SPE Copyright 2007, Society of Petroleum Engineers

Similar documents
Drilling Problems. pull

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards

Plug and Abandonment Forum

C O M P L E T I O N S E R V I C E S

Foam Wiping Technology

Advancing Reservoir Performance. Wellbore Cleanup Tools and Displacement Chemicals

DecisionSpace Well Engineering Software

Perforating Basics. How the perforating processes work. George E. King Engineering GEKEngineering.com 3/14/2009 1

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin*

BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions

Fiber Optics in a Bakken Multi-Stage Fractured Well. Montana Tech 2011 SPE Drilling Symposium Presented by: Chelsea Kadler

COMPARISON OF DRILLING TECHNOLOGIES BETWEEN TOP DRIVE AND ROTARY TABLE IN GEOTHERMAL FIELDS: A CASE STUDY OF OLKARIA GEOTHERMAL FIELDS.

Manual: Nearshore CPT Testing NEARSHORE CONE PENETRATION TESTING (TOP PUSH TECHNIQUE)

Whipstock Options for Sidetracking

4D reservoir simulation workflow for optimizing inflow control device design a case study from a carbonate reservoir in Saudi Arabia

RSS Proves Valuable In Vertical Wells

Enhanced Oil Resources Inc. Provides 2012 Activity Update

High Power Laser for Rock Drilling

Drilling Rigs and Well Technology. RAPID RIGS AND WELL TECHNOLOGY Cairn India Limited.

Unit 24: Applications of Pneumatics and Hydraulics

Rotary Vertical Drilling System (RVDS)

Continuous Gas Circulation; A New Artificial Lift Method

Estimation of shear force for blind shear ram blowout preventers

LINKING SEABED TO SURFACE

Composite Drill Pipe Perfect Fit for Short-Radius Drilling

KWANG SING ENGINEERING PTE LTD

Directive 059: Well Drilling and Completion Data Filing Requirements

Graduate Courses in Petroleum Engineering

E-Line and Braided Line. E-Line Open Hole wireline

SPE Life beyond 80 A Look at Conventional WAG Recovery beyond 80% HCPV Injection in CO2 Tertiary Floods David Merchant, Merchant Consulting

OTC MS. New Findings in Drilling and Wells using Big Data Analytics J. Johnston, CGG; A. Guichard, Teradata. Abstract

Energize your mind. April Lightweight Cement Meets Challenges of Weak Formations and Depleted Zones

Certificate Programs in. Program Requirements

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

6 Cavendish Square, London W1G 0PD, England,UK

SPE Copyright 1999, Society of Petroleum Engineers Inc.

WELL DEVELOPMENT COMPARING SEVERAL METHODS OF WELL

MUDSOLV NG. Integrated filter-cake removal service for optimizing performance of open-hole completions

Dávid Szabó*, Ján Pinka*, ¼uboš Fedorko** UGS WELLS IN DEPLETED FIELDS

BOP PRESSURE TESTING PROCEDURE

Grassroots Drilling. A History and Look Ahead. David Wennerstrom. ICOTA Roundtable October 2005 Canadian Chapter

The Impact Of Cementing On Proper Well Control

Underbalanced drilling of oil wells in Saudi Arabia: case history and lessons learned

Tubular Management Services

TruTrak Automated directional drilling system

HDD High Definition Data. defining a new standard for Open Hole, Cased Hole & Production Logging

Petrel TIPS&TRICKS from SCM

Irresponsible of Statoil

SPE Copyright 2004, Society of Petroleum Engineers Inc.

Fishing Jar. Fishing Jar Accessory Tools. Assembly and Operation. Construction. Recommended Spares

How to avoid fluid losses that slow drilling

Subsea Drilling Systems

An Introduction to Oil and Gas Well Servicing

Aker Drilling Riser Brazil

Varel International Workover Bits for remedial, re-entry AND frac plug Drilling Applications

CLEAR. Hole cleaning and wellbore risk reduction service

Introduction of Gravel Pack with Inflow Control Completion in Brazil

Positive Displacement Motors (PDM)

DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002)


Tax Executives Institute

Specialized Tools for Wellbore Debris Recovery

GEOTHERMAL DRILLING ABSTRACT

TUBULAR Holing and Slotting Of Casing

Pressure Coring, A New Tool for Unconventional Oil & Gas Characterization. Matt Bjorum Global Product Line Manager

APPLICATIONS OF REAL-TIME WELL MONITORING SYSTEMS

Setting a Global Standard. SingleBore Subsea Completion System

The material of which a petroleum reservoir. Effects of the Workover Fluid on Wellbore Permeability. t e c h n o l o g y

TBA 100 A Performance Study of the New Generation 100-ton Advanced Technology Rig. Maximilian Trombitas, Product Manager Bauer Deep Drilling GmbH

AAPG International Conference: October 24-27, 2004; Cancun, Mexico

Standard Test Method for Mechanical Cone Penetration Tests of Soil 1

Wellbore Integrity Restoration Services

Drilling, Completion & Well Intervention and its relation to Geology

BHA Design Best-drilling-practices.tk. All rights reserved.

Society of Petroleum Engineers Drilling Systems Automation Technical Section (DSATS) Drillbotics. International University Competition

Subsea wellhead systems. Advanced solutions for extreme conditions

DIRECT PUSH DRILLING.

Best Practice for Stand-alone Screens

Selection and Determination of Tubing and Production Casing Sizes

Index Page. Pumping Systems Intensifiers Gas Boosters High Pressure Generators

FORMATION DAMAGE AND WELL TREATMENT SYSTEM

Sample Career Ladder/Lattice for Energy (Petroleum Sector)

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009

Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS

GB Tubulars RECOMMENDED PRACTICE For CASING on LOCATION

Char-Lynn Spool Valve Hydraulic Motors. Repair Information. W Series Geroler Motors

2003 WJTA American Waterjet Conference August 17-19, 2003 Houston, Texas Paper WATERJET NOZZLE MATERIAL TYPES

Drill String Design. The following topics will be discussed

Rail Vehicle Systems IP-241. Rev 07 3/9/ en. Installation and Maintenance Guide. Slack Adjuster Model KRD-482-E and KRD-482-R P/N ,

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

HMIS Top Drive System

OWPST & Titan 200 & UK Offshore

Rexroth Hydraulic Pump A10VO Series User Manual

Safety In The Workplace

FlairFlex. Real-time fluid logging and analysis service

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur

Removing Solids with Automatic Self-Cleaning Filters

Understanding Well Construction and Surface Footprint

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

Transcription:

SPE 106972 First Installation of an Openhole Expandable Sand Screen Completion in the Iranian Oilfields Leads to Operational Success and Production Enhancement - A Case History A. Hooshmandkoochi and F. Ghorbani, National Iranian Oil Company Copyright 2007, Society of Petroleum Engineers This paper was prepared for presentation at the 2007 SPE Production and Operations Symposium held in Oklahoma City, Oklahoma, U.S.A., 31 March 3 April 2007. This paper was selected for presentation by an SPE Program Committee following review of information contained in an abstract submitted by the author(s). Contents of the paper, as presented, have not been reviewed by the Society of Petroleum Engineers and are subject to correction by the author(s). The material, as presented, does not necessarily reflect any position of the Society of Petroleum Engineers, its officers, or members. Papers presented at SPE meetings are subject to publication review by Editorial Committees of the Society of Petroleum Engineers. Electronic reproduction, distribution, or storage of any part of this paper for commercial purposes without the written consent of the Society of Petroleum Engineers is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of where and by whom the paper was presented. Write Librarian, SPE, P.O. Box 833836, Richardson, Texas 75083-3836 U.S.A., fax 01-972-952-9435. Abstract Expandable sand screens were developed to overcome the shortcomings of both existing sand control techniques, while also providing some unique benefits. The first commercial application of this technology took place in January 1999. Since then, their use has spread quickly to all parts of the world and in many diverse applications. As of June 2005, over 340 installation of expandable sand screen (ESS) had been run in over 700 years of combined production. The productivity performance of the ESS has been shown to be very good, with an average skin of 0.3 being achieved in recent openhole applications. ESS completions generally perform better than the baseline models. Where field comparisons were possible, they also performed better than alternative sand control completions. However, its introduction and acceptance into the Iran has been slower in coming. It was not until in 2005 that National Iranian Oil Company (NIOC) decided to complete its Mansuri oilfield, well MI-34 sidetrack, using openhole expandable sand screen for sand control, thus making it the first such completion in the Iranian oilfields. This paper will provide a brief overview of expandable sand screen, its construction and advantages and will describe some of the issues addressed in this well completion. It will provide details of the installation procedure, the fluids employed and well production results achieved. It will conclude that the use of expandable sand screen as an alternative to conventional sand control methods in the Iranian Oilfields is viable. Introduction Mansouri 34 is the first application of openhole ESS (Expandable Sand Screen) technology within Southern Iran. NIOC awarded the contract of sand control solution as a part of Mansuri oilfield development project to Weatherford Completion and Production Systems. There were some wells completed with ESS in southern Iran before but they all were cased hole, hence make this job the first time of its own. The deployment and expansion of the screens was carried out as per the Weatherford guidelines without any problems. An openhole completion strategy was selected in order to boost well productivity, with the reservoir section lined with ESS in order to provide borehole support and optimize production rates still further and more importantly allow them to be sustained for a longer period, improving ultimate reservoir recovery factors. The operation began with the setting of a whip stock. A window was then milled in the 7 liner. The kick off point was at 2153.5m. A total length of 64m of 6-1/8 openhole was drilled. This produced a 52m reservoir section between 2168m and 2220m. The formation was then acidized to remove the mud cake. Following the acidization, the casing was scraped. This ensured the deployment packer had no problems setting, and there was nothing in the well that might damage the ESS. The EXP hanger-packer was set in the 7 29 lb/ft liner with the expandable sand screens across the Asmari Formation. The ESS was then expanded using the Axial Compliant Expander Tool (A.C.E. tool). The back pressure generated by pumping through a bit nozzle in the tool nose ensures the sand screens are expanded to fully contact the borehole, even in irregular hole geometries. Background Well History- The well was drilled in 1993 in the axial structure of Mansuri field and in 800 meters NW of well MI- 15 and 1300 meters SW of well MI-6. The formations were drilled without a major problem from Aghajari formation in surface to 2294 m TD in Asmari formation. The cap rock is determined at 2164 m, drilling through Asmari formation was reported with slight losses. The well was producing from sandstone layer 3 of Asmari formation. Objective of Sidetrack and Re-Completion- The objective of sidetrack and re-completion in this well was to increase production from layers 1 & 2 of Sandstone Asmari formation as well as cut the sand production with installing a sand control device in the well. NIOC decided to use expandable sand screen (ESS) as the most profitable sand control method over existing sand control solutions for this well.

2 SPE 106972 Expandable Sand Screens Technology Previously published papers have discussed the development of the expandable sand screen in detail [4], but a brief overview of the concept is discussed here. Expandable sand screen is a relatively new technology that is rapidly gaining industry acceptance. The difference between ESS and other expandable tube technologies lies in the slotted basepipe. The slotted basepipe allows expansion ratios up to 80% greater than the original diameter. This provides both a larger inflow area and larger flowing I.D. than conventional sand screens deployed in similar wellbore geometries. ESS is constructed of three sandwiched layers; the basepipe, the filter media, and the outer protective shroud (see figure 1). The basepipe and outer shroud slots open during expansion to accommodate the change in diameter, while over-lapped layers of filter media slide across each other to maintain sand integrity. The entire length of the ESS joint is expanded, including the connectors. This allows flow along the entire ESS completion without any blank sections. Several methods have been designed to expand ESS. The simplest method is to push a fixed O.D. cone ring through the ESS. This method results in a minimum screen I.D. equal to the cone ring O.D., plus an additional 4%. This method is considered non-compliant, as the O.D. of the ESS is able to conform to the wellbore (casing or openhole) by only a 4% variation. Two methods of compliant expansion have been developed. The first was the CRES (Compliant Rotary Expansion System). This CRES has been replaced by a more reliable and more easily operated system, known as ACE (Axial Compliant (Fig. 2). The tool is compliant in that the pistons can extend or retract if an increased or decreased hole diameter is encountered. This allows the ESS to expand fully to give improved wellbore contact, thus providing improved hole support and eliminating any microannulus. Activation of the compliant roller/traveling piston assemblies is achieved by generation of a back-pressure within the ACE tool. This back-pressure is a result of flow through an integral drill bit jetting nozzle directly in front of the compliant section. This system was used to expand the ESS string in well MI-34. Whipstock Setting and Casing Window Milling The window that was milled in the casing represented a significant risk to the success of this job. The main concern was that it would not be properly dressed, and the ESS would be damaged while running in hole. The window was dressed with a watermelon mill when the window was cut. However, if the window was properly dressed with the 6-1/8 water melon mills, it occurred before the openhole section was drilled (with a 6-1/8 tri-cone bit). All the work dressing the window was undone when the bit was run to drill the reservoir section. The bit may create burs, which may cause tears in the ESS as it is run through the window. A better method is as follows: Set the whip stock and mill the window. Drill the openhole section. Perform polishing run with two water melon mills. Tail pipe can be run below the mills. Hence this trip will perform two tasks. Polish the window and check the openhole section. Also we can go further to suggest that the casing scrapper also be run on this trip. If the window is not properly polished the ESS could easily be torn. Tears in the petroweave will allow sand production. If the recommendations above are considered, we can achieve two things; a reduction of the chance of failure during installation, and save time through combining trips that have previously been run individually [3]. Well Details Well details are tabulated in table 1. Also figures 3 to 5 illustrates MI-34 Final well schematic, MI-34 Openhole ESS deployment string configuration, MI-34 Openhole EST expansion string configuration [3]. Fluid Data Deploying expandable sand screen in good, well-conditioned, clean fluid is very important. The fluid should be free of any particles that may plug the screen. This is an important part of all ESS operations. For this installation the well was displaced to brine. This made fluid conditioning much easier. Time was also spent conditioning the fluid over 100 micron shakers. This is the correct size for 270 micron ESS. As with all openhole ESS installations the fluid was checked with a mud flow through tester. No problems were encountered with these tests. Losses have been a common problem with workover operations in the Mansuri field. On this installation however, losses were almost zero. Initially after the acidizing of the formation the losses were 5bbl/hr. However this rate declined to zero at the time of installation. The low rate of losses should limit formation damage, and result in high flow rates from the well, once production commences [3]. Deployment and Expansion Deployment and expansion of the 4 ESS was carried out as per Weatherford procedures. On the final check trip before running the ESS, TD was tagged approximately 5m high. This is believed to be due to sand. When the ESS was run, we tagged TD 4 m high (at 2216m instead of 2220m). Attempts to work the string deeper and to wash the string down were unsuccessful. Once the EXP packer was set, it was confirmed with three tests: a 10K lb over-pull, a 10K lbs slack-off, and a 500psi annulus test. All tests passed. One issue worth discussing here relates to the rat hole left for ESS operations. Here there were left with no rat hole. The formation extended all the way to TD. This presents two problems. Firstly we have to expand to the bottom of the ESS and into the Expandable Bottom Connector (EBC). It would be preferred to have the bottom of the formation above the EBC by one or two meters. This means that even if there is a small error on our pipe tallies, we can ensure the entire reservoir is covered with the sand screen, and we don t risk tagging the EBC. Secondly it is difficult to set the packer at the correct depth with no rat hole to work in. General practices when running completions is to pick up to setting depth. This takes any buckling out of the string and makes the depth more accurate. This cannot be done without a rat hole. In this well the formation stopped us from having any rat hole, however, in future wells it is something that should be available. One area where some small improvements can be made relates to picking up the ACE tool. Due to the short length of this item, it is difficult to make up on the rig floor. Significant rig time could have been saved if the ACE tool and one joint of drill collar were torqued

SPE 106972 3 together before the job. This details all the events associated with system deployment, EXP setting, and ESS expansion in general terms. However, a more detailed description of the expansion observations are shown in Table 2 [3]. 4. P.D. Metcalfe; The Development of the First Expandable Sand Screen OTC 11032, 1999 Offshore Technology Conference, Houston Post Completion and Production Well fluid was displaced by gas oil and the well was flowed into different choke sizes. The well is now producing 6000 BOPD without sand production which impressed the operator. Conclusions 1. Screens and Liner Hanger were run in hole without any unexpected problems. 2. The Liner Hanger / Packer was set at the required depth and in complete adherence to its specifications as per the Weatherford running and setting procedures. 3. The entire length of screen was expanded without problem, and within the typical weight on- bit range. 4. The application of an integrated completion using expandable sand screens as the primary sand control completion technique proved to be an enhanced economic solution when compared to other conventional sand control solutions. Recommendations 1. One joint of drill collar be sent to service company base before each installation. This means that the ACE tool and stabilizers can be torqued together before the job. 2. Procedures relating to dressing / polishing of the casing window should be reviewed. In particular the water melon mills should be run after the openhole section is drilled. 3. The dog leg severity must be limited to 7 deg/100ft (in this well we had 12 14 deg/100ft). 4. The hole should be 5-7/8 or 6. The 6-1/8 hole is too big for 4 ESS. The 4 screen is good for a maximum hole size of only 6.06. Acknowledgement The author wish to acknowledge NIOC for permission to publish this paper, and to the many other involved whose efforts contributed to the success of this job. References 1. Bobby D. Sanford, Clinton Terry, Michael J. Bednarz, Chris Palmer, and Doran B. Mauldin, Case History: First Installation of an Expandable Sand-Screen Completion in the Gulf of Mexico, OTC 13282, OTC conference, Houston, Texas, May 2001. 2. C. Jones, M. Tollefsen, P. Metcalfe, J. Cameron, D. Hillis, and Q. Morgan, Expandable Sand Screens Selection, Performance and Reliability; a Review of the First 340 Installations, SPE 97282, SPE/IADC Middle East Drilling Technology Conference and Exhibition, 12-14 September 2005, Dubai, United Arab Emirates. 3. Mansuri Project Weatherford, MI-34 work over completion report, NIOC Mansuri field development reports, 2006.

4 SPE 106972 Figure 1. ESS Construction Filter Medium Figure 2. Compliant Rotary Expansion System (CRES) and Axial Compliant Expansion (ACE).

SPE 106972 5 Figure 3. Final Well Schematic Figure 4. Openhole ESS Deployment string configuration

6 SPE 106972 Figure 5. Openhole EST Expansion string configuration Table 2. Expansion sequences ACE Tool Expansion Event Joint 1 (8 m of Joint 2 (9.5m of Joint 3 (9.5m of Joint 4 (9.5m of Joint 5 (9.5m of Joint 6 (9.5m of Joint 7 (4m of WOB (Klbs) Pump Rate/Pressure (spm & psi) Rate of Expansion (ft/min) 20-30 30/1700 12.5 20-30 30/1750 11 20-30 29/1650 11 20-30 29/1675 21 20-30 29/1650 9 20-30 29.5/1700 11 20-30 29.5/1700 11 Table 1. Well Details Liner Size / Weight : 7 29 lb/ft (N80) 7 Window @ : 2150.5m 2153.5m MD Max Deviation : 250 (Note: build angle was 12-14 deg/100ft) TD : 2220m MD Fluid Type / Weight : Brine / 70 pcf Liner Hanger Type : Weatherford EXP 7 x 5.5 FLJ Setting Depth : Center of elements 2117.57m MD ESS Size / Type : 4 ; 316L Stainless Steel Top of ESS : 2156m MD Bottom of expanded ESS : 2116m MD Amount not expanded : All expanded Expansion Force : Variable (20-35 Klbs)