ILLINOIS HOUSING DEVELOPMENT AUTHORITY STANDARDS FOR CONSTRUCTION COST ESTIMATING



Similar documents
ILLINOIS HOUSING DEVELOPMENT AUTHORITY STANDARDS FOR ENVIRONMENTAL REVIEWS AND PROFESSIONALS

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT

RFP Milestones, Instructions, and Information

GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR QUALIFICATIONS FOR AN ARCHITECT FAMILIAR WITH COMMUNITY DEVELOPMENT BLOCK GRANT APPLICATIONS

AC 3290-S (Rev. 9/13) NEW YORK STATE VENDOR RESPONSIBILITY QUESTIONNAIRE FOR-PROFIT BUSINESS ENTITY

Responses to this RFP will be due on or before November 14, 2013, as described below in Sections III. and V.

REQUEST FOR PROPOSAL FOR GENERAL CONTRACTOR FOR AFFORDABLE MULTI-FAMILY HOUSING BREVARD COUNTY, FLORIDA. Issue Date: March 10, 2015

Jersen Construction Group

Multifamily Cost Estimator Contractor

KENTUCKY HOUSING CORPORATION OWNER S & CONTRACTOR S COST CERTIFICATION GUIDELINES TABLE OF CONTENTS

Vendor Responsibility Questionnaire

Contractor s Guide. April 2016

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)

Request for Proposal for Construction Management Services

FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS. REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES Risk) FOR

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

COUNTY OF LOS ANGELES OFFICE OF SMALL BUSINESS/PTAC

CONSTRUCTION CONTRACT NO. T F

APPLICATION for NATIONAL CERTIFICATION as a WOMEN BUSINESS ENTERPRISE

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

GEORGETOWN PUBLIC SCHOOLS REQUEST FOR PROPOSALS. Perley Elementary School Roof Replacement Project DESIGN SERVICES

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES

REQUEST FOR PROPOSAL: GIS MANAGEMENT AND DESIGN SUPPORT: FOR UTILITY SERVICES OCTOBER 21, 2011 CITY OF ALEXANDRIA DIVISIONS OF FINANCE AND UTILITIES

Proposal Writing - A Cover Letter of Compliance

Request for Proposal No. RFP Project Construction Management Services. for. Capital Levy BTA IV Project: Ingraham High School Classroom Addition

Morgan Hill Unified SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS. October 19, 2015

Tribal Employment Rights Office -Pacific Northwest Region-

Town of Somers, Connecticut Geographic Information Consulting Services Request for Proposals

Construction Management At-Risk

PITTSBURG UNIFIED SCHOOL DISTRICT

SAN BERNARDINO MOUNTAINS COMMUNITY HEALTHCARE DISTRICT

REQUEST FOR PROPOSALS VOLUNTEER SECURITY VETTING SERVICES

Shawnee County ATTN: Bill Kroll 200 SE 7 th Street, Rm B-30 Topeka, KS Phone Bill.Kroll@snco.us

GREENBURGH CENTRAL SCHOOL DISTRICT No. 7 REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES

Delaware Sustainable Energy Utility Request for Proposals for Financial Advisory Services

NEGAUNEE PUBLIC SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS

REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS

DEPARTMENT OF WORKFORCE SERVICES LABOR STANDARDS DIVISION CHAPTER 4

Norsouth Construction Company of Georgia, Inc. Bid Information and Requirements To Whom it May Concern:

BOROUGH OF HADDONFIELD CAMDEN COUNTY NEW JERSEY ARCHITECTURAL SERVICES RELATED TO THE HADDONFIELD LIBRARY REQUEST FOR PROPOSAL

MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION GUIDELINES TABLE OF CONTENTS

HOMER TOWNSHIP HIGHWAY DEPARTMENT ADDENDUM #1. June 13, 2014 VARIOUS (2014 ROAD PROGRAM) SECTION NO.: GM

Executive Office for Administration & Finance. Request for Qualifications For Construction Management Services

REQUEST FOR QUALIFICATIONS ARCHITECTURAL DESIGN SERVICES FOR A FIRE STATION

Fire Damage Repairs, 2510 Burton Street

CITY OF COMMERCE CITY BID BOND

CITY OF JERSEY CITY REQUEST FOR PROPOSALS: AUDITING SERVICES: FORENSIC AUDIT OF FINANCIAL ACTIVITIES OF PROPERTY OWNER GRANTED PILOT AGREEMENT

CONSTRUCTION MANAGER-AT-RISK AGREEMENT. between. Houston Independent School District. and. [insert legal name of firm] for

International Peace Support Training Centre Westwood Park P O Box Karen, Kenya

Memorandum Potentially Affected AIA Contract Documents AIA Document A AIA Document B Important Information

RFQ REQUEST FOR QUALIFICATIONS. Architectural/Engineering Services. MENANDS SCHOOL DISTRICT 19 Wards Lane Menands, NY 12204

VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY (Virginia Tech) REQUEST FOR QUALIFICATIONS RFQ #CM

CHAPTER IV REQUIRED DOCUMENTS FOR HOUSING PROJECT MANAGEMENT

The School Board of Miami-Dade County, Florida Department of Contractor Prequalification Frequently Asked Questions and Answers

City of Powell Request for Proposals for a Total Compensation Survey

REQUEST FOR QUALIFICATIONS PROPERTY APPRAISAL SERVICES. Prepared by. City of Richmond Finance Department. February 18, 2016 RESPONSES DUE:

Procedure Manual. Title: Small Disadvantaged Business Program. A6Hx Page: Page 1 of 5. Policy Number: 6Hx2-6.36

Pricing of Construction Contract Change Order Documentation

Application for General Contractor License

REQUEST FOR PROPOSALS FOR Franchise Fees, Sales and Use Tax Audits

SUBCONTRACTOR QUALIFICATION FORM

FHA Section 542(c) Risk-Sharing Program for Multifamily Housing Program Rules

Request for Proposals Community Engagement and Business Development Consultant Contractor Loan Fund May 16, 2016.

Request for Qualifications. for. Design-Build of the Proposed. Calaveras River Pump Variable Frequency Drive Upgrade Project

MINORITY/WOMEN BUSINESS ENTERPRISE CERTIFICATION PROCEDURES

CONTRACTOR GUIDELINES

Carmel Unified School District. Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School

Eanes Independent School District

PROCUREMENT POLICY CHAPTER

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

1 RCNY CHAPTER 100

Prequalification Document for Procurement of Works

Bidding Requirements, Contract Forms and Conditions of the Contract INSTRUCTIONS TO BIDDERS Section 00100

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN

Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property

Minority and Women Business Enterprises (MBE/WBE) Program

Request of Qualification Proposal for Construction Management Services

$&71R SENATE BILL NO (SUBSTITUTE FOR SENATE BILL 812 BY SENATOR SCHEDLER)

FINANCIAL DOCUMENTS FOR ELIGIBILITY CHECK

CHAPTER 5. ALLOWABLE COSTS TO BE REPORTED ON FORM HUD A

CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE

Final Audit Follow-up As of January 31, 2014

MANTON CONSOLIDATED SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS

DOCUMENT BID FORM TO THE SAN FRANCISCO PORT COMMISSION, CITY AND COUNTY OF SAN FRANCISCO

SUBCONTRACTOR PREQUALIFICATION STATEMENT Name of Company: Street Address:

CONNECTICUT LOTTERY CORPORATION REQUEST FOR PROPOSALS RE: LEGAL SERVICES RFP # CLC

Transcription:

ILLINOIS HOUSING DEVELOPMENT AUTHORITY STANDARDS FOR CONSTRUCTION COST ESTIMATING December 2014 As part of the Application for Multifamily Financing, the Illinois Housing Development Authority (IHDA) requires applicants to secure Construction Cost Estimates from professional services firms experienced in providing cost estimating services and capable of producing the desired services in a professional, timely and cost-conscious manner. All applicants must submit a Construction Cost Certification form, as found on the Authority s website. In cases where there is an Identity of Interest between a Sponsor and Project general contractor, between a Sponsor and the Project architect or between the Project architect and Project general contractor, IHDA requires the Construction Cost Certification form must be completed by an independent third-party construction cost estimation firm. The independent third-party construction cost estimation firm verifies that the project s scope and costs are within appropriate budget. The preparer of the report shall at all times be an independent observer and cannot be connected in any other fashion to the project such as the design architect, project architect of record, general contractor, property manager or sponsor. The cost estimating firm selected by the applicant must meet the Standards for Construction Cost Estimating listed below as well as the Supplemental Consultant standards (attached). The information below is intended as a guide to applicants in the selection of construction cost estimating consultants to be used on IHDA-funded projects. It is the responsibility of the applicant to make his/her own determination regarding the capability, competence and/or limitations of a consultant. IHDA reserves the right to change or waive any of the requirements below and reject any submitted cost estimates. I. Scope of Services Cost estimating firms shall assist applicants with estimating costs for all aspects of demolition, remodeling and new construction including associated site work. Estimates shall include itemized direct costs, general conditions, contractor overhead and profit, federal and state prevailing wages. If paid for by the Project general contractor and dependent upon the financing provided, the cost estimate should also consider any environmental related costs such as lead-based paint, asbestos-containing materials removal, radon mitigation, etc., if apparent. The applicant must supply the selected cost estimating firm with the necessary documents to perform the tasks, such as a full set of plans and specifications. The applicant is also required to supply all documents (aerial photos, surveys, soils reports etc.) to the cost estimation firm to assist in identifying existing conditions, the project nature, associated accessibility and other site building restraints which would have cost impacts. II. Format

Professional cost estimators are required to quantify the needed materials, labor, and equipment required by the scope of a project, and then price these items. This is a two-phase process that includes quantity takeoff and cost estimating. To complete the quantity takeoff, the plans and specifications are examined to determine total quantities of materials required, as well as labor and equipment. During the cost estimating phase, the estimator examines the direct costs of proposed materials and equipment, federal and state labor rates, construction equipment and tools, and indirect expenses, such as general conditions, overhead, profit, inflation and market conditions. Cost estimates shall be prepared using a recognized construction cost source such as RS Means Building Construction Cost Data (BCCD), most recent edition. Cost data shall be organized according to the Construction Specifications Institute's 16-division Master Format 95 or the 44-division 2004 CSI Master Format numbering system. The IHDA Standards for Architecture and Construction state: 1.01 The general contractor (GC) is allowed Profit in the amount of 6%, Overhead in the amount of 2% and General Conditions (a.k.a. general requirements) in the amount of 6%, all of which are maximum amounts calculated from the hard construction costs. Profit is defined as the proceeds of transaction minus the cost. Overhead being the expenses necessary to conduct a business. Cost shall also include those specific to the project and include transportation, travel expenses, temporary housing etc. Overhead shall be eliminated if there is an identity of interest between the owner/developer and general contractor. General conditions are the functions needed to complete the construction phase and shall include the following costs: project superintendent, surveys, plans/printing, testing, communications, mobilization, temporary heat and utilities, portable toilets, temporary fencing, signage, OSHA protection, field office, hoisting equipment, security, disposal, cost certifications, audits, final clean and general labor. Finance, holding charges or other types of interest shall be included in the Overhead or General Conditions calculation. Payment for any shop drawings will be limited to 5% of the total cost for that line item. The construction budget shall include any costs resulting from scheduling delays or seasonal constraints such as winter conditions, water extraction from recent rains, etc. When a contractor is acting in the capacity of a GC, they shall provide all the functions typically associated with the position. The GC is responsible for the overall construction management aspects and tasks involved from the Project s start-up through final completion. Functions include (but are not limited to): scheduling, coordination of the trades, supervision, safety, program compliance, monitoring, etc. As such IHDA will not allow for a Straw GC or a firm which reaps the benefits and fees associated with the GC title but in reality subcontracts these functions to another GC. IHDA will allow the GC functions to be subcontracted out but will only pay once for these services. Subsequently the GC needs to be on the site during construction and at least daily. Similarly any side agreements to the contrary or kickbacks will result in forfeiture of any future work with the Authority. Limited partnerships, joint ventures and other types of associations between the owners and the GC shall be subject to IHDA s limitations on Overhead. In all instances where there is a Construction-Cost Plus contract or other contract agreement that may result in cost savings at the completion of the Project, the disposition of any savings shall be in the sole discretion of IHDA.

Material suppliers for construction related products shall be identified on the contractors sworn accordingly. Dependent upon the finance structure of the project, the cost estimating firm shall provide separate cost estimates for each use in a mixed-use building (residential, commercial, recreational etc.). The cost estimating firm shall verify with the owner the financing structure of the project. Multi-structure projects require separate estimates for each structure type, townhome buildings, community center etc. Separate site construction-cost estimates must be associated with the estimates for each structure type. If indicated on the plans, alternates shall be identified in separate line items. The estimates must be submitted on letterhead and must be signed by the professional services firm providing the construction cost estimate. Estimates must also indicate the status of the design process (i.e. preliminary drawings, working drawings with outline specifications, full-scale drawings and specifications, etc.). IHDA must be explicitly addressed as being able to rely on the cost estimate. The cost estimating firm shall furnish to the applicant a minimum of two (2) hard copies of the final cost estimates and an electronic copy saved on a CD, DVD or flash drive. The applicant shall submit to IHDA one (1) hard copy and the electronic copy. III. Certification Third-party construction cost estimates must be prepared by professional cost estimators. The American Society of Professional Estimators (ASPE) recognizes the estimating proficiency and ethical awareness of the Certified Professional Estimator (CPE). Certification as a cost engineer by the Association for the Advancement of Cost Engineering (AACE), as a certified professional estimator by the American Society of Professional Estimators (ASPE), or a State of Illinois Licensed Architect or Engineer, is required. IV. Ethics The standards of practice in the Canons of Ethics published by the AACE and the ASPE apply to all estimating services. The Canons of Ethics are available on both their Web sites. V. Fee Basis Fees for all cost and expenses related to the performance of the scope of services shall be determined between the professional services firm and the applicant. The applicant is responsible for payment of fees and entering into a written agreement with the selected professional services firm. Kickbacks or incentives for procuring inflated values will not be permitted. IHDA shall review the construction cost estimation fees associated with the development to insure they are proper, fair and reasonable. IHDA has evaluated the fees from past IHDA financed projects. These fees were based on the construction type, number of unit configurations and design phase. As such, the construction cost estimation fees listed below reflect the maximum percentage IHDA will accept as a reasonable fee for services. Higher percentages for the construction cost estimation fees are acceptable but the owner/developer will be responsible to pay the difference between the higher percentage and the percentage in the table below. The fees shall include the following:

New Construction Rehab # of Unit Configurations Schematic Design 90% Construction Document Schematic Design 90% Construction Document 1-3 Unit Configurations $5000 $8000 $3000 $6000 4 + Unit Configurations $7000 $10,000 $5000 $8000 VI. Questions Any questions or request for clarification regarding this service must be submitted to Stephen Gladden, Assistant Director of Multifamily Programs at (312) 836-5351 or sgladden@ihda.org the Manager of Architecture and Construction Services, Multifamily Financing Department at (312) 836-5200.

ILLINOIS HOUSING DEVELOPMENT AUTHORITY SUPPLEMENTAL PROFESSIONAL SERVICES FIRM REQUIRMENTS December 2014 As part of the Application for Multifamily Financing, the Illinois Housing Development Authority (IHDA) requires applicants to secure studies from professional services firms experienced in providing cost estimating services, market studies, I Environmental studies, Rent Comparability Studies, and Property Needs Assessments. The professional services firms selected by the applicant must meet the Supplemental Consultant standards listed below along with the standards for each discipline as found on the IHDA website. The information below is intended as a guide to applicants in the selection of consultants to be used on IHDA funded projects. It is the responsibility of the applicant to make his/her own determination regarding the capability, competence and/or limitations of a consultant. IHDA reserves the right to change or waive any of the requirements below and reject any studies. I. Minimum Qualifications Professional services firms selected and retained by applicants must be registered with the Illinois Department of Revenue to conduct business in Illinois and not be debarred, suspended or otherwise prohibited from professional practice by any Federal, State or Local Agency. The selected firm is required to have been in business for a minimum of five (5) years and must demonstrate knowledge and related experiences with regard to preparation of studies for affordable housing projects using federal, state and city funds. The professional services firm must supply the applicant with documentation of the firm s professional qualifications, including: Illinois Department of Revenue registration, resumes of key members assigned to the project demonstrating a minimum of ten (10) years experience in the design, development and/or construction of affordable housing. II. Minority Procurement Efforts The applicant is required to make a proactive effort in selecting and retaining qualified firms certified as Minority Business Enterprise (MBE), Disadvantaged Business Enterprise (DBEs) and Women Business Enterprise (WBEs) whenever possible. The applicant is required to verify any selected MBEs, MBEs and WBEs are registered and have a valid certification number. III. References The selected firm must supply the applicant at least three (3) professional references pertaining to the firm s experience in performing consultant services for projects of a similar type, scale, and complexity.

IV. Fee Basis Fees for all cost and expenses related to the performance of the scope of services shall be determined between the professional services firm and the applicant. The applicant is responsible for payment of fees and entering into a written agreement with the selected professional services firm. Kickbacks or incentives for procuring inflated values will not be permitted. IHDA shall review the fees associated with the development to insure they are proper, fair and reasonable. IHDA has evaluated the fees from past IHDA financed projects. As such, the fees listed in each specific consultant standard reflect the maximum percentage IHDA will accept as a reasonable fee for services. Higher fee are acceptable but the owner/developer will be responsible to pay the difference between the higher fees and the fees indicated in the individual consultant standards. V. Insurance The selected firm must supply the applicant with proof of Professional Liability insurance with a policy limit of $1,000,000 per occurrence and $2,000,000 excess umbrella and must submit a copy of the certificate to IHDA. The applicant will determine and notify the applicant of any additional parties, if required prior to contract issuance. Selected firms must not allow their liability insurance to expire or cancel for any reason during the contract period. VI. Conflict of Interests Professional firms selected to perform services shall not have any direct or indirect interest in any property to be evaluated. IHDA reserves the right to determine necessary actions to eliminate or neutralize any conflict discovered after an applicant secured a professional firm to provide this service. The professional services firm shall certify that no undue pressure or collusion with the client or their representatives exists in the determination of the study. The study certification shall also state that all information and procedures used to establish the study were from factual data and prepared in a professional manor. The study must include a statement from the individual signing the study that there is no identity of interest between the signatory and any member of the development team. If any member of the development team or ownership has an identity of interest with the entity providing the study, the identity of interest relationship must be disclosed. Failure to disclose any organizational conflict of interest may result in rejection of the application and/or the study by the professional firm with the conflict and request of a study from a different firm at applicant s expense.