UNFCCC/CCNUCC Is a duly completed Post registration changes request form (CDM-PRC-FORM) submitted? PCP para 161 (a)

Similar documents
Version 03.1 Page 1 of 6

Annex 8 GUIDELINES FOR COMPLETING THE PROJECT DESIGN DOCUMENT FORM. (Version 01.0) CONTENTS

Clean Development Mechanism Status and outlook

Annex 26 GUIDELINES FOR COMPLETING THE PROJECT DESIGN DOCUMENT FORM FOR CARBON CAPTURE AND STORAGE CDM PROJECT ACTIVITES. (Version 01.

Standard Clean development mechanism project standard

Procedure Development, revision and clarification of baseline and monitoring methodologies and methodological tools

Annex 12 GUIDELINES FOR COMPLETING THE PROJECT DESIGN DOCUMENT (CDM-PDD) AND THE PROPOSED NEW BASELINE AND MONITORING METHODOLOGIES (CDM-NM)

UNFCCC/CCNUCC DRAFT. Annex 1

Project Procurement Standard

Procedure Terms of reference of the support structure of the CDM Executive Board

CDM two-year business plan and management plan 2016

1. Whether the concept of materiality can be applied in the context of the CDM

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN

The Project Design Document

Methodological tool Tool for the demonstration and assessment of additionality

2010 Rating of Designated Operational Entities (DOEs) accredited under the Clean Development Mechanism

Clean Energy and Carbon Finance Consultant, Workshop on CDM Accreditation Standard Mumbai 25 May 2010

EURELECTRIC responses to the invitation in Draft decision -/CMP.5 to make submissions to the UNFCCC secretariat on:

SASSA LOW PRESSURE SOLAR WATER. May 19, 2011 Department of Energy, Pretoria

The role of carbon finance in business plan for clean energy projects

Identifying and Monitoring of Sustainable Development Benefits on CDM Projects and PoAs

How To Get A Carbon Credit

GUIDELINES FOR USERS OF THE JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM. Version 04. Revision history of the document

A Summary of the Kyoto Protocol and the Marrakesh Accords By James G. Derouin Fredric D. Bellamy David R. Nelson Mark E. Freeze 1

Addendum. Part Two: Action taken by the Conference of the Parties serving as the meeting of the Parties to the Kyoto Protocol at its first session

Requirements set for account holders and representatives of emissions trading accounts

Assessment Report for CDM proposed standardized baseline (Version 01.0)

Draft Large-scale Consolidated Methodology ACM00XX: Construction of a new natural gas power plant

Evolution I Semester e-apostille + e-document digitally signed supplied by the user Service: In-person + online service

Call for Inputs on the Framework for Various Approaches September 2014

Monitoring Software Practitioners Workshop on CDM Standards June 8-10, Bonn

Methodological Tool. Draft tool to determine the weighted average cost of capital (WACC) (Version 01)

PRESIDENCIA DE LA REPÚBLICA MINISTERIO DE AMBIENTE DESARROLLO SOSTENIBLE

MONITORING REPORT FORM (CDM-MR) * Version 01 - in effect as of: 28/09/2010 CONTENTS

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Twenty-first session Buenos Aires, 6 14 December 2004

Crediting the displacement of non-renewable biomass under the CDM

JCM Modalities of Communication Statement Form. Section 1: Project description

Afforestation and Reforestation Projects under the Clean Development Mechanism

Legal & Contracting Issues in the CDM. Glenn S. Hodes UNEP Risø Center

FCCC/TP/2013/5. United Nations. Technical synthesis on the framework for various approaches. Technical paper. Summary. Distr.: General 22 October 2013

Fatima-Zahra Taibi, UNFCCC secretariat. Regional Workshop on CDM and NAMAs for Latin America and the Caribbean (31 Aug 2 Sep, 2014) Bogotá, Colombia

Annex 1 Tool for the demonstration and assessment of additionality

Guidance to the CDM & JI Pipelines February 2008 By Joergen Fenhann, UNEP Risø Centre Denmark, Phone (+45) , j.fenhann@risoe.

Draft Small-scale Methodology AMS-III.AV: Low greenhouse gas emitting safe drinking water production systems

Carbon Projects and Potential Source of Revenue for Microfinance Institutions to Accelerate Renewable Energy Lending in Nepal

Concrete Example of CDM Project : Lages Methane Avoidance Project

Revision to the approved baseline methodology AM0011

CDM: Cheap Development. transition to clean energy. CSE, November 2012

REPORT OF THE CONFERENCE OF THE PARTIES ON ITS SEVENTH SESSION, HELD AT MARRAKESH FROM 29 OCTOBER TO 10 NOVEMBER Addendum

Annex 49 GUIDELINES FOR QUALITY ASSURANCE AND QUALITY CONTROL OF DATA USED IN THE ESTABLISHMENT OF STANDARDIZED BASELINES. (Version 01.

Bundling small-scale energy efficiency projects

DOE/AIE Forum Werner Betzenbichler Bangkok, April rd CDM Roundtable The Project Cycle Processes and the VVS DOE Viewpoints

Activities of the UNFCCC Regional Collaboration Centre in the Caribbean

Thermax Sustainable Energy Solutions Limited

Introducing RCC- Asia Pacific & Climate Neutral Now - online platform for voluntary cancellation of CERs

ORDINANCE ON THE ELECTRONIC SIGNATURE CERTIFICATES IN THE. Chapter One GENERAL PROVISIONS

Advance unedited version. Decision -/CMP.3. Further guidance relating to the clean development mechanism

Citizen s Charter (Services of the Embassy)

REPORT 2016/035 INTERNAL AUDIT DIVISION

Advance unedited version. Decision -/CMP.1 * Aware of its decisions -/CMP.1 (Mechanisms) and -/CMP.1 (Article 12) and its annex,

CLEAN DEVELOPMENT MECHANISM SMALL-SCALE PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-SSC-CPA-DD) Version 01 CONTENTS

Strengthening Institutional, systemic and individual capacity for successful CDM project development and implementation in Uganda

Smart Meters Programme Schedule 5.2. (Software) (CSP North version)

MEDICAL COUNCIL OF INDIA

Advance unedited version

Further guidance relating to the clean development mechanism

Structuring the risks of CDM projects based on Monte Carlo simulations

Green-e Climate Stakeholder Process Voluntary GHG Project Certification Programs

Draft consolidated baseline and monitoring methodology ACM00XX

Cyber Security Walk-Through Procedure

The Clean Development Mechanisms (CDM) What is it? And how can it be used to promote climate protection and sustainable development?

MU 20/15 - LIA MINIMUM STANDARD FOR LIFE INSURANCE ADVISORY PROCESS (EFFECTIVE DATE: NO LATER THAN 1 APRIL 2015)

VER+ A robust Standard for Verified Emission Reductions (Criteria Catalogue)

Table Of Contents. DOCUMENT CONTROL EHS-XX Page 1 of 7. Environment, Health & Safety

Saša Eichberger (MBA;MSE; CMVP ) WEEC 2014, Washington DC, October 2014

Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements

II. Overview of Steps in the Methodology Development, Offset Project Approval and Credit Issuance Process

Independent Verification and Validation of SAPHIRE 8 Software Configuration Management Plan

How To Calculate Fuel Type I

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME

Subject: No. Page PROTOCOL AND CASE REPORT FORM DEVELOPMENT AND REVIEW Standard Operating Procedure

June 29, UNFCCC Cooperative Mechanisms Programme P.O. Box D Bonn, Germany. (

Human Resources PolicyPro - Quebec Edition

Draft Small-scale Methodology AMS-I.H: Biodiesel production and use for energy generation in stationary applications

The PMP Application Process

PROCEDURES ON IMPORTATION AND REGISTRATION OF A CLASSIC CAR IN SINGAPORE

(b)2.

Auditing HACCP Programs

MENTOR PREPARATION FOR NURSING EDUCATION IN NORTHERN IRELAND

PKD Board ICAO PKD unclassified B-Tec/37. Procedures for the ICAO Public Key Directory

ADVISORY CIRCULAR AC

PROCEDURES ON IMPORTATION AND REGISTRATION OF A VINTAGE MOTORCYCLE/SCOOTER IN SINGAPORE

United Nations FCCC/KP/CMP/2013/5 (Part I)

Review of Credentialing Systems: Supplemental Information and ECRI Institute Resources

EARLY CALL FOR REGISTRATION FOR UNIVERSITY DOCTORAL STUDIES (PhD) FOR STUDENTS WITH NON-EHEA QUALIFICATIONS. ACADEMIC YEAR

LAW FOR THE ELECTRONIC DOCUMENT AND ELECTRONIC SIGNATURE. Chapter two. ELECTRONIC DOCUMENT AND ELECTRONIC SIGNATURE

GOLD STANDARD VERIFICATION REPORT

submission of Information to the Central Bank Under Solvency II

DEPARTMENT ADMINISTRATIVE ORDER No

Transcription:

REQUEST FOR ISSUANCE AND POST REGISTRATION CHANGES: COMPLETENESS CHECK CHECKLIST PCP : Clean development mechanism project cycle procedure (version 09.0), EB 82, annex 15, 20 February 2015. PS : Clean development mechanism project standard (version 09.0), EB 82, annex 13, 20 February 2015. VVS : Clean development mechanism validation and verification standard (version 09.0), EB 82, annex 14, 20 February 2015. Item Description of the Item References 1. COMPLETENESS CHECK - POST REGISTRATION CHANGES (only types of changes described in Appendix 1 to the Project standard) 1.1 Submission completeness 1.1.1 Is a duly completed Post registration changes request form (CDM-PRC-FORM) submitted? PCP para 161 (a) 1.1.2 1.1.3 Is a Validation Report for post-registration changes, including a validation opinion, submitted by the DOE and prepared in accordance with a valid version of the VVS? Is a revised PDD (in both clean and track-change versions) submitted as applicable (except in case of temporary deviations) and using the valid version of the applicable CDM-PDD form? PCP para 161 (b), VVS para 293 PCP para 161 (c), PS para 270 1.1.4 Is supplemental documentation (e.g. emission reduction worksheet, financial calculations, etc.) submitted as appropriate? PCP para 161 (f) 1.2 Consistency of information 1.2.1 Is the reference to the type of post registration changes consistent among the following documents? CDM-PRC-FORM PRC Validation Report 2. COMPLETENESS CHECK - ISSUANCE 2.1 Submission completeness 2.1.1 Is a monitoring report using a valid version of the monitoring report form (CDM-MR-FORM) submitted? 2.1.2 Is a spreadsheet containing the emission reductions calculations submitted? PCP para 222 Version 03.0 Page 1 of 6

2.1.3 Is a verification and certification report submitted and prepared in accordance with a valid version of the VVS? 2.1.4 Is a signed request for issuance of CERs using a valid version of the CDM project activity issuance request form () submitted? 2.1.5 Are additional documents specified in the submitted? 2.2 Additional notes 2.2.1 Are all documents in English or do they contain a full translation of relevant sections into English? PS para 260 2.2.2 Is the spreadsheet supplied in an accessible and verifiable (unprotected) format? PS para 260 2.2.3 If the DOE performing verification is the same DOE that performed other validation activities (i.e. registration, renewal of crediting period and/or inclusion of CPAs in the PoA), has the DOE been authorized by the Board to perform the verification of the project activity? Is a reference to the meeting report where the authorization was granted provided? PCP para 156 2.2.4 Is the crediting period starting on or after the date of registration of the project activity? PS para 69 2.3 Consistency of information 2.3.1 Are the project title and reference number consistent in the following documents? CDM-PRC-FORM PRC Validation Report Version 03.0 Page 2 of 6

2.3.2 Is the number of CER and the breakdown of CERs to be issued up to 31 December 2012 and CERs issued from 01 January 2013, where applicable, consistent in the following documents? 2.3.3 Are the monitoring period dates consistent in the following documents? 2.3.4 Are the monitoring report date and version consistent in the following documents? 2.3.5 Is the PDD version consistent in the following documents? 2.3.6 Are the title(s) and version(s) of the methodology(ies) and, where applicable, of the standardized baseline(s) consistent in the following documents? PRC Validation Report Version 03.0 Page 3 of 6

2.3.7 Are registration date and crediting dates consistent in the following documents? 2.3.8 Are sign-off dates consistent/logical in the following documents? 2.3.9 Are the calculations of baseline emissions, project emissions, leakage consistent in the following documents? Version 03.0 Page 4 of 6

Appendix 1. Request for Issuance: Completeness Check Issues of an Editorial Nature or Consistency* The table below lists issues of an editorial nature or consistency for which the secretariat may request the DOE to submit the missing or revised documents and/or information in accordance with paragraph 228 of the PCP. Item Description of the Item 1. Inconsistencies clearly attributable to typographical errors and/or documents containing blank pages. 2. Documents and appendices (including spreadsheets) are not readable or contain part of text not in English. ER calculation spreadsheet is missing. 3. Request for issuance information is not consistent (i.e. dates of monitoring period, dates and version of monitoring report, date and version of PRC Validation Report, amount of CERs, sign-off dates, valid version of the VVS). 4. Project s information is not consistent (i.e. PDD version and date, registration date, crediting period, project title and reference number). 5. Version of forms submitted is not valid at the time of the request for issuance. 6. A PRC is wrongly reported on the request for issuance form or the PRC form is not provided (only in cases where the PRC Validation Report and the revised PDD are duly submitted). 7. PRC information is not consistent (i.e. type of PRCs, sign-off dates, valid version of VVS). The revised PDD is submitted only in clean or tracked changes version. 8. Lack of signatures on relevant documents. * This list is not exhaustive and will be revised as and when required. The secretariat may contact the Designated Operational Entity/Project Participant on any issues of an editorial nature that are not included in the list above. - - - - - Version 03.0 Page 5 of 6

Document information Version Date Description 03.0 9 July 2015 Revision to: Expand the list of issues in Appendix 1; Editorial improvements. 02.0 27 March 2015 Revision to: Incorporate the new provisions in CDM project standard (CDM-EB65-A05-STAN), CDM validation and verification standard (CDM-EB65-A04-STAN) and CDM project cycle procedure (CDM-EB65- A32-PROC) adopted at EB 82; Editorial improvements. 01.1 16 May 2012 Editorially revised title. 01.0 3 May 2012 Initial publication. Decision Class: Regulatory Document Type: Information note Business Function: Issuance Keywords: certification, completeness check, post-registration change Version 03.0 Page 6 of 6