CHAPTER 8 EXISTING SANITARY SEWER SYSTEM FACILITIES



Similar documents
See Appendix A for additional information, or contact ASTM directly.

Wastewater Collection Practice Test #3 Page 1 of 15

CHAPTER 3 STORM DRAINAGE SYSTEMS

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

SANITARY SEWER BACKUP. Causes & Prevention

CHAPTER 11 STORM DRAINAGE

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

Protect Your Home From Flooding. A guide for Lethbridge Residents

Chapter 9 Sanitary Sewers

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities

CHAPTER 2 HYDRAULICS OF SEWERS

BASEMENT FLOODING. Prevention Guide for. Homeowners

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT

Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

SANITARY SEWER SYSTEM ASSESSMENT

SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005

CHAPTER 11 STORM DRAINAGE

PREVENTING WET OR FLO ODED BASEMENTS

SEWER CLEANING, INSPECTION AND ASSESSMENT

SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

MODEL WEB CONTENT FOR CITY SANITARY SEWER DEPARTMENTS

Kansas City s Overflow Control Program

Emerging Technologies in Wastewater Collection Systems

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 003 SANITARY SEWER COLLECTION SYSTEM

GUIDANCE DOCUMENT FOR SIZING AND INSTALLATION OF GREASE TRAPS AND INTERCEPTORS

City of Mebane Wastewater Collection and Treatment Facility

FREQUENTLY ASKED QUESTIONS

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

Home Drainage & Causes of Basement Flooding. Water

How To Install An Overhead Sewer

SANITARY SEWER SPECIFICATIONS

Type of Sewer Systems. Solomon Seyoum

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010

CHAPTER Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities

DeSoto County is not a water service provider and does not operate any

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

Design of Sewage Pumping Stations by John Zoeller, PE, CEO/President

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

SECTION 3 SANITARY SEWER DESIGN

Collection Systems Technology Fact Sheet Sewers, Conventional Gravity

First in Service First in Safety

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

Beechmont Park Project

Protect your home from basement flooding

SEWER BACKUP PREVENTION PROGRAM

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES

SEWER BACK UP PREVENTION PILOT PROGRAM

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Amendments to the 2012 International Plumbing Code

Appendix S Pump Station Evaluation

City of Green Bay Department of Public Works Engineering Department

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

Review of Footing Drain Disconnection Projects

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

CLEANING, INSPECTION, AND TESTING OF SEWERS

SEWER LINE EXTENSION DESIGN CHECKLIST

SECTION 3 SANITARY SEWER DESIGN AND CONSTRUCTION REQUIREMENTS

4.3 Cisterns and Rain Barrels

Frequent occurrences of basement flooding can result in long-term damage to the building and equipment that may not be covered by insurance.

Sanitary Sewer Overflow (SSO) Incident Report Form

Dry Weather Flow from Footing Drains and Service Connections

City of Largo Environmental Services Department Environmental Control Program th Avenue North Clearwater, FL Phone: (727)

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Village of St. Louis Sewer Back-up Policy

CHAPTER 5. Storm Sewer

APPROVED CONSOLIDATION AGREEMENT BETWEEN THE TOWN OF AMHERST SANITARY SEWER DISTRICTS 1 and 16 REGARDING THEIR CONSOLIDATION INTO A SINGLE DISTRICT

Class Environmental Assessment Schedule B Project File Report

SANITARY SEWER MASTER PLAN

Outline. Objective. Overview Sanitary Drainage System. Design. Materials

Lansdowne Stormwater UPDATE

Transcription:

Comprehensive Utilities Plan Village of Sister Bay, Wisconsin CHAPTER 8 EXISTING SANITARY SEWER SYSTEM FACILITIES The sanitary sewer collection system and lift station facilities operated and maintained by the Village of Sister Bay include: 1. Four large sanitary sewer lift stations 2. Four small sanitary sewer grinder stations 3. Force mains associated with lift stations 4. A network of gravity sewer piping and manholes The general location and layout of the sanitary sewer system facilities is illustrated in Figure 8-1. A schematic of the sewer system is illustrated in Figure 8-2. This chapter presents a summary of the design and operating characteristics of the existing sanitary sewer system and components. 8.1 DESCRIPTION OF SYSTEM The Sister Bay sanitary sewer collection system was originally constructed in 1972, and is a combination of gravity sewers, lift stations, and force mains. Wastewater is collected in the system and conveyed through piping to the Main Lift Station No. 1 (LS 1), where the flow is pumped to the Wastewater Treatment Plant (WWTP). After the wastewater is treated, it is discharged through an outfall sewer into Sister Bay. The existing service area of the collection system is approximately 1,200 acres in size, and serves approximately 930 connections/customers. Those residents who are not connected to the system are served by private sewage disposal systems or holding tanks. The Liberty Grove Sanitary District No. 1 is connected to the Village of Sister Bay collection system. Areas on the south side of the Village flow north and east to LS 1, and areas on the north side of the Village and Sanitary District flow south and west to LS 1. The WWTP is located east of Woodcrest Road and south of Scandia Road. LS 1 is located east of Bay Shore Drive and south of Scandia Road. The gravity collection system piping ranges in size from 6 inch to 12 inch diameter pipe. Some 14 inch pipe also exists on the outfall line between the WWTP and Green Bay. The normal pipe size for a development is typically 8 inch diameter sewer pipe. Larger pipes (10 inch and 12 inch diameter), referred to as collectors, connect different areas of the community and convey the flows downstream. Service laterals which serve individual buildings are typically 4 inch and 6 inch diameter pipes. The system s gravity, force main and outfall sewers are summarized by size in Tables 8-1 and 8-2. There are four large lift stations and four small lift stations (grinder stations) in the system. The large lift stations include LS 1, Little Sister Lift Station, Fieldcrest Lift Station, and Waters End Lift Station (located within the Sanitary District). The smaller grinder stations (GS) include Forest Lane GS, Sunny Court GS, Crows Nest GS, and Pheasant Court GS. Force mains connect each of the lift stations to the gravity collection system. The force mains range in size from 2 inch diameter for the grinder stations up to 12 inch diameter for LS 1. LS 1 has an 8 inch force main and a 12 inch force main. To confirm existing pumping capabilities of each lift station, Village staff conducted test pumping during the fall of 2005. The test pumping process involved manually controlling pump operation and measuring the time duration to pump a specific volume of wastewater. Adjustments were made in the calculations to SISTB0502.00 8-1 April 2008

TABLE 8-1 SANITARY SEWER SIZE DISTRIBUTION SISTER BAY SANITARY SEWER SYSTEM VILLAGE OF SISTER BAY, WISCONSIN Diameter Approximate Total Percentage of (inches) Length 1 (feet) Total 6 364 0.4% 8 65,715 81.0% 10 9,473 11.7% 12 4,956 6.1% 14 590 0.7% Total 81,099 100.0% 1 Source: 2005 Sister Bay sanitary sewer system computer model. Sanitary Sewer Size Distribution Sister Bay Sewer System 8-inch 81% 6-inch 0% 14-inch 1% 12-inch 6% 10-inch 12% X:\S\SISTB\050200_UTILITIES\Project\Sister Bay copy\report\chapter 1-5 8 11\[table8-x.xls]Table 8-1 SISTB0502.00 8-2 April 2008

TABLE 8-2 SANITARY SEWER SIZE DISTRIBUTION LIBERTY GROVE SANITARY DISTRICT NO. 1 TOWN OF LIBERTY GROVE, WISCONSIN Diameter Approximate Total Percentage of (inches) Length 1 (feet) Total 8 19,525 89.9% 10 2,193 10.1% Total 21,718 100.0% 1 Source: 2005 Sister Bay sanitary sewer system computer model. Sanitary Sewer Size Distribution Liberty Grove Sanitary District Water System 8-inch 90% 10-inch 10% C:\Documents and Settings\pplanton\My Documents\Sister Bay copy\[table8-x.xls]table 8-2 SISTB0502.00 8-3 April 2008

Comprehensive Utilities Plan Village of Sister Bay, Wisconsin account for any influent discharging into the lift station wetwell during the pump test. The test pump results and other lift station data is summarized in Tables 8-3 and 8-4. The Village s existing sanitary sewer base map denotes manhole I.D. numbers and sewer pipe sizes, but contains no information on pipe length, invert or rim elevations. To populate the sanitary sewer computer model of the Sister Bay collection system with the necessary information, record drawings of the system were reviewed and the needed information was tabulated. The system information collected was stored in geographic information system (GIS) format using DataView software developed by SEH. The DataView software provided a convenient way to collect and store system data in a format that allowed easy retrieval and manipulation. 8.2 CONDITION OF SYSTEM The original Sister Bay collection system was installed in 1972, and has continued to expand on a regular basis since that time. Most of the sanitary sewers that were installed in the early 1970s were constructed of PVC pipe with glued joints. The larger sewer pipe (10 inch diameter and above) was either RCP or asbestos-cement pipe. By the late 1970s, sewer pipe installed in Sister Bay was constructed of PVC pipe utilizing a gasketed joint system. Sewer manholes are constructed of precast reinforced concrete. The Village flushes sanitary sewer pipes each year in the spring and fall. Most areas of the system have not been televised recently, so the current condition of the pipe interior is unknown. From the available information that has been reviewed for this study, the general condition of the existing collection system is fair, although several system problems have been identified. Infiltration and inflow (I/I) is present in the spring due to the elevated water table, snow melt and rainfall events. The WWTP experiences a significant spike in flows during spring months. While it is not readily apparent where the clear water is entering the collection system, it is likely that there are multiple sources. The State Plumbing Code calls for all homes to have floor drains adjacent to water heaters for drainage purposes. In most cases, these floor drains are connected to the sanitary sewer system. In areas of high groundwater, it is possible that building foundation drains and sump pumps are also connected to this floor drain system, and therefore are contributing clear water to the sanitary sewer system. The area near the current intersection of State Highways 42 and 57 was originally a ravine that was filled prior to development. Some sanitary sewers in this area have reportedly settled, creating flat or negative slopes, and resulting in sewer flow capacity restrictions. The sanitary sewers have been televised in the past, and standing water and a buildup of solids was observed in the sewer pipe. An example of this condition exists between MH 47 and MH 45, where the 10 inch pipe has a visible dip between manholes. According to Village maintenance staff, there are several areas of the sanitary sewer collection system that are known to have relatively flat slopes. These locations include: Woodcrest Road and Scandia Road area Areas north of Bay Shore Drive and Sister Bluff Drive Areas north of Bay Shore Drive and Sister Bluff Drive (Sister Bluff Estates) have manholes with sumps. The manhole pipe inverts constructed in this area are the catch basin type that result in solids deposition and which require frequent cleaning. North Spring Road and Pheasant Court also contain these types of manholes. SISTB0502.00 8-4 April 2008

TABLE 8-3 EXISTING LIFT STATION DATA SISTER BAY SANITARY SEWER SYSTEM VILLAGE OF SISTER BAY, WISCONSIN Lift Stations Pump Data Lift Station No. 1 (Main Lift Station) Fieldcrest Lift Station Little Sister Lift Station LGSD No. 1 Waters End Lift Station Type Wetwell / Drywell Wetwell / Drywell Wetwell / Drywell Submersible Pump Manufacturer Gorman Rupp Smith & Loveless Smith & Loveless Barnes Year Installed/Remodeled 1989 1990 1987 1997 Contractor Crane Engineering Energenecs Energenecs Energenecs Pump Number 1 2 3 1 2 1 2 1 2 Model No. T6A3 T8A3 T8A3 4B2B 4B2B 4B3B 4B3B 4SE 4SE Force Main Size (inches) 8 & 12 4 6 4 Rated Pump Capacity (gpm) 300 1000 1000 100 100 300 300 100 100 Total Dynamic Head (feet) 80 n/a n/a 48 48 135 135 40 40 Test Pump Capacity (gpm) 216 526 435 94 94 273 238 74 53 Test Pump Capacity - Both pumps (gpm) Motor Data 812 124 335 83 Horsepower 30 60 60 5 5 20 20 5 5 RPM 1765 1775 1775 1170 1170 1760 1760 1750 1750 Voltage / Phase 460/3 208/3 480/3 230/3 X:\S\SISTB\050200_UTILITIES\Project\Sister Bay copy\report\chapter 1-5 8 11\[table8-x.xls]Table 8-3 SISTB0502.00 8-5 April 2008

TABLE 8-4 EXISTING GRINDER LIFT STATION DATA SISTER BAY SANITARY SEWER SYSTEM VILLAGE OF SISTER BAY, WISCONSIN Grinder Lift Stations Pump Data Forest Lane Grinder Station Sunny Court Grinder Station Crows Nest Grinder Station Pheasant Court Grinder Station Type Grinder Grinder Grinder Grinder Pump Manufacturer Year Installed/Remodeled Contractor Barnes 2004 Energenecs Barnes Barnes Barnes 2004 2004 2004 Energenecs Energenecs Energenecs Pump Number 1 2 1 2 1 2 1 2 Model No. SGV5002L SGV5002L XSGV XSGV XSGV XSGV XSGV XSGV Force Main Size (inches) 2 2 2 2 Rated Pump Capacity (gpm) 50 50 45 45 40 40 40 40 Total Dynamic Head (feet) 125 125 n/a n/a n/a n/a n/a n/a Test Pump Capacity (gpm) 51 56 43 45 40 43 41 58 Test Pump Capacity - Both pumps (gpm) Motor Data 77 62 47 85 Horsepower 5 5 2 2 2 2 n/a n/a RPM 3450 3450 3450 3450 3450 3450 3450 3450 Voltage / Phase 240/1 240/1 240/1 240/1 X:\S\SISTB\050200_UTILITIES\Project\Sister Bay copy\report\chapter 1-5 8 11\[table8-x.xls]Table 8-4 SISTB0502.00 8-6 April 2008

Comprehensive Utilities Plan Village of Sister Bay, Wisconsin The Utility maintenance crew follows a regularly scheduled computerized plan for maintenance of the lift stations. This plan includes monthly flushing and adding degreaser to all stations. The maintenance plan also includes: Servicing electrodes every two months Servicing air release valves every three months Changing bearing/seal cavity oil every six months Checking and adjusting clearances every six months Greasing motors every two years Grinder station pumps are serviced on an annual basis (using a lift station service firm) 8.3 EXISTING SYSTEM FLOWS Historical system flow data was collected and reviewed for this study. Average monthly flow recorded at the WWTP was approximately 170,000 gallons per day (gpd) during 2005. The flows have steadily increased over the past 5 years, and have tended to be higher during the summer tourist season. The data also shows significant flow spikes during rainfall or snowmelt events, which is an indication that some level of I/I is present in the collection system during certain periods of the year. Lowest flows typically occur during the winter months of December, January and February. During 2005, the lowest monthly flow occurred in the month of January with an average flow of 90,000 gpd. The highest 2005 flow reported occurred in the month of July with an average flow of 280,000 gpd. Daily flows during the maximum month, and hourly flows during the maximum day were also reviewed for 2005. A summary of 2005 flows recorded at the WWTP is summarized in Table 8-5. A list of the top sanitary sewer flow producers in the community was not available. However, a list of the top water users was reviewed, and was previously summarized in Chapter 4 (Table 4-5). It is common that the largest water users in a community system are also the largest wastewater flow contributors. SISTB0502.00 8-7 April 2008

TABLE 8-5 SUMMARY OF 2005 FLOWS AT WWTP SISTER BAY SANITARY SEWER SYSTEM VILLAGE OF SISTER BAY, WISCONSIN Month Total for Month (MG) Average Day (MG) Minimum Day (MG) Maximum Day (MG) January 2.784 0.090 0.072 0.152 February 2.514 0.090 0.072 0.118 March 2.840 0.092 0.072 0.132 April 3.901 0.130 0.104 0.183 May 5.310 0.171 0.115 0.269 June 6.471 0.216 0.171 0.261 July 8.683 0.280 0.251 0.344 August 8.255 0.266 0.205 0.311 September 5.876 0.196 0.166 0.298 October 6.589 0.213 0.138 0.323 November 4.082 0.136 0.112 0.175 December 3.727 0.120 0.089 0.189 MG: Million Gallons P:\PT\S\SISTB\050200_UTILITIES\Project\Sister Bay study\report Final Draft\Chapter 8\Tables and Figures\[table8-5.xls]Sheet1 SISTB0502.00 8-8 April 2008