Price County Building Requirements

Similar documents
WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

MOBILE HOME LAW. Revised November 2001

QUEEN ANNE'S COUNTY BUILDING CODE TECHNICAL ASSISTANCE BULLETIN

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Section 801 Driveway Access Onto Public Right-of-Ways

City Code of ANN ARBOR, MICHIGAN Chapter 55 Zoning

Manufactured Home Application Packet

Electronic Signature and Fee Payment Confirmation

Residential Plan Routing Information

THE TOWN OF COLONIAL BEACH, VIRGINIA DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT

Town of Barnstable Stable Permit Application Stable Regulations Town Code 376

ORDINANCE NO

A-2, RURAL ESTATE-AGRICULTURE DISTRICT

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS

Town of Surf City Community Development. General Permit Information

ST. MARY S COUNTY DEPARTMENT OF LAND USE AND GROWTH MANAGEMENT FREQUENTLY ASKED QUESTIONS

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Waupaca County Planning & Zoning

PROPERTY LINE ADJUSTMENT APPLICATION

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

EASTTOWN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA APPLICATION FOR ZONING PERMIT

Fill out all sections or mark with N/A (not applicable)

BOROUGH COUNCIL BOROUGH OF SELLERSVILLE BUCKS COUNTY, PENNSYLVANIA ORDINANCE NO. 685

4. New $ Minimum Plumbing, HVAC, Alarms, Sprinklers, and any permanent systems 5. Replacement $ Minimum

9. Does the County of San Diego keep home plans on file for existing homes?

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

2016 BUILDING PERMIT FEES*

RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form

Ferry County Out Building Application

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

TOWNSHIP OF TOMS RIVER ZONING OFFICE DECK CONSTRUCTION

Development Variance Permit Application Package

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

REQUESTS FOR ANY INSPECTION MUST BE 24 HOURS IN ADVANCE.

Single Family Residential Building Permit Questions & Answers

INTRODUCTION TO ZONING DISTRICT REGULATIONS

d. Building permits may only be approved if consistent with the approved development plan and land division for all units with common walls.

FREQUENTLY ASKED QUESTIONS. New Subsurface Sewage Treatment System (SSTS) Ordinance

Township of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES

Warwick Township. Office of Code Compliance. Residential Building Permit Application. Plan Submittal Guide Our Goal is a Safe Environment

APPLICATION FOR A FILL, EXCAVATION AND SITE GRADING PERMIT

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

ONSITE WASTEWATER TREATMENT SYSTEM Property Transfer Certification Instructions and Inspection Report

Chapter 7 ZONING PLAN

Development Services Department City of San Antonio. Permits & Licenses. Development Services Manager. Deputy Historic Preservation Officer

Division Yard, Lot, and Space Regulations.

Answers to Commonly Asked Questions

HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES

Conservation Tax Credit Regulations Chapter A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER

Department of Community Development, P. O. Box 427, Herndon, Virginia

Neighborhood Business. Neighborhood Mixed Use. Community Business. Factoria Land Use District 1 2A 2A 2A 30 (23) 15 (23) 30 (23) 30 (23)

BUSINESS USE PERMIT APPLICATION

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

Staff Report General Development Plan/Master Plan Aldermanic District: 1 County Commission District: 2 MPC File No PLAN February 23, 2016

NYE COUNTY, NV PAHRUMP REGIONAL PLANNING COMMISSION REGULAR MEETING JANUARY 15, 2014

SITE PLAN REVIEW APPLICATION

Floyd County Department of Inspections 120 West Oxford Street PO Box 218 Floyd, VA Phone: Fax:

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS:

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT

Retail Marijuana Establishment License Application

SECTION 5 RESIDENTIAL R1 ZONE

Sec General commercial district (C-4).

Kirkland Zoning Code

2013 ANNUAL REPORT DEPARTMENT OF LAND MANAGEMENT & RECORDS. Mission Statement

Edgecombe County Solar Energy Development Ordinance

NOTICE OF A TYPE Ix DECISION ON A PROPOSAL IN YOUR NEIGHBORHOOD

Minor Accommodation Planning Review Application

COASTAL DEVELOPMENT PERMIT

Information Packet SOLAR ENERGY SYSTEM (SES) WHEN IS A SOLAR ENERGY SYSTEM ZONEING PERMIT NECESSARY? Application for Solar Energy System

Definition of Tower from the Bradley County Zoning Resolution

16 12 INDIVIDUAL SEWAGE DISPOSAL CODE OF HOPEWELL TOWNSHIP.

NEVADA COUNTY COMMUNITY DEVELOPMENT AGENCY

MAINE SHORELAND ZONING

ZONING HEARING BOARD APPLICATION CHECKLIST

ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM REQUIREMENTS

Commercial Construction Permit Application

Residential Accessory Buildings

Zoning Most Frequently Asked Questions

SECTION III. LEACHING AREA REQUIREMENTS Residential square footage requirements are based on sidewall area only: Minimum square feet per bedroom

STATE OF FLORIDA DEPARTMENT OF HEALTH APPLICATION FOR CONSTRUCTION PERMIT Permit Application Number

TENT AND STAGE CUSTOMER ASSISTANCE GUIDE

NEW OR ADDITIONS TO GARAGE/SHOP/STORAGE PERMIT REQUIREMENTS

BUILDING PERMIT SPECIFICATIONS

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1

Maximum Floor Area and Maximum Development Area

City of Beacon Building Department

APPLICATION. Internal Use Only 1311 Chestnut Street TDLR# Bastrop, Texas Intake Date

CHAPTER 16. Private On-Site WasteWater Treatment System Introduction Administration and Enforcement... 4

TOWN BOARD OF THE TOWN OF NORTH SALEM WESTCHESTER COUNTY, NEW YORK LOCAL LAW # OF THE YEAR 2012

CUSTOMER INFORMATION BULLETIN

5. Specific Use Regulations

Fox Township On-lot Sewage Program

BEFORE YOU BUILD GUIDE

Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet

Page 11-1 rev

Transcription:

Price County Building Requirements ~Township, State, and Federal permits may also be required for your project~ This guide has been put together to aide in the building process and provide a checklist of requirements. It will help you fill out all the necessary forms for your project and help to limit the amount of time for the permit process. The following list of projects is in an outline form to show what permits are required to be obtained before the project may begin. If you have any questions please contact the Price County Zoning Department. New Dwelling (all of the following must be submitted) 1) Price County Application Please complete this application form. A plot plan must be drawn on the back of the form or on a separate sheet to indicate the proposed site(s) in relationship to lot lines, roads, lakes, etc. Multiply the square footage of the dwelling by the appropriate fee to determine the permit fee. The sanitary permit must be obtained before a land use permit can be released. 2) 911 Uniform Number $40.00 a) 911 Emergency Number Application Fill out the application completely. An example of how to fill out the application is on the back of application. b) Driveway Access Permit (Or obtain from highway dept.) The type of driveway access permit required depends upon what type of road your driveway connects to. If you are going to be building a new driveway on a town road the town chairman must sign the sheet. A new number on an existing driveway would also require the town chairman to sign the driveway access permit. A list of Town Chairpersons is provided. If your driveway is on a county highway or a state highway contact the Price County Highway Department at 339-3081 to obtain a driveway access permit. 3) Sanitary Permit (two options are available to meet sanitary requirements)

a) State sanitary permit A state sanitary permit is obtained by first having a soil test done on your property. Take the soil test to a Wisconsin Licensed Plumber. The plumber will have you sign the necessary forms and submit all the information to obtain a permit. If possible, obtain the permit at least a year before you anticipate to build. The permit is good for two years. A list of plumbers and soil testers are provided. b) Privy permit A privy may be installed to meet the requirements for sanitary. There are two types of privies. There is an open pit privy that requires you to have a soil boring to ensure the soils allow for it and you ll have to sign the Privy Installation Agreement. The other type of privy is a vaulted privy. It does not require a soil test, but it still requires the Privy Installation Agreement. In shoreland areas a vaulted privy can only be utilized. Accessory Buildings or Dwelling Additions not affecting septic systems 1) Price County Application Please complete the application form. A plot plan must be drawn on the back of the form or on a separate sheet to indicate the proposed site(s) in relationship to lot lines, roads, lakes, etc. Multiply the square footage of the dwelling by the appropriate fee to determine the permit fee. Dwelling additions that modify wastewater flow (bedroom additions) 1) Price County Application Please complete the application form. A plot plan must be drawn on the back of the form or on a separate sheet to indicate the proposed site(s) in relationship to lot lines, roads, lakes, etc. Multiply the square footage of the dwelling by the appropriate fee to determine the permit fee. 2) Septic System Inspection (one or both of the following may need to be performed) a) Septic Tank Inspection The septic tank will need to be pumped and inspected by a POWTS inspector, POWTS maintainer, WI Licensed Plumber, or a Septic Hauler to ensure the tank does not have any holes. b) Soil Inspection Most septic systems newer than 1980 will have a soil test on record and will not require a soil boring. Many septic systems older than 1980 did not have a soil test done and will require a soil boring to ensure that the septic system has at least 36 inches of good soil to a limiting factor such as high ground water.

Sanitary System Setback Parameters Well Dwelling Lot Line Water Service Line Pool Lake, River or Stream Septic or Holding Tank 25 ft. 5 ft. 2 ft. 10 ft. None 25 ft. Septic Disposal Field 50 ft. 10 ft. 5 ft. 10 ft. 15 ft. 50 ft. Privy 50 ft. 25 ft. 25 ft. None None 75 ft. Horizontal Setbacks of Zoning Districts (RR-1) Recreational- Residential (RF-1) Residential- Forestry (A-1) Agricultural- District (CI-1) Commercial- Industrial (C-1) Conservancy District Front Yard 30 ft. 30 ft. 50 ft. 15 ft. 30 ft. Side Yard Principal Building 10 ft. 10 ft. 20 ft. 15 ft. 10 ft. Barns & Stables 100 ft. 100 ft. None None None

Accessory Building 5 ft 5 ft. 10 ft. 5 ft. 5 ft. Rear Yard 20 ft. 20 ft. 20 ft. 20 ft. 20 ft. Minimum Lot Width At the Building Site 100 ft. 100 ft. 100 ft. 100 ft. 100 ft. I. Land Use Permits Non-shoreland Shoreland 1. New Home or $0.22/sq. ft. $0.22/sq. ft. Mobile home $100.00 Minimum $100.00 Minimum (Fee is based upon finished area, including basements, lofts, etc.) Additions $0.15/sq. ft $0.15/sq. ft.. $50.00 Minimum $50.00 Minimum Accessory $0.10/sq. ft. $0.10/sq. ft. Buildings $50.00 Minimum $50.00 Minimum Additions: $0.10/sq. ft with no min. Decks/Three Season Porches:

$0.15/sq. ft. $0.15/sq. ft. 2. Grading and/or Filling $100.00 3. Remodeling Fee... $100.00 Includes any grading or filling of an area in excess of 5,000 square feet which is within 300 feet landward of the ordinary high water mark of navigable water. NOTE: A DNR permit may also be required for grading and filling that exceeds 10,000 square feet. A Land Use Permit is not required for additions to buildings used for human habitation when the addition does not exceed 80 square feet of horizontal expansion (all setback requirements must be met); nor is a Land Use Permit required for farm buildings, school bus stop shelters, temporary shelters for horses, equipment for humans at a logging or pulpwood cutting operation or handicap ramps used exclusively to enter and exit a dwelling provided such structures meet the dimensional and setback requirements of the ordinances. II. State Sanitary Permit 1) Non-Pressurized In-Ground. $275.00 8) Revision Fee... $50.00 2) Holding Tanks... $345.00 9) Repair Fee.... $50.00 3) Mound... $325.00 10) Permit Renewal... $50.00 4) Pressurized In-Ground $325.00 11) Permit Transfer... $25.00 5) At-Grade... $325.00 12) Reconnect... $50.00 6) Aerobic Treatment Unit... $345.00 13) Holding Tank Review Fee... $60.00 7) Sand Filter... $345.00

III. Privy Permit... $45.00 IV. Certified Soil Test Filing Fee... $25.00 V. Land Divisions... $ 100.00 first lot + $ 20.00 each additional lot, plus survey review fees if applicable VI. Conditional Use/Special Exception Permits..... $170.00 VII. Board of Adjustment Variance............ $500.00 VIII. Petition for Zoning Amendment (Rezone)... $200.00 IX. Sign Permits... $20.00 X. Non-Metallic Mining... See Ordinance ADDITIONAL INFORMATION SHORELAND CUTTING AND GRADING The first 35 feet inland from the Ordinary High water Mark is protected. Check with the Zoning Office before you decide to cut trees, remove brush or grade within the buffer area. Grading and/or filling more than 5000 square feet requires a permit if you live in a shoreland district. Check with the Zoning Office to see if you are in a shoreland district. MOBILE HOMES AND RV s A mobile home less than 32 feet long is considered to be a recreation vehicle. RV s may be kept on a parcel for up to four months in a calendar year without a permit. The site must have a 911 number and sanitary system. If the RV is on a parcel for more than four months, a land use permit must be obtained. A mobile home longer than 32 feet must have a land use permit and a sanitary permit to be considered a habitable structure. In Recreational-Residential Zoning Districts, mobile homes older than 1976 are not allowed. WATERFRONT STORAGE STRUCTURES Waterfront storage structures are permitted under a Conditional Use Permit with a Land Use permit also being required. The primary use of the structure shall be for the storage of watercraft. It must be located at least 35 feet from the ordinary high water mark and shall not exceed 300 square feet in area. Waterfront storage structures shall not be constructed where the existing slope is more than 20%. MINIMUM LOT SIZES All lots abutting water shall be 30,000 square feet in area and shall have 150 feet of frontage. All lots in Sanitary Districts shall have a minimum of 10,000 square feet in area. All other lots shall be 1 acre in size. Any lot created must have 40 feet of frontage on a

public road or have a recorded easement 66 feet wide to the lot from a public road. All land divisions must be received by the 15 th of each month to be considered at the following month s Land Use and UW Extension Committee meeting. CONDITIONAL USE PERMITS In each zoning district, there are specific listed uses. If you do not fall under one of the specific permitted uses, a Conditional Use Permit is required. Home and expanded home occupations, commercial activities, etc. require a Conditional Use Permit. The Land Use and UW Extension Committee shall notify every landowner within 300 feet of the proposed site and a public hearing will be conducted after a class II notice is published in the newspaper for two weeks. The applications must be received by the 1 st of each month to consider at the next month s Land Use and UW Extension Committee meeting. Dwelling Setback Parameters -Ordinary Highwater Mark (OHWM) of a lake, river or stream......75 feet -Well... 2 feet -Centerline of State Highway...110 feet or right-of-way line of a State Highway... 50 feet -Centerline of County Highway...75 feet or right-of-way line of a County Highway...42 feet -Centerline of Town Road... 63 feet or right-of-way line of a Town Road...30 feet