Manufacturing Resource Planning (MRP II)

Similar documents
Material Requirements Planning (MRP)

Production Planning Solution Techniques Part 1 MRP, MRP-II

BILL OF RESOURCES AND PRIORITY-CAPACITY BALANCING

Material Requirements Planning. Lecturer: Stanley B. Gershwin

1 Material Requirements Planning (MRP)

An investigation into production scheduling systems

Short-Term Scheduling

TU-E2020. Capacity Planning and Management, and Production Activity Control

CHAPTER 6 AGGREGATE PLANNING AND INVENTORY MANAGEMENT 명지대학교 산업시스템공학부

An Introduction to Capacity Planning

Operations Management

OR topics in MRP-II. Mads Jepsens. OR topics in MRP-II p.1/25

Basics of Supply Chain Management (BSCM) Curriculum

BSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 -

INDEPENDENT STUDY PAILIN UDOMSANTI

Chapter 7. Production, Capacity and Material Planning

2.4 Capacity Planning

MASTER PRODUCTION SCHEDULE

Factors to Describe Job Shop Scheduling Problem

Functional Area Systems Production / Operation Systems

26/10/2015. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems

Material Requirements Planning (MRP)

ISE 421 QUANTATIVE PRODUCTION PLANNING

Rough Cut Capacity Planning-(RCCP)-(Case Study)

MATERIAL REQUIREMENTS PLANNING

Manufacturing Applications in Microsoft Dynamics GP 10.0

APICS acknowledges the Basics of Supply Chain Management Committee for its contributions in the development of this resource.

Visual Planning and Scheduling Systems. A White Paper. Gregory Quinn President Quinn & Associates Inc September 2006 Updated October 2006

CISCM STUDY GUIDE. International Purchasing and Supply Chain Management Institute,

Fundamentals of Materials and Operations Management

A DECISION SUPPORT SYSTEM FOR CAPACITY MANAGEMENT. A Senior Project. presented to

Chapter 7 Production Planning

Master Scheduling and Rough-cut Capacity Planning

IT-375 using the 6 th Edition PRODUCTION AND INVENTORY CONTROL CHAPTER 1: INTRODUCTION TO MATERIALS MANAGEMENT

INTRODUCTION. What is Enterprise Resource Planning?

ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner

Module 5 The R+ Available Stock Calculation

A New Approach for Finite Capacity Planning in MRP Environment

Expert s Guide to Successful MRP Projects. September 2012

MOS 3330 Test 2 Review Problems & Solutions

1.3 ERP System Evolution

SAP APO SNP (Supply Network Planning) Sample training content and overview

Material Requirements Planning MRP

Dependent vs Independent Demand. The Evolution of MRP II. MRP II:Manufacturing Resource Planning Systems. The Modules In MRP II System

Table of Contents. Planning the ERP System...1

Oracle Capacity User s Guide

THE USE AND APPLICABILITY OF CAPACITY PLANNING METHODS

Functional Area Systems Lecture 5

Production Planning & Control. Chapter 2. Aggregate Planning & Master Production Scheduling. Chapter2 1

LEAN MANUFACTURING ON MAKE-TO-ORDER SUPPLIERS: A CASE STUDY

QAD Enterprise Applications Standard & Enterprise Edition. Training Guide MRP/CRP

TU-E2020 ADVANCED OPERATIONS MANAGEMENT. Demand management Sales & Operations Planning Master Production Scheduling

2.5 Checklist for ERP Implementation

Contents. The Planning Hierarchy. Capacity / Load. TPPE37 Manufacturing Control

Chapter 1. The Production Paradigm

Item Master and Bill of Material

PARADIGMS THAT DRIVE COSTS IN MANUFACTURING. The whole purpose of a business enterprise is pretty simple to make a profit by selling

Short-term Planning. How to start the right operation at the right shop at the right time? Just in Time (JIT) How to avoid waste?

Standard Work for Optimal Inventory Management

AGGREGATE & CAPACITY PLANNING

Planning Optimization in AX2012

Production Management

Product Documentation SAP Business ByDesign Supply Chain Planning and Control

This supplement focuses on operations

ERP(Enterprise Resource Planning) & MRP

Demand

NEW MODELS FOR PRODUCTION SIMULATION AND VALIDATION USING ARENA SOFTWARE

BEST PRACTICES IN DEMAND AND INVENTORY PLANNING

Manufacturing Planning. Master Production Schedule. Material Requirements Plan. Work Order/ FPO Maintenance. Soft Bill Maintenance

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras

How to Configure and Use MRP

Chapter 5: Strategic Capacity Planning for Products and Services

Operations Management

Master Planning The Forgotten, But Vital, Manufacturing Supply Chain Planning Process

EnterpriseOne Requirements Planning 8.9 PeopleBook

How To Learn How To Manage A Business

Determining Inventory Levels in a CONWIP Controlled Job Shop

Introduction to production scheduling. Industrial Management Group School of Engineering University of Seville

Choosing Planning & Scheduling solutions for Metals

Planning and scheduling in the 21st century

Graphical Scheduler. Get on time All the time. For Production

Program Number. 1 System Parameters SYS800 Defines system-wide parameters. 2 Chart of Accounts GLD103 Defines chart of accounts

SIMULATION BASED APPROACH TO STUDY THE INTERACTION OF SCHEDULING AND ROUTING ON A LOGISTIC NETWORK

Ch.1 Purchasing & Supply Chain Management

Info Net LAMAR SOFTWARE, INC. Enterprise Resource Planning. Efficiency. Productivity. Flexibility

- 1 - intelligence. showing the layout, and products moving around on the screen during simulation

for Sage 100 ERP Work Order Overview Document

JD Edwards EnterpriseOne One View Reporting Functional Content Overview

SAP ERP Versus SAP APO: Which Production Planning Functionality Do I Use, and How Can I Be Successful?

Going Lean the ERP Way

Material Requirement Planning (MRP) Mohd Yusnurahman Bin Mohd Yuznah

DEVELOPMENT OF LOW COST MRP SOFTWARE FOR A MANUFACTURING,

Data Collection for Manufacturing

Business Challenges. Customer retention and new customer acquisition (customer relationship management)

Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning

Management Information Systems

Operations Management OPM-301-TE

Transcription:

P.135 Manufacturing Resource (MRP II) Sometime called MRP, in contrast with mrp ( little mrp); more recent implementations are called ERP (Enterprise Resource ). Extended MRP into: Master Production Scheduling (MPS) Rough Cut Capacity (RCCP) Capacity Requirements (CRP) Production Activity Control (PAC) 1 P.136 MRP II Hierarchy Resource Long-term Forecast Aggregate Production Short-term Forecast Rough-Cut Capacity Bills of Material Inventory Status Master Production Scheduling Material Requirements Job Pool Job Release Capacity Requirements Routing Data Demand management Job Dispatching 2 1

Long-Range P.136 Forecasting Long-range forecasting determines the capacity, tooling, and personnel requirements. Short-term forecasting converts a long-range forecasts of part families to short-term forecasts of individual end items. Both kinds of forecasts are input to the intermediate-level function of demand management. Resource planning Determines capacity requirements over the long term. Provides projected available capacity over the long-term planning horizon. Aggregate planning Determines levels of production, staffing, inventory, overtime,and so on over the long term. Wallace J. Hopp, Mark L. Spearman, 1996, 2000 Wallace J. Hopp, Mark L. Spearman, 1996, 2000 http://www.factory-physics.com 3 P.137 Master Production Scheduling (MPS) Generates an anticipated build scheduling at the highest level of planning details. (contains an order quantity in each bucket for every end item) MPS drives MRP Should be accurate in near term (firm orders) May be inaccurate in long term (forecasts) Software supports forecasting order entry netting against inventory Frequently establishes a frozen zone in MPS 4 2

P.138 Rough Cut Capacity (RCCP) Quick check on capacity of critical resources Use bill of resources (BOR) for each end item in MPS Bill of resources give the number of hours required at each critical resource to build a particular end item Generates usage of critical resources by exploding MPS against BOR Insufficient or excess capacity addressed by adjusting MPS (changing due dates) or adjusting capacity (adding or taking away resources, using overtime, or subcontracting) Does not perform any offsetting and netting, and thus is difficult to gauge its behavior. 5 P.139 Capacity Requirements (CRP) Provides a more detailed capacity check on MRP-generated production plan. Uses all planned order releases, existing WIP positions, routing data, as well as capacity and lead times for all process centers. Performs infinite forward loading. Generates job completion times for each process center, using given fixed lead times, and then computes a predicted loading over time. No correction is made for an overloaded situation, and it offers nothing about what caused an overloaded situation. There are enormous data requirements, and the output is voluminous and tedious. Wallace J. Hopp, Mark L. Spearman, 1996, 2000 http://www.factory-physics.com 6 3

P.141 Short-term Control Job release, job dispatching, and input/output control. Job release converts planned order releases to scheduled receipts. Allocation: the job release function rationalize conflicts by allocating parts to one job or another. Once a job is released, some control must be maintained to make sure it is completed on time with correct quantity and specification. Shop floor control performs two main functions: job dispatching and input/output control. 7 P.141 Shop Floor Control (SFC) Sometimes called production activity control (PAC) Provides routing/standard time information Sets planned start times Can be used for prioritizing/expediting Can perform input-output control (compare planned with actual throughput) Modern term is MES (Manufacturing Execution System), which represents functions between and Control. 8 4

P.141 Job Dispatching Develop a rule for arranging the queue in front of each workstation that will maintain due date integrity while keeping machine utilization high and manufacturing times low. Shortest process time (SPT) Jobs at the process center queue are sorted with the shortest jobs first in line. Thus, the job in the queue having the shortest processing time will always be performed next. Use of SPT typically decreases average manufacturing times and increases machine utilization. While average due date performance of SPT is good, the variance of the lateness can be quite high. 9 P.142 Job Dispatching (cont.) Earliest due date (EDD) The job closest to its due date is worked on next. EDD works better than SPT if jobs are all approximately the same size or particularly long jobs and routing are fairly consistent. Least slack The slack for a job is its due date minus the remaining processing time (including setups) minus the current time. The highest priority is the job with the lowest slack time. 10 5

P.142 Job Dispatching (cont.) Least slack per remaining operation Divide the slack by the number of operations remaining on the routing. The highest-priority job has the smallest value. Critical ratio Jobs are sorted according to an index computed by dividing the time remaining (I.e., due date minus the current time) by the number of hours of time remaining. The highest-priority job has the smallest value of critical ratio. The idea is to provide a balance between SPT and EDD. 11 P.142 Input/Output Control Keeps lead times under control Monitor the WIP level in each process center. If the WIP goes above a certain level, then the current release rate is too high, so reduce it. If the WIP goes below a specific lower level, then the current release rate is too low, so increase it. It it stays between these control levels, the release rate is correct for the current conditions. These actions (reduce and increase) must be done by changing the MPS. Provides an easy way to check releases against available capacity. 12 6