Sample Lockout/Tagout Procedure

Similar documents
LOCKOUT/TAGOUT PROGRAM ENERGY CONTROL PLAN

Page85. Lock-out Tag-out Plan

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR

LOCKOUT/TAGOUT (LOTO) SAFETY PROGRAM

Lockout/Tagout Compliance Guide and Checklist

BWC Division of Safety and Hygiene

Control of Hazardous Energy (Lockout / Tagout)

Lockout - Tagout Program

University of Nevada, Reno

Lockout / Tagout Program

Occupational Health Program Safety Training Series. Lockout/Tagout Safety Awareness Training

Lock-out/Tag-out.

CONTROL OF HAZARDOUS ENERGY (Lockout Tagout)

Lockout/Tagout (LOTO) Compliance Guide

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

LOCK-OUT/TAG-OUT PROGRAM I. Purpose

Lockout-Tagout Training for Albany Employees Control of Hazardous Energy OSHA standard

LOCKOUT/TAGOUT PROGRAM. Table of Contents

Energy Control Lockout/Tagout

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

WEEKLY SAFETY MEETING All Euramax Subsidiaries LOCKOUT / TAGOUT. Safety Meeting Contents. Meeting Notice. Leaders Guide.

LOCK-OUT / TAG-OUT SAFETY TRAINING

Lockout / Tagout Awareness

Lockout Tagout Program. Table of Contents

Lockout/Tagout Training Program

Lockout/Tagout. Training: 29 CFR Lockout Tagout Standard States employer must provide training on lockout tagout.

C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES. Leader s Guide. 2005, CLMI Training

3088 Lockout-Tagout Training Program Course Outline

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

Control of Hazardous Energy Equipment-Specific Lockout/Tagout Procedure (ELP) Template Instructions

HealthStream Regulatory Script

ISSUE: LOCK OUT BLOCK OUT

ELECTRICAL SAFETY. The standard unit for measuring electrical current.

LOCKOUT GUIDELINE. To ensure that a piece of equipment cannot be turned on, pressurized or switched on accidently while an employee is working on it.

CONTROL OF HAZARDOUS ENERGY/ LOCKOUT/TAGOUT PROGRAM

File Name: LO/TO Orig. Date: November 2005 Revision Date:November 2006 Reviewed Date: November Standard: OSHA: 29CFR

HERSHEY ENTERTAINMENT & RESORTS COMPANY LOCKOUT / TAGOUT PROCEDURE

Department of Environmental Health & Safety. Lock Out/Tag Out Program. Date Effective: November 2010

Preventative Maintenance Policy

L O C K O U T / TA G O U T A D M I N I S T R AT I V E G U I D E

RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 June 2016

Control of Hazardous Energy

Safe Operating Procedure

section 5 machine guarding and lockout

Business Unit/Area: N/A. Protocol No.: COR-3S3-PR

OSHA Training Guidelines (An Unofficial Summary)

Company Safety & Health Policy Statement

Master Workplace Inspection Checklist for General Shop Safety. MASTER WORKPLACE INSPECTION CHECKLIST General Shop Safety

Machine Guarding and Operator Safety. Leader Guide and Quiz

ENVIRONMENTAL HEALTH AND SAFETY. Fire Protection System Impairment Procedure

Citation 1 Item 1a. #22: Struck by Inspection #

IMPORTANT SAFETY NOTICE

E3902 Seeing Accidents Before They Happen Leader s Guide

Employee Safety and Health Training Plan

MANCON Human Resources Workers Compensation or ext 312 or

Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE

MORE HIGH-IMPACT LOCKOUT/TAGOUT SAFETY TRAINING

PERSONNEL WORK PLACE SAFETY PROGRAM

MD 52 WASTE MANAGEMENT AUTHORITY CORPORATE HEALTH AND SAFETY PROGRAM

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3

Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program

Lockout Tagout Presentation For GOSH Group Aberdeen UK

Preventing Overheated Boiler Incidents

KELLER S 5-MINUTE WORKPLACE SAFETY TALKS

Oil and Coolant Circulating Heating System. Model - OCSM

UC Berkeley Energy Isolation Lockout Tagout (EI-LOTO) Program

TEMPORARY EMPLOYEES SAFETY PROCEDURES

Section 1: Safety. General Safety. Recognizing Safety Precautions. Locking Out the Machine. Safety Circuits. Interpreting the Light Column

Dining Services OSHA Safety Training Program TRAINING RECORD

CARING FOR YOUR WATER HEATER

WORKING IN CONFINED SPACES GUIDELINES

This program is listed as a mandatory inspection item on the MnOSHA Investigation Checklist, Item 7D.

Planned, Limited Notice and Emergency Outage Guidelines

Model: 400E-2M. Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset. Installation Operation Maintenance. Application Engineering

CONTRACTOR SAFETY POLICY

EASTERN MICHIGAN UNIVERSITY Revision 1

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap

Union County Public Schools. Facilities Department. Electrical. Safe Work Practices

BERMAD Fire Protection

Machinery Safety. Presented by Paul Laidler. TÜV SÜD Product Service

Electrocution Hazards

810. Health and Safety Policy

Operational Overview and Controls Guide. Two or Three Pump IronHeart Lite with Variable Frequency Drives

WE-350 Series ¼ Turn Electric Actuator

OVERVIEW SCOPE DEFINITIONS

LOS ANGELES UNIFIED SCHOOL DISTRICT DIVISION OF ADULT AND CAREER EDUCATION SAFETY TEST FOR ELECTRICIAN PROGRAM

2-SLICE COOL TOUCH TOASTER

Chevron Mining Inc. Managing Safe Work at Chevron Mining

IMPORTANT SAFETY RULES TO FOLLOW

Providing and using work equipment safely

Congratulations on your purchase of a PTR Baler.

Notes. Material 1. Portable Ground Fault Interrupter 2. PPE (safety glasses, gloves, other) 3. Circuit Tester

ecomax Instructions for use Wall hung room sealed fan assisted condensing boilers For the user

OSHA SAFETY TRAINING TABLE for more information see

Work Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit?

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

Conducting a Job Hazard Assessment. Environmental, Health and Safety

Rutherford County Workplace Injuries and Safety

3053 Electrical Safety Training Program Course Outline

Electric Panel Pump Control System. Operation, Maintenance and Installation Manual

Transcription:

1. Purpose Michigan Municipal Workers Compensation Fund Sample Lockout/Tagout Procedure A. To prevent injury from the unexpected energizing, startup or release of stored energy that could cause injury. 2. Examples of Stored Energy Where Lockout/Tagout Applies A. Electrical B. Mechanical C. Thermal, Steam D. Chemical, Acids and Caustics E. Explosives, Natural Gas F. Hydraulic G. Pneumatic H. Gravity 3. Scope A. A lockout/tagout is mandatory whenever employees perform maintenance or service work on machines or equipment. Required Lockout/Tagout. a. Maintenance or service work means constructing, installing, setting up, adjusting, inspecting, modifying, maintaining and/or servicing machines or equipment. These activities may also include lubrication, cleaning or releasing jams in machines or equipment and making adjustments or tool changes if the employee may have exposure to the unexpected energizing or startup of the equipment or release of hazardous energy. b. Before removal or bypassing any guard or other safety device. c. When an employee must place any part of his or her body into a "point of operation" or other danger zone that exists during a machine operation cycle. Exceptions to Lockout/Tagout. a. Normal production activities in which lockout cannot take place because of the nature of the operation or if the operation is routine, repetitive, and integral to the use of the equipment for production, but only if the employer provides alternative measures that provide effective protection. b. Cord and plug type of equipment (operator has "control" of cord). c. Hot Tap operations. Sample Lockout/Tagout Procedure 9-C-1

4. Responsibilities A. Safety Manager 1. Procedure development and maintenance. 2. Authorization of lockout/tagout devices. 3. Employee training. 4. Annual inspections for compliance of procedures. B. Supervisors 1. Knowledge of lockout/tagout procedures. 2. Enforcement of lockout/tagout procedures. 3. Recognition when retraining is needed. 4. Participates in development of specific job procedures. C. Authorized Employees to Perform Lockout 1. Understanding of purpose of lockout/tagout. 2. Understanding hazards of unexpected energizing of equipment. 3. Can perform lockout/tagout. D. Affected Employees Employees in Area of Lockout/Tagout 1. Understanding the importance of lockout/tagout and the importance of not attempting to remove a lockout/tagout device. 5. Approved Lockout/Tagout Devices A. All authorized employees will receive specific lockout locks. 1. The Safety Manager will issue approved locks. Locks will be standardized. 2. The lock owner will receive only one key with the lock. The lock owner must maintain the key. The Safety Manager may maintain a master key but cannot use it without following lock removal procedures. 3. The lock owner s name will be engraved with his or her name. 4. The employer will maintain a record of all assigned locks in the maintenance office and the Safety Manager s office. 5. Employees must not make duplicate keys. 6. Employees must not use locks for any purpose other than lockout. 7. Multiple lock adapters will be available for all jobs requiring more than one safety lock. B. Tags will not replace locks unless it is impossible to physically install locks to isolation devices. Employees will inform the Safety Manager when lockout is impossible so the Safety Manager can arrange for engineering changes that allow the use of locks. Sample Lockout/Tagout Procedure 9-C-2

6. Training A. Frequency 1. During facility or job orientation. 2. Before new job assignment. B. Affected Employee 1. Purpose and function of energy control (lockout/tagout) program. C. Authorized Employee 1. Purpose and function of energy control (lockout/tagout) program. 2. Recognition of type and magnitude of applicable hazardous energy sources. 3. Methods and means for isolation and control of energy (lockout/tagout) D. Record Keeping 1. Maintained in the Safety Manager s office. 7. Retraining A. When procedure inspection reveals non-compliance. B. Accidents due to non-compliance of procedures. C. Changes in lockout/tagout program. D. Changes in equipment or machines. 8. General Lockout Procedure A. Employee Notification Notify all affected employees that a lockout or tagout system is will be in use and inform them of the reason for lockout. B. Preparation Locate all energy sources needing isolation. C. Equipment Shutdown Shut equipment down by the normal stopping procedure (depress stop button, open toggle switch, etc.), if it is operating. Contact operator for shutdown procedures. Note: Do not use the electrical disconnect switch to stop equipment. D. Equipment Isolation Operate the switch, valve, or other energy isolating device(s) to cut the equipment off from its energy source(s). 1. For electrical energy. Locate correct electrical disconnect switch and pull down the disconnect switch. Sample Lockout/Tagout Procedure 9-C-3

2. For mechanical energy. Allow mechanical energy, such as that in springs, elevated machine members or rotating flywheels to dissipate or restrain it by methods, such as repositioning or blocking. 3. For thermal, chemical, flammable, pneumatic, hydraulic where such energy is contained in lines or pipes. Close valves, disconnect lines, or install isolating "blanks". E. Application of Lockout/Tagout Device Place assigned lock on disconnect switch, valve or other locking device. 1. Each person shall place his/her lock on the locking device. The use of a single lock is not permissible to represent more than one employee unless management has established procedures for such a situation and the procedure will provide "at least as effective" protection to all employees working on that particular equipment. 2. If maintenance "crew" is conducting extensive equipment service or repair that will continue into the next shift, group lockout procedures shall be followed. a. Supervisor will assume responsibility or assign responsibility for group lockout. b. The "responsible" individual will follow equipment lockout procedure and install group lockout device. c. Each employee performing equipment servicing will install personal lockout device and remove personal lock when completing work. (This includes "responsible" individual installing group lock.) d. The group lock will remain on equipment throughout repair and the responsible individual is the only person who can remove it. 3. Employees may not use tags unless a specific job procedure that demonstrates their necessity and correct use is in place and the tags are "at least as effective" as a lock. (The Safety Manager must approve the procedure.) F. Release of Stored Energy It is mandatory to release, disconnect, restrain or otherwise make safe all potentially hazardous stored or residual energy. If servicing of hazardous chemical transfer lines occurs, lines must be flushed out, according to company (or manufacturer s) procedures. G. "Test Start" After assuring that no personnel have exposure, and as a check on having disconnected the energy sources, operate the push button or other normal operating controls to make certain the equipment will not operate. Sample Lockout/Tagout Procedure 9-C-4

9. Specific Lockout Procedures A. If equipment meets one of the following criteria, follow the specific lockout procedures for that type of equipment: 1. Equipment having more than one energy source. 2. Equipment requiring more than one lockout device. 3. Equipment lockout requiring multiple lockout box. 4. A previous unexpected energizing accident occurred to that type of equipment. 5. Equipment requiring tags rather than locks. 10. Restoring Locked Equipment A. Notify personnel in startup area. B. Clear all tools and repair equipment. C. Remove locking devices. D. Restore all isolating devices. E. Notify operating personnel of operation status. 11. Emergency Removal of Lock; Other Than By Installer A. Attempt to reach person who installed lock to determine equipment status. B. Notify security. C. Security supervisor and maintenance supervisor will inspect equipment that requires starting. 1. Review work order. 2. Repair completed? 3. Guards installed? 4. Tools cleared from machinery? D. Notify personnel in area of startup and follow unlocking procedures. (See Section VII.) 12. Inspections/Enforcement A. Inspections will take place annually and records maintained. Safety Manager will be responsible to complete and record inspection. B. If inspections reveal improper or lack of lockout/tagout procedures, retraining of affected employees will be conducted. C. Supervisors will conduct daily inspections for compliance of lockout procedures and employees will receive discipline if they fail to lockout properly. Sample Lockout/Tagout Procedure 9-C-5