BUILD MANUAL: ARTI FLOATING DOME BIODIGESTOR

Similar documents
DIY Poly Digester. What is Supplied in the Kit. Sketch of Arrangement

INSTALLATION INSTRUCTIONS BL-8704

INSTALLATION INSTRUCTIONS MK-8704

Installation guide Nordic mixer taps. Before installing read this guide first

How To Launch A Rocket From A Formica

Porcelain Vessel Sink Installation

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT CHEVROLET/GMC VANS FOR

Overview PARTS LIST. B. Lever mounting base C. Flush handle assembly D. Grey/Blue float stop E. Grey float (Full Flush) F. Flush valve washer

Gear PEPSI CAN STOVE INSTRUCTIONS


Gas Bio-digester Information and Construction Manual For Rural Families

GEET Fuel Processor Plans

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

1.8 CRANKSHAFT OIL SEALS

Appendix 8 Step-by-step guide to constructing small-scale aquaponic systems

Go-kart for little race-drivers

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Keggomax CM Reflux Still

Close Coupled & Back To Wall WC Saintaryware. Fitting Instructions

Installation Instructions

Build Your Own. Biogas Generator. Basic Principles

INSTALLATION INSTRUCTIONS

Making a Rain Barrel at Home

Industrial Strength Rocket Launcher

I N S T A L L A T I O N I N S T R U C T I O N S F O R T H E H i l k o i l Energy S aving Hot Water Kit

THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494

Power Cube Open Source Ecology Page 1. Power Cube. Version 4

NOBLE. MODIFYING SPOT SPRAYERS for Broadcast Pasture/Lawn Use. Authors: Eddie Funderburg, Jeff Ball, Jim Johnson and David Annis NF-SO-04-01

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

Hot, Warm and Cold Mineral Water Cooler [Models Cool18, Cool25, Cool36, Cool50, Cool75, Cool100]

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

Installing Window and Door Mouldings

Stainless Steel Single and Dual Circulation Kits

Time needed: ~3h for lid replacement only. Add 1h for operation harness in lid and ~2h more for installing drive unit and cable harness in trunk.

How to Build a Poker Table

Installation instruction do88 Intercooler for Volvo S40 / V50 / C30

How to Build Your Own CornHole Game

Guidelines for Earthquake Bracing of Residential Water Heaters

VW GOLF Mk4 TDI FRONT MOUNTING INTERCOOLER INSTALLATION INSTRUCTIONS

How To Replace A Reverse Osmosis Water Tank

Guidelines for Earthquake Bracing Residential Water Heaters

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

AM/FM ANTENNA RELOCATION KIT

ELECTRIC PERISTALTIC MORTAR POINTING PUMP

How To Make A Spiral Fluted And Wire Wrapped Dagger Handle

*h5h/7h$ù,5,7ø75(ùø0/(59(68.$d$./$5, <$1/,ù0217$-'$1.$<1$./$1$%ø/ø5 &ø+$=,$6/$d$/,ù0$67$1',h=(5ø1'( 7$ù,0$<,1,=

Power Window/Power Lock Installation. To begin with you will need all the parts listed below:

Plugging Home Drains to Prevent Sewage Backup

TAMPERS Tabor Place, Santa Fe Springs, California, CA 90670, U.S.A.

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE

MGB Chrome Bumper Conversion

Watts Pure Water Systems

with installation dynafact boost GAUGE this manual is for use with systems

30 minutes in class, 2 hours to make the first time

ENGINE FUEL FUEL FILTER... FUEL HEATER... INJECTOR... SUPPLY PUMP... COMMON RAIL... FUEL PRESSURE LIMITTER...

PARTS NEEDED FOR CONVERTING FROM LP TO NG

Auto-belay Cable Replacement Process

Hive Top Ventilation Shims

Hommage 2 PIECE WATER CLOSET BOWL MODEL TANK MODEL 7721 U1 SEAT MODEL

SHOP NOTES METAL SHAPER FOR YOUR SHOP

Honda CX500 & GL500 Forum

OHIO University Mechanical Engineering Summary Report: Human Power System for Small Appliances and Machinery

VOYAGER 570G. 744A Sprayer Control

BASIC PLUMBING. 2 - Preparation. The simple skills required for basic plumbing are explained in this project.

POD Visor Instructions

Skirt 1 / 4. The Skirt. The skirt patterns were downloaded from Mark's site but they need expanding before they can be used.

Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls

INSTRUCTIONS. FLHR/C/S (Road King) FRONT END LOWERING KIT 1WARNING -J03242 REV General. Removal (Left and Right Forks) Kit Number

SUPERCHIPPER CASTING MAINTENANCE

Range Road RR Series Semi-Automatic Firewood Processor. Crated Unit Assembly Manual

XL PREMIUM OIL COOLER KIT

VW Caddy W INSTALLATION INSTRUCTIONS

Tech Bulletin. Hose / Cord Replacement and Required Wraps. Series RT

MODEL INSTALLATION INSTRUCTIONS

H EAD TUBE BASICS. Figure 1 - Head tube, front fork and hardware

INSTRUCTIONS: LocknCharge Laptop Carts

AM/FM ANTENNA KIT (TOUR-PAK MOUNT)

Permanent Magnetic Generator Construction Manual

DTU Animal Cart Programme

TOOLS FOR SELF RELIANCE REFURBISHING SHEET No 2. Registered Charity No Saws for Woodworking

WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

Ocean Engineering Technical Data Sheet Stuffing Tubes

Determine the desired location fixture and center the coaxial cord location to the electrical box.

This little motorcycle has been designed

Installation instruction CASAFLEX - Connecting piece DN 100

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Installation Instructions

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

Modular Locomotive System Instruction Manual for HBK5 Billy Body Kit

The Drink-Aide The NEW look of independence

RI27-J CNG REDUCER INSTALLATION PROVISIONS & WARNINGS

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base

Constantemp Double Wall Low pressure steam-water Heater F-340LDW,F-640LDW, F-940LDW and F-1240LDW

MFH-5057 Ford Small-Block V-8 Fresh Water Cooling Kit Instructions

Char-Lynn Hydraulic Motor. Repair Information Series. October, 1997

Building The Modular Moveable Greenhouse described in The Four Season Farm Gardener s Cookbook By Barbara Damrosch and Eliot Coleman

H41 Electrical Stage Aft Air Conditioner Unit Installation

General Allowances for Insulation & Cladding

Transcription:

BUILD MANUAL: ARTI FLOATING DOME BIODIGESTOR (www.eawag.ch) Revision Date Author Final Draft (edited by Steve Crowe) 30 th July 2009 Ben Dana 1. Introduction... 2 2. Materials List... 2 3. Tools List... 2 4. Fit the small tank into the large tank... 3 4.1 Mark where to cut off the top of the big tank... 3 4.2 Cut the hole... 4 5 Making the Inlets and Outlets... 5 5.1 Making the rubber washers... 6 5.2 Feedstock Inlet... 7 5.3 Feedstock Funnel... 10 5.4 Residue Outlet... 10 5.5 Gas outlet... 12 5.6 Sealing the higher outlet from the small tank... 13 6 Float Limiting Structure... 13 7 Further Information... 14 1

1. Introduction The Appropriate Rural Technology Institute (ARTI) is an NGO based in Maharashtra, India. ARTI has developed a compact biogas plant which uses waste food rather than manure as feedstock, to supply biogas for cooking. The compact plants are made from cut-down high-density polythene (HDPE) water tanks, which are adapted using HDPE or PVC piping. The standard plant uses two tanks, with volumes of typically 0.75 m3 and 1 m3 (750l and 1000l). The smaller tank is the gas holder and is inverted over the larger one which holds the mixture of decomposing feedstock and water (slurry). An inlet is provided for adding feedstock, and an overflow for removing the digested effluent/ residue ( www.eawag.ch ) The Appropriate Infrastructure Development Group (AIDG) helps individuals and communities to benefit from affordable and environmentally sound access to electricity, sanitation and clean water. AIDG s strategy focuses on business incubation, education and outreach and its projects are based in Guatemala and Haiti. 2. Materials List 1000l plastic water tank (1100l tank used at AIDG); 750l plastic water tank; 2m of x PVC pipe; PVC glue. Feedstock Inlet: 2 x 4 PVC to male threaded fitting; 1 x 4 PVC to female threaded fitting; 1 x 4 PVC T; 1 x 4 female cap; scrap sheet metal (for funnel: 115cm x 35cm x 20cm long); 5 rivets. Residue Outlet: 1 x 4 PVC to male threaded fitting; 1 x 4 PVC to female threaded fitting; 1 x 4 PVC elbow. Small tank upper inlet 1 ½ female cap (assuming the inlet is male threaded. This is to seal the hole) Seals 80 x 80 cm x 2mm thick rubber (like bike inner tube rubber); 25cm x 25cm x 6mm thick spongy rubber; silicone; PTFE (Teflon) tape. Float Limiting Structure: 11m of 1 PVC; 4 1 PVC elbows; 0.5 x 6cm Bolts (4); 0.5cm Nuts (4); 0.5cm Washers (24); Flat iron (approx. 3.5m x 2cm x 2mm thick.) Gas outlet 1 ½ coupler; 1 ½ - ¾ male to female reducer ; ¾- ½ male thread to female thread reducer; ½ male threaded adaptor to flexible hose; ½ flexible hose; ½ hose clamp. Gas Burner: ½ hose clamp; 2 x ½ metal nipple; ½ shut off valve; 1.5cm Ø iron bar + 2.5cm Ø tubular iron iron bar to be welded into a stove frame Note: this is for one of several stove options. 3. Tools List Jigsaw; Tape measure; Flat file; Marker pen; Two large pipe wrenches; Small adjustable spanner ; Welding machine (helps to make the float limiting structure); Scissors; Hammer; Chisel; Hacksaw; Drill; Rivet gun 2

4. Fit the small tank into the large tank. A 1100l and a 750l tank were used to build a prototype at AIDG Guatemala: exterior diameters 120cm and 106cm. ARTI Bio-digester built by AIDG Guatemala 4.1 Mark where to cut off the top of the big tank Cut the top of the big tank (the fermenter) so that the small tank (the gas holder) will fit inside it (upside down.) The big tank is cut so that its opening is the size of the small tank. Cut off the top of the small tank and place it, centered, on top of the big tank to mark its perimeter. Remark the cutting line so that the hole is 3 wider than this. Ensure that the line is level. Alternatively: Mark the small tank circumference on a cord = x diameter (photo 3) Use the cord to mark the big tank so that the small one fits inside exactly (photo 2) Lay the cord in a circle. Check that distance to the tank edge is the same all round. Centre the small tank on top of the big one; check it s directly above the cord. 3

2. 3. 4.2 Cut the hole 5. 6. Penetrate with a hammer and chisel so that the jigsaw blade can pass through (chiseling is easier with another person pushing from the inside.) Then cut along the marked line with the jigsaw Make the initial cut based on the hole you have marked Check that it is large enough for the small tank Cut again until it is the right size. The final hole should be approximately 8cm wider than the small tank diameter- there should be 4cm of space on each side of the small tank. This allows the small tank to float upwards when full. Make sure that there is enough space for the small tank to float past the female fitting on the inside of the outlet of the fermenter (see section 5.4 for details- it will be cut but the threading must be left.) Use a file so that the edge is left smooth. 4

5 Making the Inlets and Outlets 7. 8. 9. Holes in the tank for the inlet and outlet are made using a jigsaw: Mark out the hole 4 diameter Drill a small hole for the jigsaw blade to pass through. Cut with the jigsaw lay the cutting surface horizontally if possible for accuracy Finish the hole to the line you have marked using a file. Make the initial cut based on the hole you have marked Check that it is large enough for the fitting Cut again or file the hole bigger until it is the right size. If you do not have a jigsaw, then drill small holes. Then cut through with a fine chisel using hammer blows. Ensure the 4 male fitting fits all the way into the hole. Screw it in with a large pipe wrench (photo 11). This is easier to do with two people. This wrench will later be used for tightening the male and female threaded fittings, either side of the inlet. 5

11. 5.1 Making the rubber washers. Rubber washers are used to seal the inlets each side of the tank wall. These are made in the following way: 1. Mark the inside and outside diameter of the washer on the rubber, drawing around the fitting. 12. 13. 2. Use scissors to cut a washer from the rubber 14. You will need 4 normal rubber washers and 2 thicker washers for the inlet, and one normal washer for the outlet. It is important for the Feedstock Inlet to be water tight. This should have two rubber washers on each side of the tank wall. A third washer made from a thicker, spongier rubber is also necessary (on both 6

sides, next to the tank wall). The Residue Outlet can be sealed with two normal washers and one thick washer on the inside, but only one rubber washer on the outside of the tank. 5.2 Feedstock Inlet The existing inlet to the large tank can be used for the feedstock inlet (approximately 8cm from the floor to the centre of the hole.) However it must be widened to 4 (the method is explained in [5].) D1 ARTI BIODIGESTOR Entrée du Composter Tank interior is on the left. There are two rubber washers and a thicker washer (black) on each side of the tank. The pipes and fittings are connected to make the inlet and outlet as shown in Diagram D1. 15. 16. 7

Mark the 4 PVC pipe to size and cut it with a hacksaw. The lengths are shown in photo 17. 17. C) 1 x 90cm of pipe - compost in B) 2 x 30cm of pipe - effluent out + compost in A) 4 x 11cm of pipe - horizontal sections of the inlet and outlet The fittings should be pushed all the way onto the pipe (photo 20.) This may require tapping with a hammer (photo 21). Use plenty of PVC glue on both the pipe and the fitting to join them together (photo 18.) 18. 19 20. 21. 8

Threaded joints should be sealed using PTFE tape (teflon) (photo 22). The tape is wound over the male threading around 10 times in a clockwise direction. 22. 23. As shown in photo 23 the inlet should be extended on the inside of the tank. On the outside, the inlet is fitted with a cap on one side of the T to enable the pipe to be unblocked or the bio-digester to be drained if necessary. This is connected by screwing onto the male fitting (photo 24). Two large pipe wrenches are needed: one to tighten the cap and the other to prevent the male fitting from moving (photo 25.) 24. 25. Rubber washers are installed ach side of the tank wall (5.3). Silicone should be applied between the rubber washers and the inlet/ outlet holes for extra sealing. Apply to all non-threaded joints between the pipe and fitting. 9

26. 27. 28. Feedstock Inlet 5.3 Feedstock Funnel The inlet needs a wider mouth to make feeding easy. A funnel can be made from a sheet of scrap metal. Cut one horizontal side longer than the other (115 x 35cm); the other sides should be angled (20cm long). Bend over into a funnel shape and 5 drill holes which line up for riveting. Rivet together. 5.4 Residue Outlet The existing inlet to the large tank can be used for the residue outlet (approximately 88cm from the floor to the centre of the hole.) However it must be widened to 4 (the method is explained in [5].) 10

D2 The female fitting used on the inside of the tank for the residue outlet must be cut short with a hacksaw. If it is not cut there will not be enough space for the gas holder to fit inside the fermentation tank. 29. 11

30. The Residue Outlet 5.5 Gas outlet The gas outlet is connected to the lower inlet to the smaller tank (this tank is upside down so it appears to be the higher inlet.) Connecting to this fitting means that there is a small space above the gas outlet from which gas cannot escape. An alternative is to make a new hole in the middle of the top of the gas holder and connect the gas outlet there. This option is more complicated for construction, as it requires making and sealing a new hole as well as sealing off the existing fitting. However, it does have the benefit of allowing all the gas to escape from the gas holder. 31. Connection of the gas outlet. The fittings to be installed are as follows: (Male inlet to tank) 1 ½ coupler 1 ½ - ¾ male to female reducer ¾- ½ male to female reducer ½ adaptor to flexible hose flexible hose (attached with a hose clamp) Use silicone to seal the joint to the inlet 12

32. The gas burner with its iron stand A stand for the gas burner can be welded from iron bar (1.5cm Ø + 2.5cm Ø tubular iron for the legs.) The fittings needed to attach the gas hose to the burner are as follows: (Gas hose) ½ metal nipple (hose attachment with a hose clamp) ½ shut off valve ½ metal nipple gas burner 5.6 Sealing the higher outlet from the small tank This should be sealed with a cap to prevent gas leakage. 6 Float Limiting Structure. 33. To prevent the gas holder (the smaller tank) from rising too high, a structure is attached to the outer tank as shown in photo 33. Three lengths of 1 PVC pipe are connected together with 90º elbows to form inverted U shapes (140cm 129cm 140cm.) This is built twice. The two structures are connected over the biodigester in an X formation. 13

A belt of thin iron is wrapped around the base of the bio-digester and connected together with bolts (photo 34.) Four metal lips are welded to the iron (photo 35), providing a surface that the PVC X structure can be bolted to. 34. 35. 7 Further Information Appropriate Rural Technology Institute (ARTI) Dr. A.D.Karve, President Maninee Apartements, Survey No. 13 Dhayarigaon Pune, India E-Mail: adkarve@pn2.vsnl.net.in or adkarve@vsnl.com Web: www.arti-india.org The Appropriate Technology Development Group (AIDG.) Jose Ordoňez Quetzaltenango Guatemala www.aidg.org 14

15