LOUISIANA COMMUNITY & TECHNICAL COLLEGE SYSTEM Policy # 4.011



Similar documents
Volume VI-B Space Guidelines

Purpose. Objective. transmission Austin. Project Manager. room types on. entered into FAMIS. Page 1of 6

SPACE CLASSIFICATION SCHEME

SCHEDULE MEETING OF THE WEST VIRGINIA HIGHER EDUCATION POLICY COMMISSION. Marshall University Graduate College South Charleston, West Virginia

Space Survey Instructions

University of Calgary Space Classification - September 2014 (version 8)

: APPENDICES

Table PARKING SPACE RATES AND PARKING SPACE OCCUPANCY

Space Planning, Management and Scheduling

Academic and Administrative Space Policy

Space Projection Model Instructions

College of Agriculture and Life Sciences Space Management Guidelines. College Space Assignments

CHAPTER 29 PLUMBING SYSTEMS

Facilities Inventory Classification and Procedures Manual

Part 2 Definitions for this Policy 2.1. ADA / TAS the Americans with Disabilities Act / Texas Accessibility Standards.

ROOM TYPE CODES DEFINITIONS, DESCRIPTIONS, and LIMITATIONS CLASSROOM FACILITIES GENERAL

Attached (townhouses) SC P P 4.2.3(A)1 Duplex SE SE P Accessory Dwelling Unit (ADU) to a primary residence SC SC SC SC P 4.2.3(A)2

CHAPTER 29 PLUMBING SYSTEMS. [P] TABLE MINIMUM NUMBER OF REQUIRED PLUMBING FIXTURES a (See Sections and ) 1 per 40 for the

SQUARE FOOTAGE REQUIREMENTS FOR USE IN DEVELOPING THE LOCAL FACILITIES PLANS AND STATE CAPITAL OUTLAY APPLICATIONS FOR FUNDING

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS

Office Space Guidelines and Allocation Standards

STATE UNIVERSITY SYSTEM OF FLORIDA BOARD OF GOVERNORS Project Summary Florida State University Housing Replacement Project Phase II

1. FUTURE ACADEMIC PROGRAMS

Those tables are provided at the end of this section in the following order.

FACILITIES INVENTORY MANAGEMENT DEPARTMENT:

Office/Workstation Space Guidelines for Academic, Research and Academic Support Functions Effective July 1, 2011

Core Requirement

Ohio State University Student Survey Results Ohio Union Feasibility Study

Clarksville Campus. Workforce Investment Area 8

Guideline for Square Footage Requirements for Educational Facilities (a) 4. Educational Facility Site, Construction, and Reimbursement

Table of Contents. I Introduction 2. II Definitions & Area Calculation 2. III Room Numbering 7. IV Appendix A 9

Higher Education Projects University of Illinois at Urbana-Champaign Gorski Reifsteck

Security Service de Services sécurité. Security Alarm Monitoring Protocol

Capital Budget Testimony to the Maryland General Assembly. Presented by Dr. Robert L. Caret

R432. Health, Health Systems Improvement, Licensing. R Nursing Facility Construction. R Legal Authority. R Purpose.

STUDENTS RIGHTS, FREEDOMS, AND RESPONSIBILITIES

1/9/2015 P:\ \Project Management\Program\Ripon Space Program - 7 January 2015.xlsx

Tax Compliance for External Income-Generating Activities Appendix C UBI EXAMPLES FROM THE IRS

F I V E Y E A R C A P I T A L O U T L A Y P L A N ( F I R S T F U N D I N G Y E A R )

ROOM ILLUMINATION LEVEL. Corridors, Passageway Lift Stairs Escalator External Covered Ways

Requested Increase SF. Current SF

Division / Space Total SF Status

Security Alarm Monitoring Protocol

Office of Residence Life. Welcome to the Lincoln University Office of Residence Life residence hall virtual tour

Room Types Definitions Table of Contents Page Classrooms Classroom Diagram 3 Classroom Definitions 4

Chapter 3: Use and Occupancy Classification

Proposal for Lease of Next 50 Pavilion

21 st CENTURY HIGH SCHOOLS

SECTION 434 ASSISTED LIVING FACILITIES

Space Planning and Management: Policies and Procedures

560 CMR: STATE 911 DEPARTMENT 560 CMR 4.00: REGULATIONS GOVERNING ENHANCED 911 SERVICE FOR MULTI-LINE TELEPHONE SYSTEMS

California State University

University of Wisconsin La Crosse January 2015 Presentation of Findings. Paulien & Associates

Certificate of convenience and necessity.

ANALYSIS AND RECOMMENDATIONS FOR VISUAL AND PERFORMING ARTS PROGRAMS AT CAÑADA COLLEGE

George Mason University. ANALYSIS OF SPACE NEEDS for the COLLEGE OF HEALTH AND HUMAN SERVICES

Commercial Energy Use Worksheet

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

FUTURE LAND USE ELEMENT

148 Unit Apartment / YMCA Investment Sale

Section 6. Off-street Bicycle Space Regulations

University of Connecticut Greater Hartford Campus

The Arts at Virginia Tech

VACANCIES ASSOCIATE PROFESSOR COMMUNICATION

Space Management Policy

Non-State Funded Administrative and Instructional Support Codes

FORT HAYS STATE UNIVERSITY

Schedule A. Residential and Seasonal Dwellings. for estimating value of construction in the Township of North Kawartha

Trends in Student HOUSING. Background

MPP Internal Benchmark Survey Job Descriptions by Job Title

STATE UNIVERSITY OF NEW YORK COLLEGE AT NEW PALTZ 2015 CAMPUS STATEMENT

Clemson University. College of Business and Behavioral Science. Master of Professional Accountancy

Date. October 5, Project. University of Georgia Physical Master Plan. Subject. Space Needs Analysis to Target Year (Section IV) From

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************

A. Permitted uses. The following uses are permitted by right in the C-2 zone, subject to the limitations specified:

Veterans Health Administration March 2008 Washington, DC Revised: October 01, 2015

SCHEMATIC DESIGN PRESENTATION NEW JOSHUA MIDDLE SCHOOL

STRATEGIC PLAN, 2007 COLLEGE OF DESIGN, CONSTRUCTION AND PLANNING

American Culinary Federation Education Foundation Secondary Certification Initial Application Inquiry Packet

CHAPTER 202: VETERANS HEALTH ADMINISTRATION SUBSTANCE ABUSE CLINIC. 1 Purpose and Scope Definitions

New Program Request Form for Bachelor and Master s Degrees. Administrative Information

Chief Facilities Officer-Associate Vice President of Facilities

Population 71. The MAE Legacy. Department History. Mechanical & Aerospace

UHM SPACE PLANNING GUIDELINES. Created by the Office of Planning & Facilities

ORDINANCE NO Ordinance No Page 1 of 7. Language to be added is underlined. Language to be deleted is struck through.

How To Relocate To Greenville One

The intent of this chapter in establishing the R-G Residential General District is as follows:

Inventory of Physical Facilities of Ontario Universities

Chapter 11 - Fiscal and Business Affairs - Fees and Charges Page 11-1 Code of Policies CHAPTER 11 FISCAL AND BUSINESS AFFAIRS - FEES AND CHARGES

APPENDIX 8 EXCERPTS FROM STATE HEALTH REGULATIONS

Guide to College Housing

INFORMATION BULLETIN #68 SALES TAX FEBRUARY (Replaces Information Bulletin #68 dated January 1998)

Capital Budget Summary

Appendix N: Bicycle Parking Ordinance

PAGE INTENTIONALLY LEFT BLANK

BUILD NYC RESOURCE CORPORATION PROJECT COST/BENEFIT ANALYSIS January 7, 2016

Capital Projects Town Hall Meeting

POLICIES AND PROCEDURES TO GUIDE THE IMPLEMENTATION OF ASSISTIVE TECHNOLOGY SERVICES WITHIN THE SPECIAL EDUCATION SETTING

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces.

Facilities Master Plan State University of New York College of Technology at Delhi

Transcription:

LOUISIANA COMMUNITY & TECHNICAL COLLEGE SYSTEM Policy # 4.011 Title: SPACE AND QUALITY STANDARDS FOR FACILITIES CONSTRUCTED PURSUANT TO COLLEGE OR UNIVERSITY PROPERTY LEASE AGREEMENTS Authority: Board Action Original Adoption: December 13, 2006 Effective Date: January 1, 2007 Last Revision: Initial This policy was developed pursuant to Act 758 of 2006, in consultation with the Board of Regents, and is subject to approval of the Division of Administration Office of Facility Planning and Control. Post-Secondary Educational Institutions Act 758 of 2006 (R. S. 17:3361 (A)(2) requires each higher education management board to adopt, subject to approval by the Division of Administration, Office of Facility Planning and Control, and in consultation with the Board of Regents, proposed space standards and quality standards and exceptions thereto on or before January 1, 2007 for construction of improvements on college or university leased property. This document will serve as a preliminary set of standards for use by the management boards as agreed at a joint meeting facilitated by the Board of Regents staff. Thereafter, each management board may choose to make modifications to address their particular facility needs. Since 1991, the first year for the 3 rd party process as a means to provide facilities, there have been eighty-five projects encompassing fifteen types of facilities. Since a wide variety of types of facilities can be built using the 3 rd party process, standards are needed for essentially all types of facilities needed by post-secondary educational institutions. Space Standards Many factors influence the space requirements for an institution. Different types of institutions with different role, scope, and missions have different needs. Student count, in terms of student contact or clock hours (SCH) or full time equivalent students (FTE), is often the prime factor. Sometimes, projected student count must be considered, as when starting a new campus. Other factors include the funding available for a project and its source. Accrediting agencies also set minimums for space if an institution or its programs are to be accredited, which is often necessary from an academic perspective. Facilities for institutions such as medical or agricultural centers cannot be based on enrollment alone, nor do they have in-state peer institutions against which space needs can be compared. Athletic facilities are based on public appeal and attendance. Some institutions must accommodate in their public service role people that do not show up in headcount or FTE numbers. The fact that some students must work impacts community colleges more than four-year institutions, as do non-traditional students who are often parents as well as students. Latitude for exceptions on a case by case basis as anticipated by Act 758 will allow for facilities to meet the unique needs and circumstances for - 1 -

individual institutions. Most, but not all, 3 rd party projects use self-generated funding and are proposed only after a feasibility study and market research has been performed that may include student polls, surveys, or even referenda in which students elect to self-impose fees to accomplish a project. Often, space is determined by how much money can be raised or is otherwise available, not by specific FTE or headcount numbers or related numerical relationships arbitrarily set in advance. In such projects the Board of Regents Facilities Policy requires a business plan with cash flow proforma to assure the financial viability of the project. In requesting space needs for 3 rd party projects, reporting requirements for ecorts can serve as a model. That documentation calls for type of space needed, numbers and types of occupants, and net area per occupant to derive total net area. Total net area is then adjusted by an appropriate burden factor to determine total gross area for the proposed facility. Cost figures are then determined based on net and burden areas. However, no standards are established and no published standards identified, leaving it to reviewers to apply their intuition to the process. Years ago, the Board of Regents adopted space standards promulgated by the Western Interstate Commission for Higher Education (WICHE). Those standards, developed in 1971, defined only classroom and laboratory utilization. Briefly stated, in classrooms, each student station was to have 15 SF, rooms were to be used 30 hours per week, and when in use, a room was to be 60% occupied. For labs, 40 SF was provided per station, rooms were to be used 20 hours per week, and when in use, a room was to be 80% occupied. Those numbers provided a reasonable average for that era, even though differences in classroom or laboratory use were not specified. That is, observation of actual use of facilities demonstrates a tendency to have rooms very crowded when in use, but in use fewer hours per week. Moreover, modern teaching practices have increased those numbers somewhat. Establishing classroom and laboratory use, as those statistics do, begins to get into academic or educational decisions that are the sole purview of the Board of Regents and the management boards. Hours and times to teach as well as student to professor ratios are decisions must be left to the educational community. By the same token, it is inappropriate for those outside the educational community to make academic decisions regarding office sizes to be assigned to certain academic titles. A dean can require much different space at a major research institution as contrasted with his/her counterpart at a community college. Space assignments can legitimately be made on a desire to attract and retain as much as for the functional necessities of the work to be performed therein. Often, the functional necessities of the person occupying a space is not conveyed by their title alone. Some offices are required by the federal government to maintain records in a secure manner, precluding cubicles. In other instances, maintaining the privacy of conversations with students precludes the use of shared space. These considerations impact space needs and can only evolve as the design professional gets into the specifics of his/her work through the interview process. Space related statistics can provide an overview, but often fail to adequately portray that available space is not configured for the functional necessities of the institution. Therefore, an institution can be short of a specific type or kind of space even when it appears statistically to - 2 -

have all the space it needs based on student count or other benchmarks. Categories of space for post-secondary education were developed in 1972 by the National Center for Higher Education Management Systems (NCHEMS) through WICHE and is promulgated by the National Center for Educational Statistics (NCES). For each of the following categories of space type, the indicated space standards are proposed: 100 Classroom Facilities - typically teaching space not equipped for a specific use. 110 Classroom - Requests for classrooms will be submitted as a required number of small, medium, and large classrooms accommodating a stated number of persons each, with 18 NSF per student station. Classrooms with demonstration/conference areas 25 NSF Conference Rooms (Educational) - 25 NSF per occupant Seminar Rooms (Educational) - 25 NSF per occupant Lecture Halls - 15 NSF per student station Lecture Halls (fixed seating) - 12 NSF per student station 200 Laboratory Facilities - typically basic wet labs, but the category also includes P-Tech labs, art and fine arts studios, music practice areas, and specialized and research labs. Relative to special and research labs, until the occupant, his research area, possible grants relating to the research and space are known, sizing such space on predetermined numbers is futile. 210 Class Laboratory - Requests for class labs will be submitted as a required number of small, medium, and large labs accommodating a stated number of persons each, with 40 NSF per student station. 215 Class Laboratory Service - 10 % of the relevant lab(s) served 220 Special Class Laboratory - 40 NSF per student station 225 Special Class Laboratory Service - 10 % of the relevant lab(s) served 230 Individual Study Laboratory - as required on a case by case basis 235 Individual Study Laboratory Service - as required on a case by case basis 250 Non-Class Laboratory - as required on a case by case basis 255 Non-Class Laboratory Service - as required on a case by case basis 260 Research Laboratory - as required on a case by case basis 265 Research Laboratory Service - as required on a case by case basis 270 Computer Labs - often a function of grants or other funding for computers. Size as required on a case by case basis. 300 Office Facilities 310 Office (Faculty) - Requests for faculty offices will be submitted as a required number of very small (100 NSF), small (125 NSF), medium small (150 NSF), medium (175 NSF), medium large (200 NSF), and large (225 NSF) offices similar to that of ecorts submittals. The assignment of such offices will remain an academic decision. Office (Administrative) - Same as for faculty offices, with exception of (250 large) Open Space Cubicle - based on a 8' x 8' module = 64 NSF. Open Space Shared Cubicle - 100 NSF - 3 -

Shared Office - 160 NSF Suite - as required on a case by case basis. Suites will serve departmental, college, or institutional administration s offices and will include reception and waiting, secretarial pool areas, department, college, or institution head s office, other offices, ancillary facilities as necessary and appropriate, and conference room(s).special Offices - unique circumstances do occur where a particularly large or well appointed office is justified. These must be considered on a case by case basis. 350 Conference Room (Office Related) - small (150 NSF), medium (250 NSF) and large (350 NSF) 400 Study Facilities - libraries, study halls, study facilities, Libraries will be sized based on ACRL accrediting standards. 410 Reading/Study Room 420 Stack 430 Open Stack Study Room 440 Processing Room Space needs for all types of space in categories 500, 600, 700, and 800 will be programmed in submittals on a case by case basis with the stipulation that a thorough analysis and/or feasibility study including space analysis/needs will have been performed and the provisions in the Board of Regents Facilities Policy relative to business plans and economic proformas will have been met, and presented and approved by the management board and the Board of Regents. 500 Special Use Facilities - stadia, playing fields, assembly centers, natatoriums, weight rooms, bell towers, day care facilities, band and choir halls, recital halls, 510 Armory 520 Athletic/Physical Education 523 Athletic/Spectator Seating 530 Audio/Visual, Radio, TV 540 Clinic (Non-health Professionals) 550 Demonstration 560 Field Building 570 Animal Quarters 580 Greenhouse 590 Other 600 General Use Facilities - bookstores, student rec. centers, alumni centers, faculty club, hotels, conference centers, continuing education facilities, museums, art galleries, union, theaters, 610 Assembly 620 Exhibition 630 Food Facilities 650 Lounge 660 Merchandising Facilities 670 Recreation 680 Meeting Room 690 Locker Rooms - 4 -

700 Supporting Facilities - parking garages, central facility services, central utility plant, printing, supply receiving, motor pool, campus security/police station. In technical institutions, shop areas include carpentry, welding, automotive, and other trade training areas. 710 Data Processing/Computer 720 Shop 730 Storage 740 Vehicle Storage Facility 750 Central Food Stores 760 Central Laundry 800 Health Care Facilities - infirmaries. 810 Patient Bedroom 820 Patient Bath 830 Nurse Station 840 Surgery 850 Treatment 860 Service Laboratory 870 Supplies 880 Public Waiting 900 Residential Facilities All residential facilities of any type shall provide a minimum area for bed and study desk but exclusive of common space, closets, lavatories, showers or baths, or toilets of 100 NSF per student station. 910 Sleep/Study Area without Toilet/Bath 919 Toilet/Bath 920 Sleep/Study Area with Toilet/Bath 950 Apartment - Apartment shall provide private rooms for each occupant and common space including kitchenette, eating area, and living room accommodation. Individual apartments may accommodate one, two, three or four individuals. 960 Apartment (Semi-Private) - where an institution elects to provide a lower cost option to students, apartment type facilities may provide semi-private accommodation not to exceed two occupants per room with limited common space. 970 House 000 Unclassified Facilities Unclassified facilities are typically existing facilities that should be renovated into useful space. Space standards for new construction would be based on the standards listed herein for the type of space proposed. 050 Inactive Area 060 Alteration or Conversion Area 070 Unfinished Area Quality Standards - 5 -

Act 758 of 2006 calls for quality standards to be established. There are two levels of quality that are legitimate concerns: too low, and too high. Facility Planning and Control has expressed concern that the state will inherit 3 rd party projects at some point in time, and they will, because of inferior quality when constructed, become a financial burden to the state. Some are concerned that overtly high levels of quality are inconsistent with, or are perceived as being inconsistent with the public purpose. There is a reluctance for agencies of the state to establish quality standards because doing so tends to relieve design professionals and contractors of responsibility for failed building components. For management boards to set minimum or maximum quality standards, a very thick specification book listing every possible building component would be required, with specific acceptable products and perhaps unacceptable products listed. Such a book would require almost constant updating as available products become obsolete, or new products are added. Levels of quality are not called for when ecorts is submitted for traditional capital projects. Levels of quality are conveyed to design professionals on a case by case basis. Often, the environment into which the new facility will go sets the expectation of quality. The established AFC (Available For Construction) and building space program also establish the quality level. As a design develops, a delicate balance is kept between space needs and cost, which is a direct reflection of quality. Post-secondary education has put in place the means to alleviate concerns that 3 rd party projects will ever become a burden to the state. First, the Board of Regents Facilities Policy requires a Maintenance Reserve Account (MRA) be established and maintained for the life of 3 rd party projects where appropriate. Based on facility type, up to10% of the cost of construction up front, or 1-1/2% annually from income generating projects, is set aside in an actuarially sound account for the maintenance of major facility components over the anticipated life of the facility. Secondly, most projects include provisions for demolition at the end of the financing term. Accordingly, each project proposal shall include its size, type of facility, and the per square foot cost for construction. Those three data set the level of quality. Facility Planning and Control may, based on its historical data and experience for similar facilities in comparable locales, evaluate the level of quality and either approve it or not. As design and specifications are developed thereafter, gold plated faucets will not be affordable, but in some instances, stainless may supplant galvanized, to paraphrase the most common points of comparison. - 6 -