YELLOWKNIFE CITY GOLD PROJECT



Similar documents
NOVEMBER January 2013

SAVANT LAKE GOLD PROJECT. May 24,

HARTE GOLD CORP. Gold Exploration and Mine Development in White River, Ontario, Canada APRIL 2016 TSX : HRT

Aurvista Gold Plans Significant Exploration Program at Douay

FORWARD LOOKING STATEMENTS

TSX-V: CDA WKN: A0M6U5

Unprecedented Opportunities in Final Frontier of B.C. s Golden Triangle. Exploration and mineral resource development

Focusing on Near Term Production and Exploration in Quebec

Gold Mining Camps in the Canadian Shield

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

How To Understand The History Of The American Gold Mine

INVESTOR PRESENTATION DECEMBER 2011

Barkerville Gold Mines Investor presentation q Mines are found in the shadows of headframes

Gold. Grade. Infrastructure. CORPORATE PRESENTATION

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

TSX-V: GLD. Corporate Presentation February 2016

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

Sabina Gold & Silver Corp.

HISTORIC INTERSECTIONS INCLUDE 19.8 G/T AU OVER 8.9 METRES AND 24.4 GT AU OVER 9 METRES

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

Golden Band Resources Inc.

INVESTOR PRESENTATION

The last great Canadian gold mining camp controlled by a junior mining company.

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

March, 2013 Update. A Company in Transition

Financial and Operating Highlights through and subsequent to March 31, 2016: Completion of Flow-Through Share Financing

For personal use only

Bellhaven Expands the La Garrucha Discovery at the La Mina Project, Colombia

Dragon Mining A Growing Nordic Gold Producer. RMG Helsinki Mining Summit October 2012

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

TARGETING +100Moz OF SILVER LA CIGARRA PROJECT, MEXICO

Corporate Presentation October 2015

FOR IMMEDIATE RELEASE

The Point Rousse Project - An Economic Analysis

TSX.V: HSR Frankfurt: B6IH. Homestake Ridge Kinskuch Project

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

San Gold Launches Timmins Exploration Subsidiary

NEW GOLD DISCOVERY IN GHANA WEST AFRICA

CREAM MINERALS LTD. Suite Granville Street Vancouver, B.C. V6C 3P1

FOCUS MINERALS LIMITED

GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.

Value and Growth in a Gold-Copper Company: Focused in Colombia. April 2012 TSX-V:BHV

Galahad Gold plc (Galahad)

CNSX: TV

Nevada Copper Corp. Mission: To Develop a Major Copper Mine in Nevada. March 07 Nevada Copper Corp. TSX-V:NCU 1

DREAMING DONE... HISTORY IN THE MAKING

Endeavour Management Presentation

Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade

Panoramic View on the Prospects & Investments in the Tapajós-Xingu Provinces. Elton L.S. Pereira 22/May/2012

New Copper Gold Porphyry District. Corporate Presentation December 2014 TSX.V: CDB OTC US: CDBMF

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

EXPLORING WORLD CLASS MINERAL FRONTIERS

EXPLORATION TONY HOUSTON Head of Exploration

NexGen Commences Largest Drill Program at Arrow and Expands Site Infrastructure at Rook I

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

DUFFERIN GOLD MINE. Targeting First Gold Dore Q Nova Scotia, CANADA

Leapfrog : new software for faster and better 3D geological modelling

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

Q CONFERENCE CALL. Q Earnings Call. Thursday, August 13, :00 am EST.

INVESTOR PRESENTATION January 2014

FOR IMMEDIATE RELEASE NR15-19 November 10, 2015 RENAISSANCE GOLD REPORTS FIRST QUARTER 2016 RESULTS

Strategic Metals Ltd.

For personal use only

RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003

Alecto Minerals plc / EPIC: ALO / Market: AIM / Sector: Exploration & Development 8 February 2016 Alecto Minerals plc ( Alecto or the Company )

Forward Looking Statements

FORWARD-LOOKING STATEMENTS

MANAGEMENT S DISCUSSION AND ANALYSIS CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS (UNAUDITED)

CANADA S INTERMEDIATE GOLD PRODUCER

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

Saskatchewan is poised for a streak of standout growth over the next two years and is very much at the forefront of the economic surge underway in

Punching Above Its Weight

Bendigo Mining Limited Investor Briefing February 2010

FORWARD LOOKING STATEMENT

F January 20 Mar, c 2 h 01 1,

ACQUISITION OF TWO QUALITY MINES IN NEVADA

AGNICO-EAGLE MINES LIMITED

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

Core : CXO. and. Uranium Session SAREIC Conference Adelaide 13th April 2015

Acquisition of Rice Lake. December 2015

A Cash and Project Generator FOCUSED ON MINERAL PROCESSING AND EXPLORATION IN PERU

DESERT GOLD. February 2012

Highlights of selected high-grade mineralized zones exposed in drift tunnels include:

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

Near-Term Gold Producer British Columbia, Canada SYS.V

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

Exploration and Development Activity

New Copper Gold Porphyry District. Corporate Presentation October 2015 TSX.V: CDB OTC US: CDBMF

Miocene Metals and Carube Resources Announce Start of Drilling on Bellas Gate Copper- Gold Joint Venture Project in Jamaica

RT MINERALS CORP. MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE YEAR ENDED NOVEMBER 30, 2010

Strategic Gold Project in Ghana s Ashanti Belt Corporate Presentation December TSX.V: CAP castlepeakmining.com

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT

Hot tpot tproject A Demonstration of How Groundwater Chemistry is being Used to Discover a Gravel Covered Gold Deposit

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

International Lithium Corp. international lithium corp. (ILC: TSX.V)

MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE YEAR ENDED MARCH 31, 2015

Corporate Presentation U.S. Marketing

A Leading Zinc Junior in Established Canadian Mining Districts

Transcription:

TXR TSX-V TX0 Frankfurt TRXXF OTC YELLOWKNIFE CITY GOLD PROJECT Advancing the Last High-Grade Gold Camp in Canada June 27, 2016

Cautionary Statement 1 2

Cautionary Statement 2 3

Investment Highlights GEOLOGY -Covers 23 km of strike (118 km 2 ) on one of the major high-grade gold camps in Canada and the least explored. LOCATION - In the shadow of the head frame immediately north and south of the world-class Giant and Con Gold Mines - 14.2 Moz Gold 1 produced over 60 years @ average grade of 16 g/t Au 1 ACCESSIBLE-Road access to city of Yellowknife (5 km to south), supply centre for NWT exploration; new (2013) hydro-power dam on property; 8 km from commercial airport; skilled trades people and local support EXCELLENT ENDOWMENT -Multiple gold-bearing structures: - Mispickel new discovery winter 2016 drilling 8.00m @ 60.60 2 g/t Au and 7.30m @ 23.60 g/t Au3 3 - Barney Shear (extension of shear that hosted Con and Giant) -TerraX drills 22.4 m @ 6.35 g/t Au 4 - Crestaurum drill intercept of 5.0 m @ 62.9 g/t Au 5 - Shear 20 drill intercept of 21 m at 2.97 g/t Au 6 - Hebert-Brent new discovery summer 2015 -surface channel sampling of 11.0m @ 7.55 g/t Au 7 - Sam Otto 2016 drill intercepts of 49.70m @ 1.00 g/t Au 8 and 30.70m @ 1.33 g/t Au 8 FUNDED & ACTIVE - June 2015 -$5.2M raised in placements and sale of option on 1% NSR to OsiskoGold Royalties for $1M - May 2016 -$3.2M raised in placements - Fully funded for multiple drill programs in 2016 and 2017. SECURE LAND HOLDINGS Northwest Territories, Canada - 100% ownership; majority of property is mineral leases, with no work commitments or property payments ATTRACTIVE SHARE STRUCTURE 77.8M shares issued - 13.5% ownership by management and staff - 14.5% acquired for cash in private placements by Osisko Gold Royalties (TSX: OR) EXPERIENCED MANAGEMENT- Exploration, resource definition, mine planning and operations 4

June 24 2016 Company Overview Issued Shares: 77.8 mln Options: Total : 6.1 mln 1,860,000 @ $0.17 (Jun. 28, 2018) 395,000 @ $0.35 (Dec 24, 2017) 100,000 @ $0.61 (Sept 30, 2016) 295,000 @ $0.45 (Dec 23, 2016) 1,050,000 @ $0.35 (Mar 14, 2019) 500,000 @ $0.61 (May 5, 2019) 750,000 @ $0.38 (Mar 26, 2018) 175,000 @ $0.31 (July 22, 2018) 790,000 @ $0.25 (Sept 12017) 250,000 @ $0.32 (Feb 11, 2018) Warrants: Total: 10.8 mln 1,236,462 @ $0.50 (Dec 20, 2016) 750,000 @ $0.51 (Feb 12, 2017) 650,000 @ $0.57 (Feb 28, 2017) 4,018,738 @ $0.50 (Sept 30, 2017) 946,136 @ $0.55 (June 5, 2018) 3,017,500 @ $0.50 (May 6, 2019) 151,380 @ $0.40 (May 6, 2018) Fully Diluted Shares: Basic Market Cap (C$0.41/share) Held by Management: 13.5% Held by Osisko Gold Royalties: 14.5% Working Capital $4.9 Million 94.7 mln $31.9 mln TXR TSX-V TRXXF OTC Pink TX0 Frankfurt 5

Accomplished Management Joseph Campbell, P. Geo President, CEO and Director 36 years of experience, including Exploration and Mine Development, open pit & underground Project Manager for 7 years from discovery to pre-feasibility - Meliadine gold project, Nunavut Introduced Meliadine to Agnico Eagle (AEM) in 2007; wrote Endowment Study for AEM Completed pre-feasibility level scoping study in 2008 with AEM engineers in Val D Or; AEM acquired 9% of Comaplex($46.9M in cash) in 2008; AEM acquired balance of Comaplex for $650 Million in shares in 2010; One of Agnico Eagle s largest projects in terms of reserves and resources: P&P Reserve of 3.3 Moz @ 7.44 g/t Au with Indicated Resource of 3.3 Moz @ 5.06 g/t Au Agnico s fastest growing project with multiple high-grade zones : Inferred resource at 3.5 Moz @7.65 g/t Au Dr. Thomas Setterfield, P. Geo VP Exploration and Director 36 years of international experience: Ph.Din Geology from Cambridge University (1991) Expert in IOCG, Epithermal Au and VMS deposit types Stuart Rogers, CFO and Director 25+ years as director and senior officer of public companies on TSX-V, TSX and NASDAQ Paul Reynolds, P. Geo Director 28 years of experience in resource exploration and public company management Elif Lévesque, CPA, CGA, MBA Director Chief Financial Officer and VP Finance for Osisko Gold Royalties since June 2014 13 years of experience in finance, treasury and strategic management in the mining industry 6

Yellowknife - One of Six High Grade Gold Camps in Canada More Than 300M* Oz Gold have been mined from Archean Gold deposits in Canada, with the vast majority from High Grade Gold Camps Yellowknife is the most northerly and least explored of these camps * Gold Ounces in Camps include known historical production, reserves and drill indicated resources from public records. Totals should be considered approximate with an error range sufficient for comparison purposes. Other large Archean gold areas include Detour/Sunday Lake; Rice Lake; Chibougamau; Meliadine; and Meadowbank 7

Geology of the YCG property Ideally Located for Discovery YCG is 118 2 km and 23 km strike length covering the extension of the Geology Containing the Con and Giant Mines Past Production Includes: o Con Mine 1938 to 2003 6.1 million oz @ 16.1g/t Au 1 o Giant Mine 1945 to 2004 8.1 million oz @ 16.0g/t Au 1 YCG properties cover the most prospective geology of this belt Unique Situation for a Junior Mining Company to Control a Major Gold Camp in Canada 8

Unmatched Accessibility Excellent Infrastructure Year Round Access from Yellowknife 8 km by road to Yellowknife Airport - site of TerraX core facility Blue Fish Hydro Dam on Property expandable for Mine Development Skilled available workforce Local service providers City of Yellowknife: Population - 20,000 Founded on 2 Gold Mines Transportation hub for NWT Highway Access to the Rest of Canada Daily jet service to major cities TerraX Core Facility 0 2.5 5 kilometers 9

THE CORE GOLD AREAS Concentrating our exploration efforts Based on Surface work and drilling up to 2016 TerraX has defined a 10 x 4 km Core Gold Area of mineralization o The Core Gold Area is contained within a major flexure of the main Yellowknife Gold Camp Shear Zone o To date TerraX has discovered within the Core Gold Area: Mispickel Sam Otto Barney Hebert-Brent 20 Shear and Crestaurum Taken collectively we believe the shears and veins could be indicative of goldbearing vein sets common to large mineralized systems 0 2.5 5 kilometers 10

RESULTS OF 2016 WINTER DRILLING Mispickel - 6.0m @ 7.29 g/t Au 9 in chip sampling on surface; 8.00m @ 60.60 g/t Au 2, 7.30m @ 23.60 g/t Au 3, & 8.60m @ 12.87 g/t Au 3 in 2016 drilling Sam Otto - 49.70m @ 1.00 g/t Au incl. 10.35m @ 2.54 g/t Au 8 & 30.70m @ 1.33 g/t incl. 15.00m @ 2.02 g/t Au 8 Barney - Structure with gold mineralization at >500m vertical depth; re-interpretation that high grade lodes are on shear flexures; 5.34m @ 3.09 g/t Au 2 in porphyry Hebert-Brent Initial Discovery of Replacement Style Gold Mineralization; template for exploration of deposit type, 7.10m @ 3.61 g/t Au 10 and 8.00m @ 3.21 g/t Au 10 Homer Lake - Discovery of new gold Zone - 15.91m @ 1.78 g/t Au incl. 2.70m @ 5.51 g/t Au 11 & 18.19m @ 1.20 g/t incl. 5.59m @ 3.31 g/t Au 11, gold structure traced in geophysics and LiDAR for approximately 5 km AES - All holes intersected gold hosted in quartz veins (up to 2.98 g/t Au 2 ) within 5km shear extending from Giant property where mining occurred Pinto and VSB - no significant assay results BARNEY HOMER EXTENDED ICE ROAD & TRAILS PINTO HEBERT-BRENT MISPICKEL SAM OTTO AES UPGRADE CURRENT ICE ROAD 11 VSB

Looking South 6.0 m @ 7.29 g/t Au 19 u 19 MISPICKEL DISCOVERY Winter 2016 X-Section A-A A A 3 9 Magnetic Survey Area Summer 2016 2 3 A A 12

WALSH LAKE 2016 MAGNETIC SURVEY Winter 2016 Ground Magnetic survey completed on Lake portions of Walsh Lake Property o Defined high magnetic trend associated with the Mispickelgold zone for 5 kilometers o Survey was completed in time to assist in location of 2 nd phase of Mispickel drilling Summer 2016 Magnetic survey completed on land sections o approximately 200 line km completed to date o includes coverage of the Sam Otto gold zone, and other trends parallel to Mispickel SUMMER 2016 MAGNETIC SURVEY AREA MISPICKEL SAM OTTO 0 1 kilometers 2 13

100 meters SAM OTTO ZONE 8 WINTER 2016 DRILLING 14

Major Findings reinterpreted 2014 and 2015 drilling Gold grade in Barney Shear Zone increases at shear dip flexures The high grade Barney Zone occurs on a ledge in the steeply dipping Barney Shear 4 4 13 12 Positions of historical drilling, particularly NB96-09 on this section, may need corrected positions High grade ledge has now been interpreted over +300 meters of strike 100 meters Targeting for more ledges in Winter 2017 drilling 15

16

Replacement Style Targets - Sericite Zone Alteration 5 TIMES LARGER ON SURFACE THAN HEBERT-BRENT ZONE 17

Crestaurum Zone 2014/15 Drill Programs BLOCK MODEL GRADES South Ore Shoot Central Ore Shoot North Ore Shoot North Ext Ore Shoot 0m 2014 Program to twin 1945-47 drilling and in-fill drilling on known high grade shoots Twin Drill Holes incl. TNB14-011 10.02m @ 4.17 g/t Au 15 In-fill Drill Holes incl. TNB14-019 2.85m @ 33.60 g/t Au 16 2015 Drill Programs SOUTH SHOOT 100m 200m 400m o TCR15-003 7.00m @ 10.23 g/t Au 17 o TCR15-068 4.21m @ 12.49 19 o TCR15-052 10.80m @ 3.49 g/t Au 19 2015 Drill Programs TCR15-025 8.86m @ 2.86 g/t Au, incl. 2.00m @ 10.24 g/t Au 18-400m strike extension Areas of 2014 Drill Holes LEGEND Areas of 2015 Drill Holes 18

FULLY FUNDED Approximately $4.9M in working capital o $3.2M raised in private placements in May 2016 for 2017 exploration $120,000 received from GNWT for 2016 exploration under Mineral Incentive Program Exploration Activities for Remainder of 2016 Extensive surface exploration Summer/Fall 2016 o Mapping Prospecting Replacement Style Deposits; Southbelt; Walsh Lake Mispickel/Sam Otto targets o Expanded Ground Magnetic Survey along the Mispickel structure half completed o Ground IP on prospective replacement targets Airborne LiDAR and Radiometric survey on Southbelt Surveys are completed - June 2016 Summer/Fall drill program - approximately 5000 meters planned o Mispickel expansion o Advanced Replacement Style targets o Other Targets of opportunity Drill permit application for Southbelt drilling in Winter 2017 19

1 (604) 689-1749 (Vancouver) 1 (613) 843-8109 (Ottawa) E-Mail: info@terraxminerals.com www.terraxminerals.com TXR TSX-V TRXXF OTC REPAIRS ON CRESTAURUM ROAD JUNE 2015 SUMMER 2015 ROAD TO CRESTAURUM WINTER DRILL SITE FEBRUARY 2016 MISPICKEL 20

Appendix I - References for Assay Values Within this Presentation 1. Slides 4, 8 - Con Production from Extech III Field Guide, 2002, The Yellowknife Mining Camp Over 60 Years of Mining, editor Hendrick Falck, Section - Miramar Con Mine, pg 80, table 1; and Slides 4, 8 - Giant Production from James P. Siddorn, PhD thesis, The Giant-Con Gold Deposit: A Once Linked Archean Lode-Gold System, Chapter 2 Siddorn, J. P., Cruden, A. R.; Early Gold Mineralization Versus Late Overprinting in a Structurally Complex Gold Deposit: The Giant Gold Deposit, Yellowknife Canada, pg 13 2. Slide 4, 11, 12 News Release June 6, 2016 3. Slides 4, 11, 12 News Release February 23, 2016 4. Slides 4, 15 News Release August 25, 2014 5. Slide 4 News Release October 2, 2013 6. Slide 4 News Release October 16, 2013 7. Slide 4 News Release August 11, 2015 8. Slide 4, 11, 14 News Release April 13, 2016 9. Slide 11, 12 News Release October 30, 2013 10. Slide 11 News Release May 19, 2016 11. Slide 11 News Release May 4, 2016 12. Slide 15 News Release August 14, 2014 13. Slide 15 News Release May 13, 2015 14. Slide 16 News Release October 28, 2015 15. Slide 18 News Release June 2, 2014 16. Slide 18 News Release September 15, 2014 17. Slide 18 News Release Feb 26, 2015 18. Slide 18 News Release April 1, 2015 19. Slide 18 News Release December 8, 2015 21