Use a TCO Model to Estimate the Costs of Your Data Center



Similar documents
What to Consider When Designing Next-Generation Data Centers

The Six Triggers for Using Data Center Infrastructure Management Tools

Selecting a Mobile App Development Vendor

The Outlook for IT to Michael Smith VP Distinguished Analyst January 31, 2014

Data Center Redesign Yields an 80%-Plus Reduction in Energy Usage

Agenda Overview for Marketing Management, 2015

Containers and Modules: Is This the Future of the Data Center?

Survey Analysis: Adoption of Cloud ERP, 2013 Through 2023

How to Reduce Network Equipment Maintenance Costs

Organizations Struggle with Data Center Capacity Management

Agenda Overview for Social Marketing, 2015

Make Migration From Windows Server 2003 a Priority, Before Support Ends in July 2015

Energy savings from well-managed data centers can reduce operating expenses by as much as 20%.

This research note is restricted to the personal use of

The Edge Manifesto: Digital Business, Rich Media, Latency Sensitivity and the Use of Distributed Data Centers

Beware the Effect of the Operating Lease's Demise on Finance and Real Estate

Managing the Risks of Running Windows Server 2003 After July 2015

Data Center Consolidation Projects: Benefits and Pitfalls

Future of Money: Digital Payment Advisors Will Transform the Payment Landscape

How to Measure Energy Consumption in Your Data Center

Agenda Overview for Multichannel Marketing, 2013

2015 CIO Agenda: An Africa Perspective

Top 10 Technology Trends, 2013: Cloud Computing and Hybrid IT Drive Future IT Models

Realize That Big Security Data Is Not Big Security Nor Big Intelligence

COM M. Margevicius

Eight Critical Forces Shape Enterprise Data Center Strategies

Digital Marketing Budgets Increase, Reflecting Focus on Customer Experience

Agenda Overview for Emerging Marketing Technology and Trends, 2015

Agenda for Supply Chain Strategy and Enablers, 2012

Backup and Disaster Recovery Modernization Is No Longer a Luxury, but a Business Necessity

When IT Leaders Should Select Private Over Public Cloud Services

Agenda Overview for Digital Commerce, 2015

Highlights of the 2015 CEO Survey: Business Leaders Are Betting on Tech

What's a Digital Marketing Platform? What Isn't?

Cloud Decision-Making Criteria for Educational Organizations

Reducing Your Data Center's Carbon Footprint Will Have Economic and Sustainability Benefits

Recognize the Importance of Digital Marketing

Why CEOs Want A Digital Strategy This Year

Modify Your Storage Backup Plan to Improve Data Management and Reduce Cost

Clients That Don't Segment Their Network Infrastructure Will Have Higher Costs and Increased Vendor Lock-in

Gartner's View on 'Bring Your Own' in Client Computing

Leveraging Radware s ADC-VX to Reduce Data Center TCO An ROI Paper on Radware s Industry-First ADC Hypervisor

The Value of Integrating Configuration Management Databases With Enterprise Architecture Tools

Agenda Overview for Customer Experience, 2015

Cloud IaaS: Service-Level Agreements

Juniper Networks QFabric: Scaling for the Modern Data Center

Agenda Overview for Multichannel Marketing, 2015

Research. Key Issues for Software as a Service, 2009

Data Center Consolidation: Top 10 Best Practices for Project Success

The Current State of Agile Method Adoption

Agenda Overview for Mobile Marketing, 2013

NAC Strategies for Supporting BYOD Environments

Analyzing the Virtualization Deployment Advantages of Two- and Four-Socket Server Platforms

Key Issues for Consumer Goods Manufacturers, 2011

Increasing Data Center Efficiency through Metering and Monitoring Power Usage

Dutch University's Successful Enterprise System Implementation Yields Valuable Lessons

Figure 2: Dell offers significant savings per chassis over HP and IBM in acquisition costs and 1-, 3-, and 5-year TCO.

The Next Generation of Functionality for Marketing Resource Management

Toolkit: Reduce Dependence on Desk-Side Support Technicians

Use Heterogeneous Storage Virtualization as a Bridge to the Cloud

Case Study: A K-12 Portal Project at the Miami-Dade County Public Schools

Knowledge Management and Enterprise Information Management Are Both Disciplines for Exploiting Information Assets

IT asset management (ITAM) will proliferate in midsize and large companies.

Is an energy-wasting data center draining your bottom line?

Public/Private/Hybrid Cloud choosing horses for courses. NetEvents APAC Cloud Summit

How To Calculate Hd Costs

Integrated Marketing Management Aligns Executional, Operational and Analytical Processes in a Closed-Loop Process

The Business-Centric CIO

How the Port Density of a Data Center LAN Switch Impacts Scalability and Total Cost of Ownership

Invest in an analysis of current metrics and those missing, and develop a plan for continuous management and improvement.

Choosing a Replacement for Incumbent One-Time Password Tokens

How Deal Size Matters in IT Infrastructure Outsourcing (Executive Summary) Executive Summary

Prepare for the Inevitable With an Effective Security Incident Response Plan

Key Issues for Identity and Access Management, 2008

For cloud services to deliver their promised value, they must be underpinned by effective and efficient processes.

Best Practices for Confirming Software Inventories in Software Asset Management

Data center management lacks unified tools and strategy for infrastructure monitoring

Top U.S. Supply Chain Undergraduate University Programs, 2014

High Performance Computing (HPC) Solutions in High Density Data Centers

Understanding Vulnerability Management Life Cycle Functions

Predicts 2008: The Market for Servers and Operating Systems Continues to Evolve

Agenda Overview for Mobile Marketing, 2015

Vendor Focus for IBM Global Services: Consulting Services for Cloud Computing

Research Agenda and Key Issues for Converged Infrastructure, 2006

The ROI of Tape Consolidation

X.509 Certificate Management: Avoiding Downtime and Brand Damage

Cost Optimization: Three Steps to Saving Money on Maintenance and Support for Network Security Products

Reduce Risk and Increase Speed Using Gartner's Guide for Salesforce.com Implementation Partners

IT Architecture Is Not Enterprise Architecture

Cloud Trends 2015 and beyond

Data in the Cloud: The Changing Nature of Managing Data Delivery

Cost-Cutting IT: Should You Cut Back Your Disaster Recovery Exercise Spending?

The Total Economic Impact Of FlashSoft TM Software From SanDisk

2010 FEI Technology Study: CPM and BI Show Improvement From 2009

Case Study: Innovation Squared: The Department for Work and Pensions Turns Innovation Into a Game

Ensure Emerging Trends and Technologies Advance Your Marketing Strategy

How To Use Data To Drive Digital Marketing

Eight Criteria for Evaluating Software License Metrics

Enterprise Data Centre

Transcription:

G00233221 Use a TCO Model to Estimate the Costs of Your Data Center Published: 26 June 2012 Analyst(s): David J. Cappuccio The cost to own and run a data center is significantly higher than many IT managers realize. Develop a total cost of ownership model to capture or estimate these costs, analyze where costs are allocated, and determine where budgets need to be increased or reduced. Key Challenges Data center total cost of ownership (TCO) is more about the cost of operations than ownership. Hardware refreshes, maintenance and upgrades represent 35% of the total annual costs. Personnel represent an average of 40% of data center TCO. Recommendations Data centers should develop a broad-brush TCO model to define and establish the overall cost categories. Use industry metrics and averages as a baseline comparison tool. Focus on operational costs versus total costs, unless you're using the model for an ROI analysis. Use Gartner's TCO model as a general guideline to developing a company-specific TCO. Analysis As an increasing number of organizations consolidate data centers, the ongoing cost to own and operate a data center is being exposed to senior level executives, often for the first time. Couple this with the continuing demand for data center services to support the business and alternative IT delivery models, and the need for a comprehensive model to estimate these ongoing costs becomes paramount.

The model Gartner has developed is based on the integration of cost models and a significant amount of Gartner produced survey data. It is not intended to be the answer to what it costs to run a data center, but to highlight a methodology for determining your own TCO, by applying your own data to this methodology. The numbers presented here represent averages across many of our clients and a realistic sampling of costs. Why a New Model, and What's So Great About This One The Methodology To develop this TCO model, we broke down data center costs into six broad categories: facilities, energy, servers, storage, communications and software. Obviously, one of the largest components in operational costs is personnel, and this will be broken down into subcomponents under each of the top-level categories. Facilities Facilities costs are a combination of the data center's overall construction costs (yearly depreciation), building maintenance, electrical/mechanical systems maintenance, physical security and upgrades. In this model, we have incorporated data center construction costs generated via a data center build cost-modeling tool, which we have developed internally (and validated externally through client interactions). Depreciation is assumed to be straight line over 20 years. Taxes are assumed to be 10% of the annual building costs. These factors will vary from site to site and from organization to organization. Energy Capturing energy costs is problematic in most data centers because the overall energy budget is often buried in the broader facilities budget. For the purposes of this model, we estimate energy consumption by comparing kilowatt (kw) per rack design estimates against estimated rack density and floor space utilization levels. Electrical loss is also factored in from uninterruptible power sources (UPSs), power distribution units (PDUs), static switches, etc., as well as the estimated cooling load required. For the purposes of this research, we're assuming an average charge of $0.09 per kilowatt hour (kwh). Servers Physical server capacity is calculated as a percentage of rack space available (i.e., the total number of rack units [RUs] minus network and storage allocations multiplied by average rack utilization). The average cost to support a physical server per year was obtained from Gartner's IT Key Metrics data report for 2012 (see "IT Key Metrics Data 2012: Key Industry Measures: Cross Industry Analysis: Multiyear"). This report does not factor in the virtualization differential and its impact on staffing (this impact will be addressed in future research); however, it does include the estimated depreciation cost for server adds/replacements yearly. Page 2 of 9 Gartner, Inc. G00233221

Storage Total storage capacity is assumed to be a combination of high-performance arrays for transactional applications and high-density storage for standard data types. The cost estimates were derived from Gartner's IT Key Metrics Data 2012 research. All storage figures below reference terabytes of capacity. Communications Communications encompasses the cost of intra-data-center networking. This includes LANs, switches, cabling and the tools to manage them. Communications costs below are based on the total number of ports required and the average cost per port, as derived from the Gartner IT Key Metrics Data of 2012. Software Software includes all system management software, OS licenses, security licenses, storage management and operational tools. It does not include application software specific to an individual enterprise. The Metrics This model incorporates metrics from the data center construction model Gartner has developed, which is used to estimate average construction costs for any size data center, in most geographies. These costs are then straight-line depreciated over 20 years to determine annual costs. Factored into this are the estimated annual costs of building maintenance, upkeep and cleaning, as well as mechanical and electrical system maintenance and upgrades. Annual property taxes are not included. The second set of metrics used come from Gartner's IT Key Metrics database, which has been developed over many years from thousands of client benchmarks. These metrics reflect the estimated costs for specific IT functions within data centers and include everything from estimated software costs, communications, business continuity/disaster recovery (BC/DR), hardware and personnel. These costs are not the definitive answer, but represent the average cost across many Gartner clients in that specific category. Your costs will vary, based on the IT efficiency measures you've put in place, the building efficiency methods adopted, and your levels of standardization. In the example below, we have estimated the cost to build a specific data center and then calculated its annual depreciation and maintenance costs, as well as the estimated ongoing yearly costs, based on an assumed 40% floor space utilization level. Gartner, Inc. G00233221 Page 3 of 9

Figure 1. TCO Example Connect 2% BC/DR 4% Hardware 33% Staff 42% Software 19% Source: Gartner (June 2012) Facility Specifics Building 4,000 square feet of IT space; Tier 3 Total power load 720 kw Sixty percent rack density; 40% floor space utilized Cost Specifics The breakdown in Table 1 is based on estimated equipment counts (e.g., terabytes, physical servers, ports), given a 4,000 square foot data center at 40% floor space capacity and with racks at 60% capacity. For example, the total server count was calculated by determining the number of server racks multiplied by the percentage of rack utilization, and then multiplied by the floor space utilization. In this case, 2U server configurations were assumed. The storage component represents roughly 20% of the rack space, whereas telecom represents 15% of rack space. Page 4 of 9 Gartner, Inc. G00233221

Table 1. Cost Breakdown Units 1 Hardware Software Staff Connect BC/DR Full-Time Equivalents Storage 518.4 $1,263,859 $278,049 $581,375 $101,109 $126,386 5 Servers 928 $1,543,967 $1,476,838 $3,020,806 $67,129 $201,387 27 Network 3,859 $192,767 $25,702 $192,767 $25,702 $4,284 2 Totals $3,000,594 $1,780,590 $3,794,948 $193,940 $332,057 33 Gartner (June 2012) The estimates for annual facilities/it costs are shown in Table 2. These reflect cost estimates only, and are based on client feedback. Your IT costs will vary based on depreciation schedules, refresh cycles, equipment age and growth. Equipment placement and power/cooling requirements (resource utilization) can also have a significant impact on energy costs. Gartner, Inc. G00233221 Page 5 of 9

Table 2. Annual Facilities Costs Category Results Facility Building size 10,000 IT space 4,000 Construction costs $7,892,230 Depreciation per year $315,689 Power/cooling $252,565 Maintenance Building $701,546 IT Costs Hardware $3,000,594 Software $1,780,590 Staff $3,794,948 Connectivity $193,940 BC/DR $332,057 Annual TCO $10,371,929 Monthly $864,327 Source: Gartner (June 2012) Factors that we will include in future iterations of this model are the impact of Unix and mainframe environments, virtualization impacts (especially on administrative costs) and mixed storage environments to accommodate the increasing use of high-density SATA versus high-performance 15K drives and solid-state drives (SSDs). Bottom Line Developing a data center TCO model can be a difficult process, especially in large and complex environments; however, by incorporating average industry costs for building maintenance and known depreciation factors for your facility, then integrating Gartner's IT Key Metrics averages, it is possible to develop a usable baseline model. This will provide a clearer understanding of the true costs of running your data center. Page 6 of 9 Gartner, Inc. G00233221

Recommended Reading Some documents may not be available as part of your current Gartner subscription. "IT Key Metrics Data 2012: Key Industry Measures: Cross Industry Analysis: Multiyear" Evidence 1 Cost Specifics The units column indicates the approximate number/size of devices in each category, based on the data center size and the density of the racks being used. In this example, the racks are allocated as follows (this is the total RU allocation): Servers = 65% Storage = 20% Telecom = 15% Rack space consumes approximately 30 square feet per rack, yielding 134 racks maximum in the 4,000 square foot data center. Server space represents 65% of rack space, yielding 87 dedicated server racks. At an average of 14 servers per rack, this would support approximately 928 physical 2U servers. Server count varies, depending on data center rack density policies. Storage space represents 20% of rack space (27 racks); however, of the maximum capacity possible (assuming three tiers), only 40% is currently allocated (518 TB). Telecom counts equate to physical ports within the data center; at 15% of floor space, telecom consumes 20 racks worth of space. At a data center capacity level of 60%, the combination of host ports and switch ports equates to 3,859. Gartner's IT Key Metrics Data is a substantial database of information available to Gartner clients on the gartner.com website. It represents survey work that we complete yearly that outlines the estimated costs our customers are spending to support various functions with IT. The costs shown below include hardware, software, personnel, connectivity, facilities and BC/DR for each category and are yearly estimates: Storage $4,876 per terabyte Wintel servers $8,260 per physical server Host costs per port $111.00 Data center switch costs per port $500 Unix servers $23,520 Cost per OS instance $6,349 Gartner, Inc. G00233221 Page 7 of 9

By taking a data center's maximum capacity, we calculate expected current capacity based on floor space utilization levels (in this example, 60%). Once current capacity is determined, it can be broken down into servers, storage and telecom ports required; then the IT Key Metrics Data can be applied to these factors to yield an operational TCO result. Combining the operational TCO with the physical building TCO (build costs, facilities maintenance, etc.) results in a combined TCO for the data center. Your results may vary, because server density, topology (RUs per server), storage type and network topology can all affect these costs. Page 8 of 9 Gartner, Inc. G00233221

GARTNER HEADQUARTERS Corporate Headquarters 56 Top Gallant Road Stamford, CT 06902-7700 USA +1 203 964 0096 Regional Headquarters AUSTRALIA BRAZIL JAPAN UNITED KINGDOM For a complete list of worldwide locations, visit http://www.gartner.com/technology/about.jsp 2012 Gartner, Inc. and/or its affiliates. All rights reserved. Gartner is a registered trademark of Gartner, Inc. or its affiliates. This publication may not be reproduced or distributed in any form without Gartner s prior written permission. The information contained in this publication has been obtained from sources believed to be reliable. Gartner disclaims all warranties as to the accuracy, completeness or adequacy of such information and shall have no liability for errors, omissions or inadequacies in such information. This publication consists of the opinions of Gartner s research organization and should not be construed as statements of fact. The opinions expressed herein are subject to change without notice. Although Gartner research may include a discussion of related legal issues, Gartner does not provide legal advice or services and its research should not be construed or used as such. Gartner is a public company, and its shareholders may include firms and funds that have financial interests in entities covered in Gartner research. Gartner s Board of Directors may include senior managers of these firms or funds. Gartner research is produced independently by its research organization without input or influence from these firms, funds or their managers. For further information on the independence and integrity of Gartner research, see Guiding Principles on Independence and Objectivity on its website, http://www.gartner.com/technology/about/ ombudsman/omb_guide2.jsp. Gartner, Inc. G00233221 Page 9 of 9