THE EFFECT OF SUBSTRATE PREPARATION ON EARLY AGE SHRINKAGE AND CRACK DEVELOPMENTS OF COMPOSITE CEMENTITIOUS MATERIALS

Similar documents
Shrinkage and Creep Properties of High-Strength Concrete Up To 120 MPa

Strength of Concrete

PROPERTIES AND MIX DESIGNATIONS

Fire and Concrete Structures

Proper use of the Rebound Hammer Updated to reflect the changes to ASTM C805

Overview of Topics. Stress-Strain Behavior in Concrete. Elastic Behavior. Non-Linear Inelastic Behavior. Stress Distribution.

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

Properties of Concrete with Blast-Furnace Slag Cement Made from Clinker with Adjusted Mineral Composition

Chapter 2 Basis of design and materials

Analysis of M35 and M40 grades of concrete by ACI and USBR methods of mix design on replacing fine aggregates with stone dust

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

WATERPROOFING OF WET ROOMS

Manufacturing Quality Concrete Products

Mass Concrete. Robert Moser CEE8813A Material Science of Concrete. Definitions & Standards, Thermal Cracking, and Temperature Rise

Chapter 8 Design of Concrete Mixes

Effect of basalt aggregates and plasticizer on the compressive strength of concrete

1.5 Concrete (Part I)

Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete

The Influence of Porosity & Aspect Ratio on the Compressive Behavior of Pervious Concrete. Alexander Hango

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

Evaluation of M35 and M40 grades of concrete by ACI, DOE, USBR and BIS methods of mix design

Example Specification for Concrete using Current Building Code Requirements

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

Ultra-High Strength Concrete Mixtures Using Local Materials

Shotcrete Quality Control and Testing for an Underground Mine in Canada

A STUDY ON BONDING STRENGTH OF POLYMERIC FIBERS TO CEMENTITIOUS MATRIX

Choosing the Right Mortar for the Job

STRENGTH OF CONCRETE INCORPORATING AGGREGATES RECYCLED FROM DEMOLITION WASTE

A Study on the Flexural and Split Tensile Strengths of Steel Fibre Reinforced Concrete at High Temperatures

SPECIAL COMPOUND FOR RHEOPLASTIC AND ANTI-CORROSION SUPERCONCRETE WITH VERY HIGH DURABILITY

Moisture and Resilient Floor Covering

EXPERIMENTAL INVESTIGATION ON BEHAVIOUR OF NANO CONCRETE

Precast Concrete Parking Structures

MINIMUM QUALITY CONTROL PLAN FOR FIELD PLACEMENT OF LATEX MODIFIED MORTAR OR CONCRETE WEARING SURFACE

Bonding Agents: The Good, the Bad, and What Works. Bond with Your Concrete

AGREGADOS RECICLADOS MITOS Y REALIDADES

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS


Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Ageing effect and long term performance of cement bonded particleboard. Prepared for: Viroc Portugal Indústrias de Madeira e Cimento S.A.

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures


Vikrant S. Vairagade, Kavita S. Kene, Dr. N. V. Deshpande / International Journal of Engineering Research and Applications (IJERA)

Life-365 Service Life Prediction Model Version 2.0

STATE OF THE ART OF CONCRETE PAVING BLOCKS IN SRI LANKA (CPBs)

PROPERTIES OF SPRAYED CONCRETE WITH RECYCLED TYRE POLYMER FIBRES

Effects of Temperature and Fly Ash on Compressive Strength and Permeability of High-Performance Concrete*

GigaCrete Specification PlasterMax

C. Section TESTING LABORATORY SERVICE.

Tex-421-A, Splitting Tensile Strength of Cylindrical Concrete Specimens

3. Test Methods for Evaluation of ESCR of Plastics

Strength and Workability Characteristics of Concrete by Using Different Super Plasticizers

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

LARGE SCALE TENSILE TESTS OF HIGH PERFORMANCE FIBER REINFORCED CEMENT COMPOSITES

BEST PRACTICE GUIDE. Fibrelime Premixed Universal Plaster and Render

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

Technical handbook Panel Anchoring System

Acceptance Criteria for Durability Tests

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

CAUSES, EVALUATION AND REPAIR OF CRACKS IN CONCRETE

Lab 1 Concrete Proportioning, Mixing, and Testing

Properties of Fresh Concrete

STUDY ON THE CHLORIDE DIFFUSION COEFFICIENT CALCULATED FROM A SIMPLE ACCELERATED CHLORIDE PENETRATION TEST USING ELECTRICITY

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

ELASTOCEM. Technical features. Applications. Two-component flexible, waterproofing and protective cementitious grout.

Concrete Repair. Applications and Procedures

PRE INSTALLATION MANUAL

EVALUATION OF THE PERFORMANCE OF THE PROTECTIVE SURFACE COATINGS FOR CONCRETE

Experimental assessment of concrete damage due to exposure to high temperature and efficacy of the repair system

A COMPREHENSIVE STUDY ON PARTIAL REPLACEMENT OF CEMENT WITH SUGARCANE BAGASSE ASH, RICE HUSK ASH & STONE DUST

Mineral waterproof coating PCI Dichtschlämme

Dubai Municipality Standard DMS 1: Part 5: 2004

Testing and appraisal of Lucobit polymer effect as an additive on asphalt mixture performance

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement

CRACK and JOINT REPAIRS on INDUSTRIAL CONCRETE FLOORS, PAVEMENTS and SECONDARY CONTAINMENT AREAS

(T indicates a Tropicalised version with extended workability. No change has been made to the formulation)

EFFECT OF NANO-SILICA ON CONCRETE CONTAINING METAKAOLIN

2. PREPARATION OF TEST SPECIMENS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

Chapter Two Types of Cement The properties of cement during hydration vary according to:

A NEW APPROACH FOR MEASUREMENT OF TENSILE STRENGTH OF CONCRETE

USE OF CFRP LAMINATES FOR STRENGTHENING OF REINFORCED CONCRETE CORBELS

How to build a Pizza Oven in 4 days

A Comparative Analysis of Modulus of Rupture and Splitting Tensile Strength of Recycled Aggregate Concrete

TABLE OF CONTENTS CHAPTER NO. TITLE PAGE NO. ABSTRACT

EXPERIMENTAL INVESTIGATION ON STRENGTH AND DURABILITY PROPERTIES OF HYBRID FIBER REINFORCED CONCRETE

Minor Cracks in Horizontal Surfaces

M10. Cement based levelling/ wearing screeds. Scope. Contents. Reference documents. General guidance 2


Commonwealth of Pennsylvania PA Test Method No. 632 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure.

Hardened Concrete. Lecture No. 14

Resurfacing Concrete. Page 1 of 5

Thermal Mass Availability for Cooling Data Centers during Power Shutdown

Common Perils of Ceramic Floor Tile Systems. Parkway, Suite 220, Plano, Texas 75093; PH (469) ;

Strengthening of Brick Masonry Walls against Earthquake Loading

Transcription:

THE EFFECT OF SUBSTRATE PREPARATION ON EARLY AGE SHRINKAGE AND CRACK DEVELOPMENTS OF COMPOSITE CEMENTITIOUS MATERIALS OK C G Ong, National University of Singapore, Singapore L R Chandra*, National University of Singapore, Singapore Timothy Wan Juang Foo, Ngee Ann Polytechnic, Singapore 35 th Conference on OUR WORLD IN CONCRETE & STRUCTURES: 25-27 August 2010, Singapore Article Online Id: 100035005 The online version of this article can be found at: http://cipremier.com/100035005 This article is brought to you with the support of Singapore Concrete Institute www.scinst.org.sg All Rights reserved for CI Premier PTE LTD You are not Allowed to re distribute or re sale the article in any format without written approval of CI Premier PTE LTD Visit Our Website for more information www.cipremier.com

35 th Conference on OUR WORLD IN CONCRETE & STRUCTURES: 25 27 August 2010, Singapore THE EFFECT OF SUBSTRATE PREPARATION ON EARLY AGE SHRINKAGE AND CRACK DEVELOPMENTS OF COMPOSITE CEMENTITIOUS MATERIALS K C G Ong, National University of Singapore, Singapore L R Chandra*, National University of Singapore, Singapore Abstract Casting a new concrete layer on the top of old concrete is frequently applied in practice such as in the area of concrete repair and retrofitting. In such a composite system, some parameters of the old substrate layer, namely surface roughness and moisture conditions may influence the durability of the new concrete layer. Higher interface roughness results in higher restraint by the substrate and consequently, higher stresses within the new concrete layer which may lead to premature cracking. Simultaneously, the moisture condition of the old substrate layer may also influence the durability of the new concrete layer. It had been postulated that excessive early age shrinkage of the new concrete layer due to water absorption by the substrate layer which can lead to de-lamination at the interface between these layers. Despite the extensive studies available on shrinkage and cracking behavior of such composite materials, it is important to note that most of the studies were carried out after a period of curing in which the influence of early age shrinkage strains occurring during the first 24 hours may not be included. In the present paper, the effect of substrate preparations on early age shrinkage strains with respect to the depth from the top surface as well as on the development of early age cracking and delamination at the interface of composite specimens is investigated with emphasis on the first 24 hours after adding water to the mixture. The results showed that substrate preparation may significantly affect the early age shrinkage strains of the new concrete layer and result in de-lamination at the interface of the composite materials. Based on the results obtained, a careful selection of substrate preparation needs to be emphasized in order to ensure the durability of the composite material. 1. Introduction Durability of a composite structure typically depends on the bonding between the new and the old concrete at the interface as well as the durability of the new concrete layer itself. Earlier studies have shown that several important parameters of the old concrete substrate layer, such as surface roughness and moisture condition may influence the bond strength of the interface layer [1,2,3,4,5,6,7,8]. Moreover, these parameters may also have an influence on the durability of the new concrete layer. Higher interface roughness results in higher restraint by the substrate and

consequently, higher stresses within the new concrete layer may develop leading to premature cracking. It is also important to note that the moisture absorption of the old concrete substrate layer may also influence the durability of the new concrete layer. The water absorbed by the concrete substrate layer may not only increase the shrinkage strains of the new concrete layer, but may also induce expansion of the old concrete substrate which may lead to de-lamination at the interface between these layers [1]. The durability assessment of composite specimens in terms of the assessment of cracking and de-lamination, both at the microscopic and macroscopic scales, has been extensively reported in the literature [1,6,9,10,11,12,13]. At the microscopic scale, the presence of microcracks has been documented experimentally by using optical and scanning electron microscopy [1,9] as well as by using acoustic emission sensors [10,11]. While at the macroscopic scale, the development of macrocracks in the new concrete layer has also been well documented [1,6,12,13]. Carlsward reported that cracks in the range of 0.05 to 0.6 wide were apparent on the surface of the new repair layer after 5 days of sealed-moist curing [6]. Another study by Banthia on composite specimens exposed to a dry environment of 50 0 C and 5% RH showed that plastic shrinkage cracks started to develop rapidly during the first three hours after adding water to the mixture. At 20 hours after adding water to the mixture, the crack widths monitored were in the range of 0.4 to 1.8 [12]. In addition, the occurrence of de-lamination at the interface between the concrete substrate and the new concrete layer after a period of moist curing was also reported [1,6,13]. The de-lamination was apparent as early as after 2 days of exposure to a dry environment. The de-lamination cracks in the range of 0.1 to 0.6 wide were observed at the interface between the concrete layers [1]. Despite the extensive studies on cracking and de-lamination of composite specimens, it is important to note that most of the studies were carried out after a period of curing in which the influence of early age shrinkage strains which occur during the first 24 hours was not included. In the present paper, the development of early age shrinkage strains with respect to the depth from the top exposed surface of composite specimens by direct measurement is investigated with emphasis on the first 24 hours after adding water to the mixture. The influence of substrate surface preparation and moisture condition prior to the application of the new concrete layer is studied along with the assessment of cracking and de-lamination due to early age shrinkage during the first 24 hours after adding water to the mixture. The information on shrinkage development and cracking behavior would be important for a better understanding of the composite specimen behavior and durability at an early age. 2. Materials Table 1 shows the concrete mixture proportions used in the present study. The substrate concrete layer was cast with a water-to-cementitious ratio of 0.50 while the new concrete layer was prepared with a water-to-cementitious ratio of 0.45. In all concrete mixtures, type I Portland cement with a Blaine fineness of 365 m 2 /kg was used. Crushed granite with a maximum size of 12.5 and a specific gravity of 2.60 was used as coarse aggregate. The fine aggregate used was natural sand with fineness modulus and specific gravity of 2.80 and 2.60 respectively. Both coarse and fine aggregates were prepared according to the requirement specified in ASTM C33-08 [14]. The total volume of the aggregate was kept between 62% and 65% by volume. In the case when a high range water-reducing admixture was used, the amount of liquid was accounted for in the mix proportion calculation. Table 1 Mix proportions Mixture w/c Agg. Vol. % Water Cement, Silica Fume Fine Agg. Coarse Agg. lt/m 3 HRWRA by cement mass (%) C45 New Layer 0.45 65% 196 436-790 900 0.66 0.06 C50 Substrate 0.50 62% 224 448-736 873 0 0.00 The concrete substrate of dimension 50 100 400 was cast and de-moulded 1 day after casting. The concrete substrate was later moist-cured for 28 days before it was allowed to dry in a temperature and relative humidity controlled room at 30 ± 0.5 0 C and 65 ± 2% for at least 3 months prior to the casting of the new concrete layer.

In order to investigate the influence of substrate surface roughness on shrinkage of the new concrete layer, two different surfaces were prepared; smooth surface and rough surface. The smooth surface was obtained from the mould face while the rough surface was obtained by creating a series of grooves of about 5 width and 5 deep spaced 20 apart on the surface of the smooth substrate. Three different moisture conditions were prepared; oven dry (OD), pre-wetted surface (SW), and saturated surface dry (SSD) conditions. The OD concrete substrate was prepared by placing the substrate in an oven at a temperature of 105 ± 5 0 C for a duration of 24 hours. After heating, the concrete substrate was allowed to cool down to the ambient temperature before casting the new concrete layer. The SW and SSD substrates were prepared in the same manner as the OD substrates, but were subjected to water-ponding for 1 hour and 24 hours prior to the casting of the new concrete layer respectively. The surface of the SW and SSD substrate was mopped to remove any excess moisture just before casting of the new concrete layer. 3. Testing Technique Image analysis testing equipment with a resolution of ±12 με was utilized for monitoring the variation of early age shrinkage strain with respect to the depth from the top surface of the composite prism specimens. The detail of this image analysis technique is provided elsewhere [15]. The monitoring of the targets started as soon as the specimen was placed in the environmental chamber, approximately 30 minutes after adding water to the mixture and monitored continuously for 24 hours. A temperature of 30 ± 0.5 0 C [86 ± 0.9 0 F] and a relative humidity of 65 ± 2% were maintained in the environmental chamber for the entire duration of the experiment. Two types of shrinkage strains were monitored in the present study; free shrinkage strains and restrained shrinkage. The restrained shrinkage was monitored on the composite specimens comprised of a 50 thick concrete substrate and a 50 thick new concrete layer. The concrete substrate was at least 3 months old at the time of the new concrete layer placement to make sure that most of its drying shrinkage had taken place. The shrinkage strains monitored on the composite specimens were compared to free shrinkage strains monitored on monolithic specimens, which had thickness equal to the thickness of the new concrete layer (i.e. 50 ). The target arrangements for early age shrinkage monitoring on the composite specimens are shown in Figure 1. The shrinkage strains of the new concrete layer were monitored at a depth of 3, 20, and 40 from the top surface, while the shrinkage strains of the concrete substrate were monitored at a depth of 60, 75, and 90 from the top surface. Two surface treatments, sealed and unsealed surface, were performed on the new concrete layer. The sealed and unsealed surfaces represented, respectively, adequately cured and inadequately cured specimens. 25.0 [1.0] 50.0 [2.0] 3.0 [0.1] Steel Mold Teflon sheet New Concrete 20.0 [0.8] New Concrete 40.0 [1.6] 60.0 [2.4] 75.0 [3.0] 90.0 [3.6] Substrate 100.0 [4.0] 50.0 [2.0] 50.0 [2.0] Substrate 400.0 [16.0] 100.0 [4.0] SIDE VIEW SECTION VIEW Figure 1-The test arrangement of the composite concrete specimens, [in] The cracks on the surface of the new concrete layer and the de-lamination development at the interface between the new concrete and substrate layers were also monitored by means of the image analysis technique. These cracks were either assessed through cracks images or through the same targets embedded for measuring shrinkage strains. The cracks images were obtained by demoulding the composite specimens at a specific time and capturing the image of the cracks or the delaminations manually from the top or the side of the specimen by means of a digital microscope. The crack width measurement was also performed by using the targets embedded in the composite specimens. The cracks width was monitored at a distance of 25 and 75 from the edge of the

specimens. Given the ability of the image analysis technique to resolve the movement of embedded targets in sub-pixels value, the resolution of the test set-up is approximately 4 μm. 4. Results and Discussion Figure 2 and Figure 3 show the absolute shrinkage strains values monitored at 24 hours after adding water to the mixture on the monolithic and composite specimens with smooth and rough surfaces for the sealed and unsealed specimens respectively. The shrinkage strains was zeroed at the stiffening time and the corresponding absolute shrinkage strain values was taken 24 hours after adding water to the mixture. Figure 2- Absolute shrinkage strains values at 24 hours after adding water to the mixture on sealed composite specimens Figure 3- Absolute shrinkage strains values at 24 hours after adding water to the mixture on unsealed composite specimens 4.1. Effect of substrate surface roughness In order to investigate the influence of substrate surface roughness on early age shrinkage of the new concrete layer, a comparison was made between the monolithic specimen and the SSD

composite specimens as well as between the smooth substrate and the corresponding rough substrate. Comparing the absolute early age shrinkage strains values monitored on the 50 thick monolithic specimens with that monitored on SSD composite specimens with smooth substrate, both sealed and unsealed specimens showed a similar trend; lower shrinkage strains absolute values or expansion were monitored on the composite specimens. As expected, the reduction was more significant near the interface as the new concrete layer was effectively restrained by bonding with the concrete substrate. The results also implied that even with a smooth surface, the friction provided by the SSD substrate and a minimal water movement across the interface towards the saturated substrate, a significant portion of the new concrete s early age shrinkage strains may be restrained near the interface between the two layers. In general, it seems that with friction provided by the substrate along with a minimal water movement across the interface towards the saturated substrate, the shrinkage of the new concrete layer would not reach the shrinkage strains of the corresponding monolithic specimens. A comparison of the early age shrinkage strains monitored on the new concrete layer cast on smooth and rough substrates also showed that the restraining effect of the substrate roughness was more apparent on composite specimens with SW and OD substrates while negligible effect was observed for the composite specimens with SSD substrate. It can be seen that for both sealed and unsealed specimens, the absolute shrinkage strain values is lower when the rough substrate was used. This reduction was also apparent near the top surface of the new concrete layer. The results showed that the restraining effect of substrate may not only affect the new concrete layer near the interface but also the absolute shrinkage strains monitored on the top of a 50 thick new concrete layer. 4.2. Effect of substrate moisture conditions The influence of substrate moisture conditions was assessed by comparing the shrinkage development in the new concrete layer cast on either smooth or rough substrate with different moisture conditions (i.e. SSD-saturated surface dry, SW-substrate with pre-wetted surface, and ODoven dry substrate). A comparison between the monolithic specimens and the SSD composite specimens was also made since the SSD composite specimen may also be able to absorb a minimal amount of water from the new concrete layer. As shown in Figure 2, the results showed that in the case of sealed specimens, the possibility of water absorption by the SSD substrate was negligible as the new concrete layer registered an expansion during the first 24 hours after adding water to the mixture. Comparing the absolute shrinkage strains values of the sealed composite specimens with different substrate moisture conditions, the results showed that the highest shrinkage strains was observed in the new concrete layer cast on SW substrate regardless of the substrate roughness. Near the interface, by changing the substrate moisture conditions from SW to OD, the absolute shrinkage strain values monitored decreased from 130 με to 40 με and from 80 με to -20 με (i.e. expansion) for the smooth and rough substrates respectively. Moreover, the effect of substrate moisture absorption on the sealed composite specimens was quite substantial. It can be seen that in the case of composite specimens cast on SW and OD substrate, the absolute shrinkage strain values monitored were much higher than the corresponding monolithic specimens. On the other hand, in the case of unsealed composite specimens, the results indicated that the absolute shrinkage strain values decreased with a reduction in the substrate moisture content (i.e. a dryer substrate). These results are particularly interesting since it usually perceived that the OD substrate has the highest moisture absorption thus giving rise to higher shrinkage strains in the new concrete layer. Based on the results obtained, it seemed that a presence of additional layer of water at the interface of concrete layer as a results of water-ponding prior to the casting of the new concrete layer may significantly affect the early age shrinkage behavior of the new concrete layer. The additional layer of water may increase the local water-to-cementitious ratio at the interface thus creates a porous layer with low bonding strength that may act as a sliding layer for the new concrete layer. This result is in agreement with a previous study reported by Morgan [8]. It was reported that an excessively wet surface (i.e. defined as a surface condition that would wet a hand drawn over it) would result in a high local water-to-cementitious ratio at the bond interface and thus may have a more damaging effect on the bond strength. The formation of the sliding layer may also explain the results obtained for the sealed specimens. Comparing the composite specimens with SW and OD substrate, due to the formation of this sliding layer in the SW substrate, the new concrete layer could shrink more compared to the same mixtures cast on a OD substrate.

4.3. Assessment of Early Age Crack and De-lamination As mentioned previously, the two kinds of failure in a composite system due to early age shrinkage strain that are often reported are cracking and de-lamination of the new concrete layer. In this investigation, however no cracks were visible to the naked eye on the top surface of the new concrete layer. The absence of surface crack could be attributed to the fact that both ends of the composite specimen were not restrained. Restraint was provided only at the bottom of the new concrete layer through interface bonding with the substrate concrete. In addition, the size of the composite specimens used in the present investigation may not be sufficiently large to promote the occurrence of surface cracks. On other hand, the occurrence of de-lamination or cracks at the interface was clearly observed in the composite specimens as shown in Figure 4. Figure 4-De-lamination at the interface of the unsealed composite specimen monitored observed on the side of the specimen (OD substrate with smooth surface) Crack width ( m) 120 100 80 60 40 Stiffening Time (~ 2.5 hrs) 25 75 20 Unsealed Top Surface 20 0 Smooth Substrate 0 0 4 8 12 16 20 24 0 4 8 12 16 20 24 Time (hours) Time (hours) (a) (b) Figure 5-Cracks width monitored at the interface of the unsealed composite specimens with (a) smooth substrate, and (b) rough substrate during the first 24 hours after adding water to the mixture. Crack width ( m) 120 100 80 60 40 Stiffening Time (~ 2.5 hrs) Unsealed Top Surface Rough Substrate 25 75 Table 2 Cracks width measurement of sealed composite specimens at 24 hours after adding water to the mixture Smooth substrate Substrate moisture condition at 25 at 75 Rough substrate at 25 at 75 SSD 2.0 6.0 11.0 11.0 SW 42.0 20.0 34.0 8.0 OD 55.0 26.0 73.0 31.0 Table 3 Cracks width measurement of unsealed composite specimens at 24 hours after adding water to the mixture Smooth substrate Substrate moisture condition at 25 at 75 Rough substrate at 25 at 75 SSD 40.0 25.0-5.0-9.0 SW 64.0 20.0 47.0 29.0 OD 102.0 41.0 48.0 13.0

As mentioned previously, the measurement of the crack widths or the de-lamination at the interface was performed using the same targets used for early age shrinkage monitoring. Using the same composite specimens with images of the cracks captured from the side or from the cut section, the crack widths or the de-lamination development at the interface of the composite specimens was monitored by calculating the increase in the distance between a pair of targets located one each side the interface. In this approach, it was assumed that the increase in the distance would be equal to crack widths developed at the interface of the composite specimens. Figure 5 shows the typical development of cracks at the interface of unsealed composite specimens. It can be seen that the cracks developed rapidly from the start of shrinkage monitoring up to the time when stiffening time of the new concrete layer occurred. Moreover, it can be seen that the targets located of 25 from the end of the composite specimen registered wider cracks widths compared to that monitored on targets located 75 from the end of the composite specimens. This was expected since the de-lamination would start from the ends of composite specimens and progressed towards the middle portion of the composite specimens. The results of crack widths measured using the targets located near the interface were suarized in Table 2 and Table 3 for the sealed and unsealed composite specimens respectively. The absolute crack width values were measured 24 hours after adding water to the new concrete mixture. Comparing the absolute cracks width values measured on smooth and rough substrates, the results showed that the composite specimens with a smooth substrate generally registered wider cracks compared to that with a rough substrate. As expected, the composite specimens with a smooth substrate exhibit higher risks of de-lamination at the interface. In the composite specimens with a rough substrate, the grooves may provide mechanical interlocking that inhibits the occurrence of the de-lamination and also prevents the cracks from developing further into the middle section of the composite specimens. The effect of substrate moisture conditions on crack development was found to be more significant than the effect of substrate surface roughness. It can be seen that wider cracks were observed in all composite specimens with a oven dry (i.e. OD) substrate. In addition, the results also showed that water-ponding for about 1 hour prior to the casting of the new concrete layer did not significantly reduce the risk of de-lamination at the interface. The results of composite specimens with SW substrate showed that the crack widths measured at the interface was only slightly narrower than that monitored on composite specimens with OD substrate. Comparing the sealed and unsealed composite specimens, the results showed an interesting result. While wider cracks are typically observed in the composite specimens with an unsealed top surface, the results also suggested that even with adequate moisture protection at the top surface of the new concrete layer, the substrate moisture absorption may cause the sealed composite specimens to register comparable crack widths at the interface. As shown in Table 2 and Table 3, in the case of composite specimens with SW substrate, the sealed and unsealed composite specimens registered comparable absolute cracks width values regardless of the substrate roughness. 5. Conclusion Based on experimental study carried out, the following conclusions could be drawn: 1. The restraining effect of substrate surface roughness was found to be significant near the interface and also affects early age shrinkage at the top of a 50 thick new concrete layer. Moreover, the restraining effect was found to be more significant in composite specimens with SW and OD substrate. 2. The moisture conditions of the substrate concrete prior to the casting of the new concrete layer significantly influenced the early age shrinkage strains development of the new 50 thick concrete layer. Based on the results of the sealed and unsealed composite specimens, it is postulated that in the substrates with SSD and SW conditions, a presence of additional excess water near the substrate surface as a result of water-ponding prior to the casting of the new concrete layer may increase the local water-to-cementitious ratio of the new concrete layer. This may result in the formation of a more porous layer with low bonding strength. This more porous layer may act as a sliding layer and gives rise to the slip of the new concrete layer as indicated by higher absolute shrinkage strains values monitored. 3. In this investigation, the development of de-lamination at the interface of the composite specimens due to early age shrinkage strains during the first 24 hours after adding water to the mixture was clearly shown. The results showed that the composite specimens with smooth substrate generally registered wider cracks compared to those with rougher substrate. In the composite specimens with the grooved substrate, the presence of the groove may provide higher mechanical

interlocking as well as preventing the cracks from extending further towards the middle section of the composite specimens. The substrate moisture condition prior to the casting of the new concrete layer also plays a significant role in the de-lamination development at the interface. The results showed that a significant increase in crack widths was observed in composite specimens with SW and OD substrate. In addition, the results also suggested that even with adequate moisture protection at the top surface of the new 50 thick concrete mixture, substrate moisture absorption may cause the sealed composite specimens to register crack widths at the interface comparable with that monitored on the unsealed composite specimens. References 1. Xu, W., "Durability of Repaired Structure," PhD Thesis, National University of Singapore, 1999, 291 pp. 2. Wall, J.S. and Shrive, N.G., "Factors Affecting Bond Between New and Old Concrete," ACI Materials Journal, V. 85, No.2, 1988, pp. 117-125. 3. Austin, S., Robins, P., and Pan, Y., "Tensile bond testing of concrete repairs," Materials and Structures, V. 28, No.5, 1995, pp. 249-259. 4. Climaco, J.C.T.S. and Regan, P.E., "Evaluation of bond strength between old and new concrete in structural repairs," Magazine of Concrete Research, V. 53, No.6, 2001, pp. 377-390. 5. Kyaw, M.-L., "Early Age Shrinkage and Bond at Interface Between Repair Material and Concrete Substrate," PhD Thesis, National University of Singapore, Singapore, 2007, 252 pp. 6. Carlswärd, J., "Shrinkage cracking of steel fibre reinforced self compacting concrete overlays," PhD Thesis, Luleå University of Technology, 2006, 250 pp. 7. Courard, L., "Adhesion of repair systems to concrete: Influence of interfacial topography and transport phenomena," Magazine of Concrete Research, V. 57, No.5, 2005, pp. 273-282. 8. Morgan, D.R., "Compatibility of concrete repair materials and systems," Construction and Building Materials, V. 10, No.1, 1996, pp. 57-67. 9. Bisschop, J. and van Mier, J.G.M., "How to study drying shrinkage microcracking in cementbased materials using optical and scanning electron microscopy?," Cement and Concrete Research, V. 32, No.2, 2002, pp. 279-287. 10. Kim, B. and Weiss, W.J., "Using acoustic emission to quantify damage in restrained fiberreinforced cement mortars," Cement and Concrete Research, V. 33, No.2, 2003, pp. 207-214. 11. Pease, B., Hossain, A.B., and Weiss, J., "Quantifying Volume Change, Stress Development, and Cracking Due to Early-Age Autogenous Shrinkage " ACI SP-220, O.M. Jensen, D.P. Bentz, and P. Lura, Editors. 2004, American Concrete Institute: Farmington HIlls, MI. pp. 23-38. 12. Banthia, N. and Gupta, R., "Plastic shrinkage cracking in cementitious repairs and overlays," Materials and Structures, V. 42, No.5, 2009, pp. 567-579. 13. Shin, H.-C. and Lange, D.A., "Effects of shrinkage and temperature in bonded concrete overlays," ACI Materials Journal, V. 101, No.5, 2004, pp. 358-364. 14. ASTM-C33-08, ""Standard Specification for Concrete Aggregates," ASTM C 33 / C33M-08," Annual Book of ASTM Standards. 2008, American Society for Testing Materials: West Conshohocken, PA. 15. Ong, K.C.G., Chandra, L.R., and Kyaw, M.-L. "Early age shrinkage strains at various depths of mortar prism specimens," Proceedings of the 8th International Conference on Creep, Shrinkage, and Durability of Concrete and Concrete Structures Ise-Shima, Japan, T. Tanabe, ed., 2008, pp. 309-314.