Standard Agreement 2010: Schedules

Similar documents
A guide to appointing an architect

RIBA Plan of Work 2013 Overview

CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR

Standard Conditions of Appointment. Architect s Copy ONLINE VERSION ONLINE VERSION ONLINE VERSION. for an Architect (CA-S-07-A)

Appointment Contracts RIBA Agreements 2010

RIBA Plan of Work 2013: Consultation document. You are invited to complete the online questionnaire by 12 August 2012.

Project manager services

Guide to Reviewing Contract Documentation

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No

Briefing document: Understanding the Royal Institute of British Architects (RIBA) Building Contracts. 5 November 2014

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

DIRECTORATE OF ESTATES & FACILITIES

Dated 2015 (1) THE HALL FOR CORNWALL TRUST. and (2) [ARCHITECT] Appointment of Architect

CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS

CONCODE Guide to contract strategies for construction projects in the NHS STATUS IN WALES ARCHIVED

A Guide to Small Works. A brief explanation

Gestión BIM a lo largo del ciclo de vida del proyecto. Manuel Bouzas Cavada, Arquitecto MArch, RIBA, PMP, LEED GA

A client s guide to engaging an architect

BUILDING INFORMATION MODEL (BIM) PROTOCOL

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014

Engineering Council of South Africa

CLIENT / PROJECT MANAGER AGREEMENT

CAPITAL WORKS GUIDANCE DOCUMENT

Explaining an architect s services. General information on the usual tasks undertaken by an architect

The South African Council for the Project and Construction Management Professions. Guideline Scope of Services and Tariff of Fees

Association of Consultant Architects ACA SFA/08

Concise Conditions of Appointment for an. Architect . I. I -I t i I I

Design and Construct. Your specialist commercial insurance partner across Europe

PROJECT BRIEF Version (insert number)

aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608

Parkes Lees Architects Ltd

GUIDANCE NOTE Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities

CONCODE Agreement for the appointment of architects, surveyors and engineers for commissions for minor works STATUS IN WALES ARCHIVED

Thames Water Utilities Limited. Settlement deed

OUTLINE SCOPE OF SERVICES FOR THE ROLE OF INFORMATION MANAGMENT

for multi-disciplinary consultancy services in connection with. between. and [ ] Bradley Court Park Place Cardiff CF10 3DP

The Context for Practice

Guide to Procuring Construction Projects

LEGAL INDEMNITY POLICY OF TITLE INSURANCE FOR COMMERCIAL PROPERTY COVERAGE FOR KNOWN RISK

Project Management. Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services

Developing a Project

2. Subject to any special rules applied by the College's funding bodies, the tendering procedures will be applicable to:

ARTWORK COMMISSION AGREEMENT

INTERNSHIP TRAINING SCHEME

The Role of Construction Managers. FIDIC offers two contributions on the question of the role of a construction manager in a construction contract:

Guide to Procedure for Competitive Tendering March 2003

How To Write A Contract

JCT Standard Building Contract SBC/Q

A JCT 2011 Minor Works Building Contract

scotland ACE Agreement 2: Advisory, Investigatory and other Services

EXPRESSION OF INTEREST DESIGN, DOCUMENTATION AND PROJECT MANAGEMENT UNIT COMPLEX - LOT 8955 PALMERSTON

SMS0045 Construction Health and Safety Policy and Procedures

RIAS. Scottish Conditions of Appointment of an Architect Small Project Version ASP/2005 (November 2011 revision)

Chartered Architectural Technologists: Client information for domestic projects

Delivery Management Guidelines Delivery Process 2 - Project Management

Check. They re Chartered. Chartered Project Managers

Consumer Code. for Home Builders. This document contains the Rules that govern the behaviour of Home Builders and Home Warranty Bodies

ACE Agreement 2: Advisory, Investigatory and other Services (for use in Scotland)

Risks in International Consultancy Appointments: The FIDIC White Book

Menu of Architecture Services 2009

Project Management Handbook "To Understand the Causes of Things"

Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26

To be used in conjunction with the Invitation to Tender for Consultancy template.

Consumer Code for Home Builders

TECHNICAL RELEASE TECH 09/14BL ACCOUNTANTS REPORTS ON COMMERCIAL PROPERTY SERVICE CHARGE ACCOUNTS

Government of the Kingdom of Lesotho. Ministry of Public Works and Transport. Principal Building Agreement

PBAPCSA. Project Bank Account Documentation. Project Bank Account

Procurement Strategy and Contract Selection

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.

Item: 16 Page: Purpose

Procurement requirements for reducing waste and using resources efficiently

Prescription of qualifications: ARB Criteria at Parts 1, 2 and 3

SCHEDULE 16. Exit Plan. sets out the strategy to be followed on the termination (including Partial Termination) or expiry of this Agreement; and

Consumer Code. for Home Builders. This document contains the mandatory Consumer Code requirements that Home Builders are required to follow

FACTORING POLICY. This policy sets out the scope of and management arrangements for the Association s Factoring Service.

Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter.

LEAD PROVIDER FRAMEWORK CALL OFF TERMS AND CONDITIONS

6.0 Procurement procedure 1 Infrastructure

This document must be read in conjunction with Beacon Consulting s Fee Proposal. Together they form the Rules and Conditions of Service Delivery.

Employer s Information Requirements Version Core Content and Guidance Notes

ISO 9001:2015 Overview of the Revised International Standard

REPORT 4 FOR DECISION. This report will be considered in public

Consultant Warranty of [Specify discipline of Consultant]

ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES

2a. Membership of UKALA shall commence from the date advised in writing by UKALA and will last for a contract term of twelve calendar months.

Standard conditions of the Electricity Distribution Licence

Self Build: A Guide to Building your Own Home. Are you, or a member of your family, disabled and thinking about building a home?

International Construction Warranties Limited. Terms & Conditions. Version UK1

Principal Designer Guidance

Release 3.2 Oct 2009.

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note April 2000

The Society of Garden Designers

Practice Note Deciding on the appropriate JCT contract

The New Standard Construction Contracts: NZS3910, 3916 and 3917

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

POSTGRADUATE CERTIFICATE IN PROFESSIONAL PRACTICE IN ARCHITECTURE

Appendix A. Call-off Terms and Conditions for the Provision of Services

DETERMINATION. Regarding transfer of land at Fortismere School, Tetherdown, London N10 1NE

ANGUS COUNCIL SUPPLEMENTARY CONDITIONS OF CONTRACT. SC 01 - Contract Performance Guarantee Insurance

Transcription:

Standard Agreement 2010: Schedules (2012 revision RIBA Plan of Work 2013 compatible version) This is the Standard Agreement 2010: Schedules (2012 revision) referred to in the Agreement relating to The Project, namely: between The Client, namely: and * Initials Initials *Insert The Architect or The Consultant, namely Royal Institute of British Architects

What is this document? This component comprises the schedules for use with the Standard Conditions of Appointment for an Architect, 2012 revision or a Consultant, 2012 revision. They are also available from www.ribabookshops.com/agreements as separate editable electronic files. Note that the Services Schedule can be replaced if necessary or added to by the following online alternatives: Access Management Services Schedule Contractor s Design Services Schedule Initial Occupation and Post-occupation Evaluation Services Schedule Historic Building or Conservation Project Services Schedule Multi-disciplinary Design Services Schedule Master Planning Services Schedule All parties must rely exclusively upon their own skill and judgment or upon their advisers when using electronic components from the suite of RIBA Agreements 2010, 2012 revision, and RIBA and RIBA Enterprises Ltd do not assume any liability to any user or any third party. Copyright Licence: 4 This document is for the sole use of the purchaser. 4 You may use it for one professional services contract only. 4 You and the other party to your contract may distribute copies of this document to advisers and to other persons as necessary in connection with the proper performance of your contracts. In any other case, you may not distribute or reproduce the whole or any part of this document in any work, whether in hard copy, electronic or any other form, without the prior written consent of RIBA Enterprises Ltd. You may not use the RIBA initials or logo unless you are an RIBA chartered member or RIBA chartered practice. In this updated edition amendments have been made: in the Project Data to the text relating to Time and Cost and Liability and Insurance. in the Services Schedule to reorganise the Other Services schedule which includes an additional service Prescribed software for data transfer. in the Fees and Expenses schedule to the layout. Copyright notice Royal Institute of British Architects, 2010, 2012 Schedules, 2012 revision Published by RIBA Publishing, 15 Bonhill Street, London EC2P 2EA First published 2010; updated September 2011 Revised edition published 2012 RIBA Publishing is part of RIBA Enterprises Ltd. www.ribaenterprises.com 2

Project Data 2010, 2012 revision THE PROJECT The Client is acting for business or commercial purposes / is a Public Authority / is a consumer client Delete unwanted options. The Services relate to [1] at ( the Site ) to be procured by [2] Project description This box may be deleted if briefing documents are attached see next entry [1] Insert Project title. [2] Eg lump sum building contract, design and build, construction management etc. 3

Project Data 2010, 2012 revision Brief Briefing document(s) are attached as Appendix [3] : Conditions Amendments to the Conditions are attached as Appendix [4] : Time and cost The Client wishes the Project to be completed in accordance with the initial Timetable (Project Programme) for [5] : and the initial Project Budget including the Construction Cost of the Project, ex VAT, ie: or such other date(s) or cost as may be agreed If not stated the time or cost constraints are a fair and reasonable period or amount. LIABILITY AND INSURANCE Clauses 7.1, 7.2 and 7.4 The time limit for action or proceedings and insurance cover is: years If no period is stated the period is six years (or 12 years if executed as a deed). [6] If an aggregate cap applies delete in respect of each and every claim or series of claims arising from the same originating cause and insert in the aggregate. The amount of PI insurance cover to be maintained in respect of each and every claim or series of claims arising out of the same originating cause is: except where an annual aggregate limit applies in respect of pollution and contamination the limit is: and/or asbestos or fungal mould the limit is: If no entries are made, liability is unlimited. 7.7 Supplementary Agreements applicable to this Agreement Appendix [7] Collateral Warranty Third Party Schedule [8] Novation Agreement other [3] Insert number or letter. [4] Insert number or letter. [5] Insert the event eg Practical Completion and the target date. [6] If no period is stated, where the law of England and Wales or the law of Northern Ireland applies, the period is six years (or 12 years if executed as a deed). If no period is stated, where the law of Scotland applies, the period is six years where the Agreement is valid but not formally executed in a self proving manner and 12 years where the Agreement is formally executed in a self proving manner, subject to the prior operation of statutory prescription. [7] Select the preferred option and insert number or letter of the appendix. [8] A Draft Third Party Rights Schedule is available at www.ribabookshops.com/agreements 4

Project Data 2010, 2012 revision Clauses 9.1 to 9.3 DISPUTE RESOLUTION Mediation Adjudication Select the preferred procedures The parties may agree to refer a dispute or difference arising out of this Agreement to the Mediation service of: [9] Delete if mediation is not required. A dispute or difference arising out of this Agreement may be referred to adjudication in accordance with: CIC Model Adjudication Procedures current at the date of the reference The Scheme for Construction Contracts Regulations [10] Other Or for a consumer client The RIBA Adjudication Scheme for Consumer Contracts where the Client is a consumer and the claim does not exceed: If required, the nominator of the Adjudicator is: If no nominator is stated, the nominator is the Royal Institute of British Architects. Litigation or arbitration Select the applicable option Without prejudice to any right of adjudication, any dispute or difference arising out of this Agreement is determined by legal proceedings is referred to arbitration in accordance with the clause 9.3 except in connection with the enforcement of any decision of an adjudicator If no selection is made, legal proceedings apply. Where arbitration is chosen the appointor is the President or Vice-President [11] of: If no appointor is stated, the appointor is the President or a Vice-President of the Royal Institute of British Architects. Applicable law The law applying to this Agreement is the law of: Unless otherwise stated, the law of England and Wales applies. Effective date The effective date of this Agreement is: Unless otherwise stated, the Effective Date is the date on which performance of the Services commenced. [9] Mediation services available from Royal Institute of British Architects, Royal Incorporation of Architects in Scotland, Resolex Ltd and ADR Net Ltd. [10] As relevant to England and Wales, Scotland or Northern Ireland. [11] Or the President or the Secretary of the Royal Incorporation of Architects in Scotland. 5

Project Data 2010, 2012 revision PROJECT APPOINTMENTS [12] Core Project Roles The Other Persons listed below are or are to be appointed to perform services in connection with the Project: Client Representative Project Lead Health & Safety Advisor Cost Consultant Contract Administrator Lead Designer Architect [13] as Designer Civil and Structural Engineer as Designer Building Services Engineer as Designer Additional Roles Employers Agent Landscape Designer Site Inspector(s)/Clerk(s) Of Works [12] Insert profession, name and address or to be agreed/notified. If appropriate, identify particular elements to be included in their responsibilities. Where the appointment of a sub-consultant has been agreed, enter Profession/role in the space to the left of the page and Consultant Sub-consultant name and address in the space to the right. [13] Architect is a protected title which can only be used by registered architects in the UK. 6

Enter the applicable stages in the right hand box for the Roles to be performed by the appointee Delete or strike through any Roles not included in the Agreement The Services are set out in the parts of this schedule identified below Role Specifications Design Services [14][15] Other Services and additional schedule(s) [16] The Services shall be performed in the specified stages [as defined in the RIBA Plan of Work 2013] and include performance of any specified roles in the list below. Stages Role Specifications [17] Project Lead If no Project Lead is appointed then the Client or Client s Representative performs the role. Health & Safety Advisor The Client, if defined as domestic Client in the CDM Regulations, will be exempt from statutory duties arising including the requirement to appoint a Co-ordinator. Cost Consultant Contract Administrator Employer s Agent Lead Designer Architect as Designer Civil and Structural Engineer as Designer Building Services Engineer as Designer Site Inspector(s)/Clerk(s) of Works [14] Applicable to Designers only. [15] Amend reference if a different schedule is used. Other available schedules include Access Consultancy Services, Contractor s Design Services, Initial Occupation and Post-occupation Evaluation Services, Multi-disciplinary Design Services and Master Planning Services. [16] Applicable to Designers only. [17] The Specified Roles to include any performed by sub-consultants employed directly by the Architect. 7

RIBA Outline Plan of Work 2007 as amended November 2008 The RIBA Plan of Work 2013 organises the process of briefing, designing, constructing, maintaining, operating and using building projects into a number of key stages. The content of stages may vary or overlap to suit specific project requirements. The RIBA Plan of Work 2013 should be used solely as guidance for the preparation of detailed professional services contracts and building contracts. www.ribaplanofwork.com 0 1 2 3 4 5 6 7 Stages Tasks Strategic Definition Preparation and Brief Concept Design Developed Design Technical Design Handover Construction and Close Out In Use Core Objectives Identify client s Business Case and Strategic Brief and other core project requirements. Develop Project Objectives, including Quality Objectives and Project Outcomes, Sustainability Aspirations, Project Budget, other parameters or constraints and develop Initial Project Brief. Undertake Feasibility Studies and review of Site Information. Prepare Concept Design, including outline proposals for structural design, building services systems, outline specifications and preliminary Cost Information along with relevant Project Strategies in accordance with Design Programme. Agree alterations to brief and issue Final Project Brief. Prepare Developed Design, including coordinated and updated proposals for structural design, building services systems, outline specifications, Cost Information and Project Strategies in accordance with Design Programme. Prepare Technical Design in accordance with Design Responsibility Matrix and Project Strategies to include all architectural, structural and building services information, specialist subcontractor design and specifications, in accordance with Design Programme. Offsite manufacturing and onsite Construction in accordance with Construction Programme and resolution of Design Queries from site as they arise. Handover of building and conclusion of Building Contract. Undertake In Use services in accordance with Schedule of Services. Initial considerations for Procurement The procurement strategy does not fundamentally alter the progression assembling the project team. *Variable task bar Prepare Project Roles Table and Contractual Tree and continue assembling the project team. of the design or the level of detail prepared at a given stage. However, Information Exchanges will vary depending on the selected procurement route and Building Contract. A bespoke RIBA Plan of Work 2013 will set out the specific tendering and procurement activities that will occur at each stage in relation to the chosen procurement route. Administration of Building Contract, including regular site inspections and review of progress. Conclude administration of Building Contract. Programme *Variable task bar Establish Project Programme. Review Project Programme. Review Project Programme. The procurement route may dictate the Project Programme and may result in certain stages overlapping or being undertaken concurrently. A bespoke RIBA Plan of Work 2013 will clarify the stage overlaps. The Project Programme will set out the specific stage dates and detailed programme durations. (Town) Planning *Variable task bar Pre-application discussions. Pre-application discussions. Planning applications are typically made using the Stage 3 output. A bespoke RIBA Plan of Work 2013 will identify when the planning application is to be made. Suggested Key Support Tasks Review Feedback from previous projects. Prepare Handover Strategy and Risk Assessments. Agree Schedule of Services, Design Responsibility Matrix and Information Exchanges and prepare Project Execution Plan including Technology and Communication Strategies and consideration of Common Standards to be used. Prepare Sustainability Strategy, Maintenance and Operational Strategy and review Handover Strategy and Risk Assessments. Undertake third party consultations as required and any Research and Development aspects. Review and update Project Execution Plan. Consider Construction Strategy, including offsite fabrication, and develop Health and Safety Strategy. Review and update Sustainability, Maintenance and Operational and Handover Strategies and Risk Assessments. Undertake third party consultations as required and conclude Research and Development aspects. Review and update Project Execution Plan, including Change Control Procedures. Review and update Construction and Health and Safety Strategies. Review and update Sustainability, Maintenance and Operational and Handover Strategies and Risk Assessments. Prepare and submit Building Regulations submission and any other third party submissions requiring consent. Review and update Project Execution Plan. Review Construction Strategy, including sequencing, and update Health and Safety Strategy. Review and update Sustainability Strategy and implement Handover Strategy, including agreement of information required for commissioning, training, handover, asset management, future monitoring and maintenance and ongoing compilation of Asconstructed Information. Update Construction and Health and Safety Strategies. Carry out activities listed in Handover Strategy including Feedback for use during the future life of the building or on future projects. Updating of Project Information as required. Conclude activities listed in Handover Strategy including Post-occupancy Evaluation, review of Project Performance, Project Outcomes and Research and Development aspects. Updating of Project Information, as required, in response to ongoing client Feedback until the end of the building s life. Sustainability Checkpoints Sustainability Checkpoint 0 Sustainability Checkpoint 1 Sustainability Checkpoint 2 Sustainability Checkpoint 3 Sustainability Checkpoint 4 Sustainability Checkpoint 5 Sustainability Checkpoint 6 Sustainability Checkpoint 7 Information Exchanges (at stage completion) Strategic Brief. Initial Project Brief. Concept Design including outline structural and building services design, associated Project Strategies, preliminary Cost Information and Final Project Brief. Developed Design, including the coordinated architectural, structural and building services design and updated Cost Information. Completed Technical Design of the project. As-constructed Information. Updated As-constructed Information. As-constructed Information updated in response to ongoing client Feedback and maintenance or operational developments. UK Government Information Exchanges Not required. Required. Required. Required. Not required. Not required. Required. As required. *Variable task bar in creating a bespoke project or practice specific RIBA Plan of Work 2013 via www.ribaplanofwork.com a specific bar is selected from a number of options. RIBA 8

Part 1: Role Specifications The person appointed to the specified Roles is authorised to perform and shall be responsible for performance of the activities in all relevant stages. Project Lead Preparing the Client s initial statement of Project Objectives, taking into account the Client s core operations and identifying constraints. Establishing the requirement for professional skills, procedure and programme management, and legal, insurance and financial services. Identifying the roles of Client representatives and stakeholders. Managing the appointment of the project team. Issuing information, decisions, approvals and instructions to the Lead Designer, Cost Consultant and Contract Administrator/Employer s Agent. Implementing of any feasibility studies and/or options appraisals required. Developing and maintaining a project strategy. Developing and maintaining a management structure and communications environment in which all consultants, contractors and other persons can perform effectively. Managing development of the Brief and overseeing its implementation. Identifying project procedures including: any relevant existing procedures of the Client; administrative actions such as contributions to and frequency of progress reports, etc; change control procedures for programme and cost matters and contingency expenditure; risk management; and performance and design quality reviews. Preparing and maintaining Cost Information in co-ordination with any construction cost estimates and cash flow projections prepared by others. Monitoring performance and activity, cost planning and control, programme and progress, and reporting to the Client. In consultation with consultants and/or contractors, authorises or applies for authorisation to take any corrective action required. Facilitating communications between the project team except that communications on significant design matters are dealt with by the Lead Designer and/or the Health & Safety Advisor. Leading, co-ordination and preparation of a Project Execution Plan and the Project Programme. Advising on methods of procuring construction. Reviewing the progress of design work with the Lead Designer and Health & Safety Advisor. Developing and managing change control procedures, and making or obtaining decisions necessary for time and cost control. With the Contract Administrator, Lead Designer and Health & Safety Advisor co-ordinating and reviewing the work of consultants and site inspectors during Stages 4 and 5. 9

Part 1: Role Specifications Health & Safety Advisor [18] [19] Exercising the powers and duties of and associated with the statutory function of Co-ordinator under the Construction (Design and Management) Regulations 2007. Providing, as and when requested, information on health and safety issues to the Project Lead, Lead Designer, the Contract Administrator/Employer s Agent, Designers and any Other Persons providing work or services reasonably necessary for such persons to carry out their duties. Facilitating communications on health and safety issues between the Client and such Other Persons. Cost Consultant Providing and updating Cost Information including estimates, advice, valuations and other information concerning the cost of construction works. Co-ordinating and integrating estimates, advice, valuations and information provided by any Other Person. Providing quantity surveying services. Contract Administrator (Stages 5-6) or Employer s Agent (Stages 5-6) Inviting and appraising a tender or tenders, including: considering with the Client a tenderer or a list of tenderers for construction works; considering with the Client appointment of a contractor, and advising on the powers and duties of the parties and the Contract Administrator under the Building Contract; preparing the Building Contract and arranging for signatures. Administering the Building Contract, including: reviewing the contractor s programme and the progress of construction works; issuing of information, instructions, etc; reviewing with relevant consultants of information provided by the contractor; providing information required for preparation of valuations of work carried out or completed or validating contractor s applications for payment; giving notice of any adjustment to the Completion Date; ascertaining or instructing ascertainment of loss and expense due to the contractor; certifying payments due; presenting financial reports to Client; collating record information in conjunction with the Health and Safety Advisor; and exercising impartial and independent judgment when dealing between Client and the contractor (not applicable to Employer s Agent). [18] For the purposes of the Agreement, the Co-ordinator is a member of the consultant team. In any conflict with the Agreement the CDM Regulations take precedence. [19] Note: The Co-ordinator is to be appointed by the Client as soon as is practicable after preliminary design work, planning or other preparation for construction work has begun. Not applicable to a Client if defined as domestic Client in the CDM Regulations. 10

Part 1: Role Specifications With the Lead Designer, Cost Consultant and the Health & Safety Advisor, co-ordinating and reviewing the work of all consultants and site inspectors, if any, to the extent required for the administration of the Building Contract, including: providing information required by consultants and site inspectors for their services during the construction period; receiving reports from such consultants and site inspectors to enable decisions to be made in respect of the administration of the Building Contract; consulting any Other Person whose design or specification may be affected by a Client instruction relating to the Building Contract, obtaining any information required and issuing any necessary instructions to the contractor; managing change control procedures and making or obtaining decisions as necessary for time and cost control during the construction period. Reporting to the Client. Lead Designer Co-ordinating preparation of stage programme[s] for the design process. Co-ordinating design of all constructional elements, including work by consultants, specialists or suppliers and for health and safety matters in conjunction with the Health & Safety Advisor. Establishing the form and content of design outputs, their interfaces and a verification procedure. Communicating with the Client on significant design issues. Leading and co-ordination preparation of a Project Execution Plan, including work outstanding from previous stages. Advising on the need for and the scope of services by consultants, specialists, subcontractors or suppliers. Monitoring the work of the Designers. Designers (including Lead Designer) Preparing and maintaining for each stage a programme for performance of the Services, including any Services not completed in a previous stage. Providing designs, specifications, advice and information concerning the design for which the designer is responsible ( the Relevant Design ) with due regard to cost, functionality, build quality and impact, buildability, construction safety, operation and maintenance. Determining materials, elements and components, standards of workmanship, type of construction and performance in use for the Relevant Design. Preparing drawings, sketches, schedules, specifications, calculations and production and tender information for the Relevant Design as appropriate. Giving due regard to the guidelines contained in the current publication Good Practice in the Selection of Construction Materials 2011 (British Council of Offices Publication) unless authorised by the Client in writing to specify or authorise products or materials generally known within the Designer s profession at the time of specification or authorisation to be deleterious or hazardous to health or safety or to affect the durability of construction works. 11

Part 1: Role Specifications (Where engaged to provide services during the construction stage other than any duties in connection with administration of the Building Contract), making the appropriate number of visits to the site for: inspection generally of the progress and quality of the Relevant Design as built; approval of such elements of the works as may be specified to be to the reasonable satisfaction of the Designer; obtaining information necessary for the issue of any notice, certificate or instruction by the administrator of the Building Contract. Architect as Designer s services include siting, spatial arrangement, amenity and appearance of buildings and external works elements. Includes services as relevant to Landscape Architects or Interior Designers. Civil and Structural Engineer as Designer s services include civil engineering elements, structural stability of building sub-structures, super-structures and external works elements. Building Services Engineer as Designer s services include building services (including mechanical, electrical, public health, transport and/or communications systems) elements. Specialist Designer s services relate to elements allocated to a contractor or sub contractor who it is intended will construct the specialist work, or to a consultant with special expertise where the specialist work will be constructed by another firm. Site Inspector s/clerk of Work s services include inspecting and reporting upon the progress and quality of the works and conformity with the contract documentation. 12

Part 2: Design Services Delete or strike through any services not required. Make any necessary amendments to include services and/or add additional services. WORK STAGE SERVICES Stage 0 Strategic Definition Receiving Client s instructions and information about the Project. Assisting the Client in defining the Client s strategic requirements and the preparation of the Strategic Brief. Providing information for a report on the Project Budget. Reviewing with Client alternative project team options. Contributing to the Project Programme and assembling the project team. Stage 1 Preparation & Brief Visiting the Site and carrying out an initial appraisal. Assisting development of the Initial Project Brief including consideration of Project Objectives, Quality Objectives, Project Outcomes, Sustainability Aspirations, Project Budget and other parameters or constraints. Undertaking Feasibility Studies and review of Site Information. Undertaking development of Handover Strategy and Risk Assessments. Assisting assembly of project team including contributions to the Design Responsibility Matrix, Information Exchanges and the Project Execution Plan. (Compiling, revising and editing the Initial Project Brief on behalf of the Client is Other Service 3a) Stage 2 Concept Design Preparing Concept Design and including outline specifications. Providing information for approximate estimate of Construction Cost for inclusion with Cost Information. Contributing to completion of the Final Project Brief. Preparing Stage Report in accordance with agreed Information Exchanges and submitting to Client. Preparing Sustainability Strategy, Maintenance and Operational Strategy and reviewing Handover Strategy and Risk Assessments. Assisting with Third Party Consultations, updating of the Project Execution Plan, preparing of the Construction Strategy and Health and Safety Strategies. 13

Part 2: Design Services Stage 3 Developed Design Developing the approved Concept Design to show spatial arrangements, type of construction, materials and updated outline specifications in sufficient detail to co-ordinate the structural and building services design of the project. Investigating effect of statutory standards and construction safety on Concept Design. Consulting statutory authorities. Providing information for estimate of Construction Cost. Preparing Stage Report in accordance with agreed Information Exchanges and submitting to Client. Reviewing the Project Execution Plan and Risk Assessments and the Sustainability, Maintenance and Operational, Handover, Construction and Health and Safety Strategies. Undertaking Third Party Consultations as required. Planning Applications. Arranging and preparing information for Pre-application discussions. Preparing and submitting application for detailed planning permission. Assisting discharge of conditions attached to Planning Consent. Stage 4 Technical Design Preparing technical designs, calculations and specifications sufficient to construct the project in accordance with the Design Responsibility Matrix and agreed Information Exchanges. Consulting statutory authorities on developing design. Providing information for updating estimate of Construction Cost. Reviewing the Project Execution Plan and Risk Assessments and the Sustainability, Maintenance and Operational, Handover, Construction and Health and Safety Strategies. Undertaking Third Party Consultations as required including preparing and making submissions under building acts and/or regulations or other statutory requirements. Reviewing design information provided by contractors or specialists to establish whether that information can be co-ordinated and integrated with other project information. Giving general advice on operation and maintenance of the building. 14

Part 2: Design Services Stage 5 Construction Making visits to construction works as Designer. [20] Responding to site queries as reasonably required for construction Complying with the requirements of the Handover Strategy including agreement of information required for commissioning, training, handover, asset management, future monitoring and maintenance and on-going compilation of As Constructed Information. Assisting with the updating of the Construction and Health & Safety Strategies. Providing record drawings showing the building and main lines of drainage and other information, where applicable, for the Health and Safety File (CDM 2007) and the building log book (Building Regulations Approved Document Part L2). Reviewing compliance with statutory and contract requirements. Stage 6 Handover and Close Out Advising on resolution of defects. Providing information for agreeing final account. Assisting building user during initial occupation period, if applicable as attached schedule. Stage 7 In Use Carrying out Post-occupation Evaluation, if applicable as attached schedule. Procurement Activities Identify extent of design work by contractor and/or specialist sub-contractors. Prepare documents required for tendering purposes. NB: Activities in italics may be moved to suit project requirements. NB: Activities underlined will vary to suit project requirements. [20] See Role Specifications for definition. 15

Part 3: Other Services Delete or strike through any services not required. Select the boxes for the required services [Y or 4], alternatively, enter T for time-based services or LS for lump sums, make any necessary amendments and/or add additional services. Sites, buildings and related services 1 Selection of project team members 2 Options appraisal 3a Initial Project Brief 3b Final Project Brief Compiling, revising and editing 3c Room data sheets 4 Selection of sites and/or buildings 5 Surveys, inspections or specialist investigations 6 Accessibility audit 7 Environmental studies 8 Services in connection with party wall matters 9 Community architecture services 10 Outline planning submissions and/or pre-application planning consultations 11 Negotiations in connection with statutory approvals 12 Submissions to and negotiations with landlords, freeholders, etc 13 Applications or negotiations for statutory and other grants 14 Prescribed software for data transfer 15 Services in connection with value engineering 16 Services in connection with risk management 17 Electronic document control system 18 Services in connection with a site waste management plan 19 Two-stage tendering 20 Briefing and/or tender documentation for specialist services 21 Negotiating a price with a contractor (in lieu of tendering) 22 Additional site inspections or provision of resident site staff 16

Part 3: Other Services 23 Interim and final valuations 24 Compiling maintenance and operational manuals 25 Specially prepared drawings of building as built, models, photographs, etc 26 27 28 29 30 Special Services Special Services only required if the need arises during the commission, which may be instructed as additional Services: Revision of or preparation of additional documents to: comply with requirements of planning or statutory authorities, landlords, etc; comply with changes in interpretation or enactment or revisions to laws or statutory regulations; make changes or corrections not arising from any failure of the Architect/ Consultant. Investigations and instructions relating to work not in accordance with the building contract. Assessment of alternative designs, materials or products proposed by a contractor or sub-contractor. Assistance to the Contract Administrator dealing with extensions of time and contractor s claims. Services on behalf of the Client in connection with any dispute between the Client and another party. Services following damage to, or destruction of, a building in construction or existing buildings. Services following suspension or termination of any contract or agreement with or the insolvency of any other party providing services to the project. Services in connection with easements or other legal agreements. 17

Fees and Expenses Schedule 2010, 2012 revision Basic Fee Identify the applicable clauses, relevant work stages and the basis for calculation of the amount of the fee Stage Clause Fee Notes In stages 5 and 6 the Basic Fee includes site visits [21] Unless otherwise stated, the maximum number of visits will be one per month Other fees Other fees are fees for any Other or Special services required but not included in the Basic Fee and, if applicable, any specified copyright licence fee for the Client s use after the date of the last Service performed under this Agreement of materials produced by the Architect (drawings, documents etc.) in performing the Services. Subject Clause Fee Notes [21] Unless time charges apply in which case, delete. 18

Fees and Expenses Schedule 2010, 2012 revision Time Charges Person/grade Rate [22] Person/grade Rate [22] Expenses and The specified expenses listed below will be charged [23] Disbursements a) at net cost plus a handling charge of % of net cost Specified Expenses or b) by the addition to the amount due of % of the total fee or c) Other [24] Other Expenses (including disbursements [25] ) will be charged at net cost plus % of net cost Where applicable, travel will be charged at per mile Hard copies of Drawings A4 A3 A2 A1 AO and Documents in black and white in PDF format or similar Payment VAT Registration number of the payee is: Enter frequency Where payments are to be equalised or based on milestones, specify details: Accounts for instalments of fees [26] shall be issued: [22] /hour or /day. [23] Delete those that do not apply. [24] Use where specified expenses are to be charged by a method different from those listed above. [25] Such as payments to the Local Authority for planning submissions or Building Regulations approval. [26] State whether calculated on basis of the estimate of the percentage of completion of the Services or stages or additional services or such other specified method. 19