English Contract Law in Practice Case study: Shipbuilding arbitration



Similar documents
Scandinavian Maritime Law

At first sight Wellesley Partners LLP v Withers LLP [2015] EWCA Civ 1146 is just

TEMPLE LITIGATION ADVANTAGE INSURANCE FOR DISBURSEMENTS AND OPPONENT S COSTS Certificate of Insurance

LEGAL INDEMNITY POLICY OF TITLE INSURANCE FOR COMMERCIAL PROPERTY COVERAGE FOR KNOWN RISK

Forensic Services. kpmg.hu

A reckless disregard for the safety of property and/or human life.

PARTICIPATION AGREEMENT. GlobalDairyTrade operates the Trading Platform known as GlobalDairyTrade to facilitate sales of certain dairy Products.

The Fiona Trust Litigation

Mr and Mrs Sample and future owners or occupants of the Property and Your/their mortgage lender(s).

DNVGL-RU-0050 Edition October 2014

of 2 December 1985 (revised 1997)

LONDON SHIPPING LAW CENTRE SEMINAR SALEFORM ISSUES. THE UNION POWER DECISION Simon Curtis, Senior Partner Curtis Davis Garrard LLP

Taking Action. Dispute resolution, legal action and claims for negligence

Pantaenius Yacht Third Party Liability Clauses

Adviceguide Advice that makes a difference

Why use ADR? Pros & cons

Business Insurance RICS - compliant professional indemnity section only Summary of cover

Back to Basics: Professional Indemnity Construction and Engineering

ENGINEERING COUNCIL OF SOUTH AFRICA

Advice Note. An overview of civil proceedings in England. Introduction

APPROVAL OF COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM USED ON BOARD SHIPS

Global Guide to Competition Litigation Poland

Mr and Mrs Sample and future owners or occupants of the Property and Your/their mortgage lender(s).

Consumer Code. for Home Builders. This document contains the Rules that govern the behaviour of Home Builders and Home Warranty Bodies

Law 2735/1999 (the Law) governs international commercial arbitration taking place in Greece. It is based on the UNCITRAL model law.

Fleet Legal Guard. Policy Wording

The What to Expect Series FINRA s Dispute Resolution Process 1

THE SECOND HARBOUR TUNNEL. A case study illustrating recent issues in construction insurance

PROFESSIONAL INDEMNITY INSURANCE FOR DESIGN AND CONSTRUCT POLICY WORDING

LEGAL SCHEME REGULATIONS

Claims Management Services Regulation. Conduct of Authorised Persons Rules 2013 (2)

Dispute Resolution. White Paper. This document on Dispute Resolution outlines the four main approaches to resolving contractual disputes.

Chapter 2 The Marine Insurance Act 1906

Varying a contract of employment

Consumer rights to return faulty goods

Sample. Equitable Remedies: Specific Performance. 2.1 Introduction. Aims of this Chapter. Jenny wins the lottery. Outline

Alternative Dispute Resolution (ADR) Procedures

QBE BUILDER S RISK PROPOSAL FORM

Clinical Negligence. Issue of proceedings through to Trial

MODEL DIRECTIONS FOR CLINICAL NEGLIGENCE CASES (2012) - before Master Roberts and Master Cook

Consumer Rights Act 2015

NSW Self Insurance Corporation Amendment (Home Warranty Insurance) Act 2010 No 30

THE ATTORNEY GENERAL DEFENDANT/RESPONDENT

Weekly update. A Clyde & Co case on the applicable law of an arbitration agreement in an insurance policy. Sealion Shipping v Valiant

TERMS OF BUSINESS AGREEMENT - INSURANCE BROKING

Key Concept 9: Understand the differences between compensatory and punitive damages 1. A. Torts. 1. Compensatory and Punitive Damages

CIVIL LITIGATION ASSISTANCE SCHEME CONDITIONS OF ASSISTANCE

Management liability - Employment practices liability Policy wording

60 Day Expert Determination Structured to Meet the Commercial Expectations of Business Management

Expert Evidence In Professional Negligence Claims

About the Institute and Faculty of Actuaries eshop

Expert. Clear. Professional.

NSW Retail Tenant s Guide

UNITED NATIONS CONVENTION ON CONTRACTS FOR THE INTERNATIONAL SALE OF GOODS (1980) [CISG]

Loan Car Legal Cover Terms and Conditions

NEGLIGENT SETTLEMENT ADVICE. Daniel Crowley and Leona Powell consider the Court s approach to negligent settlement advice.

CHUBB INSURANCE COMPANY OF EUROPE SE

Insurance Contracts Bill

Compensation Recovery Unit. Z2 - Mandatory reconsideration and appeal guide for recovery of benefits and/or lump sum payments

Practicalities of ship arrest in Hong Kong and Mainland China. Issues to consider Hong Kong Mainland China

MASSACHUSETTS LEMON LAW SUMMARY

LEGAL COSTS IN SOUTH AUSTRALIA'S WORKERS' COMPENSATION SCHEME

Ukraine. Taras Dumych. Wolf Theiss Kiev. Law firm bio. Olena Kravtsova. Wolf Theiss Kiev

INSURANCE LAW. LEE KIAT SENG LLB (NUS), LLM (Land), Advocate & Solicitor (Singapore)

Consumer Code for Home Builders

Processor Binding Corporate Rules (BCRs), for intra-group transfers of personal data to non EEA countries

MODEL CONTRACTS FOR SMALL FIRMS LEGAL GUIDANCE FOR DOING INTERNATIONAL BUSINESS

3.6. Please also note, unless your policy confirms otherwise, the rights under your policy may only be pursued in an English court.

LIABILITIES AND REMEDIES OF BOAT DEALERS, BROKERS AND REPAIRERS

In force as of 15 March 2005 based on decision by the President of NIB ARBITRATION REGULATIONS

Thames Water Utilities Limited. Settlement deed

How To Buy A Phone Kiosk From A Seller

Norway Advokatfirmaet Grette

TT ELECTRONICS INTEGRATED MANUFACTURING SERVICES LIMITED CONDITIONS OF PURCHASE

Consumer Code. for Home Builders. This document contains the mandatory Consumer Code requirements that Home Builders are required to follow

IEC Electronics Terms and Conditions

Business leases guide

Guidelines Legal Services Advertising, Marketing and Promotion The purpose of these Guidelines is to provide practitioners with a starting point for

IN THE SOUTH GAUTENG HIGH COURT OF SOUTH AFRICA

CONTRACT BASICS. This Fact Sheet has been made possible by the funding received by the Creative People s Centre from the New Zealand Law Foundation.

Claims Management Services Regulation. Conduct of Authorised Persons Rules 2014

Combar/CLLS Guidance note on the Agreement for the Supply of Services by a Barrister in a Commercial Case

Trinity Online Application - Terms and Conditions of Use

VOLVO CONSTRUCTION EQUIPMENT. CARETRACK LICENCE (Version 3 April 2010)

Sample Arbitration Clauses with Comments

Quick Guide 12: Bringing a Small Claim in the County Court

MODEL CONTRACTS FOR SMALL FIRMS LEGAL GUIDANCE FOR DOING INTERNATIONAL BUSINESS

Octagon Insurance Legal Expenses Policy

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

Measured development Construction and Engineering Training Supplement Guide

CCBE POSITION WITH RESPECT TO THE FREE CHOICE OF A LAWYER IN RELATION TO LEGAL EXPENSES INSURANCE

Greene Wood & McLean v Templeton Insurance Ltd [2008] APP.L.R. 07/10

International Construction Warranties Limited. Terms & Conditions. Version UK1

This chapter covers expeditions organised and undertaken by private individuals

NEW YORK NY GENERAL OBLIGATIONS LAW TITLE 17 STRUCTURED SETTLEMENT PROTECTION ACT

Software Support and Maintenance Terms

Transcription:

English Contract Law in Practice Case study: Shipbuilding arbitration Alexander Michael Plows, Advokat, Solicitor (England & Wales) Leiv Mikael Erdal, Advokat, Solicitor (England & Wales)

Introduction About the lecturers About Thommessen One of Norway s largest law firms Specialist Shipping & Offshore department English law in a Norwegian practice Especially relevant in shipping, offshore, oil and gas and financing transactions English law is a neutral and familiar choice of law in contracts, also regarded by many international businesses as commercial with highly experienced and qualified judges and arbitrators London arbitration for dispute resolution is an established concept The London market is key to brokerage, insurance, financing etc. Many of the biggest global law firms have their HQs there Our view: a basic knowledge of English law concepts even if you do not formally advise in it is essential in practice in a department like ours 2

Today s topic: a shipbuilding arbitration case study Confidential London arbitration, so we have had to change a few facts around - but the issues remain: 1. Interpretation of a performance standard 2. Quantification of an (uncertain) loss Briefly about a typical arbitration procedure 1. Appointment of arbitrators 2. Written submissions 3. Evidence/witness statements and disclosure 4. Expert evidence 5. Oral hearing 6. Arbitral award Questions before we begin? 3

Case Study: Main Facts Parties Claimant: Buyers of a specialist oil services vessel Defendant: Norwegian shipyard, with Ukrainian subsidiary yard Vessel ordered 2006 for delivery in 2008 cost USD 150m Construction of hull/steelwork took place at the Ukrainian subsidiary s yard, with the hull then transported to Norway for outfitting and finalisation Buyers had active supervisors at the Ukrainian yard, who complained about the quality of the welding and steelwork generally Yard took extensive corrective action during the build phase, rectifying and reinforcing poor welding seams, forcing steel plates into alignment etc 4

Ilustration of steelwork (NB not our vessel) 5

Case Study: Main Facts (cont.) Vessel was eventually delivered, after outfitting, from the yard in Norway, and met classification society requirements Buyers accepted delivery, as they wanted to trade the vessel, but did so under a reservation of rights with respect to any claims for defective delivery quality The vessel was chartered out at a normal market rate and no issue was raised by charterers concerning any defects Buyers initiated arbitration in 2010 after unfruitful settlement attempts, claiming breach of contract and about USD 20m in damages Basis: breach of performance standard set out in the contract 6

Case study Issue I: Interpretation Wording of the clause 1. Description and Standard The Vessel shall be built at the Builder s yard at XXX, Norway The Vessel shall be designed and built in accordance with first class shipbuilding practice in Western Europe for new vessels of similar type and characteristics 3. Classification, Rules and Regulations The Vessel, including its machinery equipment and outfittings shall be designed and constructed in accordance with the rules and regulations of the Det Norske Veritas (the Classification Society) 4. Subcontracting The hull and major sections thereof are to be built by the Builder at the Yard set out in Article II [the Norwegian yard], except for the steel hull which can be built at a Related Shipyard [the Ukrainian yard fell within this definition] The parties agreed that the Builders were entitled to sub-contract construction of the hull to the Ukrainian yard, so the issue in question was the interpretation of and relationship between the two sets of wording highlighted above. NB Sale of Goods legislation had been excluded. 7

Case study Issue I: Interpretation The opposing arguments Buyer s case in brief: The Buyer submits that the Tribunal simply has to evaluate, using the evidence before it on the construction of the Vessel, whether the picture which emerges is one which conforms to the phrase built in accordance with first class shipbuilding practice in Western Europe for new vessels of a similar type and characteristics as the Vessel Builder s case in brief: The Builder submits that the words relied on by the Buyers add nothing to the other terms of the Building Contract since first class shipbuilding practice in Western Europe is not a definitive written standard and it is difficult to see how it can be capable of enforcement. Further, the Builder says that the scheme of the Building Contract is for the standards to be those of Class rules as long as the Vessel is in class on delivery, it has been constructed to the required contractual standard. Discussion: Which view feels right in your opinion? 8

Case study Issue I: Interpretation Basic principles of contractual interpretation to keep in mind The point of departure: words are to be given their ordinary and natural meaning, but: A word is not a crystal, transparent and unchanged, it is the skin of a living thought and may vary greatly in colour and content according to the circumstances and the time in which it is used. (Holmes J., in Towne v Eisner (1918) 245 U.S. 416) Interpretation of commercial contracts should have regard to the custom in the trade and business common sense : If a detailed semantic and syntactical analysis of words in a commercial contract is going to lead to a conclusion that flouts business commonsense, it must yield to business commonsense (Lord Diplock in The Antaios [1984] AC 191) where a term of contract is open to more than one interpretation, it is generally appropriate to adopt the interpretation which is most consistent with business common sense (Lord Clarke in Rainy Sky SA and ors v Kookmin Bank [2011] UKSC 50) 9

Case study Issue I: Interpretation How did the arbitrators resolve the issue? They rejected the argument that the absence of a definitive written standard for first class Western European shipbuilding practice should prevent enforcement It may be that such standards are difficult to apply but whether such terms are agreed expressly or implied into a contract, they are nevertheless contractual terms which any court or tribunal must do its best to apply. However, they acknowledged that the significance of the term must be placed in its appropriate factual context Trading vessels are purchased to earn a return not to impress the friends of the owner as, for instance, a luxury yacht may be. Does it matter whether the welds look neat and steelwork smooth? Or, as put by counsel for Builders: Did you buy a work horse or a show horse? 10

11

Case study Issue I: Interpretation How did the arbitrators resolve the issue? (cont.) Was there any case law which had considered the wording? Not the specific wording here, but similar wording in Rolls Royce v Ricardo Consulting [2004] All E.R. (Comm) 129: If services are provided of first class quality it seems to me that they are provided to a standard which would not be exceeded by anyone else who might actually have been engaged to provide them. The arbitrators took the view that the first class wording was not cancelled out by wording such as the requirement of meeting DNV standards As a rule, words incorporated in their contract are intended to have meaning, with very limited exceptions - from Chitty (2008): If there is in a contract a word or phrase to which no sensible meaning can be given or which is mere surplusage, it may be rejected to carry out the intention of the parties. 12

Case study Issue I Interpretation Conclusion The arbitrators found on the facts that the obligation to build to first class Western European shipbuilding practice had been breached Whether or not rectification remedied breach : the Tribunal does not accept that the fact that all defects that were not initially acceptable to class were repaired to class satisfaction means that there was no breach The gap between Class and first class : the gap between class standards and first class standards is a narrow one but it is, in our view, a real one and one to which a monetary value can be attached. The show horse/work horse argument: we are satisfied that these matters do have an effect on the benefit an owner might expect to derive from ownership of the Vessels since they can affect longevity, cost of maintenance, freedom from steelwork failure and value on resale. 13

Case study Issue I Interpretation Conclusion Discussion: do you agree? And what would the result have been under Norwegian law? Meland in Skipsbygging kommentarer til norsk standard skipsbyggingskontrakt (2006) suggests, with reference to the arbitral award in ND.1999.369, that first class shipbuilding practice can have independent meaning, beyond the Class requirements After the break we will consider the next issue: Quantum 14

Case study Issue II Quantum Basic legal principles Remedies (the basics) damages action for an agreed sum specific performance/injunction etc. restitution Damages Award of damages damages compensatory compensation for what?» loss or bargain / "loss of expectations : the injured party claims to be put so far as money can do it in the same situation as if the contract had been performed. Robinson v Harman (1848) 1 Ex. 850 at 855» reliance loss» restitution» incidental and consequential loss 15

Case study Issue II Quantum Basic legal principles (cont.) Measure of damages (aka quantum, quantification, assessment etc.) Reliance/restitution Loss of bargain Difference in value actual or market values? if there is a market if there is no market other? 16

Case study Issue II Quantum How did the arbitrators resolve the issue? Common ground: the measure of the buyers loss was the difference between the value of the vessel as delivered and the value of the vessel had the builders complied with the contract No direct evidence on market value could be submitted (basically because the brokers did not want to commit) Buyer s approach: presenting a calculation of cost savings to be expected from building the hull in a low cost European country, compared to costs involved in a W European yard Builder s approach: quality of the hull steelwork was normally not a consideration for a buyer of tonnage of this type, provided the vessel was in class, therefore had no effect on market price 17

Case study Issue II Quantum How did the arbitrators resolve the issue? (cont.) The arbitrators found the issue very difficult main problem was that that there was only a general market for vessels of this type, not a separate geographical one for the sub-category Eastern European arbitrators had to do their best with the material that was provided, asking what discount would a buyer require and the seller be willing to offer to make up for any perceived difference in value? The arbitrators did not find the expert evidence very helpful Buyers expert carried out the wrong calculation Builders expert had a tendency to hyperbole (exagerrate) Conclusion Having regard to all the evidence, the Tribunal is satsified that the value of the vessel as constructed is lower by a considerable margin than it would have been had it been constructed in accordance with first class Western European practices BUT BY HOW MUCH? 18

Case study Issue II Quantum How did the arbitrators resolve the issue? (cont.) Arbitrators applied buyer s expert s methodology i.e. cost savings but changed an important parameter from comparing cost for hull construction in Ukraine. vs. Norway to comparing cost of a first class vs. less than first class hull, both built in Ukraine because hulls of this type are simply not constructed in Norway or in the rest of Western Europe The burden of proving loss is on Buyers and to the extent the buyers fail to prove their loss, the claim must fail arbitrators therefore adopted a conservative approach, given the state of the evidence Doing the best it can the Tribunal is satisfied and finds that the Buyers have established that they have suffered a loss, being a reduction in the market value of the Vessel on delivery in the amount of X % The X was significantly lower than the applicable percentage had the claims succeeded in full 19

Concluding remarks A Pyrrhic victory? 20

Concluding remarks: did the arbitrators get it right? Issue I: There was a breach of the performance standard Class is not the same as first class Issue II: The market value was lower, even though there was no proper market to benchmark against - forcing the arbitrators to be very conservative Moral of the story: a seemingly good case on liability must always be evaluated against the prospects of documenting and succeeding on quantum This case was big enough to be worth the gamble not all cases will be 21

THANK YOU FOR YOUR ATTENTION