Baker Oil Tools. Well Completion. Subsoil Conference, Esbjerg 6. February, by Trond Rese Baker Oil Tools, Scandinavia

Similar documents
Fiber Optics in a Bakken Multi-Stage Fractured Well. Montana Tech 2011 SPE Drilling Symposium Presented by: Chelsea Kadler

Setting a Global Standard. SingleBore Subsea Completion System

Rigorous Qualification and Development Program

An Introduction to Oil and Gas Well Servicing

10 Wireline operations

Subsea Drilling Systems

Introduction to Subsea Production System

NORSOK Standard D-010 Rev. 4, August 2012

Well control equipment. Matanović Davorin, professor

LINKING SEABED TO SURFACE

Tax Executives Institute

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin*

Perforating Basics. How the perforating processes work. George E. King Engineering GEKEngineering.com 3/14/2009 1

C O M P L E T I O N S E R V I C E S

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Last update: August 12, 2015

Plug and Abandonment Forum

The Python Subsea Wellhead

Dávid Szabó*, Ján Pinka*, ¼uboš Fedorko** UGS WELLS IN DEPLETED FIELDS

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

E-Line and Braided Line. E-Line Open Hole wireline

Foam Wiping Technology

OFFSHORE FIELD DEVELOPMENT

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards

AAPG International Conference: October 24-27, 2004; Cancun, Mexico

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

Well completion Introduction

Selection and Determination of Tubing and Production Casing Sizes

Solving challenges. Drill out solutions Package

2100 AD Mirror Elevator Ball Nut Replacement Procedure

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions.

BERMAD Fire Protection

2003 ACCORD - Automatic Transmission Removal

MEK4450. Templates & Manifolds. 29 August Templates and Manifolds. This module will cover:

Total Subsea Solutions

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

Toroidal Conductivity Sensor

How To Build A Kingkong Production System

Certificate Programs in. Program Requirements

Utility Distribution Systems

Recommended Practices Associated with Hydraulic Fracturing Operations

DOE Award Number: TITLE PAGE. Phase I Topical Report. Don L. Hanosh

Drilling Rigs and Well Technology. RAPID RIGS AND WELL TECHNOLOGY Cairn India Limited.

V47 Series Temperature Actuated Modulating Water Valves

Graduate Courses in Petroleum Engineering

FIBER-OPTIC SENSING TECHNOLOGIES

Riser less Light Well Intervention (RLWI) - "A success for reducing OPEX - cost and increasing oil recovery for subsea completed fields"

BOP Basic Safety Functions. Katrine Harsem Lund Principal Engineer, Department Manager Scandpower AS

BOP PRESSURE TESTING PROCEDURE

Acumen Enterprises, Inc.

1998½-2007 Dodge Ram 5.9L Cummins

Submersion/Insertion Toroidal Sensor

Pressure Coring, A New Tool for Unconventional Oil & Gas Characterization. Matt Bjorum Global Product Line Manager

The SPE Foundation through member donations and a contribution from Offshore Europe

Introduction of Gravel Pack with Inflow Control Completion in Brazil

MDT5N25 & MTD5N40 SERVICE PARTS

Drilling Problems. pull

Helping Our Customers Achieve Superior Results. Top Drive

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS

Advancing Reservoir Performance. Wellbore Cleanup Tools and Displacement Chemicals

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS

Evaluering av risiko forbundet med løftegass i ringrom og forskellige gassløft barrierer

VOYAGER 570G. 744A Sprayer Control

valid as of 1 April 2014 Intec injection hose system

Style 07 Zero Flex Rigid Coupling. Style 75 Flexible Coupling. Style 77 Flexible Coupling 11. Description

GEET Fuel Processor Plans

SUBSEA CHRISTMAS TREE SYSTEMS

TECHNICAL PUBLICATION

MODEL G300 BRAKE BLEEDER

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

COMPLETION SOLUTIONS 1

SUGGESTED SPECIFICATION EXHAUST SYSTEM SILENCER, FLEX CONNECTOR, INSULATION BLANKETS, WALL / ROOF THIMBLES

ADDING AN ELECTRIC AUXILIARY FAN TO RADIATOR STACK ON 03 ALPINE COACH

New Generation of Deepwater BOP Stacks. Dominique Allegre CAMERON Paris, October 23rd 2013

Well Integrity Basics, Prevention, Monitoring, Red Flags & Repair Options

TYPE E Main Valve Sizes 3 /8 through 12

SRA-125/SRAX-125 Double-Rail Lift-Out Rail System Installation & Service Manual with Parts List

Mueller B-101 and A-3 Drilling and Tapping Machines

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014

Medical Air Systems: Scroll

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

Figure 2 The fan and shroud also needs to be removed for access to the four a/c compressor bolts and removal of the compressor from the top.

UST RULES CHANGES. Heather Peters, Environmental Specialist

BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions

4D reservoir simulation workflow for optimizing inflow control device design a case study from a carbonate reservoir in Saudi Arabia

Material taken from Fluid Power Circuits and Controls, John S. Cundiff, 2001

300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS

TUBULAR Holing and Slotting Of Casing

Completion Assembly Services. Critical preparation services whenever they are needed

Index Page. Pumping Systems Intensifiers Gas Boosters High Pressure Generators

Downhole Fiber Optic Distributed Temperature Sensing System. See where Technology can take you. Simply Intelligent TM

ENGINE FUEL FUEL FILTER... FUEL HEATER... INJECTOR... SUPPLY PUMP... COMMON RAIL... FUEL PRESSURE LIMITTER...

Example. Fluid Power. Circuits

Oil Sight Glass BENEFITS

Acta Montanistica Slovaca, vol. 11 (2006), special issue 1, pages A selection method of the horizontal wells completion

Subsea wellhead systems. Advanced solutions for extreme conditions

Transcription:

Baker Oil Tools Well Completion Subsoil Conference, Esbjerg 6. February, 2007 by Trond Rese Baker Oil Tools, Scandinavia

Content Completion - Definition Basic well completion sequence Pertinent completion concepts PSI completion Basic completion principles Completion elements Advanced completion technology

The Purpose of the Completion The well completion is the installation that enables production of fluids in a safe and efficient manner. Ideally, the lowest cost completion (considering both initial and operating costs) that meets the demands placed upon it for the well life.

Reservoir Management Tool The choice of completion concept is dictated by: The reservoir model and operator s drainage strategy. Horizontal wells Single zone/multiple zone Co-mingled production/flow control Pressure maintenance Reservoir properties. Open hole/cased hole completion Sand control measures Stimulation Artificial lift The physical and chemical qualities of the ROCK fluids. Completion metallurgy Elastomer qualities Deposits/Scale Chemical injection Other development considerations. Expandable tubulars Future well interventions Well trajectory Intelligent Wells Multilateral wells GRAIN ZXP Liner Hanger and Packer w/ PBR Seal Bore Diverter PERMEABILITY PERMEABILITY HCM Sleeve P/T gauge Schrouded HCM Sleeve Sw POROSITY CEMENT So Production Packer w/ feed through ZXP Liner Hanger and Packer w/ PBR Hydrasplit w/ 4 1/2" on lateral leg and 7" on main leg Production Anchor w/pbr seal assembly MLZX Liner Hanger and Packer w/ PBR

Basic Sequences of a Well Completion Drilling operation Drill 30 36 pilot hole Set 30 conductor Drill 26 surface hole Install 20 surface casing Drill 17 ½ intermediate hole Install 13 3/8 intermediate casing Drill 12 ¼ hole to top of the reservoir Install 9 5/8 casing Drill 8 ½ hole to TD Start of the Completion Operation Run & hang off liner Cement liner Set liner hanger packer Install production tubing Set production packer N/D BOP N/U X-mas tree Perforate Stimulate Produce

Completion Concepts Multiple zone completion Production packers set in the liner Top packer need to be V0 rated Selective zone production Reservoir Reservoir

Completion Concepts Multiple zone completion Dual string Top packer need to be V0 rated Selective zone production Reservoir Reservoir

Completion Concepts Multiple zone completion Production packers set above the liner Isolation packer between the zones Selective zone production Reservoir Reservoir Reservoir

Perforate, Stimulate & Isolate (PSI) Horizontal Completion Side-Mounted Guns with Firing Head K-3 Hold Down Retrievable ISO Packer Production Tubing Locator Tubing Seal Assembly Work String Ball Seat ISO Packer Running Tool CM Sliding Sleeve Concentric Work String Guns Work String Liner

PSI Completion Process RIH and set Sump Packer

PSI Completion Process Position POOH guns and perforate

PSI Completion Process RIH Set Clean anchor with out isolation excess and stimulate assembly

PSI Completion Process Stab into sump packer

PSI Completion Process Set Position POOH ISO Packer guns and perforate

PSI Completion Process RIH Set Clean anchor with out new excess and isolation stimulate assembly

PSI Completion Process Stab into packer

PSI Completion Process Position Repeat Set Packer process guns and until perforate all new zones zone are completed

PSI Horizontal Completion Locator Tubing Seal Assembly 9-5/8 or 10 3/4 Neo Packer Millout Extension Perforate stimulate and isolate in one trip Developed for multiple-zone hydraulic fracs Single-string selective cemented completion Completions 3.500+ zones isolated to date Liner Hanger Retrievable ISO-Packer Locator Tubing Seal Assembly Liner Tubing CM Sliding Sleeve (closed) Sump Packer

Well Completion Scematic Upper Completion (Well Control) Lower Completion (Production Control) Cased Hole Completion Open Hole Completion

Well Completion Scematic EXCLUDER 2000 Schroud Membrane Wire wrap Base pipe Screen

Well Completion Scematic PBR Packing element Liner hanger slips Liner Hanger

Well Completion Scematic Inner Flow Ports Outer Flow Ports Inner Sleeve Sliding Sleeve

Well Completion Scematic Inner Sleeve Outer Flow Ports Inner Flow Ports Shroud Plug Flow Ports Shrouded Sliding Sleeve

Well Completion Scematic Slips (cast iron) Packing element Slips (cast iron) Production Packer

Well Completion Scematic Maine bore Orienting sleeve Tool guards Side pocket w/flow ports Side Pocket Mandrel

Well Completion Scematic Completion Gaslift Gas fluid Side Pocket Mandrel

Well Completion Scematic Safety Systems DHSV CASV FLX-4 PCT

The Intelligent Well System Wellhead /Tubing Hanger penetrates and feedthroughs Data Acquisition System Bumper Wire Termination Subs Safety Valve Control Panel Other Completion Components (Gauge Mandrel, Side Pocket Mandrels, Expansion Joint, Wet Disconnects, etc.) Cable Protection Systems (Clamps) Tubing Production Packer Hydraulic/Electric Conduit Splice Sub and Connectors Isolation Packer Permanent Monitoring Hydraulic/Electric Sleeve Mechanical Sleeve Seating Nipple or Bull Plug Fiber or Electric Conduit

The Intelligent Well System Basic Elements Hydraulic Control Lines, Chemical Injection Lines and Communication Lines Permanent Sensors for Pressure, Temperature and Flow Production and Isolation Packer with by-pass feature Remote Control Flow Regulators

Multilateral Wells MULTILATERAL

ML TAML Code (Technology Advancement Multilateral) LEVEL 6 LEVEL 1 LEVEL 5 LEVEL 2 43 Open Cased and Cased Pressure Cased unsupported Cased cemented and and integrity cemented and main at cemented the junction bore cemented main junction & bore lateral. main bore Pressure achieved and main lateral isolation with bore at the junction casing achieved with completion Lateral Open cased hole, but or not unsupported cemented liner in lateral

Multilateral Systems Level 6 FORMation Junction Level 5 FORM 5 Junction HydraSplit HP Junction 1 RAM Hanger (3 or 5) 2 Level 3-4 HOOK Hanger System 1 Under development (Qtr 1-08) 2 Under development (Qtr 1 07)

Expandable Tubulars 8-1/2" Open Hole 6-7/8" EXPress Screen

Expansion Video

linexx Video

Reducing Annular Space, Increasing ID Large annular flow due to greater resistance to flow in the pipe than the annulus No annulus, no annular flow

Well Construction Evolution Traditional Monobore Expandable technology Current Reduced consumption Drilling Fluids 60% reduction Casing 60% reduction Cement 75% reduction Reduced environmental impact Cuttings 60% reduction Less consumption means less transport Reduced drilling risk Smaller rig/vessel Future

Summary Lower Completion Cased hole completion Open Hole Completion Zone Isolation/Control Upper Completion Safety systems Artificial Lift Packer Systems Flow Control Advanced Completion Systems Multilateral Well Completion Intelligent Well Systems Expandable Metal Systems

Baker Oil Tools Thank you for your attention.