Environmental nonconformity, corrective & preventive action



Similar documents
COMPANY NAME. Environmental Management System Manual

HONG KONG ENVIRONMENTAL ELECTRICAL APPLIANCE COMPANY. Environmental Procedure

ISO 14001:2015 Client Transition Checklist

ISO 14001:2004 EMS Internal Audit Checklist & Gap Analysis

Internal Audit Checklist

Summary of Requirements for ISO 14001:2004 February 24, 2005

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

Jonathan Wilson. Sector Manager (Health & Safety)

ISO 9001:2000 AUDIT CHECKLIST

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEMS MANUAL

SHENZHEN ENVIRONMENTAL PRINTED CIRCUIT BOARD COMPANY. Environmental Procedure

OH&S Management Systems Audit Checklist (NAT, E3)

EMS ISO Checklist

SMALL BUSINESS OH&S SELF APPRAISAL

DNV GL Assessment Checklist ISO 9001:2015

ISO 9001:2000 Gap Analysis Checklist

Environmental Management System Tool

Contents. Management Policy Manual SEM USA Page 2 of 12

DEPARTMENT OF COMMERCE ENVIRONMENTAL MANAGEMENT SYSTEM

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

ISO 9001 Quality Management Systems Professional

The following paragraphs, identified to coincide with the OHSAS 18001:2007 numbering system, provide a clause-by-clause summary of the standard.

Sierra Army Depot ISO Environmental Management System (EMS) Awareness Training. ~ protecting our environment is. everyone s responsibility ~

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

City of Raleigh Public Utilities Department. Wastewater EMS Manual

Integrated management systems Ship operating companies

Environmental management systems Requirements with guidance for use

ISO-9001:2000 Quality Management Systems

Health, Safety and Environment Management System

PUBLICATIONS. Introduction

UNCONTROLLED DOCUMENT ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL UNCONTROLLED DOCUMENT

Appendix 3 (normative) High level structure, identical core text, common terms and core definitions

Nonconformance and Corrective and Preventive Action

Table of Contents INTEGRATED MANAGEMENT SYSTEM MANUAL

ENVIRONMENTAL MANAGEMENT POLICY MANUAL

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?

COMPANY NAME. Environmental Procedure

ENVIRONMENTAL POLICY & MANAGEMENT SYSTEM GUIDE

Health & Safety Management System Manual

ISO 9001:2008 Audit Checklist

QW Enterprises, LLP. Quality Manual

INTERNATIONAL STANDARD

Correspondence between ISO 9001:2008 and 14001:2004, OHSAS 18001:2007, ISM and the SeaBird Management System

May 2005 Lear Corporation For use by Lear Corporation and its Suppliers only. Copies or reproduction for any other purpose is permitted only by prior

ENVIRONMENTAL MANAGEMENT SYSTEM ISO-14001:2004 POLICY MANUAL

Wan Bao Construction Limited. Environmental Procedure

Programs Implementing Management System Elements AT&T Environment, Health and Safety Management System ISO EMS Element 4.1General 4.

Environmental System Manual ISO14001:2004E

Committed to Environment, Health, & Safety

ISO 9001:2015 Internal Audit Checklist

AVNET Logistics & EM Americas. Quality Manual

SHE Standards. Safety, Health and Environmental Protection Standards

Uncontrolled Document

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Health, Security, Safety and Environment (HSE)

CERTIFICATION OF SEAFARER RECRUITMENT AND PLACEMENT SERVICE PROVIDERS

ISO 9001 Quality Systems Manual

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

Effective Root Cause Analysis For Corrective and Preventive Action

FINE LOGISTICS. Quality Manual. Document No.: Revision: A

Module 15: Nonconformance And Corrective And Preventive Action

NABL accreditation is a formal recognition of the technical competence of a medical testing laboratory

Row Manufacturing Inc. Quality Manual ISO 9001:2008

TOTAL QUALITY MANAGEMENT II QUALITY AUDIT

ISO/IEC QUALITY MANUAL

Title: Rio Tinto management system

LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003

FORT KNOX. Environmental Management System Manual EMS-01 FORT KNOX. Environmental Management System Manual. Reference Number: Revision Date: 19MAY15

Quality Assurance System Manual

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL

CENTRIS CONSULTING. Quality Control Manual

Asset Management Systems Scheme (AMS Scheme)

ISO & ISO Legal Compliance Know Your Risk - Reduce your Risk"

Quality Management System Manual

Table of Contents. Chapter 3: ESTABLISH A COMMUNICATION PLAN Discussion Questions Documenting the Communication Element...

UNCONTROLLED COPY FOR REFERENCE ONLY

The anglo american Safety way. Safety Management System Standards

HEALTH, SAFETY, ENVIRONMENT AND COMMUNITY MANAGEMENT STANDARDS. OCTOBER ISSUE No 01. Doc No: HSEC MS 001

NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

ISO 9001:2008 Quality Management System Requirements (Third Revision)

June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS)

QUALITY MANAGEMENT SYSTEM REQUIREMENTS

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP

ISO 9001:2008 Clause PR018 Internal Audit Procedure

VICTORIAN GOVERNMENT DEPARTMENT ENVIRONMENTAL MANAGEMENT SYSTEM MODEL MANUAL

ED FAGAN INC. QUALITY SYSTEM MANUAL

QUALITY MANUAL REVISION RECORD

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

ISO 14001:2004 Environmental Management System Manual

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA FAX

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM

13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM

ISO 9001:2008 Clause 5.6 PR004 Management Review Procedure

Auditing Health and Safety Management Systems. 4th Edition

Transcription:

1.0 Purpose The purposes of this procedure is to define a system for, a) To establish compliance with regulations and requirements of EMS policies, b) Handling and investigation of incidents; mitigation of consequences of incidents, c) To maintain records for analyzing the data related to nonconformities, incidents and to initiate appropriate corrective and preventive actions. d) To take appropriate corrective and preventive action 2.0 Scope Applicable to all areas, activities and operations carried out by KSPHC, including activities carried out by suppliers contract personnel. 3.0 Associated and reference documents a) ISO 14001:2004 clause 4.5.3 b) IMSP 21 - Operational Control c) IMSP 26 - IMS Internal audit d) IMSP 27 - Corrective and preventive action e) IMSP 28 - Management review 4.0 Definitions a) Nonconformity (ISO 14001:2004): Non-fulfillment of a requirement. b) Correction: Action taken to eliminate a detected nonconformity (mitigating an identified nonconformity) c) Corrective action: Action to eliminate the cause of a detected nonconformity or other undesirable situation (i.e., action taken to prevent recurrence) d) Preventive action: Action taken to eliminate the cause of a potential nonconformity or other undesirable situation (i.e., action taken to prevent occurrence) Revision: 0 Revision Date: 01.07.2011 Page 1 of 8

5.0 Responsibility Responsibility is described in the procedural part. 6.0 Procedures 6.1 Operational Nonconformities Nonconformities with regard to EMS system implementation are a) Deviation from operational control / system procedures, and b) Deviation from EMS Management Programs The above nonconformities may get identified through a) Monitoring and measurement of key characteristics of EMS elements, b) Internal audits, c) Review of emergency preparedness and response, d) Complaints received from interested parties, and e) Management review 6.1.1 Nonconformities identified through monitoring and measurement Whenever nonconformities are identified through monitoring and measurement, the personnel responsible for the monitoring and measurement of a key characteristic should immediately inform it to the concerned Head of dept. Examples: 1) If smoke emissions from DG set found to be abnormal, it should be informed to the Head of Administration / Site in charge who in turn will take up the issue with concerned contractor for its repair/maintenance. 2) It may be observed during inspection of fire safety control that a particular fire extinguisher found to be damaged / unfit for use; it should be reported to location /area head as well as EMR. 6.1.2 Nonconformities identified through internal audits Nonconformities identified through internal audits are reported through either NC Report or Audit Observation sheet. In either case, it is the responsibility of the respective auditee /respective HOD to take immediate action to mitigate the nonconformity. Further, corrective Revision: 0 Revision Date: 01.07.2011 Page 2 of 8

and preventive action may be initiated in accordance with procedure EMSP 14 - Corrective and preventive action. 6.1.3 Nonconformities identified through review of emergency preparedness and response Mock drills are conducted for the identified emergencies as per defined response plan (see EMSP 06); response to an actual emergency is also done as per defined response plan. In both the cases, there is a possibility of some nonconformities gets identified. It can be ineffectiveness of the response plan or deficiency in the plan to mitigate the effects in a timely manner. Whenever such nonconformities are identified, the emergency response team shall report it to EMR who in turn review the causes of nonconformity and initiate appropriate action (Revising the emergency response plan, re-training the team members, improving the techniques / methods used). 6.1.4 Nonconformities identified through complaints received from interested parties Whenever complaints are received from interested parties, the same should be reported to EMR. Most of the time, such complaints may be traceable to a legal requirement or a significant environmental aspect. EMR shall review the complaints and initiate appropriate actions to mitigate the problem as well as taking action to prevent their recurrences. In certain circumstances, it may have to be discussed in MRM. 6.1.5 Nonconformities identified through management review Whenever nonconformities are identified though management review, the review committee shall ensure that such nonconformities are appropriately resolved, and necessary directions are provided for the executive management members on how similar issues in other operational areas have to be dealt with. EMR shall ensure that required communication takes place in this regard. Following are the typical nonconformities that may get identified in the management review: Revision: 0 Revision Date: 01.07.2011 Page 3 of 8

a) Supplier s / Contractor s EMS performance not up to the expectations of KSPHC b) EMS management program has observed some lapses; c) Internal audit were not effective [to prevent the types of nonconformities reported during third party (certification body) audits]; d) Induction training given to new employees not effective 6.2 Incident management 6.2.1 Environmental incident Where the result of an incident / accident has an impact on the Environment (e.g. chemical spills enters storm drain that has the potential to cause water pollution). In such cases, prescribed operational control procedure should be followed. In the absence of such procedure, the operational personnel shall seek advice from EMR. 6.3 Analysis of data EMS Coordinator(s) shall compile the data related to EMS nonconformities, incidents and analyze to determine those requiring action or those that can be prevented or if the severity of impact could be reduced. This information shall be forwarded to the EMR for taking up the issue in the Management review meeting. 7.0 Corrective and preventive action Nonconformity is non-fulfillment of a requirement. A requirement may be stated in relation to the management system or in terms of environmental performance. Situation may occur where part of the system may not function as intended or environmental performance requirements are not met. System for corrective and preventive action is described in two stages. This procedure addresses all types of nonconformities including, but not limited to, a) Results of audits. b) Inputs obtained from measurement & monitoring. c) Regulatory non-compliances and incidents and accidents Revision: 0 Revision Date: 01.07.2011 Page 4 of 8

d) Non-conformances with internal objectives and targets e) Insufficient documentation to evaluate conformance with EMS f) Non-conformances with respect to existing policies and procedures. 7.1 Corrective action 7.1.1 Below mentioned table details the type of nonconformity, source for its identification, and the mitigation action recommended. Criterion for taking corrective action is described in the subsequent paragraphs. No. Type of nonconformity (NC) Source for the identification and reporting of NC Mitigation action 1 Documentation inadequacy to achieve policy and objectives, and to fulfill standards requirements Audit adequacy audit Review and revision of identified document 2 Responsibilities not defined for a system activity Document review part of audit Review and revision of identified document 3 Pertinent operational document not available at the point of use Audit Ensure its availability 4 Non-compliance with EMS Legal requirement which was not identified External Communication Update legal register; establish compliance 5 Legal and other requirements not complied with Evaluation of compliance Establish compliance for the reported finding 6 Operational control not effective to achieve planned results Management review inputs (related to process performance) Review and ensure established operational controls are adequate; personnel are competent. 7 Objectives and targets not achieved Management review inputs; Audit As decided in the MRM Revision: 0 Revision Date: 01.07.2011 Page 5 of 8

No. Type of nonconformity (NC) Source for the identification and reporting of NC Mitigation action 8 Emergency response not effective Emergency response report Revise Emergency response procedures; train personnel 9 Internal audits are not effective External audit Review by top management and implement the actions proposed 10 Incident occurred is related to an unidentified aspect. Internal communication Implement operational controls; update aspectimpact. 6.1.2 Criterion for initiating corrective action A corrective action is always preceded by cause analysis. Cause analysis may not feasible for all the identified / reported nonconformity. Following criterions shall be applied for various steps of corrective action. No. 1 2 3 Corrective action steps Reviewing nonconformities (NC) for initiating corrective action. Determining the causes of nonconformities Evaluating the need for action to ensure that nonconformities do not recur Criterion for initiating the corrective action step If it is a major nonconformity; It is a minor NC being recurred more than 3 times If it is related to achievement of objective and targets or a legal concern 1) If it is a major nonconformity; 2) It is a minor NC being recurred more than 3 times 3) If it is related to achievement of objective and targets or a legal concern o o If the NC is related to a critical legal requirement (subject for penalization) If it is affecting the business performance considerably Revision: 0 Revision Date: 01.07.2011 Page 6 of 8

No. 4 5 Corrective action steps Determining and implementing action needed Maintaining records of the results of action taken Criterion for initiating the corrective action step If the NC is related to a critical legal requirement (subject for penalization) If it is affecting the business performance considerably Financial viability of the proposed action as compared to consequences of taking no action Mandatory for all CA taken 6 Reviewing corrective action taken Mandatory for all CA taken; to be carried out during subsequent internal audit Once it is determined to complete the corrective action process, concerned process owner / functional head shall carryout the root-cause analysis, and further complete the corrective action process steps detailed above. Generally the root-cause of nonconformity will be one or more of the following: a) Personnel competence, awareness and training b) Resources - deficient resources / constraints in resources provided c) Policies and procedures deficient / inadequate / inconsistent with organization s overall policy 7.2 Preventive action Elements for which a preventive action can be implemented are similar to those described under corrective action. One or more of the following means can be utilized to identify opportunity for preventive action: a) Trend analysis of element (of EMS system) wise nonconformities; b) Trends in no loss incidents c) Periodic inspection / walk-through d) Suggestion from employees e) Audit recommendations Revision: 0 Revision Date: 01.07.2011 Page 7 of 8

Root-cause analysis shall be carried out for the identified / reported potential nonconformity. Preventive actions proposed for an identified / reported potential nonconformity shall be reviewed in the management review meetings or by the EMR for techno-commercial viability. The respective functional heads shall implement those that are approved. Records of the results of action taken shall be maintained. 8.0 Records No Name of the Record Custodian Retention Period 1 Summary of incidents / accidents. EMS Coordinator 3 Years 2 Corrective/Preventive action report Concerned functional head; copy shall be given to EMR 3 Years 9.0 Revision details This document supersedes and replaces EMSP 12 and EMSP 14. This document being part of the integrated management system, it is designated as IMSP 25 and the revision status is set to 0. Approved by : Chairman and Managing Director Revision: 0 Revision Date: 01.07.2011 Page 8 of 8