ELECTRIC TRANSMISSION 101: Markets, ISO/RTOs and Grid Planning/Operations. Jay Caspary Director, R&D and Special Studies Southwest Power Pool

Similar documents
INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)

Performance Metrics. For Independent System Operators And Regional Transmission Organizations

Monitoring Competitive Markets

THE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) Southwest Power Pool, Inc. ) Docket No.


Evolution of the Electric Industry Structure in the U.S. and Resulting Issues

Presentation for The National Commission for Energy State Regulation of Ukraine

The Power Market: E-Commerce for All Electricity Products By Edward G. Cazalet, Ph.D., and Ralph D. Samuelson, Ph.D.

Closing the Gap Between Wholesale and Retail

Barriers to Grid Modernization

June 22, Via Electronic Submission

Energy in the Wholesale Market December 5, :30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

TRANSMISSION GRID DEVELOPMENT & PORTFOLIO SERVICES December 22, Senior Vice President Trans Grid Development & Portfolio Services

Governance. What s a Governance?

On-Site vs. Off-Site Electric Power Supply in Refineries in the USA: The Use of Cogeneration in Texas and Louisiana

Is It Possible to Charge Market-Based Pricing for Ancillary Services in a Non-ISO Market?

Administrative Services for the PJM Interconnection Operating Agreement

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Electric Creditworthiness Standards ) Docket No.

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. RTO/ISO Performance Metrics ) Docket No. AD

ABOUT ELECTRICITY MARKETS. Power Markets and Trade in South Asia: Opportunities for Nepal

How To Mitigate Market Power

SINGLE MARKET-BASED RATE TARIFF

Market Solutions to Loop Flow

ENERGY MARKET REFORM

Electric Transmission Planning under FERC Order No. 1000

The Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to approximately 22 million Texas customers representing 85

Strategic Plan

COLORADO SPRINGS UTILITIES ATTACHMENT K TO OPEN ACCESS TRANSMISSION TARIFF

THE STRUCTURE OF AN ELECTRICITY MARKET

Generation and Transmission Interconnection Process

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 101. (Docket No. RM ; Order No. 668)

Strategic Plan New York Independent System Operator

ALCOA POWER GENERATING INC. Long Sault Division. Open Access Transmission Tariff

NYISO Compensation Program

Retail Electric Rates in Deregulated and Regulated States: A Ten Year Comparison

PACIFIC GAS AND ELECTRIC COMPANY Transmission Owner Tariff (TO Tariff) FERC Electric Tariff Volume No. 5

Economic Dispatch: Concepts, Practices and Issues

Dan T. Stathos, CPA* Associate Director

GUIDE TO FEDERAL REGULATION OF SALES OF IMPORTED ELECTRICITY IN CANADA, MEXICO, AND THE UNITED STATES

Transactive Energy. A Sustainable Business and Regulatory Model for Electricity. Ed Cazalet SPRING 2014 MEMBERS MEETING MAY 5-8, 2014 DENVER, COLORADO

Federal Energy Regulatory Commission. Small Entity Compliance Guide Mandatory Reliability Standards (Order No. 693)

PERFORMANCE METRICS IN REGIONS OUTSIDE ISOs AND RTOs

Public Utilities and Their Reliability in Florida - History

CLEAN LINE ENERGY PARTNERS:

Addressing Barriers to Renewable Energy Procurement. In association with the EPA Green Power Partnership

TRANSMISSION OPERATIONS (August 5, 2010)

Retail Electric Rates

MISO Annual Compliance Program Update

Job Descriptions. Job Title Reports To Job Description TRANSMISSION SERVICES Manager, Transmission Services. VP Compliance & Standards

U.S. DEPARTMENT OF COMMERCE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY

Note No. 141 April The United States enjoys a highly competitive natural gas market and an increasingly efficient

Electric Utilities, Deregulation and Restructuring of U.S. Electricity Markets

Duke Energy Progress Standards of Conduct Transmission Function Employee Job Titles and Job Descriptions 9/1/13

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

The Wind Coalition WIND ENERGY IS HERE TODAY AND IN AMERICA S FUTURE

Appendix A. Glossary. For Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC

Updated November 20, Director, System Planning

How PURPA is driving utility scale solar in North Carolina By QF Solutions April 7, 2015

NV Energy ISO Energy Imbalance Market Economic Assessment

ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013

Independent Transmission Companies: Business Models, Opportunities, and Challenges

JOHN H. STOUT PRESIDENT, MARINER CONSULTING SERVICES, INC LAKEWAY DRIVE TAYLOR LAKE VILLAGE, TEXAS

Southwest Power Pool (SPP)

Application for an Exemptive Order Under Section 4(c)(6) of the Commodity Exchange Act, in Accordance with Sections 4(c)(1) and 4(c)(2)

Financing a National Transmission Grid: What Are the Issues? by Gilbert E. Metcalf

BUSINESS PLAN: to

A Regional Comparison of Smart Grids

How To Manage The Ercot Grid

San Diego Gas & Electric (SDG&E)

The Materials Contained Are Property of GP Renewables & Trading, LLC and are considered proprietary. This is not for distribution.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) Southwest Power Pool, Inc. ) Docket No. ER )

1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS

Overview of California Renewable Energy and Grid Infrastructure Policies, National and Global Trends

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS

Overview of the Nigerian Electricity Industry (Roles, Responsibilities,

Wind Energy Incentives in the USA

SECURITIES AND EXCHANGE COMMISSION FORM 8-K SAN DIEGO GAS & ELECTRIC COMPANY

Japan. Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi

Texas transformed. Achieving significant savings through a new electricity market management system

ESDER Implementation and TeMix Comments

Drafting the Natural Gas Sale and Purchase Agreement

U.S. COMMODITY FUTURES TRADING COMMISSION

GAO ELECTRICITY RESTRUCTURING. FERC Could Take Additional Steps to Analyze Regional Transmission Organizations Benefits and Performance

Role of CIM for Power System Model Exchange - ISO/RTO Exchanges with TOs

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions. Electric Grid Operations

Introduction to the Integrated Marketplace

Wind Turbine Manufacturers. Renewables Advocates. Retail Customers. Wind Project Generators. Gas, Nuclear and other Generators. Electric Utilities

Google s Green PPAs: What, How, and Why

Appendix A Glossary For 2011 Western Region Request For Proposals (RFP) for Long-Term Supply Side Resources

Article 7: Supporting innovative electricity storage with federal and state policy

TENNESSEE VALLEY AUTHORITY. TRANSMISSION SERVICE GUIDELINES 2013 Edition

An Agent-Based Computational Laboratory for Wholesale Power Market Design

What is hourly pricing and what does it mean for you? Customer Meetings May 2006

OPC also provides legislative analysis for, assistance to and testimony before the D.C. Council on utility matters.

FERC Workshop on Price Formation: Scarcity and Shortage Pricing, Offer Mitigation, and Offer Caps in RTO and ISO Markets (Docket. No.

Protecting Consumers and Small Businesses from Deregulation in Arizona

Transcription:

ELECTRIC TRANSMISSION 101: Markets, ISO/RTOs and Grid Planning/Operations Jay Caspary Director, R&D and Special Studies Southwest Power Pool

Organized Markets Organized markets are managed by regional oversight entities called Regional Transmission Organizations and Independent System Operators, created by regional stakeholders in response to FERC s Orders 2000 and 888 respectively, to: Facilitate competition among wholesale suppliers Provide non-discriminatory access to transmission by scheduling and monitoring the use of transmission Perform planning and operations of the grid to ensure reliability Manage the interconnection of new resources, e.g., generation, loads Oversee competitive energy markets to guard against market power and manipulation Provide greater transparency of transactions on the system Some are confined to a single state, while some cross multiple states (The terms ISO and RTO often used interchangeably)

3 Interconnections / 8 NERC Regions

ISO / RTO Map

Annual Average Wind Speed - 80 meters 5

6

Regional Transmission Organizations Independent System Operators No standard market design for every ISO/RTO Manage and provide a central clearing house for transactions (transmission and generation) versus bilateral markets with parties working directly to establish terms and conditions Includes allocation of transmission rights, day ahead and spot market purchases Participants still negotiate bilateral arrangements as appropriate for business needs Provides more efficient grid management Participation is officially voluntary though FERC provides incentives to encourage membership

Regional Grid Enlargement in Bilateral Market Areas Outside RTOs and ISO, there are many types of transmission owners, only some regulated by FERC. FERC regulates only wholesale transmission by public utilities. One-third of U.S. transmission is not owned by public utilities nor subject to full FERC wholesale regulation. States regulate most transmission for retail power sales. Transmission not fully regulated by FERC includes transmission owned by public power (governments), by most cooperatives, and by most of the utilities in Texas. Outside RTOs and ISO, FERC s ability to promote coordinated enlargement of the interconnected grid is weaker than in RTOs and ISOs because its policies to do not apply to all the owners of the interconnected system.

FERC Authorities and Rules Transmission Reliability FERC implemented EPAct 2005 authority over transmission reliability. The new authority is to protect existing grid but not to order additions. Regional Transmission Planning Planning needs to be regional to get some new resources to distant markets and improve grid operations to lower customer costs. FERC requires regional planning by the transmission owners and operators it regulates.

Regional Planning Process RTO/ISO planning encompasses the regional footprint; stakeholders can provide input and advocate positions throughout the process Project is submitted to RTO/ISO for modeling to evaluate the impact on the regional system, including costs and benefits If the data shows the project is beneficial based on the RTO/ISO s established criteria, it is approved Approved projects are eligible for cost recovery according to the RTO/ISOs methodology Projects may proceed outside the planning process but no cost recovery through RTO/ISO will be available

Regional Planning is Expanding As a result of FERC Order 1000, regional planning and related cost allocation is expanding beyond ISO/RTOs to include other regions Certainty regarding cost allocation and cost recovery of transmission investments are critical for grid expansion As you would expect, cost allocation is very challenging given complex and highly interconnected nature of the bulk power system and existing regulatory frameworks, not considering merchant transmission developments and opportunities which can transcend regions

Bilateral vs. Organized Markets Bilateral contract a buyer and seller negotiate directly and sign a two-party contract to trade electric power. Outside the RTOs/ISO mainly the Southeast, the upper Great Plains, and the West outside of California, wholesale power trades occur through bilateral contracts. Areas outside RTOs and ISOs are often called bilateral market areas. In the RTOs and ISOs, there are both bilateral markets and organized markets that pool all sellers and buyers. In the RTOs, FERC s oversight of transmission is stronger because all transmission owners follow the RTO s or ISO s transmission policies approved by the Commission.

Some Obstacles To Carrying Out Regional Transmission Plans Cost allocation A major obstacle to carrying out a regional plan is deciding Who pays? for it. Transmission Siting Local transmission siting can be another obstacle to realizing a regional transmission plan. EPAct 2005 gave FERC backstop siting authority in DOE designated areas. Interregional Planning is next frontier DOE funded efforts for each interconnection FERC Order 1000 is providing guidance and direction