Project Finance Structuring: Case Study - Nam Theun 2



Similar documents
XAYABURI HYDRO POWER PLANT, LAO PDR

Asian Development Bank Institute. ADBI Working Paper Series

Clean Development Mechanism Project Opportunities in Indonesia

Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

How KASIKORNBANK Plans to Support Green Projects

CHAPTER 3 RESEARCH DESIGN

Daily report. April 26, BCEL-KT Securities Company Limited Page 1. Market Summary. Turnover by investor type (LAK m)

Pakse Urban Environmental Improvement Project (RRP LAO 43316)

Thailand s Commercial Banks Role in Financing Dams in Laos and the Case for Sustainable Banking

Financing hydropower Introduction to the Specifics of Small Hydro Power Plants

Integrated Water Resources Management. Dong Nai Pilot Project, Vietnam Nam Ngum Pilot Project, Lao PDR Stung Sen Pilot Project, Cambodia

Greater Mekong Sub-region Power Trade and Interconnection, Mongolia Grid Interconnection Perspectives

Clean Energy Project Financing. March 5, 2012

PORT REFORM TOOLKIT WORLD BANK

GMS Economic Cooperation Program

Options Assessment for Structuring and Financing new Hydropower in PNG

3.0 OVERVIEW OF LAO POWER SECTOR

Strategic Directions for Integrated Water Resources Management in the Lower Mekong Basin

Quarterly Report. For the three month period ended. April 30, 2015

Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2

China s Small Hydropower in Rural Energy Development

HeveaBoard Berhad (Company No A) (Incorporated in Malaysia)

The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency

TAX ISSUES RAISED BY LNG PROJECTS

Asian Journal on Energy and Environment

FINANCIAL AND OPERATING HIGHLIGHTS

Integrated Water and Sediment Management of Yellow River

Hydropower in Myanmar: Moving Electricity Contracts from Colonial to Commercial

Week 8: Raising and managing working capital

Case Study More Money Please

ASIAN DEVELOPMENT BANK PPA: LAO 22065

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

PROJECT PROFILE ON THE ESTABLISHMENT OF ALUMINIUM FRAMES PRODUCING PLANT

(1.1) (7.3) $250m 6.05% US$ Guaranteed notes 2014 (164.5) Bank and other loans. (0.9) (1.2) Interest accrual

FOREIGN DIRECT INVESTMENT IN CAMBODIA

Financial Performance and Financial Statement Projections

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

Methodology for Merit Order Dispatch. Version 1.0

FINANCIAL STATEMENTS. Alberta Beverage Container Recycling Corporation. Contents

Examples of Good Practice

6. Gross Domestic Product by Country

RISK FACTORS AND RISK MANAGEMENT

Xayaburi Dam: Timeline of Events (Last updated: July 2013)

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

NEWS RELEASE. Avcorp announces 2014 Third Quarter Financial Results. November 13, 2014

Khan Resources Inc. Interim Consolidated Balance Sheets (Expressed in United States dollars) (All dollar amounts are in thousands) (Unaudited)

Agreements, bonds and guarantees

LAFE CORPORATION LIMITED Un-audited Q Financial Statement and Dividend Announcement (All in US Dollars)

CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS September 30, 2015 (Unaudited) TSX-V: ANF.

FINANCIAL PERFORMANCE AND PROJECTIONS

Condensed Interim Consolidated Financial Statements

How To Get Power From Bhutan To India

DAWEI Sea PROJECT Port Project DAWEI AND THE REGION

Kyrgyzstan: Power Generation & Transmission

DKSH Company Presentation

Comparison of Electricity Supply and Tariff Rates in South Asian Countries

THE ORIENTAL HOTEL (THAILAND) PUBLIC COMPANY LIMITED AND ITS SUBSIDIARY COMPANIES REPORT AND CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31

CENTURY ENERGY LTD. FORM F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014

Northern Blizzard Resources Inc. Condensed Consolidated Interim Financial Statements For the Three Months Ended March 31, 2016 and 2015 (Unaudited)

eqube Gaming Limited Condensed Interim Consolidated Financial Statements For the Three and Nine Months Ended November 30, 2015 (Unaudited)

Public-Private Partnerships

Electricity Business in the Asia-Pacific Region

CEMATRIX CORPORATION Consolidated Financial Statements (in Canadian dollars) September 30, 2015

CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS

IMPACT Silver Corp. Interim Consolidated Financial Statements March 31, 2009 Unaudited

Economic Analysis of Small Hydropower Project A Case Study of Lower Khare Small Hydropower Project

Nature of operations and basis of preparation (Note 1) Commitments and contingencies (Note 10) Subsequent events (Note 12)

RULES AND REGULATIONS FOR FINANCING PROJECTS AND COMMERCIAL ACTIVITIES

CLIMATE CHANGE ADAPTATION ACTIVITIES

ABENGOA YIELD The sustainable total return company

1. Energy. 2. Power. 3. Regional cooperation. 4. Greater Mekong Subregion. I. Asian Development Bank.

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

Indian Accounting Standard (Ind AS) 7 Statement of Cash Flows

Nufarm Finance (NZ) Limited Annual Report For the year ended 31 July 2013

Standard Chartered Bank (Thai) PCL & its Financial Business Group Pillar 3 Disclosures 30 June 2015

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand

INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2013

Dhanamitr Factoring Public Company Limited (Formerly: Dhanamitr Factoring Company Limited)

PPPs in Renewable Energy: IFC Advisory Perspective. April 2012

Income Measurement and Profitability Analysis

-Translation- 2. Related Parties Vintage Engineering Public Company Limited ( Company or VTE ) Green Earth Power (Thailand) Company Limited ( GEP )

DEBT SUSTAINABILITY ASSESSMENT

Manage water resources for on site hydro-electricity generation

Mitsubishi Electric Announces Consolidated Financial Results for the First 9 Months and Third Quarter of Fiscal 2016

International Accounting Standard 36 Impairment of Assets

NEPAL ACCOUNTING STANDARDS ON CASH FLOW STATEMENTS

Transcription:

Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management, Ahmedabad Project History 1970s - Mekong secretariat identified the hydropower potential of the Nam Theun River 1989/91 - World Bank feasibility study undertaken by Snowy Mountains Engineering Corp 1993 - Government of Lao PDR (GOL) and private sponsors (leader: Transfield) sign an agreement to develop the project 1994 - GOL asks World Bank to participate to the project financing 1997 - A first series of environmental and social safeguard documents is produced 1997/98 - Asian crisis: Laos and Thailand agree to delay the project development 2000 - EGAT and NTPC (leader: EDF) agree on a proposed electricity tariff (May 2000) 1

Project History (continued) 2001 - Shareholders agreement signed between EDFI, EDL, EGCO and ITD (September 2001) 2002 - NTPC is created as a Lao company (September 2002) Concession agreement signed (October 2002) Joint work between GOL, World Bank and NTPC to finalize safeguards documents 2003 - Power purchase agreement signed (November 2003) 2004 - Project financing activities Completion of safeguards documents with the participation of WB, ADB and AFD 2005 - Financial close (June 2005) and beginning of full construction activities 2009 - Beginning of commercial operation (December 2009) Schematic Diagram 2

Project Details The development, construction, and operation of a 1,070 MW transbasin diversion power plant on the Nam Theun, a tributary of the Mekong. The project site is in the central provinces of Khammuane and Bolikhamxay, about 250 kilometers southeast of Vientiane, and stretches from the top of the annamite mountain chain along the Lao PDR-Viet Nam border, to the Nakai Plateau, and ultimately to the confluence of the lower Xe Bang Fai with the Mekong. It will capture the flow of water from the watershed of the Nam Theun and the Nakai Plateau by building a dam 39 meters (m) high at the northwestern end of the plateau. Project Details (continued) The project will create a reservoir of 450 square kilometers (km2) on the Nakai Plateau. Water from the reservoir will drop about 350 meters to a powerhouse at the base of the Nakai escarpment near the town of Gnommalat. The water discharged from the powerhouse will then flow through a 27 km channel to the Xe Bang Fai, which drains into the Mekong approximately 150 km south of the Nam Theun confluence. A regulating pond will be constructed downstream of the powerhouse to ensure smooth release of water into the downstream water courses. 3

Sponsors Franco-Lao-Thai partnership with multilateral support Nam Theun 2 Power Company Limited (NTPC) is a Lao company established in Sept 2002 with the following shareholders: 35% EDF International (EDFI) 25% Electricity Generating Public Company Limited (ECGO) 25% Government of the Lao PDR (GOL) 15% Italian-Thai Development Public Company Limited (ITD) EDF is also acting as head contractor, managing three civil work subcontracts and two electromechanical works subcontracts. Contractual Arrangements Concession agreement signed between GOL and NTPC on 3 October 2002 for a 25 year period following the beginning of commercial operation Power purchase agreements signed on 11 November 2003 for a 25 year operating period between EGAT and NTPC (5,600 GWh per year), between EDL and NTPC (300 GWh per year). 4

Contractual Arrangements (continued) Head construction contract between NTPC and EDF- CIH provides for a date certain, fixed-price turnkey contract and comprises five major sub-contracts NTPC will take full responsibility for O&M for the project All environment and social commitments described in the concession agreement: Long term Binding E&S : ~ 10% of total project costs 5

Summary of Project Base Cost Estimates ($ million) Item Foreign Exchange Local Currency Total a. Construction cost 396.2 315.3 711.5 b. Environmental-social mitigation 48.8 0.0 48.8 c. Development cost A 150.6 14.0 164.6 d. Financing cost B 173.0 106.3 279.3 e. Base contingencies 27.1 18.7 45.8 Total base cost 795.7 454.3 1,250.0 Total contingent costs 116.6 83.4 200.0 Total 912.3 537.7 1,450.0 63% 37% 100% Project Capital Structure US dollar THB Total % ($ million) ($ million ($ million) equivalent) Equity 345.2 4.8 350.0 28.0% Debt 450.0 450.0 900.0 72.0% Total 795.2 454.8 1,250.0 100.0% % 63.6% 36.4% 100.0% 6

Financing Plan Exchange Rate Risk Debt and equity are denominated in a mix of dollars (63%) and baht (37%) to match the composition of the two currencies in project base costs. The 50/50 mix of US dollar and baht debt is designed to match the tariff paid by EGAT and EdL. EGAT and EdL will carry exchange rate risk. To the extent the Lao PDR government will receive royalty and taxes in dollars some of the risk will be mitigated. 7

million cubic meters 14000 12000 10000 8000 6000 4000 2000 0 1950 1952 1954 1956 1958 Hydrology Risk Historic Flow Records Total Flow capacity 1960 1962 1964 1966 1968 1970 1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 Hydrology Risk The annual inflows have varied historically, on average, by approximately 20 percent from the long-term average of 7,526 million m3. This is almost double the capacity of the reservoir, so that in an average year, the reservoir should be fully replenished even after operating the plant at full capacity during the dry season. The minimum water flow recorded was 3,776 million m3 in 1998. This was the result of El Nino that brought droughts over much of Southeast Asia. 8

Hydrology Risk (continued) The reservoir s probable maximum capacity is 3,910 million m3 amounting to an annual mean energy of 5,700 GWh. 1998 would have been the only year since 1950 when the flow would not have been sufficient to fill the reservoir from empty. However, as the reservoir will not be fully emptied during operations but will always retain a minimum water level, even in 1998 the reservoir s probable maximum active storage of 3,530 million m3 could have been filled by the water inflows At full supply level (FSL) at an elevation of 538.0 m, the reservoir would have an area of 450 sq km and would hold 3,910 million cubic meters of water. The powerhouse would have an installed capacity of 1,070 MW. Annual energy generation of 5,462 GWh. 9

Energy Component Primary Energy (PE) Secondary Energy 1 (SE1) Secondary Energy 2 (SE2) Quantity GWh/year (1) EGAT Obligation to Purchase 4,406 100% 948 100% 282 0% Total 5,636 95% Applicable Tariff 50% in USD, 50% in THB (2) 50% in USD, 50% in THB (2) 100 % THB Fixed over the Term Payment USD and THB respectively 100 % THB (3) 100 % THB Declarations NTPC makes periodic declarations to EGAT. Declarations contain information as to the energy availability which may be provided by NTPC. Declarations serve two main functions: to determine the amount of NTPC s revenues payable by EGAT; and to determine the amount of liquidated damages payable by NTPC to EGAT. Any unavailability reduces the revenues payable by EGAT, whilst any outage results in liquidated damages payable by NTPC 10

Dispatch EGAT has the flexibility to dispatch NTPC on a unit by unit basis as it requires, subject only to certain operational constraints. As EGAT is not required to dispatch all of NTPC s declaration, if it dispatches less, dispatch shortfall occurs. As EGAT would have paid NTPC based on all of that declaration, it has the right to make-up subsequently, i.e. the right to dispatch for electrical energy without incurring any additional payment obligation. Dispatch excess: EGAT may dispatch more than all of NTPC s declaration, subject to the limitations to be observed by EGAT in NTPC s declarations Excess Dispatch An excess energy month is: any month in which there is spillage of water from the reservoir; August or September and the water level is above 537.5 m ASL on the last day of the preceding month; or as elected by NTPC. Increased risk of spillage during an excess energy month. All the dispatch excess energy as determined at the end of an excess energy month shall be accounted as SE2, provided, however, that the outstanding amount of accumulated dispatch shortfall energy is below 200 GWh. 11

12

Offtake Risk Thailand now has surplus generating capacity, because of the economic downturn in the late 1990s and the large amount of capacity that was then under development and could not be stopped on reasonable terms. On the basis of demand forecast, excluding new plant from end-2003, the capacity surplus will be consumed by 2006. By the time of NT2 COD, the project will supply about one-half year of energy demand growth. NT2 would provide about 6 percent of the incremental energy requirement over 2009 to 2016. 13

Offtake Risk 14

Graph shows comparative economic costs for the most prominent large-scale generation options available to Thailand. A screening curve shows the cost per kwh of a generation plant at a range of capacity utilization rates (or CU rates). While CCGT has a lower investment cost per kw of capacity than does NT2, it has variable operating and fuels costs that NT2 does not have. At CU rates above 30 percent, NT2 is the least-cost alternative for Thailand. 15

Liquidity Risk The debt has to be repaid within 15 years - much less than the life of the project. The royalty and tax rates to be applied in each year have been designed specifically for the project on the basis of NTPC s debt repayment schedule. NTPC is exempt from income tax over the 2009 2014 period and then pays the following the rates over the remainder of the concession; 5.0% between 2015 and 2021, 15.0% between 2022 and 2027, and 30.0% between 2028 and 2034. Liquidity Risk The royalty and tax rates...(continued) The increase in the income tax rate from 5.0% to 15.0% is not implemented until immediately after all NTPC debt is repaid at the end of 2021. The royalty is applied at 5.2% between 2009 and 2024, 15.0% between 2025 and 2029, and 30.0% over the remainder of the concession. 16

Country Risk Loans are guaranteed by World Bank, ADB Export Credit Agencies Development agencies loans Only THB loan not guaranteed 17