Software Project Management. Lecture 21

Similar documents
Chapter 6: Project Time Management. King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072

Project Time Management

Chapter 6: Project Time Management

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects

Chapter 2: Project Time Management

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu

Lecture 6: Project Time Management By: Prof. Lili Saghafi. Information Technology Project Management, Fifth Edition

Learning Objectives. Learning Objectives (continued) Importance of Project Schedules

Chapter 4: Project Time Management

The Project In the beginning was The Project, and then arose the Assumptions.! And The Project was without form and the Assumptions were void.

Goals of the Unit. spm adolfo villafiorita - introduction to software project management

Project Management Glossary

Project Time Management

Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza

PROJECT TIME MANAGEMENT. 1 Powered by POeT Solvers Limited

8. Project Time Management

Precedence Diagram Method. CSTM 462 Planning & Scheduling

Project Planning. Lecture Objectives. Basic Reasons for Planning. Planning. Project Planning and Control System. Planning Steps

Scheduling Glossary Activity. A component of work performed during the course of a project.

Software Project Management I

Object-Oriented Analysis. with the Unified Process. John W. Satzinger Southwest Missouri State University. Robert B. Jackson Brigham Young University

SYSTEMS ANALYSIS AND DESIGN DO NOT COPY

Project Time Management

Egypt Scholars Presented by Mohamed Khalifa Hassan Jan 2014

Appendix A of Project Management. Appendix Table of Contents REFERENCES...761

Project Time Management

Scheduling. Anne Banks Pidduck Adapted from John Musser

Network Diagram Critical Path Method Programme Evaluation and Review Technique and Reducing Project Duration

The Project Planning Process Group

Operational Research. Project Menagement Method by CPM/ PERT

Unit 4: Time Management (PMBOK Guide, Chapter 6)

Project Planning and Scheduling

Time Management. Part 5 Schedule Development. Richard Boser

Use project management tools

PROJECT TIME MANAGEMENT

Chapter-6. Developing a Project Plan

Cambridge International AS and A Level Computer Science

CPM-200: Principles of Schedule Management

Information Technology Project Management

Basic CPM Calculations

A Short Introduction to Project Management

Test Fragen + Antworten. October 2004 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi

CPM -100: Principles of Project Management

Introduction to Project Management

ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS

Test Fragen. October 2003 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003

Lecture 26 CPM / PERT Network Diagram

Module 3: The Project Planning Stage

Project Time Management

Systems Analysis and Design

108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised )

ME 407 Mechanical Engineering Design Spring 2016

PROJECT EVALUATION REVIEW TECHNIQUE (PERT) AND CRITICAL PATH METHOD (CPM)

Project Time Management Activity Definition Activity Sequencing Duration Estimating Schedule Development Schedule Control

TIME MANAGEMENT TOOLS AND TECHNIQUES FOR PROJECT MANAGEMENT. Hazar Hamad Hussain *

Featured Paper Satya Narayan Dash By Satya Narayan Dash, PMP, CSM, MCP

SCHEDULING AND TIME MANAGEMENT. Project Management and Leadership 2015D, PhD, PMP

Guidance on Critical Path Analysis

Table of Contents Author s Preface... 3 Table of Contents... 5 Introduction... 6 Step 1: Define Activities... 7 Identify deliverables and decompose

Synergy between PMBOK and MS Project 2007 A Schedule Management Perspective

Microsoft Project From the WBS to a Complete Schedule Emanuele Della Valle, Lecturer: Dario Cerizza

Scheduling Best Practices

Introduction to Project Management

Chapter 6. (PMBOK Guide)

added to the task, using Project, it will automatically calculate the schedule each time a new resource is added.

Chapter 3 Managing the Information Systems (IS) Project

MODEL SCHEDULING SPECIFICATION

How To Manage A Project With Project Management On M Project Software On A Pc Or Macbook 2.5 (Windows)

Project Initiation and Revision Training Manual. Table of Contents

Project Management Fact Sheet:

MECH 896 Professional Development for MEng Students. Homework Discussion. Scheduling Overview. Winter 2015: Lecture #5 Project Time Management

Introduction to Project Management ECE 480. Erik Goodman

The work breakdown structure can be illustrated in a block diagram:

Leaving Certificate Technology. Project Management. Teacher Notes

Project Management Fact Sheet: Developing a Gantt Chart

CIS Project Management

WORK PROGRAM GUIDELINES

Network Planning and Analysis

Time Management. Herb Pollard III

Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza

Define Activities Sequence Activities Estimate Activity Resources Estimate Activity Durations Develop Schedule Control Schedule

Collaborative Scheduling using the CPM Method

Chapter 6 (part 1) Project Time Management. (Project Scheduling)

pm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

Priori ty

CRITICAL PATH METHOD (CEE 320 VDC SEMINAR)

SE351a: Software Project & Process Management

Project Management Dr. James A. Bednar

Unit 1: Project Planning and Scheduling

Network Calculations

Microsoft Project 2010

Notes on the Critical Path Method for project planning and management.

Chapter 1.7 Project Management. 1. Project financing is one of the step of project management- State True or False

State of Michigan (SOM) August Department of Technology, Management & Budget

PN /16/ CRITICAL PATH METHOD PROGRESS SCHEDULE

Scope management can be defined as controlling what is and what is not a part of the project.

Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time

Metadata-Based Project Management System. A Case Study at M-Files Corporation. Iulia Adomnita

PMBOK GLOSSARY. Activity Duration Estimating. Estimating the number of work periods which will be needed to complete individual activities.

Transcription:

Software Project Management Lecture 21 1

Words of Wisdom Know the truth that you were created as the best creation, with Allah (SWT) Himself breathing into you His spirit. And (remember) when your Lord said to the angles: I am going to create a man (Adam) from dried (sounding) clay of altered mud. So, when I have fashioned him completely and breath into him (Adam) the soul which I have created for him, then fall (you) down prostrating yourselves to him 2

Scheduling Duration Estimates WBS, Deliverables, & Tasks Network Definition Schedule Resource Loading 3

Scheduling The WBS provides an is-part-of organizational hierarchy of work activities A Schedule Network provides an is-preceded-by and isfollowed-by time sequencing of work activities Validating when the work tasks need to be done. A schedule is the conversion of a project action plan into an operating timetable. Details the time allowed for the project and each activity, the main tasks to be accomplished, the people and skills required, the important issues and risks and when the projects are to be started and finished. It serves as a fundamental basis for monitoring and controlling project activity and, taken together with the plan and budget. 4

Importance of Project Schedules Managers often cite delivering projects on time as one of their biggest challenges Average time overrun from 1995 CHAOS report was 222%; improved to 63% in 2001 study Time has the least amount of flexibility; it passes no matter what Schedule issues are the main reason for conflicts on projects, especially during the second half of projects 5

Conflict Intensity Conflict Intensity Over the Life of a Project 0.40 0.35 0.30 0.25 0.20 0.15 0.10 Average Total Conflict Schedules Priorities Manpower Technical opinions Procedures Cost Personality conflicts 0.05 0.00 Project Formation Early Phases Middle Phases End Phases 6

Scheduling Steps Identify work activities and estimate resource needs for each work activity Identify predecessor and successor activities for each work activity tie them to your milestones Develop an activity network and determine the schedule Develop resource loading profiles for each type of resource needed Iterate steps 1 through 4 to achieve a balance among a) work to be done, b) the schedule to do it, and c) the resources needed 7

PMI s Project Time Management Processes Project time management involves the processes required to ensure timely completion of a project. Processes include: Activity definition Activity sequencing Activity duration estimating Schedule development Schedule control 8

Where Do Schedules Come From? Defining Activities Project schedules grow out of the basic document that initiate a project Project charter includes start and end dates and budget information Scope statement and WBS help define what will be done Activity definition involves developing a more detailed WBS and supporting explanations to understand all the work to be done 9

Activity Sequencing Involves reviewing activities and determining dependencies Mandatory dependencies: inherent in the nature of the work; hard logic Discretionary dependencies: defined by the project team; soft logic External dependencies: involve relationships between project and non-project activities You must determine dependencies in order to use critical path analysis 10

Project Network Diagrams 2 5 1 3 6 8 4 7 Project network diagrams are the preferred technique for showing activity sequencing A project network diagram is a schematic display of the logical relationships among, or sequencing of, project activities 11

Arrow Diagramming Method (ADM) Also called activity-on-arrow (AOA) project network diagrams Activities are represented by arrows Nodes or circles are the starting and ending points of activities Can only show finish-to-start dependencies 12

Process for Creating AOA Diagrams 1. Find all of the activities that start at node 1. Draw their finish nodes and draw arrows between node 1 and those finish nodes. Put the activity letter or name and duration estimate on the associated arrow 2. Continuing drawing the network diagram, working from left to right. Look for bursts and merges. Bursts occur when a single node is followed by two or more activities. A merge occurs when two or more nodes precede a single node 3. Continue drawing the project network diagram until all activities are included on the diagram that have dependencies 13

Precedence Diagramming Method (PDM) Activities are represented by boxes Arrows show relationships between activities More popular than ADM method and used by project management software Better at showing different types of dependencies 14

Task Dependency Types Task are linked by defining a dependency between their finish and start dates Finish-to-Start Task (B) can not start until task (A) finishes Start-to-Start Task (B) can not start until task (A) starts Finish-to-Finish Task (B) can not finish until task (A) finishes Start-to-Finish Task (B) can not finish until task (A) starts 15

Sample Precedence Diagramming Method (PDM) Network Diagram 16

Activity Duration Estimating After defining activities and determining their sequence, the next step is duration estimating Duration includes the actual amount of time worked on an activity plus elapsed time People doing the work should help create estimates, and an expert should review them 17

Schedule Development Schedule development uses results of the other time management processes to determine the start and end date of the project and its activities Ultimate goal is to create a realistic project schedule that provides a basis for monitoring project progress for the time dimension of the project Important tools and techniques include Gantt charts PERT analysis Critical path analysis, and Critical chain scheduling 18

Gantt Charts Gantt charts provide a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a calendar format 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 1 3 5 7 9 11 13 15 Weeks 19

Sample Tracking Gantt Chart A black diamond: milestones or significant events on a project with zero duration Thick bars: summary tasks Lighter horizontal bars: planned tasks Black horizontal bars: actual tasks Arrows: dependencies between tasks 20

Critical Path Method (CPM) CPM is a project network analysis technique used to predict total project duration A critical path for a project is the series of activities that determines the earliest time by which the project can be completed The critical path is the longest path through the network diagram and has the least amount of slack or float 21

CPM Node/Activity (0,0) St (0,0) Critical Path (0,10) A 10 (10,20) (0,20) B 20 (0,20) (20,50) C 30 (20,50) (20,50) E 30 (30,60) (50,60) D 10 (50,60) (60,80) F 20 (60,80) Earliest Start, Earliest Finish Node ID Time Remaining Latest Start, Latest Finish (80,80) En (80,80) (0,10) A 10 (10,20) 22

Finding the Critical Path First develop a good project network diagram Add the durations for all activities on each path through the project network diagram The longest path is the critical path 23

Simple Example of Determining the Critical Path Consider the following project network diagram. Assume all times are in days. start C=2 4 E=1 A=2 B=5 1 2 3 6 D=7 5 F=2 finish a) How many paths are on this network diagram? b) How long is each path? c) Which is the critical path? d) What is the shortest amount of time needed to complete this project? 24

Determining the Critical Path 25

More on the Critical Path If one of more activities on the critical path takes longer than planned, the whole project schedule will slip unless corrective action is taken Remember: The critical path is not the one with all the critical activities; it only accounts for time There can be more than one critical path if the lengths of two or more paths are the same The critical path can change as the project progresses 26

Using Critical Path Analysis to Make Schedule Trade-offs Knowing the critical path helps you make schedule trade-offs Free slack or free float is the amount of time an activity can be delayed without delaying the early start of any immediately following activities Total slack or total float is the amount of time an activity may be delayed from its early start without delaying the planned project finish date 27

Determining the Critical Path 28

Q&A 29