TVO and Nuclear Waste Management at Olkiluoto. Corporate Adviser



Similar documents
NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012

Teollisuuden Voima Oyj - General Presentation January Ilkka Mikkola Senior Adviser (Former Fuel Manager) Teollisuuden Voima Oyj

Onkalo: Recent policies on the disposal of nuclear waste in Finland

Nuclear Waste Management in Finland

NEW NUCLEAR POWER PLANT UNIT IN FINLAND ACCEPTED BY THE FINNISH PARLIAMENT

Pocket Guide Pocket Guide

Swiss media visit to Olkiluoto August 15, 2014

Management of spent fuel and radioactive waste in Finland national programme in accordance with Article 12 of the Council Directive 2011/70/Euratom

Pocket Guide. Key Figures Teollisuuden Voima Oyj Well-being with nuclear electricity. Pocket Guide

RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND

THE CONSTRUCTION OF. Natural Gas 11% Coal 12% Industry 49% Nuclear 18%

Pocket Guide. Key Figures Teollisuuden Voima Oyj Well-being with nuclear electricity

Nuclear Design Practices and the Case of Loviisa 3

Nuclear Power Financing in Finland Past experiences and future challenges. Jean-Francois Tapprest

How To Understand The Environmental Impacts Of The Fi Nal Disposal Of Spent Nuclear Fuel

POHJOLAN VOIMA COMBINES RESOURCES

Investing in our common future

Annual Report. Teollisuuden Voima Oy

Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar

Safety Case for the Disposal of Spent Nuclear Fuel at Olkiluoto

The new waste burning investment in the Helsinki Metropolitan Area

WORKING PAPER Identifying remaining socio-technical challenges at the national level: Finland (WP 1 MS 5)

Environmental Impact Assessment Report. Extension of the Olkiluoto Nuclear Power Plant by a Fourth Unit

COMPARISON OF ELECTRICITY GENERATION COSTS

New legislation in the nuclear field in Sweden

Olkiluoto 3 Basic Facts

TKS Nuclear Waste Management of the Olkiluoto and Loviisa Power Plants: Programme for Research, Development and Technical Design for

- a leading energy company in the Nordic area

Finnish Nuclear Power Producer TVO Downgraded To 'BBB-/A-3'; Outlook Negative

Fortum Corporation. Financial Statements Bulletin January Fortum Corporation. Domicile Espoo Business ID

Monitoring of Tunnel End Plug Performance in ONKALO

Values. Pohjolan Voima

Preliminary validation of the APROS 3-D core model of the new Loviisa NPP training simulator

Report of the Committee for Nuclear Energy Competence in Finland

Annual Report POHJOLAN VOIMA PRODUCES SUSTAINABLE FINNISH ENERGY

7.1 General Events resulting in pressure increase 5

Design of the Disposal Facility 2012

Fact sheet: Olkiluoto 3

General. Shareholders' meeting. Annual General Meeting in 2014

National Report 2015 to the Agency for the Cooperation of Energy Regulators and to the European Commission

Joint Convention on the safety of spent fuel management and on the safety of radioactive waste management

VESI JA ENERGIA VIENTITUOTTEENA. Fortum Miko Olkkonen Senior Executing Manager, Hydro Projects Fortum Power & Heat Oy

CO 2 emissions, energy efficiency and renewables are in the focus. A carbon neutral future as a goal

- a leading energy company in the Nordic area

Investigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software

Business review, Annual General Meeting, 9 April 2013

Fortum Corporation. Financial Statements Bulletin February Fortum Corporation. Domicile Espoo Business ID

Condensed consolidated income statement

Co-operative, Industry Driven R&D&I for Energy and Environment. Antti Tumelius CLEEN Oy

Master Degree in Nuclear Engineering: Academic year

Safety culture in the construction phase lessons learned from Olkiluoto 3 Pia Oedewald, Senior scientist VTT Technical Research Centre of Finland

Fortum a leading power and heat company in the Nordic area

The Closure of the Asse Research Mine

National Report 2014 to the Agency for the Cooperation of Energy Regulators and to the European Commission

Olkiluoto 3 Experience

Energy supply and consumption

ČEZ, a. s. BALANCE SHEET in accordance with IFRS as of June 30, 2014 in CZK Millions

Corporate Governance Statement Teollisuuden Voima Oyj Well-being with Nuclear Electricity

Storage and Disposal of Spent Fuel and High Level Radioactive Waste

Sale of Fortum s electricity distribution business in Sweden

Power Generation Portfolio

Corporate Social Responsibility 2011

CHAPTER 7 WHAT WILL BE REQUIRED OF THE BRITISH GOVERNMENT TO BUILD THE NEXT NUCLEAR POWER PLANT? Stephen Thomas

E.ON Nordic: Steady Value Growth

Security and Safeguards Considerations in Radioactive Waste Management. Canadian Nuclear Safety Commission

Energy story of Turku region, history and future

Reconciling Electricity Markets and New Nuclear Build. Platts 3rd Annual European Nuclear Power Conference

A Nuclear New Deal. Jacques Besnainou. President, AREVA Inc. AREVA

Replacement of steam generators at Ringhals nuclear power plant.

Structural Integrity and NDE Reliability II

Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi

ČEZ, a. s. BALANCE SHEET in accordance with IFRS as of March 31, 2015 in CZK Millions

Olkiluoto 3 Project June 2010

FORTUM A leading power and heat company in the Nordic area

Fortum Corporation. Financial Statements Bulletin February Fortum Corporation. Domicile Espoo Business ID

Nuclear Power s Role in Enhancing Energy Security in a Dangerous World Al Shpyth, B.A., M.E.S. Director, Government Relations Cameco Corporation

Qualification of In-service Inspections of NPP Primary Circuit Components

Strategic Centre for Science, Technology and Innovation Energy and Environment CLEEN Oy. Tommy Jacobson CLEEN Oy. 15 th of October, 2009

Vattenfall Q results

COMPUTER SYSTEMS IN THE OPERATION, MAINTENANCE AND TECHNICAL SUPPORT OF LOVIISA NPS

MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY

Solutions for Nuclear & Renewable Power Generation

How To Understand The Case Of Nuclear Waste Repository Projects

Nuclear power plant systems, structures and components and their safety classification. 1 General 3. 2 Safety classes 3. 3 Classification criteria 3

KYT2010 Finnish Research Programme on Nuclear Waste Management Final Report

Financial Statements Vantaa Energy Group

APPENDIX CC NUCLEAR WASTE STORAGE

Status, responsibilities and missions of ANDRA (France)

Anhörung Rückholung/Rückholbarkeit hoch radioaktiver Abfälle aus einem Endlager, Reversibilität von Entscheidungen

Presentation of Grupo ACS. September 2009

Stock Exchange Release 8 May 2003, at 9 am

Nuclear Waste A Guide to Understanding Where We've Been and Where We're Going

FINANCIAL INSTITUTIONS ENERGY INFRASTRUCTURE, MINING AND COMMODITIES TRANSPORT TECHNOLOGY AND INNOVATION PHARMACEUTICALS AND LIFE SCIENCES

The Risks of Building New Nuclear Power Plants

MANAGEMENT DISCUSSION AND ANALYSIS

Helmut Engelbrecht, Chief Executive of URENCO Group, commenting on the half-year results, said:

Opportunities for industry - perspective of CLEEN Ltd

Present status of the Swedish nuclear waste management programme. Kastriot Spahiu, SKB

Our Environment Loviisa power plant

Role of Northern European forestry in the energy production chain, case Fortum. Jari Nylén Purchasing Manager Fortum Power and Heat Oy, HEAT

Transcription:

Olkiluoto, 28 October 2008 TVO and Nuclear Waste Management at Olkiluoto Corporate Adviser

Nuclear Power Plants in Finland Olkiluoto OL1 BWR 860 MW 1979 OL2 BWR 860 MW 1982 Population 5.3 million Power Demand 90 TWh/a Loviisa LO1 PWR 488 MW 1977 LO2 PWR 488 MW 1981 Olkiluoto Loviisa Helsinki 2

Electricity Supply by Energy Sources in 2007 Source: Finnish Energy Industries

TVO - Teollisuuden Voima Oyj Company Privately owned generating company Established in 1969 Personnel about 700, annual turnover about million 230 Produces electricity only to the shareholders at cost basis Existing Nuclear Power Plant Units (Olkiluoto 1 and 2) 2 x 860 MW, BWR, Westinghouse Atom Commercial operation in 1979 and 1982 Modernization and upgrade in several stages from 660 to 860 MW New Nuclear Power Plant Unit (Olkiluoto 3) 1,600 MW, PWR, Areva NP/Siemens consortium Commercial operation in 2011 Other Power Plants 257 MW stake in 565 MW coal condensing unit 1 MW wind mill in Olkiluoto Subsidiaries Posiva Oy (60%), responsible for the final disposal of spent fuel produced by its shareholders TVO Nuclear Services Oy (100%), specialized in know-how consulting 4

TVO Shareholders Etelä-Pohjanmaan Voima Oy 6.6% Fortum Power and Heat Oy 29.1% Karhu Voima Oy 0.1% Pohjolan Voima Oy 57.9% Kemira Oyj 12% 1.2% Oy Mankala Ab 8.1%

TVO s Operating Principle Debt holders - market rate TVO Power at cost base Share- holders (6) Power at cost base Power to Other power off-takers Power to E x t e r n a l Shareholders - equity injection - subordinated shareholder loan - no dividend Power use in own mills Power use in own mills M a r k e t

Track Records of Olkiluoto 1 and 2

Olkiluoto Infrastructure 8

Demand for Electric Power and Production Capacity Source: Finnish Energy gy Industries

OL4 in a Nutshell TVO applied to the Government in April 2008 for a Decision-in-Principle in to build the fourth nuclear power plant unit at Olkiluoto, Eurajoki. Electrical output 1 000-1 800 MW Plant type either a boiling water reactor (BWR) or pressurized water reactor (PWR) plant All TVO s present shareholders support the venture Investment decision expected in 2012 Operation estimated to start at the end of the 2010s Investment EUR 3-4 billion 10

Organisation of Nuclear Waste Management LICENCES Government Ministry of Employment and the Economy TVO FORTUM POWER & HEAT SUPERVISION Radiation and Nuclear Safety Authority (STUK) MANAGEMENT OF FUNDING Nuclear Waste Management Fund, Ministry of Employment and the Economy POSIVA Consultants, Contractors, Universities, Research Institutes 11

Status of Nuclear Waste Management at Olkiluoto Underground d disposal of low- and dintermediate- t level operating waste VLJ Repository in operation since 1992 Spent fuel management Interim storage facility (KPA Store) in operation since 1987 1999-2001, Decision i in Principle i process for building a joint deep repository for TVO and Fortum spent fuel Since 2004, POSIVA has been constructing an underground site characterisation facility (ONKALO) Start of final disposal in 2020 Funds collected in the price of nuclear electricity for future costs of nuclear waste management TVO has set aside EUR 927.7 million by 2008 12

LLW/ILW Repository at Olkiluoto Control building Shaft Transport tunnel Research tunnel Low-level waste Hall Connection tunnel Intermediate-level waste 13

Crane Hall of the LLW/ILW Repository

Silo for LLW

Interim Storage Facility for Spent Fuel at Olkiluoto 16

Development of Spent Fuel Repository 17

Final Disposal Facility for Spent Fuel

Alternatives for Final Disposal Concept Vertical Concept (KBS-3V) Horizontal Concept (KBS-3H) Rock Rock Filling material Bentonite Canister Bentonite Canister Source: Posiva

Arguments Supporting Use of Nuclear Power in Finland Technical and economical experiences of existing nuclear power plants over 30 years CO 2 free energy form Competitive, stable and predictable production costs Security of supply aspects Politically ll accepted waste management solutions 20

Emissions Free, Päästötöntä Safe and sähköä Reliable luotettavasti Electricity from Olkiluoto. Olkiluodosta. Today Nyt and ja in tulevaisuudessa. the Future. OL4 OL2 OL3 OL1

Thank you! 22