is designed to bridge the time from the Ontario Power Authority s Demand Response 3 contract expiration to the delivery date of the next available Demand Response Auction. This section sets out how the IESO settles the CBDR Program. 3

Measurement & Verification Plan M & V Plans may be submitted for our review for one or more of the following reasons: New Participants applying to Capacity Based Demand Response; A proposed Project amendment; A new Program Schedule is added; Any proposed amendments or modifications to a Project s M&V Plan Change to the specifications of a Project such as the addition, deletion or substitution of any Contributor during the Schedule Term For Aggregators: When a Contributor Loss is invoked Overview, Submission & Approval, and Plan Information Requirements will be consistent with DR3 Program Rules and will be contained in Market Manual 5, Part 5.5 The IESO will review new or amended M&V Plans within 10 business days of receiving them from the DRMP If the Plan is completed satisfactorily, the IESO will approve and notify the DRMP No proposed amendment or modification to an M&V Plan is effective without written acceptance of the IESO 4

Demand Response Measurement Data Weekly DR Measurement Data Submission Requirements For CBDR participants that do not have a revenue meter registered with the IESO we require: weekly retail revenue measurement data submitted by 15:00 EST on the first business day of the second week following the settlement week (V1 measurement data); and revisions to the weekly data received by 15:00 EST on the last business day of the month following the month to which the data relates. (V2 measurement data) If V1 measurement data is received by the IESO past the 15:00 EST deadline, the participant will receive a 20% set-off to their Availability Payment prorated for the week (this increases each week the data remains undelivered see slide 22). 5

Demand Response Measurement Data (cont d) The IESO has 3 business days from the V1 submission deadline to process the data file(s) and notify the participant if and only if there are data file discrepancies or errors found. If there are data file errors found: DRMP will be notified and will receive a 20% measurement data set-off to their availability payment prorated for the week DRMP will then have until 15:00 EST on the next business day to resubmit error free data to avoid facing an increased measurement data setoff of 33% DR Measurement Data Set-Off Factor is an increasing factor for every week that the full data remains undelivered. The set-off calculation is detailed on slide 22. 6

Demand Response Measurement Data (cont d) Data File Submission Format is as follows: The CSV file shall contain 2 channels of 5 minute engineering unit values. The unit of measurement is kwh delivered for channel 1 and kwh received for channel 2. The CSV file shall adhere to the following format: YYYY/MM/DD, HH:MM, kwh, kwh. YYYY/MM/DD HH:MM kwh kwh 2009/03/28 00:20 749.30 0 2009/03/28 00:25 748.45 0 2009/03/28 00:30 745.45 0 7

Capacity Based DR Baseline Methodology CBDR Baseline: For each hour of a DR Activation the CBDR Baseline will be derived as follows: CBDR Baseline = Standard Baseline X In-Day Adjustment Factor A single CBDR Baseline is calculated per DR Account based on the aggregate measurement data for all Contributor(s) to that DR Account and is subject to the In-Day Adjustment Curtailment will be calculated for each hour of a DR Activation as the difference between the DR Account s calculated CBDR Baseline and its measured consumption (or net production) of electricity 8

Capacity Based DR Baseline Methodology Suitable Business Days (SBD): The Standard Baseline and the In-Day Adjustment calculation will go back to a maximum of 35 Business Days prior to the day of the Activation to establish 20 Suitable Business Days If there are insufficient Suitable Business Days within the previous 35 Business Days, then we may elect to utilize only available Suitable Business Days within the previous 35 Business Days Standard Baseline: High 15 of 20 For any Confirmed Hour of a DR Activation it is the average of the highest fifteen 15 values for the same hour as those of the Activation, in the last twenty 20 Suitable Business Days prior to the Activation. Behind the Meter Generator s: highest is replaced with lowest in CBDR Baseline calculations 9

Capacity Based DR Baseline Methodology (cont d) In-Day Adjustment Adjustment Window is the 3 hr window occurring 1 hr before an Activation event Calculates a DR Account s average actual consumption during the historical adjustment window and compares it to the average actual consumption during the DR event day adjustment window to determine an Adjustment Factor A-Value = Avg. actual consumption during the Adjustment Window hrs in the past highest 15 of 20 SBD prior to the Activation. B-Value = Avg. actual consumption during the Adjustment Window hours on the actual Activation day. In-Day Adjustment Factor = B-Value / A-Value The Adjustment is a +/-20% multiplicative capped factor: If it is calculated as less than 0.8 it will be taken as 0.8 If it is calculated as greater than 1.2 it will be taken as 1.2 CBDR Baseline = Standard Baseline X In-Day Adjustment Factor Curtailment = CBDR Baseline Metered Consumption 10

Settlement & Payment Calculating the Monthly Payment: Availability Payments Availability Over Deliver Payments Utilization Payments Performance Set- Offs/Breach Monthly Payment Availability Payment Each month, you will receive an Availability Payment for each DR Account based on the Hours of Availability, Monthly Registered MW and the Adjusted Availability Rate. Availability Premiums and Discounts: IESO may apply an adjustment to the Availability Rate, in relation to certain Designated Settlement Areas Program Participation Zones and Applicable Rate Determination will be embedded in Market Manual 5, Part 5.5: Availability Over-Delivery Payment For an Open Standby Notification, you may deliver more MWs or reduce load for a longer period than agreed to in your Program Schedule. 11

Settlement & Payment (cont d) Utilization Payments You are paid for the amount of load reduction you actually provide for a DR Activation for each Demand Response Account based on the Actual Activated MWh and the Utilization Rate. Actual Activated MW (AAM): metered reduction, can be positive or negative and will be taken as is when zonal performance aggregation is done to check for compliance. Rate Schedule (to be located in Settlements MM): 12

Settlement & Payment (cont d) All Payments are calculated once a month in the month following the month to which the payment relates and are applied as manual line item s on the last trading day of that month s settlement statement. New charge type numbers/names will be created based on the equations in these slides and will apply to DRMP s in the CBDR Program Cost Recovery of CBDR will be done monthly through the an uplift which will be designed to recover the monthly cost, of the CBDR program 13

Performance Set-Offs Availability Set-Off DRMP s are required to maintain a Reliability Rate of at least 85% for each and every interval of an Activation Hour for each DR Account, and fulfil other requirements in order to avoid Performance Set-Offs. Availability Set-Off applied will be the greatest of: the Availability Set-Off (Reliability), Availability Set-Off (Timely Confirmation), and Availability Set-Off (Low Confirmation) for a given DR Activation. If Availability Set-Off exceeds the Availability Payment, then the excess is considered owed by the DRMP to the IESO. 14

Performance Set-Offs (cont d) Availability Set-Off (Reliability) Where the Reliability Rate for a given DR Account is less than 85% during any Interval of a DR Activation hour, or where the DR Account is Not Fully Available for Curtailment, an Availability Set-Off (Reliability) for each such Activation Hour in the Activation Period Availability Set-Off (Timely Confirmation) If the DRMP, fails or delivers late, one or more required Confirmations in the month, then an Availability Set-Off (Timely Confirmation) will be calculated. Availability Set-Off (Low Confirmation) This applies when the Confirmed MW are less than 95% of the Monthly Registered MW for a Confirmed Hour of the Dispatch Period. 15

Performance Set-Offs (cont d) Planned Non-Performance Availability Set-Off Applies for any day for which you have requested a Non-Performance Event as part of either a Single Day Non-Performance Event or an Extended Period Planned Non-Performance Event. DR Measurement Data Availability Set-Off A DR Measurement Data Availability Set-Off will be applied against the Availability Payment for a DR Account if a complete set of weekly measurement data and proof of any Forced Outage(s) for that DR Account is not received by the IESO by 15:00 EST on the first business day of the second week following the week for which the data relates Utilization Set-Offs The Utilization Set-Off will be the greatest of any of the Utilization Set-Off (Reliability), Utilization Set-Off (Timely Confirmation), and Utilization Set-Off (Low Confirmation) for each DR Activation Event as calculated below. Similar to the criteria for Availability Set-Off (Reliability, Timely, Low) respectively except they offset Utilization Payment s 16

Performance Breaches The number of Performance Breaches for a DR Account will be set to zero upon successful registration for CBDR. A DRMP s compliance with DR Activation instruction is evaluated at the zonal level using a Zonal Dispatch Aggregation model when calculating Performance Breaches. Each participant will be assigned to a zonal resource for the zones and window (early/late) in which they have contributors or directly participate Zonal Dispatch Aggregation means the collection of Demand Response Accounts within the IESO defined regional zone model sharing the same Activation Period during any given Demand Response Activation. 17

Performance Breaches Performance Breach occurs: For an Activation Event per Zone: - Actual Activated MWh / Activation MW < 80% - Confirmed MW / Monthly Committed MW < 80% Participant fails to provide a complete set of weekly measurement data for a DR account by the fourth week after the deadline Performance Breach is evaluated per DRMP using the most up-todate settlement data (V1 or V2) aggregated by DR Account by Zone (in accordance with IESO zonal DR dispatch model) 18

Performance Breaches (cont d) Performance Breach Events: 1 st PB: Availability Payment for all of the DRMP s DR Accounts within the non-compliant zone will be withheld for the month in which the PB occurred. 2 nd PB: Withholding the Availability Payment (as stated above) plus, the IESO has the right to terminate all of those DR schedules and will determine the need to do this on a case by case basis. 3 rd PB: Withholding the Availability Payment (as stated above) plus, the DRMP may be terminated from the CBDR program and/or may be subject to compliance actions in accordance with section 6 of chapter 3 of the Market Rules as the IESO sees fit. 19

Settlement Statements Preliminary Settlement Statements (PSS) A PSS for each month will be made available on the IESO Market Participant report site 10 business days after the last day of the month immediately following the month to which the statement relates. It will describe all payments and applicable set-offs for the previous month. An invoice for amounts owed to or by the DRMP as per the PSS will be made available to the DRMP at the same time on the same reports site. CBDR Performance Report details still to be determined A monthly report for DRMP s located on the reports site along with PSS Details are still being determined - report similar to the one Participants receive from the OPA for DR3. The goal is to provide DRMP s with more detailed information relevant to their Settlement Statement (baseline days, outage days, activation MW, AAM are being considered for the report) 20

Settlement Statements (cont d) Notice Of Disagreements If the DRMP has a discrepancy with their PSS they will have 4 business days to file a Notice of Disagreement as per Market Manual 5, Part 5.5, section 1.3.5 Submitting a Notice of Disagreement. All Market Participants are expected to adhere to the IESO s Notice of Disagreement Process Utilization of this process allows Market Participants access to the IESO Dispute Resolution Process The dispute resolution process for NOD s will commence between the DRMP and the IESO if the IESO determines the NOD submitted is legitimate 21

Settlement Statements (cont d) Final Settlement Statement (FSS) A FSS for the settlement month will be made available on the IESO Market Participant report site 20 business days after the last day of the month immediately following the month to which the statement relates. It will contain any adjustments to the preliminary settlement statement (if applicable). Payment for those adjustments appearing on the final settlement statement (if any) will be included in the next invoice. 22

Other Performance Exemptions, Planned Non-Performance Events, and Buy-Downs These topics will all be consistent with DR3 Program Rules and will be detailed in Market Manual 5, Part 5.5 in the CBDR Settlement Section. 23

Feedback Please send feedback to Stakeholder.Engagement@ieso.ca 24

Appendix (Payment Calculations) Payment Calculations AAAAAAAAAAAA PPPPPPP = HA H x MRMW h x AAR Where: HA (Hours of Availability) MRMW (Monthly Registered MW) AAR (Adjusted Availability Rate), an amount equal to the Availability Rate*, expressed in /MWh, as increased by the Availability Premium or as decreased by the Availability Discount H is the total hours a Participant is available in a month Availability Over-Delivery Payment = H (CMW h MRMW h ) AODR h Where: CMW (Confirmed MW), means the number of MW available for curtailment by the DRMP. CMW is limited to the lesser of the Monthly Registered MW plus 15 MW and 130% of the Monthly Registered MW. MRMW (Monthly Registered MW) AODR (Availability Over-Delivery Rate*), means the over delivery rate as specified in the rate schedule. H is the set of all hours h in the month where the CMW exceeded the MRMW 25

Appendix (Payment Calculations cont d) Utilization Payment=[ (Curt h x UR h )] [ (NG h x MIN HOEP, UR h )] H H Where: Curt (Curtailment), the number of MWh Curtailed by a DRMP when requested by the IESO, can not exceed the product of the Activation MW and the activation period requested by the IESO, plus the lesser of an additional 15% of the Activation MW per hour of the activation period, OR 15 MWh per hour of the activation period. UR (Utilization Rate*), expressed in $/MWh, as specified in the rate schedule NG (Net Generation), means the MWh of net electricity generated by any contributor that is a behind the meter generator. H is the total hours h a Participant is activated in a month. 26

Appendix (Performance Set-Offs) The Reliability Rate with respect to such Interval i shall be calculated as follows: RRRRRRRRRRR RRRR i = AAAAAA AAAAAAAAA MMM ppp IIIIIIII AAAAAAAAAA MM x 1 11 oo aa hhhh x 100 Availability Set-Offs Availability Set-Off (Reliability) = H PSOF h x AAR x MRMW h Availability Set-Off (Timely Confirmation) = PSOF x AAR x MRMWh x Dispatch Period Availability Set-Off (Low Confirmation) = H (PSOF h x AAR x (MRMW h CMW)) Where: PSOF (Performance Set-Off Factor) refers to the set of factors defined in a table in MM 5, Part 5.5 AAR (Adjusted Availability Rate) MRMW (Monthly Registered MW) Dispatch Period means the four consecutive hours. Each Dispatch Period shall occur within the Hours of Availability, and shall occur within and no more than once in accordance with the Daily Schedule CMW (Confirmed MW) means the number of MW available for Curtailment by the Participant. CMW is limited to the lesser of the Monthly Registered MW plus 15 MW and 130% of the Monthly Registered MW H is the set of all confirmed hours h when the Confirmed MW s are less than 95% of the Monthly Registered MW for the Activation Period 27

Appendix (Performance Set-Offs cont d) Planned Non-Performance Availability Set-Off The calculation is: PNPAS m = Non-Activation Day Non-Performance Availability Set-Off + Activation Day Non- Performance Availability Set-Off Non-Activation Day Performance Availability Set-Off = (AAR x MRMWh x HANEH) Activation Day Non-Performance Availability Set-Off = (OH x AAR x MRMWh x NEWF) Where: HANE (Hours of Availability for a Non-Performance Event) OH (Opportunity Hours), means 64 if Option A is applicable to the DR Account; or 32 if Option B is applicable to the DR Account NEWF (Non-Performance Event Weighting Factor), means 50%, if the Actual Activated MWh per interval, as averaged over all of the Intervals in the Activation Event, is greater than or equal to the product of the Monthly Registered MW and 1/12 of an hour; or 100% otherwise 28

Appendix (Performance Set-Offs cont d) DR Measurement Data Set-Off =MDSF x (HA H x MRMW h x AAR) Where: MDSF (Measurement Data Set-Off Factor), is an increasing factor for every week that the full data remains undelivered. The factor is equal to: 20% for the first week that the full data remains undelivered; 33% for the second week that the full data remains undelivered; 50% for the third week that the full data remains undelivered ; and 100% for the fourth week that the full data remains undelivered. HA (Hours of Availability) MRMW (Monthly Registered MW) AAR (Adjusted Availability Rate) H is the total hours a DRMP is available for the applicable week 29

Appendix (Performance Set-Offs cont d) Utilization Set-Offs Utilization Set-Off (Reliability) = PSOF H x UR x MRMW h H Utilization Set-Off (Timely Confirmation) = PSOF x UR x MRMW h x Dispatch Period Utilization Set-Off (Low Confirmation) = (PSOF x UR x (MRMW h CMW) H Where: PSOF (Performance Set-Off Factor) refers to the set of factors defined in a table in MM 5, Part 5.5 UR (Utilization Rate) MRMW (Monthly Registered MW) Dispatch Period means the four consecutive hours. Each Dispatch Period shall occur within the Hours of Availability, and shall occur within and no more than once in accordance with the Daily Schedule CMW (Confirmed MW) means the number of MW available for Curtailment by the Participant. CMW is limited to the lesser of the Monthly Registered MW plus 15 MW and 130% of the Monthly Registered MW H is the set of all confirmed hours h when the Confirmed MW s are less than 95% of the Monthly Registered MW for the Activation Period 30