Supplier Quality Procurement Requirement (SQPR- 03) Supplier Packaging, Marking, Shipping and Preservation

Similar documents
PAAM COMMERCIAL PRIVATE LIMITED

BUILDING MATERIALS, Wood, Laminated (Page 1 of 3) Viz.: Rafters; Arches; Beams; Joists; Timbers or Planks, structural or roof.

Supplier Packaging Guidelines. NACCO Materials Handling Group, Inc.

II. For Type B parts:...20 III. For Type C parts:...20 IV. For Type D parts:...20 V. For Type E parts: Process Changes...

Distributors In addition to the requirements noted herein, Distributors shall have a Quality System

Specifications for Programs: 737, 747, 757, 767, 777, 787

GENERAL REQUIREMENTS AND COMMERCIAL PACKAGING

Supplier Quality Requirements and Clauses

Packaging Information for Vendors Engineer Approved Hard Copies Uncontrolled. Verify Revision Prior to Use.

Packaging Perishable Shipments

Packaging Information for Vendors Engineer Approved Hard Copies Uncontrolled. Verify Revision Prior to Use.

PACKAGING AND SHIPPING INSTRUCTIONS FOR SEAGATE PRODUCTS CONTENTS:

"PARTNERS IN PACKAGING

Manufacturing, Supply & Quality Plan for Tower Bolts. SL Tower Bolt Market Penetration

Packaging Perishable Shipments

Quality Assurance Provisions

SPECIFICATION Aluminum Module Frames. Allowed anodization before fabrication for clear frames.

Pigeon Spike Stainless Economy Bird Spikes Includes specifications for: Pigeon Spike Stainless models, hardware and surface cleaning.

Packaged Terminal Air Conditioner Wall Sleeve Installation

ALUMINUM UNIVERSAL VAN / CAP RACK INSTRUCTIONS ROOF MOUNT APPLICATION P/N ULRHDGV-1 / ULRHDGC-1

For Components PIERBURG S.A.

STOCK BOXES SIZE STYLE BUNDLE BALE NOTES

E. INTERNAL PACKAGING

Model # 940P-V6. Page 1 of 11

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

Packing and Containers

Supplier Quality Assurance Requirements Manual

ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES

INTRODUCTION: PURPOSE:

Sun Vinyl New Construction Windows Homeowner's Warranty

YFS Automotive Systems, Inc. Supplier Packaging Guidelines

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

PEDAL CAR - GO CART ASSEMBLY & OPERATING INSTRUCTIONS

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

RTV162. Electronic Grade Silicone Adhesive Sealant

... more than you expect. Shipping supplies

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

Owner's Manual & Assembly Instructions

DHL EXPRESS PACKING GUIDE. Protect your shipment with good and quality packaging

Acceptance Codes APPENDIX - A. Acceptance Criteria

Premium Nixalite All Stainless Steel Bird Barrier Spikes Includes specifications for: Premium Nixalite Models S, H and W and Mounting Hardware.

Steel Guard and Armor Guard Installation and Assembly Guide

Claims Management Policy

Packaging guidelines. Introduction. Contents

ATS Overhead Table Shelf System INSTRUCTION MANUAL

MIL-STD Standard Practice for Military Packaging

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE

TRI-FOLD TONNEAU INSTALLATION GUIDE

COATING & WRAPPING OF UNDERGROUND PIPING

SnoTrace KSR Surface Snow and Ice Melting INSTALLATION PROCEDURES

SUPPLIER QUALITY ASSURANCE REQUIREMENTS

Self-Audit Checklist

A PACKAGING SYSTEM. G. W. King Virginia Division of Forestry, Providence Forge, Virginia

James M. Pleasants Company

City of San Diego, CWP Guidelines

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

Part I: Store Display Pallets

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Guidelines for Earthquake Bracing Residential Water Heaters

CATHODIC PROTECTION SYSTEM DESIGN

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

ENGINEERING SPECIFICATION PULTRUDED DYNAFORM FIBERGLASS STRUCTURAL SHAPES. July 1, 2008 Revision 2

1) CERTIFICATE OF COMPLIANCE/CONFORMANCE

Material and Components Used for UL/C-UL/ULC Mark Follow-Up Services

ULTRA 865HD HIGH PERFORMANCE MULTI PURPOSE GREASE

If you are packing up your property yourself, please follow these tips-

1.8 CRANKSHAFT OIL SEALS

C ampus Building Recycling Guide

HYDRAULIC LIFT TABLE CART 2200-LB.

SECTION DUCTILE-IRON PIPE AND FITTINGS

Scope. Definitionn. Food for. Children) children. 12 months. up to the. the age of. or for. Plumpy Doz. 35% fat), 1 of 5 Ref: Page

PORTER INSULATION PRODUCTS

MIDMARK DENTAL CABINETRY vs LOCAL CABINET MAKERS

Tubing and Accessories

Sustainability. Advantages of Reusable Containers

FREIGHT SHIPPING INFORMATION. For SUPPLIERS. Revised: January 15, 2010

Automotive and Mechanical Parts Packaging Guidelines and Designs

Chapter 3 Pre-Installation, Foundations and Piers

Tundra Series Windows January 2016

SAFE HANDLING OF PRECAST CONCRETE PRODUCTS

March 14, Installation of Bay, Bow and Garden Windows

Assembly Instructions MDM Products Party Tent

Quality Supplier Requirements for Beckwith Electric Co., Inc.

Working at Heights and Fall Protection

STANDARD OPEN PATIO COVER

How to Install Hardwood Flooring Over a Sub Floor

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

Navico-Northstar 2kW JRC Radar Package, Scanner Cable Removal and Replacement

METHOD STATEMENT FOR INSTALLATION OF CABLE TRAY/TRUNKING/LADDER

LU6X-130 Instructions and Parts List (including LU6X Basic) Operating Instructions

Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

The existing roof angle change terminations and flashings when sound and intact can be reused.

Garden Oasis BAY WINDOW GAZEBO SEARS ITEM # Warning:

Transcription:

Supplier Quality Procurement Requirement (SQPR- 03) Supplier Packaging, Marking, Shipping and Preservation SPQR-SQA-03 Rev: A Page 1

TABLE OF CONTENTS 1. Document Revision History Page 3 2. 1.0 Purpose. Page 4 3. 2.0 Related Documents... Page 4 4. 3.0 Definitions Page 4 5. 4.0 General..... Page 4 6. 5.0 Instructions - General.. Page 5 7. 6.0 Raw Material.. Page 6 8. 7.0 Casting and Forgings Page 6 9. 8.0 COTS Items. Page 6 10. 9.0 Machined Components.. Page 7 11. 10.0 Electronic Components. Page 8 SPQR-SQA-03 Rev: A Page 2

DOCUMENT REVISION HISTORY (SQPR-03) Revision Description of Changes Date Approved By Released A Initial Release 4/16/2014 JK SPQR-SQA-03 Rev: A Page 3

1.0 Purpose 1.1 This document outlines the minimum requirements for proper packaging and preservation of goods and supplies for transportation to Tactair, Young & Franklin, and designated locations. Specific requirements called out on a Purchase Order will take precedence over any requirement in this document. 2.0 Related Documents 2.1 SAE ARP 5316 - Storage of Elastomeric Seals and Seal Assemblies Which Include An Elastomer Element Prior to Hardware Assembly. 2.2 ANSI/ESD S20.20 - Protection of Electrical and Electronic Parts, Assemblies and Equipment 3.0 Definitions 3.1 Anchoring - The securing of an item to a base by means of bolts, tie-rods, tie-down timbers, steel strapping, etc., to prevent movement. 3.2 COTS - Commercial Off-The-Shelf. 3.3 Drayage - the act of transporting something a short distance by truck or other vehicle, and the charge made for such a transport. 3.4 Dunnage - Material used to fill space in shipping containers to prevent items from shifting during shipment. 3.5 FOD Foreign objects and debris 3.6 VCI - Volatile Corrosion Inhibitor Used for rust and corrosion protection of any metal surface; from raw materials preparation, through shipment and storage 4.0 General 4.1 Seller shall pack, mark and ship all goods and supplies in accordance with the requirements of the Purchase Order so as to be in compliance with transportation regulations and good commercial practice for protection and shipment and shall secure the most advantageous transportation service and rates consistent therewith. 4.2 No separate or additional charges are payable by Buyer for containers, crating, boxing, bundling, dunnage, drayage, or storage unless specifically stated in the Purchase Order. 4.3 Any expense incurred by Buyer as a result of improper preservation, packaging, packing, marking or method of shipment shall be reimbursed by Seller. SPQR-SQA-03 Rev: A Page 4

4.4 A packing list showing the Purchase Order number (and release number, if applicable) shall be included with each shipment. 4.5 The shipping label on the shipping container shall be marked to show the Purchase Order numbers of all Purchase Orders contained within, and each interior container shall also be marked to show the Purchase Order number. 4.6 Any transportation charges paid by Seller for which Seller is entitled to reimbursement shall be shown on Seller's invoices as a separate line item with the receipted freight bill attached to the invoice. 4.7 Purchased items will be packaged to a standard that provides protection against damage, deterioration, corrosion and other risks during handling and transportation until delivered to buyer's receiving inspection department. 4.8 Where a specific packaging requirement is NOT detailed within the Purchase Order; the appropriate packaging and corrosion prevention requirements listed below shall be used. 5.0 Instructions - General 5.1 General Requirements 5.1.1 Multiple part numbers shall be segregated. 5.1.2 Maintain PO line and lot segregation. 5.1.3 Waivered parts shall be segregated and accompanied by an approved SDWR copy. 5.1.4 Prior to packaging all parts must be clean and dry. 5.1.5 Supplied material shall be returned in same or better packaging. 5.2 Unacceptable packing materials: 5.2.1 Use of staples to seal bags and containers. 5.2.2 Newspaper, tissue paper, paper towel or any sulfur bearing paper 5.2.3 Egg carton 5.2.4 Expanded polystyrene and/or starch packing peanuts. 5.2.5 Must not have any restricted chemicals. See section 4.1 5.3 Preferred packing materials: 5.3.1 All packaging material used will be appropriate for the size, weight, and shape of the part being packaged. 5.3.2 All materials used for packaging and shipping shall be of good commercial quality suitable for the purpose for which intended. The material shall be free of defect and imperfection which will adversely affect the serviceability of the packaged item. SPQR-SQA-03 Rev: A Page 5

5.3.3 Parts having significant weight will be separated using plastic or other suitable material. 5.3.4 All packaging materials used shall not cause contact corrosion of parts being packaged. 5.3.5 Sharp edges or protrusions shall be adequately protected against physical damage of items and packaging during shipment. 5.4 Acceptable dunnage material: 5.4.1 Bubble pack 5.4.2 Polyethylene foam 5.4.3 Moldable polystyrene 5.4.4 Guard pack (foam cushion only) 5.4.5 Acceptable shipping containers: 5.4.6 Rigid plastic cartons 5.4.7 Wood or plywood cases 5.4.8 Double or triple walled corrugated container 6.0 Raw Material 6.1 Raw material includes; bar stock, sheet stock, tubing, cut stock and blanks including burnouts. 6.2 All items requiring preservation coating shall be wrapped and or packed in materials that shall resist the penetration of preservation coating through wrapping or packing material. 6.3 Oversize or heavy material shall be anchored to skids to prevent movement and damage in shipping. 7.0 Casting and Forgings 7.1 Shall be bulk packaged in wood or tri-wall corrugated with sufficient dunnage to protect parts from damage during shipping. 7.2 Oversize or heavy parts shall be anchored to skids to prevent movement and damage in shipping. 8.0 COTS Items 8.1 Hardware (Nuts, bolts, washers, etc.) 8.1.1 All items requiring preservation coating shall be wrapped and or packed in materials that shall resist the penetration of preservation coating through wrapping or packing material 8.2 O-Rings and Seals SPQR-SQA-03 Rev: A Page 6

8.2.1 Shall be packaged and stored in compliance with section 5 & 6 of SAE ARP 5316 Note: Bulk packaging is acceptable must meet all other provisions of SAE ARP5316 section 5 & 6 8.3 Electrical Components 8.3.1 All items shall be cushioned in noncorrosive materials as required to prevent damage to the item 8.3.2 Preservation Commercially expectable corrosion prevention such as VCI or desiccant shall be used to prevent corrosion to any metallic surfaces and preserve all non-metallic and or insulating materials 9.0 Machined Components 9.1 General Requirements 9.1.1 There shall be no part to part contact allowed 9.1.2 No metal surfaces shall be allowed to come in direct contact with wood or untreated corrugated packaging materials 9.2 Preferred packing material 9.2.1 Housing/body/manifolds; wrapped in VCI paper or plastic bag in individual box 9.2.2 Spool & Sleeve/pistons/output shafts: plastic tube w/screw-on cap or plastic bag encased in bubble wrap secured with adhesive tape 9.2.3 Retainer/end cap/etc.: individual plastic bag with acceptable dunnage 9.2.4 Parts having significant weight will have plastic or suitable separating material 9.3 Required corrosion prevention: 9.3.1 No metal surfaces shall be stored or transported contacting wood, corrugated, pig mats, or other moisture holding materials. Some form of moisture barrier must be used between contacting surfaces, such as plastic screen. 9.3.2 Aluminum parts - To reduce the potential effects of atmospheric corrosion on un-protected (i.e. non-anodized) aluminum parts 9.3.2.1 No rust inhibitor is to be applied to aluminum parts 9.3.2.2 All parts received in VCI paper or VCI bags are to remain in the protective packaging until the parts are ready to process. Once processed clean dry parts shall be repackaged in VCI as quickly as possible SPQR-SQA-03 Rev: A Page 7

9.3.2.3 If parts need to be inspected prior to or after processing, opening in an air conditioned environment is preferred. When completed return part to in their protective packaging 9.3.2.4 Parts being returned after processing shall be visually clean, dry and in VCI paper or VCI bags, unless the process performed supplied a protective coating (i.e. anodizing) 9.3.3 Steel parts having any un-protected (i.e. Non-painted or nonplated) surfaces shall be protected with an industry accepted corrosion prevention oil that is easily removable (i.e. LPS 2), applied before packaging then placed in plastic bags, plastic tubes with caps, bubble wrap secured with tape, or wrapped in coated kraft paper 9.3.4 Nylon parts will be shipped in oil to prevent moisture expansion. Parts will be placed in sealed container (heat sealed bags, screw on plastic tube, etc.) 10.0 Electronic Components 10.1 All ESD sensitive parts shall be individually packaged in appropriate level of ESD protection in compliance with ANSI/ESD S20.20 SPQR-SQA-03 Rev: A Page 8