NEWS RELEASE LUNDIN MINING ANNOUNCES 2014 PRODUCTION RESULTS



Similar documents
2016 TD Securities Mining Conference January 2016 TSX: LUN OMX: LUMI

Management s Discussion and Analysis For the three and nine months ended September 30, 2015

Second Quarter Results 2010

Management s Discussion and Analysis For the three months ended March 31, 2015

LUNDIN MINING ANNOUNCES AGREEMENT TO PURCHASE FREEPORT'S 80% INTEREST IN THE CANDELARIA MINING COMPLEX

NEWS RELEASE New York - AG Toronto FR May 10, 2016 Frankfurt FMV Mexico - AG. First Majestic Reports First Quarter Financial Results

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

Detour Gold Provides New Life of Mine Plan for Detour Lake

Acquisition of Freeport s 80% Interest in the Candelaria Mining Complex October 6, 2014

FIRST QUARTER CONFERENCE CALL MAY 4, 2010

SCORPIO MINING REPORTS FIRST QUARTER 2015 FINANCIAL RESULTS

Coeur Reports Fourth Quarter and Full-Year 2015 Production and Provides 2016 Production Guidance

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

NEVADA COPPER FILES INTEGRATED FEASIBILITY STUDY ON SEDAR

News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS

Denver Gold Show September 24, 2013

2015 Third Quarter Results Webcast October 29, 2015

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

Q Results November 12, 2015 FNV TSX/NYSE

AVINO SILVER & GOLD MINES LTD.

NEWS RELEASE ROXGOLD ANNOUNCES SECOND PROJECT FINANCE DRAWDOWN FOR THE YARAMOKO GOLD PROJECT & PROVIDES DEVELOPMENT UPDATE

Q Financial Results Conference Call

CANADA S INTERMEDIATE GOLD PRODUCER

Lalor Project Base Metal Zones and Gold Mineralization January 2009

KATANGA MINING ANNOUNCES 2013 YEAR END RESULTS AND COMMITMENT OF GLENCORE TO EXTEND AND INCREASE LOAN FACILITIES

SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST

How To Know If Goldcorp Is A Successful Company

On February 3, 2016 the Company announced the appointment of Ms. Joyce Ngo as Interim Chief Financial Officer.

AGNICO-EAGLE MINES LIMITED

FOR IMMEDIATE RELEASE

Great Western Minerals Reports Second Quarter 2014 Results August 13, 2014 Page 2 of 7

PRESS RELEASE SEMAFO FOR IMMEDIATE RELEASE. SEMAFO Reports 2011 Cash Flow from Operations of $172 Million

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

Endeavour Management Presentation

Q Conference Call - Q3 financial results - Dividend declaration - Near term growth outlook - New Royalty Acquisitions

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

Ivanhoe Mines announces an accelerated infill drilling program at the Kamoa copper project s Kakula Discovery in the D.R. Congo

(NYSE-MKT:XRA, TSX:XRC,

NEWS RELEASE TAHOE RESOURCES AND LAKE SHORE GOLD ANNOUNCE BUSINESS COMBINATION

Western Lithium Announces Investor Conference Call. Provides Updates on Projects in Argentina and Nevada

Sierra Wireless Reports Second Quarter 2015 Results

CREAM MINERALS LTD. Suite Granville Street Vancouver, B.C. V6C 3P1

TSX-V: CDA WKN: A0M6U5

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

Trevali reports record Santander Mine production for Q and increases 2015 guidance

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

DUNDEE PRECIOUS METALS REPORTS FIRST QUARTER 2008 RESULTS

FORWARD LOOKING STATEMENTS

Inter Pipeline Fund Announces Strong Third Quarter 2009 Results

News Release. n j. NovaCopper Releases Year End Results and Continues to Focus on Adding Long Term Value

NEWS RELEASE. Supplemental information:

FIJI GOLD LION ONE METALS

CADILLAC VENTURES INC. MANAGEMENT S DISCUSSION AND ANALYSIS

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

FORACO INTERNATIONAL REPORTS Q3 2014

Management s Discussion and Analysis and Consolidated Financial Statements. Second Quarter 2014

LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT

VULCAN RESOURCES LIMITED ABN REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2006

WILLAMAX PROJECT. TSX-V: DVN Reach us at Developing B.C. mining assets to create profitable gold production.

MANAGEMENT S DISCUSSION AND ANALYSIS INTRODUCTION

2015 FOURTH QUARTER REPORT BUILDING VALUE

Management s Discussion and Analysis and Consolidated Financial Statements. First Quarter 2014

Inmet Mining announces third quarter results

Savannah North Scoping Study Looking into the future 3 February 2016

FORM F1 MANAGEMENT S DISCUSSION & ANALYSIS DECLAN RESOURCES INC. ( DECLAN OR THE COMPANY )

Second Quarter Earnings Release Conference Call. July 23, 2009

ELECTRA GOLD LTD. MANAGEMENT DISCUSSION AND ANALYSIS QUARTER ENDED JUNE 30, 2014

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

CSE: LUX XETRA: NGO Frankfurt: NGO. Environmental Reclamation & Trading

HISTORIC INTERSECTIONS INCLUDE 19.8 G/T AU OVER 8.9 METRES AND 24.4 GT AU OVER 9 METRES

COTT ANNOUNCES FIRST QUARTER 2012 RESULTS AND SHARE REPURCHASE PROGRAM FOR UP TO $35 MILLION IN COMMON SHARES

For Immediate Release. Superior Plus Corp. to Acquire Canexus Corporation Enhancing and Expanding the Specialty Chemicals Platform

SILVER STANDARD REPORTS THIRD QUARTER 2015 RESULTS

Highlights of selected high-grade mineralized zones exposed in drift tunnels include:

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

ACADIAN TIMBER CORP. REPORTS FOURTH QUARTER AND YEAR-END RESULTS

SILVERCORP INTERCEPTS HIGH GRADE SILVER LEAD ZINC MINERALIZATION AT THE TLP MINE, YING MINING DISTRICT, HENAN PROVINCE, CHINA

Annual General and Special Meeting

news release November 9, 2015

Management Discussion and Analysis for the quarter ended March 31, 2015

Sep Sep Change %

K+S CANADA HOLDINGS INC. K+S AKTIENGESELLSCHAFT POTASH ONE INC.

Waste Management Announces Fourth Quarter and Full Year 2007 Earnings. Increases Earnings per Diluted Share by 32.6% in Fourth Quarter of 2007

2015 Sustainability Report

Amerigo Announces 2011 Financial Results

September 2015 Quarterly Activities Report

MEDIA RELEASE OCEANAGOLD PROVIDES UPDATE ON DIDIPIO PROJECT AND CORPORATE RE-FINANCING INITIATIVES

Year End 2014 Earnings Conference Call

First Quarter Fiscal Year 2016 Earnings Release and Conference Call. August 4, 2015

NEWS RELEASE FOR IMMEDIATE RELEASE

TOUCHSTONE ANNOUNCES 2015 THIRD QUARTER RESULTS AND ELIMINATION OF NET DEBT; UPDATES TRINIDAD ACQUISITION

Brian Groves CEO & Director

Brookfield financial Review q2 2010

Q Investor Conference Call. February 19, 2014

First Quarter 2015 Investor Conference Call May 7, 2015

CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. FINANCIAL HIGHLIGHTS For the 6 months ended June 30,

Trip to Pulacayo. Pulacayo - Paca

Fourth Quarter 2015 Earnings Release February 3, 2016

NEW HORIZONS, HOPE & INVESTMENTS WINNERS FOR THE RECOVERY THE DONKIN MINE NOVA SCOTIA

Transcription:

NEWS RELEASE LUNDIN MINING ANNOUNCES 2014 PRODUCTION RESULTS Toronto, January 21, 2015 (TSX: LUN; Nasdaq Stockholm: LUMI) Lundin Mining Corporation ( Lundin Mining or the Company ) today announced production results for the three and twelve months ended December 31, 2014. 2014 Highlights: Exceeded the high-end of our annual production guidance for zinc and nickel while meeting our overall targets for copper and lead. Eagle ramp-up performed ahead of schedule, with production exceeding annual guidance for both nickel and copper. Ended 2014 with a net debt balance of $829.5 million. The Company does not have any amounts drawn on its $350 million revolving credit facility. A summary of the Company's production results compared against guidance is shown below: (contained tonnes) Q4 2014 Production Results Corporate Office 150 King Street West, Suite 1500 P.O. Box 38 Toronto, ON M5H 1J9 Phone: +1 416 342 5560 Fax: +1 416 348 0303 Full Year 2014 Production Results 2014 Production Guidance 1 Copper Neves-Corvo 14,220 51,369 50,000 55,000 Zinkgruvan 1,034 3,464 3,000 4,000 Aguablanca 2,020 7,390 6,000 7,000 Eagle 3,606 3,905 2,000 3,000 Wholly-owned 20,880 66,128 61,000 69,000 Candelaria (80%) 3 22,872 22,872 n/a Tenke (@24%) 2 n/a n/a 48,400 Total attributable n/a n/a n/a Zinc Neves-Corvo 17,333 67,378 60,000 65,000 Zinkgruvan 19,131 77,713 75,000 80,000 Total 36,464 145,091 135,000 145,000 Lead Neves-Corvo 467 3,192 3,500-4,500 Zinkgruvan 7,503 32,363 29,000 32,000 Total 7,970 35,555 32,500 36,500 Nickel Aguablanca 2,481 8,631 7,500 8,500 Eagle 4,093 4,300 2,000-3,000 6,574 12,931 9,500-11,500 UK Office Hayworthe House, Market Place Haywards Heath, West Sussex RH16 1DB United Kingdom Phone: +44 (0) 1444 411 900 Fax: +44 (0) 1444 456 901 www.lundinmining.com 1. 2. 3. Guidance as presented in the Company s Management Discussion and Analysis as at September 30, 2014. Production results for Tenke have not yet been released by operator Freeport-McMoRan Inc. Candelaria production results are for the period from November 3, 2014 to December 31, 2014.

Paul Conibear, President and CEO commented, We are very pleased to have met and in a number of cases excelled on production compared to annual production guidance. We are particularly proud of the continued ramp-up at the Eagle mine which had a very successful year in 2014, and is expected to generate significant cash flow for the Company going forward. For 2015, we anticipate another year of strong execution as we focus on cash generation and profit optimization at each of our operations. Of special note, I extend congratulations to our operating teams for achieving a new Company safety record performance, with improvements recorded across all operations. " Operational Commentary Operations safety performance: was a company record during 2014, with a Total Recordable Injury Frequency Rate ( TRIFR ) achieved of 1.6 (measured per 200,000 man hours worked). This was an improvement of 20% over 2013 s achievement of a TRIFR of 2.0. Improvements in safety performance at all operations were accomplished over the course of the year. Environmental performance: met expectations with no Level 3 incidents experienced (2013 had one level 3 incident). Neves-Corvo: Fourth quarter copper production achieved the highest quarterly rate of the year. Total annual copper production was in-line with expectations as high throughput levels largely offset lower than expected recovery rates. Zinc production achieved an annual record as a result of an increased proportion of zinc ore being derived from the Lombador deposit. Over 50% of the zinc ore is now being sourced from this area as well as from other high grade zinc areas in the mine. Zinkgruvan: Zinc, lead and copper production were all in line with annual production targets. Zinkgruvan again this year achieved a historic new milestone with record tonnage of ore mined and milled. Aguablanca: The operation had another strong performance with nickel and copper production both higher than guidance, which itself was increased earlier in the year. Refined mine planning has enabled open pit mining to be extended well into the first quarter of 2015, 3 months longer than expected. Underground mining development is advancing as planned and is expected to ramp up in the second quarter of 2015. Eagle: As previously announced, ramp up continued through the fourth quarter with commercial production being declared on November 24th, 2014. For the year, nickel and copper production exceeded guidance as throughput, grades and recoveries were all higher than expected. Candelaria: The acquisition of Candelaria closed on November 3, 2014. For the period from November 3, 2014 to December 31, 2014, the Candelaria and Pedro Aguirre Cerde processing plants collectively produced, on a 100% basis, 28,590 tonnes of copper, 317,996 ounces of silver, and 16,247 ounces of gold in concentrates. 2

2014 Operating Statistics Details of operating statistics by mine, by quarter and for the year follow in the attached table: Neves-Corvo Ore mined, copper (000 tonnes) 2,540 647 619 636 638 Ore mined, zinc (000 tonnes) 1,119 282 268 298 271 Ore milled, copper (000 tonnes) 2,503 604 623 631 645 Ore milled, zinc (000 tonnes) 1,102 266 269 296 271 Copper (%) 2.5 3.0 2.3 2.5 2.3 Zinc (%) 8.0 8.4 8.8 7.6 7.0 Copper (%) 80.2 78.7 77.6 81.6 81.9 Zinc (%) 74.0 75.0 73.1 74.6 72.7 Copper (tonnes) 51,369 14,220 10,904 13,480 12,765 Zinc (tonnes) 67,378 17,333 17,908 17,909 14,228 Lead (tonnes) 3,192 467 866 1,054 805 Zinkgruvan Ore mined, zinc (000 tonnes) 1,063 265 279 262 257 Ore mined, copper (000 tonnes) 167 42 36 55 34 Ore milled, zinc (000 tonnes) 1,054 270 264 272 248 Ore milled, copper (000 tonnes) 167 43 42 47 35 Zinc (%) 8.2 7.7 8.4 8.0 8.6 Lead (%) 3.7 3.4 3.1 4.1 4.4 Copper (%) 2.3 2.6 1.5 2.2 2.9 Zinc (%) 90.4 92.7 90.6 88.6 89.9 Lead (%) 82.5 82.1 80.0 83.3 84.0 Copper (%) 90.7 92.6 85.7 88.2 94.2 Zinc (tonnes) 77,713 19,131 20,050 19,293 19,239 Lead (tonnes) 32,363 7,503 6,531 9,196 9,133 Copper (tonnes) 3,464 1,034 544 903 983 3

Aguablanca Ore mined (000 tonnes) 1,755 600 606 365 184 Ore milled (000 tonnes) 1,660 432 384 426 418 Nickel (%) 0.6 0.7 0.6 0.6 0.6 Copper (%) 0.5 0.5 0.5 0.5 0.4 Nickel (%) 82.5 83.3 82.0 82.5 82.0 Copper (%) 93.9 93.4 94.0 94.0 94.2 Nickel (tonnes) 8,631 2,481 1,958 2,212 1,980 Copper (tonnes) 7,390 2,020 1,919 1,799 1,652 Eagle Ore mined (000 tonnes) 198,349 125,900 72,449 nil nil Ore milled (000 tonnes) 173,648 137,538 36,110 nil nil Nickel (%) 3.2 3.6 1.3 nil nil Copper (%) 2.4 2.8 1.0 nil nil Nickel (%) 78.5 81.8 43.7 nil nil Copper (%) 93.9 94.9 83.2 nil nil Nickel (tonnes) 4,300 4,093 207 nil nil Copper (tonnes) 3,905 3,606 299 nil nil Candelaria (100% Basis) 1 Ore mined (000 tonnes) 4,855 4,855 n/a n/a n/a Ore milled (000 tonnes) 4,347 4,347 n/a n/a n/a Copper (%) 0.7 0.7 n/a n/a n/a Gold (g/t) 0.2 0.2 n/a n/a n/a Silver (g/t) 2.6 2.6 n/a n/a n/a Copper (%) 91.8 91.8 n/a n/a n/a Gold (%) 71.8 71.8 n/a n/a n/a Silver (%) 89.3 89.3 n/a n/a n/a Copper (tonnes) 28,590 28,590 n/a n/a n/a Gold (ounces) 16,247 16,247 n/a n/a n/a Silver (ounces) 317,996 317,996 n/a n/a n/a 1 Lundin Mining ownership effective as of November 3, 2014, therefore Candelaria results prior to this date have not been disclosed. 4

Financial Results and 2015 Guidance 2015 production and cash operating cost guidance remains as per the press release issued 4 December 2014. Given current metal price declines, capital and exploration spending in selected areas is being reviewed and any resulting restraint measures will be reported along with the Company s 2014 financial results on Wednesday February 18th after market close, followed by a conference call and webcast on Thursday February 19th at 8:00 am Eastern Time. Conference call details are provided below: Please call in 10 to 15 minutes before the conference starts and stay on the line (an operator will be available to assist you). Call-in number for the conference call (North America): +1 416 340 2216 Call-in number for the conference call (North America Toll Free): +1 866 225 2055 Call-in number for the conference call (Europe Toll Free): +00 800 9559 6849 To take part in the interactive presentation, please log on using this direct link: http://www.investorcalendar.com/ic/cepage.asp?id=173539 The presentation slideshow will also be available in PDF format for download from the Lundin Mining website www.lundinmining.com before the conference call. A replay of the telephone conference will be available approximately one hour after the completion of the conference call until February 26, 2015. Replay numbers: North America: +1 905 694 9451 The pass code for the replay is: 5286647 About Lundin Mining Lundin Mining Corporation is a diversified base metals mining company with operations in Chile, Portugal, Sweden, Spain and the United States, producing copper, zinc, lead and nickel. In addition, Lundin Mining holds a 24% equity stake in the world-class Tenke Fungurume copper/cobalt mine in the Democratic Republic of Congo and in the Freeport Cobalt Oy business, which includes a cobalt refinery located in Kokkola, Finland. On Behalf of the Board, Paul Conibear President and CEO For further information, please contact: Sophia Shane, Investor Relations North America: +1-604-689-7842 John Miniotis, Senior Manager Corp Development & Investor Relations: +1-416-342-5565 Robert Eriksson, Investor Relations Sweden: +46 8 545 015 50 Qualified Person Mr. Steve Gatley, B.Sc (Eng.), C.Eng., is the Qualified Person as defined by National Instrument 43-101. Mr. Gatley is Vice President, Technical Services for the Company and has reviewed and approved the technical information contained in this news release. Forward Looking Statements Certain of the statements made and information contained herein is "forward-looking information" within the meaning of the Ontario Securities Act. This release includes, but is not limited to, forward looking statement s with respect to the Company s estimated full year metal production and C1 cash costs, as noted in the Segmented Guidance section and elsewhere in this document. These 5

estimates and other forward-looking statements are based on a number of assumptions and are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward -looking statements, including, without limitation, risks and uncertainties relating to the estimated cash costs, the timing and amount of production from the Eagle Project, the cost estimates for the Eagle Project, foreign currency fluctuations; risks inherent in mining including environm ental hazards, industrial accidents, unusual or unexpected geological formations, ground control problems and flooding; risks associated with the estimation of mineral resources and reserves and the geology, grade and continuity of mineral deposits; the possibil ity that future exploration, development or mining results will not be consistent with the Company's expectations; the potential for and effects of labour disputes or other unanticipated difficulties with or shortages of labour or interruptions in production; ac tual ore mined varying from estimates of grade, tonnage, dilution and metallurgical and other characteristics; the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses, commodity price fluctuations; uncertain po litical and economic environments; changes in laws or policies, foreign taxation, delays or the inability to obtain necessary governmental permits; and other risks and uncertainties, including those described under Risk Factors Relating to the Company's Business i n the Company's Annual Information Form and in each management s discussion and analysis. Forward-looking information may also be based on other various assumptions including, without limitation, the expectations and beliefs of management, the assumed lon g term price of copper, zinc, lead and nickel; that the Company can access financing, appropriate equipment and sufficient labour and that the political environment where the Company operates will continue to support the development and operation of mining projects. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Accordingly, readers are advised not to place undue reliance on forward-looking statements. 6