Hong Kong Interchange!"#$% Faster - Cheaper - Better &'(&)(&*



Similar documents
Transit Oriented Development and Value Capture Hong Kong

Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks

53km. Deliver the New Era Network. Island Line Extension. will be added to our Hong Kong network. New Railway Projects are in progress

Property Development

Executive Management s Report Railway Operations

Allied Environmental Consultants Limited Green Building Certification and Consultancy Project Job Reference

MTR Corporation Interim Results 13 August 2015

Water Supplies Department Active WSD Capital Works Contracts

The Group s attributable gross rental income in Hong Kong increased by 12% to HK$5,466 million

Company Name Address Telephone No.

Supported Employment Service (As at August 2014)

MTR Corporation Annual Results. 11 March MTR Corporation Limited. MTR Corporation

Data Analysis for Healthcare: A Case Study in Blood Donation Center Analysis

Planning for Office Land in Hong Kong

Liz Flight Attendant

LEGISLATIVE COUNCIL BRIEF HONG KONG SECTION OF GUANGZHOU SHENZHEN HONG KONG EXPRESS RAIL LINK

List of Aided Special Schools (2015/2016)

From Hong Kong International Airport to the hotel (37.1 km) Option 1: Hotel Shuttle (~45 minute drive, cost HK$160)

零 零 年 度. Environmental Report of Transport Department 2003

HONG KONG HOUSING AUTHORITY

Certificate Courses on Noise Control, Road Traffic Noise Assessment, Architectural Acoustics Design & Road Traffic Noise & Railway Noise Measurement

Existing Self-storage Sites are 10,000 sq ft or less

Central and Western District

2015 Application Information and Admission Arrangement for Non-JUPAS Sub-degree and Undergraduate Programmes 1 (as at )

Clearing Code and Branch Code

SHOP NOS. S8-S12,UPPER FLOOR OF EAST FOOTBRIDGE, & SHOP NO. S30 ON SECOND FLOOR, KORNHILL PLAZA, 1-2 KORNBILL ROAD

District Address Tele No. (+852) G/F YU SUNG BOON BLDG CENTRAL DES VOEUX ROAD MELBOURNE PLAZA

A CENTURY OF RAILWAY DEVELOPMENT THE HONG KONG STORY SUMMARY 1 INTRODUCTION 2 NOTATION

Sponsorship and Exhibition Opportunities. Showcase your brand at the biggest NEC event in Asia Pacific NEC ASIA PACIFIC USERS GROUP CONFERENCE

ECONOMIC CONTRIBUTION

List of Proposed ArchSD Projects for the Refurbishment of Government Buildings

ENVIRONMENTAL PROTECTION IN HONG KONG

Legislative Council Panel on Security. Construction of an Ambulance Depot at Choi Shun Street, Sheung Shui

PROVISION OF CYCLE TRACK NETWORK IN THE NEW TERRITORIES. Executive Summary

Hong Kong Mobile Market. Users Behavioral Pattern. Mobile Campaign Optimization

Programme on Source Separation of Commercial and Industrial Waste List of Properties and Buildings Receiving Certificate

DRIVING SERVICES SECTION. Guide to Taxi Written Test

Contract No. TD 100/2002. Cycling Study. Final Report. April in association with. Limited

DISCLOSEABLE TRANSACTION PROVISION OF FINANCIAL ASSISTANCE

ACQUISITION OF LAND BY PUBLIC TENDER

PROJECT MANAGEMENT OF A MAJOR MASS TRANSIT PROJECT - KCR WEST RAIL

Cataract Surgeries Programme HA List of Private Ophthalmologists

data access 270 brands throughout the journey Over offering shopping convenience to passengers

Offer details Health Check Plan (A) - Women (HBHU) HKD4,831. Detailed Medical History. Complete Physical Examination.

A. What to do if you have a problem with an HA hospital/hospital staff, Where to lodge a complaint

Why build the Silvertown Tunnel?

CHAPTER 4 RADIATION MONITORING AND ASSESSMENT

HOW TO APPLY FOR THE HONG KONG OFFER SHARES

Property management. Executive management s report Property review

Panel on Transport. Letter from Hon Charles Peter MOK on the Internet car calling service and hire car sharing service

Additional and Planned Places of Rehabilitation Services (From January to June 2015)

Company Name Address Telephone No.

Hong Kong. Airport Railway

Fire Risk in Metro Tunnels and Stations

CHAIRMAN S STATEMENT. I announce that provisions of approximately HK$1,153. million has been made for the property development

4) The personal data disclosed in this list should not be used for any unrelated purposes.

JOINT ANNOUNCEMENT CONNECTED TRANSACTION SALE AND PURCHASE OF THE ENTIRE ISSUED SHARE CAPITAL OF SOUTH CHINA ASSET MANAGEMENT LIMITED

Smoking (Public Health) (Designation of No Smoking Areas) (Amendment) Notice 2014

Ex-gratia payment scheme for phasing out pre-euro IV diesel commercial vehicles. Notes for Application

Legislative Council Panel on Education Start-up Loan for Post-secondary Education Providers

TERMINAL 2 ANNUAL REPORT 2006/07

AIA Hong Kong Demonstrates Corporate Citizenship in Greater China Love Your Heart! Fundraising Campaign to Promote Health Care

Free MTR Rides and More for Lucky Birthday Stars Each Month Under MTR Happy Birthday Happy Journey Programme

Prospectus Company Hong Kong Stock Exchange HKSCC U.S. Securities Act Stabilizing Manager

Study of the Integrated Rail-Property Development Model in Hong Kong

APPLICATION FOR PERMISSION UNDER SECTION 16 OF THE TOWN PLANNING ORDINANCE (CAP. 131) GUIDANCE NOTES

Hong Kong Youth Hostels Association Report for the Year 2011/12

Vehicle Maintenance Workshops Charter Subscriber List A Pages 1 of 13

5. Services for Exhibitors

NOTE FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE

Relevant. Development Name and Location. Requirement(s) under Lease

Legislative Council Panel on Security

Legislative Council Panel on Security Creation of a permanent Chief Superintendent of Police post of the Cyber Security and Technology Crime Bureau

Fire Service Installation Contractors CLASS 2

Senior Management s Biographical Information

Hong Kong PhD Fellowship Scheme

Transportation.

Grüezi and welcome to Swissôtel Nankai Osaka!

THE CHINESE UNIVERSITY OF HONG KONG STAFF QUARTERING UNIT USEFUL INFORMATION ON LIVING IN UNIVERSITY STAFF QUARTERS (USQ)

Examination of Estimates of Expenditure

A Guide for Students Seeking Summer Jobs 暑 期 工 作 錦 囊

Nombre Categoria Estado Ciudad Domicilio Red Proveedor

Unless otherwise defined in this announcement, terms defined in the Prospectus have the same meanings when used in this announcement.

Mai Po Inner Deep Bay Ramsar Site Waterbird Monitoring Programme

* For identifi cation purposes only

Transcription:

Hong Kong Interchange!"#$% Faster - Cheaper - Better &'(&)(&*

Executive Summary The Government s Plan is costly and difficult to build. The West Kowloon Terminus is poorly located. The plan is socially and environmentally unsustainable. A group of experts from different disciplines has come together and designed an alternative plan.

Executive Summary This plan has two components: Building the express railway terminus as an integrated interchange at Kam Sheung Road (i.e. the Hong Kong Interchange). Direct connection between the express train terminus and Central can be provided with an Extension of the Airport Express Line from Tsing Yi to Kam Sheung Road. This proposal can provide faster, cheaper, and better services than the Government s plan.

Overview Review of the Government s Plan Our Alternative Advantages: Faster, Cheaper, Better Conclusion

West Kowloon Terminus Poor Location Inconvenient for the majority of Hong Kong people. Difficult transfer - XRL@WKT, Kowloon Station, and Austin Station. Traffic problems at West Kowloon. No space for expansion. Design constraints for the WKCD.

INCONVENIENTLY LOCATED FOR THE MAJORITY OF HONG KONG PEOPLE!

INEFFICIENT LOCAL TRANSFER @ WEST KOWLOON TERMINUS

Airport Express Line Tung Chung Line through endless shops and boutiques... West Rail Line 12 MINUTES TREK 5 MINUTES TREK INEFFICIENT LOCAL TRANSFER @ WEST KOWLOON TERMINUS

Airport Express Line Tung Chung Line through endless shops and boutiques... West Rail Line 12 MINUTES TREK 5 MINUTES TREK

All transit modes are disconnected in West Kowloon.

West Kowloon Station complicates traffic situation. New roads will further impede pedestrian flows.

West Kowloon Station complicates traffic situation. New roads will further impede pedestrian flows.

Roads cut Kowloon into islands.

West Kowloon puts constraints on development of West Kowloon Cultural District.

Cost 80 60 SIL - 7Bn COST (Bn) 40 XRL@WKT - 63Bn WIL - 15.4Bn 20 SCL - 37.4Bn 0 XRL@WKT: Express Rail Line with the Terminus at West Kowloon SCL: Shatin and Central Link; WIL: West Island Line; SIL: South Island Line

SCMP

Sustainability Socially Unsustainable Most Hong Kong people will not be directly benefited. Resumption of residential land in Choi Yuen Tsuen.

Sustainability Environmentally Unsustainable Worsen traffic problems at West Kowloon. Another major excavation at West Kowloon. Huge amount of construction waste. Very high operational cost Very high total carbon footprint

Hong Kong Interchange

EXPRESS RAIL LINE HONG KONG INTERCHANGE

EXPRESS RAIL LINE HONG KONG INTERCHANGE HONG KONG ISLAND EXPRESS

DIRECT CONNECTION TO NORTHWEST NEW TERRITORIES EXPRESS RAIL LINE HONG KONG INTERCHANGE HONG KONG ISLAND EXPRESS DIRECT CONNECTION TO WEST KOWLOON EASY TRANSFER TO THE AIRPORT DIRECT CONNECTION TO HONG KONG ISLAND

ONE CONCOURSE CONNECTS MAINLAND AND HONG KONG DIRECT CONNECTION TO NORTHWEST NEW TERRITORIES EXPRESS RAIL LINE HONG KONG INTERCHANGE HONG KONG ISLAND EXPRESS DIRECT CONNECTION TO WEST KOWLOON EASY TRANSFER TO THE AIRPORT DIRECT CONNECTION TO HONG KONG ISLAND

TUEN MUN SIU HONG ASIA WORD-EXPO TIN SHUI WAI AIRPORT LONG PING YUEN LONG TO: MAINLAND CHINA TSING YI HONG KONG INTERCHANGE TSUEN WAN WEST MEI FOO NAM CHEONG KOWLOON AUSTIN EAST TSIM SHA TSUI HUNG HOM HONG KONG

Advantages Cheaper Lower construction cost Lower operational cost Cheaper fares Faster Easier local transfer Shorter Total Travel Time for the majority of Hong Kong people Better Lower risk of construction delay Increase patronage Lower social and environmental impacts

Cheaper

Cost 80 60 COST (Bn) 40 XRL@WKT - 63Bn 20 0 Government s Plan 63Bn LAND RESUMPTION - 4Bn HKIE - 7Bn XRL@HKN - 14Bn Hong Kong Interchange 25Bn

Cost Cheaper Operational Cost Shorter travel distance Lower maintenance cost More integrated design Stabling closer to the terminus Less energy consumption More efficient use of existing infrastructure Cheaper Fares

Faster

+ + + = Express Rail Travel Time Immigration and Customs Clearance Transfer to Local Transportation Local Travel Time Total Travel Time

Airport Express Line Tung Chung Line through endless shops and boutiques... West Rail Line 12 MINUTES TREK 5 MINUTES TREK

Example 1: From Boundary to Hong Kong Station (with XRL terminal at West Kowloon) + + + = Express Rail 14 min Immigration and Customs 15 min Transfer to Kowloon Station 12 min Kowloon Station to Hong Kong Station 5 min 46 min

WEST RAIL LINE (ELEVATED) HONG KONG ISLAND EXPRESS (ELEVATED) EXPRESS RAILWAY (ELEVATED/UNDERGROUND) HKIE WRL BUSES / TAXIS XRL HKIE WRL BUSES / TAXIS XRL BELOW GROUND INTERCHANGE ABOVE GROUND INTERCHANGE

Example 2: From Boundary to Hong Kong Station (with XRL terminal at Hong Kong Interchange) + + + = Express Rail 4 min Immigration and Customs 15 min Transfer to HKIE Station 2 min HKIE Station to Hong Kong Station 21 min 42 min

From Boundary to Destinations in HK (Total Travel Time, with XRL terminal at West Kowloon, in minutes) 54 YUL 69 TAP* 62 AIRPORT 67 TUM 46 TWW 46 56 PRE 38 ETS 54 SHT* HOK 76 CHW 77 TKO * ACCESS WITH BUS @ 40KM/HR

From Boundary to Destinations in HK (Total Travel Time, with XRL terminal at Hong Kong Interchange, in minutes) 24 YUL 61 TAP* 49 AIRPORT 37 TUM 29 TWW 42 HOK 50 PRE 42 ETS 56 SHT* 74 TKO 72 CHW * ACCESS WITH BUS @ 40KM/HR

Time Differences (in minutes) -30 YUL -8 TAP* -13 AIRPORT -30 TUM -17 TWW -4 HOK -6 PRE +4 ETS +2 SHT* -3 TKO -4 CHW * ACCESS WITH BUS @ 40KM/HR

Better

Construction Time XRL with Terminus at West Kowloon Construction by 2015 High Risk of Failing to meet the date XRL with Terminus at Hong Kong Interchange XRL Tunnels and Terminus 6 Years adequate with Low Risk Hong Kong Island Express 6 Years adequate with Low Risk Completion by 2015 if there is a Will to Succeed

Construction Time Work in Parallel Northern Component: XRL Tunnels and Terminus Southern Component: Hong Kong Island Express Design, EIA and Gazette Civil Construction Systems / Architectural Contingency Total 1.5 Yr 3 Yr 1 Yr 0.5 Yr 6Yr

Sustainability Social Impact Fairer: shorter total travel time for the majority of Hong Kong people - easy access from Yuen Long, Tuen Mun, Tsuen Wan and the Airport. Choi Yuen Tsuen saved. Minimal land resumption in Kam Tin and Pak Heung.

HONG KONG INTERCHANGE ESTIMATED LAND RESUMPTION Hong Kong North Station A car park An electric substation A few houses to the South Proposed Depot Pig farms Recycling storage Abandoned houses PROPOSED DEPOT

HONG KONG INTERCHANGE

HONG KONG INTERCHANGE

PROPOSED DEPOT

PROPOSED DEPOT

Sustainability Environmental Impact Simpler construction No need to dig up Jordan Road again. No need for Emergency Rescue Station. Less construction waste. Much more efficient use of space. More passengers will use rail for local transfer. Lesser traffic congestion at West Kowloon.

Other Advantages In-town check-in for long haul trains possible: using the current AEL model. Terminus construction can be staged to meet demand. Land sale at West Kowloon can proceed at anytime. Easier design and construction for the WKCD.

DIRECT CONNECTION TO NORTHWEST NEW TERRITORIES EXPRESS RAIL LINE HONG KONG INTERCHANGE HONG KONG ISLAND EXPRESS DIRECT CONNECTION TO WEST KOWLOON EASY TRANSFER TO THE AIRPORT DIRECT CONNECTION TO HONG KONG ISLAND

OUR PROPOSED DEPOT SITE GOVERNMENT PROPOSED DEPOT SITE (CHOI YUEN TSUEN)

Conclusion

Hong Kong North Station Faster Easier local transfer Shorter Total Travel Time for the majority of Hong Kong people Lower risk of construction delay Cheaper Lower construction cost Lower operational cost Cheaper fares Better Increase patronage Lower social and environmental impacts

Expert Panel Dr Hung Wing-tat +,- Ir Albert Lai Kwong-tak./0 Dr Leung Kai-chi 123 Mr Stanley Ng 4,5 Ms Pong Yuen-ying 678 Ir Ronald Taylor 9: Mr Paul Zimmerman ;<=