Colombia Firm Energy Auction: Descending Clock or Sealed-Bid?

Similar documents
New England s Forward Capacity Auction

Utilities Policy. Using forward markets to improve electricity market design q. Lawrence M. Ausubel, Peter Cramton * abstract

Asymmetric Information

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2

Overview: Auctions and Bidding. Examples of Auctions

ITALIAN EXPERIENCE WITH CAPACITY SUPPORT MECHANISMS

FERC Workshop on Price Formation: Scarcity and Shortage Pricing, Offer Mitigation, and Offer Caps in RTO and ISO Markets (Docket. No.

CAPACITY PAYMENTS IN IMPERFECT ELECTRICITY MARKETS: NEED AND DESIGN 1

The UK Electricity Market Reform and the Capacity Market

Managerial Economics

New Zealand Emissions Trading Scheme Review 2015/16 Discussion Document and Call for Written Submissions

A. a change in demand. B. a change in quantity demanded. C. a change in quantity supplied. D. unit elasticity. E. a change in average variable cost.

COMPETITIVE ELECTRICITY MARKETS AND INVESTMENT IN NEW GENERATING CAPACITY. Paul L. Joskow 1 MIT June 12, 2006

Economic Efficiency, Government Price Setting, and Taxes

How To Make A Simultaneous Auction

Measuring Unilateral Market Power in Wholesale Electricity Markets: The California Market,

8 Multi-contract tendering procedures and

Understanding the Capacity Market

GAFACADEMY Transforming the Global Dairy Industry with an Innovative Trading Platform

Concepts and Experiences with Capacity Mechanisms

Chapter 7. Sealed-bid Auctions

A dynamic auction for multi-object procurement under a hard budget constraint

ECON 459 Game Theory. Lecture Notes Auctions. Luca Anderlini Spring 2015

Demand. See the Practical #4A Help Sheet for instructions and examples on graphing a demand schedule.

Measurement and Mitigation of Market Power in Wholesale Electricity Markets

A Capacity Market that Makes Sense

Discussion Paper by CERC Staff

Monopoly WHY MONOPOLIES ARISE

Memo INTRODUCTION UNDER-SCHEDULING

Electricity Market Management: The Nordic and California Experiences

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

Reverse Auctions and the Government

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market

Electricity Market Design: The Good, the Bad, and the Ugly

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

Understanding Capacity Remuneration Mechanisms Drivers and Basic concepts

Supplementary Methods of Distributing Gilts

Market Supply in the Short Run

DECENTRALISED RELIABILITY OPTIONS Securing European electricity markets Florence Forum, 5 June 2014 Stephen Woodhouse, Director

Generator Optional. Timeline including the next steps. A practical example. Potential benefits of OFA? Key implications. How might OFA work?

Demand Response Programs In Ontario. IESO Demand Response Working Group Public Session

The Political Economy of Electricity Markets A Brief History January 10, Peter Van Doren Senior Fellow Editor, Regulation Cato Institute

State of New Jersey 31 CLINTON STREET, 11 TH FL P. O. BOX NEWARK, NEW JERSEY SUPPLEMENTAL COMMENTS OF THE

ECON 3312 Macroeconomics Exam 3 Fall Name MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

The Role of the ISO in U.S. Electricity Markets: A Review of Restructuring in California and PJM

June 28, RE: file code CMS-1270-P. Dear Dr. McClellan:

Share Trading 17/9/2012

Contracting Strategy of a Project

SELL YOUR PROPERTY IN 60 DAYS OR LESS.

EAI Response to ISEM Draft Decision

Response by NIE Energy (PPB)

Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources

A new electricity market for Northern Ireland and Ireland from Integrated Single Electricity Market (I-SEM)

SUPPLY AND DEMAND : HOW MARKETS WORK

Midterm Exam #1 - Answers

Development and Growth of the GlobalDairyTrade Platform

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

Monetary Operations: Liquidity Insurance

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

Rules on Southern Companies Energy Auction Participation

The winner of the various auctions will get 2 cents per candy.

2. Executive Summary. Emissions Trading Systems in Europe and Elsewhere

Experiment 8: Entry and Equilibrium Dynamics

Lecture Notes. 1 What is Asymmetric Information and why it matters for Economics?

VA George Mason University, Department of Economics, Fairfax, VA 22030

Contracts for Difference - the new support regime for low carbon generation

Energy Efficiency and Demand Response Programs in the United States

However, to ensure that JGN can continue attracting necessary funds, we depart from the AER s guideline by estimating:

ESB NATIONAL GRID RESPONSE TO CER/03/266 INTERCONNECTOR TRADING PRINCIPLES IN THE MAE

Comparative Study of Frameworks to protect the Long Term Interests of Pension Funds Investing in Public-Private Partnerships

AGCS Gas Clearing and Settlement AG

Doubts About State-Mandated Power Contracts

Price Responsive Demand for Operating Reserves in Co-Optimized Electricity Markets with Wind Power

CHAPTER 12 CHAPTER 12 FOREIGN EXCHANGE

Project Lead Generation:

ADDITIONAL (ASX DESCRIPTION CODE: ZGOL) AND THE DATE

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question on the accompanying scantron.

Name Eco200: Practice Test 2 Covering Chapters 10 through 15

Long Run Supply and the Analysis of Competitive Markets. 1 Long Run Competitive Equilibrium

Evaluating Energy Offer Cap Policy Market Roadmap ID: 42 Issues List: MR042. Market Subcommittee (MSC) May 3, 2016

Bridging the Missing Money Gap Solutions for competitive power cash flow shortfalls

Instruction. N Title. 1.3 In this Instruction: LCH.Clearnet SA IV.5-4. Article 1 - Scope and interpretation

6. In general, over longer periods, demand tends to become (A) More elastic (B) Perfectly elastic (C) Perfectly inelastic (D) Less elastic

Good morning, this is Jose Velez, CEO of Cementos Argos. I am joined by Mr. Ricardo Sierra, CFO and Maria Clara Aristizabal, Assistant to the CEO.

THE USE OF OUTSIDE CONTRACTORS FOR PORT MAINTENANCE. John R. Lethbridge

Using Auctions to Divest Generation Assets

Economic Insight from Internet Auctions. Patrick Bajari Ali Hortacsu

Chapter. Perfect Competition CHAPTER IN PERSPECTIVE

Chapter 14 Monopoly Monopoly and How It Arises

Chapter 22 The Cost of Production Extra Multiple Choice Questions for Review

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

ESRI Research Note. The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch

1. Supply and demand are the most important concepts in economics.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Finance, Saving, and Investment

Chapter 4 Supply and Demand Macroeconomics In Context (Goodwin, et al.)

An Introduction to Alberta s Financial Electricity Market

Treasury Floating Rate Notes

Chapter 11. International Economics II: International Finance

2009 Bates White, LLC. Asset Management Agreements Christopher Gulick Presentation to the 2009 Energy Management Fall Meeting November 10, 2009

Transcription:

Colombia Firm Energy Auction: Descending Clock or Sealed-Bid? Peter Cramton University of Maryland 3 June 2015 I am grateful to CREG for funding this research. The views are my own. 1

Outline Review of key features of market Purpose of market Why forward procurement? Commitment period Demand curve Comparison Descending clock auction Sealed bid auction Recommendation Other issues Questions 2

Purpose of market Induce just enough investment to maintain adequate resources Induce efficient mix of resources Reduce market risk Avoid market power in firm energy market Reduce market power in energy market Pay no more than necessary 3

Why forward procurement? New projects compete in advance of entry Coordinated entry Less uncertainty in achieving target Avoid boom/bust New resources set price directly Less reliance on demand curve for price setting Long-term commitment for new resources Reduced investor risk Better price signal for new investment 4

Commitment period New resources up to 20 years Generator selects duration at qualification Long commitment lets new resources lock-in firm energy price, reducing risk and encouraging investment Price is in constant $ (adjusted for inflation) Existing resources one year Does not need long commitment, since costs are already sunk Short commitment reduces risk (more draws from price distribution) 5

Demand curve Price of firm energy 2 CONE Price ceiling CONE ½ CONE 4% 0 Target CONE = Cost of New Entry (marginal unit) Existing supply can exit at prices below 80% of CONE Price floor Firm energy Uncertainty added of 1.5% to address generator market power; set by auctioneer 6

Comparison of descending clock and sealed-bid 7

International experience Descending clock Colombia Brazil New England United Kingdom Sealed bid (currently under consideration) PJM (New England) (Ireland) (Colombia)

Descending clock auction Auctioneer announces high starting price Generators name quantities Excess supply is determined Auctioneer announces a lower price Process continues until supply equals demand 9

Descending clock auction (Auctioneer s perspective) Price of firm energy Supply Rejected Supply curve is expressed in a series of rounds, starting with price ceiling P C Accepted Demand 0 Q C Firm energy 10

Descending clock auction (Bidder s perspective) Price of firm energy Supply P 1 P 2 P 3 P 4 Only supply at end of round is revealed to bidders P 5 0 Demand Firm energy 11

Sealed-bid auction (Auctioneer s perspective) Price of firm energy Supply Rejected Supply curve is expressed in a single round, starting with price ceiling P C Accepted Demand 0 Q C Firm energy In all other respects the two approaches are identical! 12

Descending clock Sealed-bid Price of firm energy Both formats are single-price auctions Supply Rejected P C Accepted Demand 0 Q C Firm energy The two only differ to the extent generators change exit bids in response to information revealed after each clock round 13

Why change your exit bid? Reason 1: Exercise market power Price of firm energy Supply Rejected P C P C Generator sees an opportunity to increase price! Accepted Demand 0 Q C Firm energy This unilateral exercise of market power is undesirable, as it may lead to prices that are above competitive levels. 14

Why change your exit bid? Other reasons Revelation of common value uncertainty Causes bidders to bid more or less aggressively as they get information about the supply curve Outcome discovery Budget, portfolio, or other constraints cause a shift in business plans Both of these reasons are good reasons for the adjustment of exit bids consistent with economic efficiency But neither seems too important in the case of a small number of new bids and a single merit order

Other factors to consider Privacy Clock auctions respect the privacy of infra-marginal bids Only reveal the high (rejected) portions of supply curve Winning generators only reveal, I m willing to supply at the clearing price Transparency Clock auctions have a higher level of transparency as bidders can see the supply curve as it is bid Simplicity A clock auction is slightly harder to conduct and participate in than a seal-bid auction; auctioneer introduces uncertainty to address market power However, with proxy bidding, participation can be just as easy But none of these factors are important in this case of a small number of new bids and single merit order

Summary of pros and cons and there importance in this setting Issue Exercise of market power Revelation of common value uncertainty Outcome discover to manage aggregate constraints Privacy of infra-marginal bids Transparency Simplicity Descending clock Sealed-bid

Recommendation Colombia should shift to a sealed-bid auction

Other issues 19

Addressing lumpy resources Single-price auction is easily defined for divisible products Clearing price and quantity established by intersection of supply and demand Market clearing is exact With lumpy resources Exact clearing is not possible Select winnings with efficiency objective Accept collection of offers that maximize net value (gains from trade) Supporting prices generally do not exist Best pricing approach is complex and setting specific

Clearing rule: maximize net value P 1. P 2. P 3. S S S P C Unit accepted P C P C Unit rejected D D D Q Q Q 21

Example maximization of net value P net value A = minus B S P A A D Q 0 Q A Q 22

Example maximization of net value P net value B = minus P B B S D Q 0 Q B Q 23

Auction frequency All reliability markets other than Colombia have annual auctions Annual auctions provide steady opportunity for entry and exit Annual auctions send price signal based on need Higher price when new entry is required Lower price when surplus New and existing compete in all years Colombia should consider shift to annual market

Recent developments in reliability markets All reliability markets other than Colombia have had performance incentives that were too weak Rules allowed many excuses for not delivering energy during scarcity periods This led to poor performance and near crisis situations Several markets now have adopted strong performance incentives, which like Colombia s reliability option, eliminates all excuses New England: pay-for-performance (shortage price = $5400/MWh) PJM: capacity performance (shortage price = $2700/MWh) Texas: scarcity pricing (shortage price = $9000/MWh) High spot price in reserve shortages is essential to motivate operational reliability in thermal systems Colombia needs high spot in its long and rare scarcity events In all markets, it is important that load is properly hedged

Questions 26