Working at height - Practical Guidance for Schools



Similar documents
Safe Working at Height

Work at Height / Falling Objects

Level 1 Award in Health and Safety in a Construction Environment

WORKING AT HEIGHT GUIDELINES. Version II

Working at Height. Procedure

THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY

Good Practice Guide. The Selection of Access Methods to Install and Dismantle Safety Netting

Procedural Guidance for Roof Access/Roof Work

PREVENTION OF FALLS WORKING ON ROOFS

Fall Protection. Office of Risk Management. uottawa.ca. Guide

Guidance Note GN049. Using portable ladders safely. WorkSafe Tasmania Department of Justice. Introduction and purpose

Facilitator s Guide PREVENTING SLIPS TRIPS AND FALLS. Copyright - All Rights Reserved. Telephone (905) Facsimile (905)

Slip, Trip and Fall Prevention Manual

Working on roofs. Planning roof work

Working at height A brief guide

Slips, Trips and Falls

Fact Sheet: Slips, trips and falls

Managing the risk of falls while working on roofs in housing construction

ladder Safety Types of Ladders

Hazard Identification, Risk Assessment and Control (HIRAC) for Work at Height Risk, Health and Safety

Slips, trips, falls and ladder safety

WEEKLY SAFETY MEETING

Walking and Working Surface Checklist:

Ladder Program and Training Materials

RRC SAMPLE MATERIAL WORKING AT HEIGHT- HAZARDS AND RISK CONTROL LEARNING OUTCOMES

Generic Risk Assessment: Working on Roofs (FMRA 0006)

Health and Safety - Ladder and Stepladder Safety

WORK AT HEIGHT. STFC Safety Code No 9. Rev. 1.4, Issued April, 2015

Portable Ladder Safety

A: SIGNIFICANT RISKS Initial Risk Rating H/M/L B: KEY CONTROL MEASURES ACTION

SLIPS, TRIPS AND FALLS POLICY

Construction OS&H Working at height

Safe use of ladders and stepladders

LADDER SAFETY (Reviewed 9/27/207)

Safe use of ladders and stepladders A brief guide

Walking/Work Surfaces Fall Protection Program

Slips, trips and falls Policy

Procedure. Working at Heights. 1. Purpose. 2. Scope. 3. Definitions. 4. Planning QUT risk check Work at Height permit

This material was produced under grant number SH F-48 Occupational Safety and Health Administration, U.S. Department of Labor.

Standard Operating Procedure. CCG SOP11 Management of Slips, Trips and Falls. Version 1. Implementation Date 01/04/2013. Review Date 30/04/2014

PreventING falls from height Introduction How will worksites be targeted? Approach Who will be targeted?

Question and answer brief for the construction industry on the Work at Height Regulations 2005

SITE SPECIFIC FALL PROTECTION PLAN

Employees have an important role in preventing slips, trips and falls.

Guide to the Safety, Health and Welfare at Work (General Application) Regulations Part 4: Work at Height

Guidance to Prevent Slips, Trips & Falls

Fall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, , , , and1926.

General Safety. Always do a risk assessment.

August 2009 WORKING AT HEIGHT HSEW. Safety H S E W A WAY OF LIVING. Standards for professionals, be aware!

GHD EPCM Standard operating procedure Working at height May 2013 v1

Guidance on preventing Slips, Trips and Falls

FALL PROTECTION PROGRAM

SAFE WORK PROCEDURE SWP 015 WORKING AT HEIGHT SEPTEMBER 2013 DOC. NO. D13/248399

Fall Protection Program

Example risk assessment for a warehouse

ADMINISTRATIVE PROCEDURE

About Real, Real-Life

Workplace Health, Safety & Welfare

Slip, Trip & Fall Prevention Handbook

Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard

Preventing Slips, Trips, & Falls

Work at Height Procedure

Independent Contractor Policy

A Casebook of Fatal Accidents Related to Work-at-Height

Working as a cashier. HealthandSafetyOntario.ca. Hazard: Poor Workstation Layout

Portable Ladder Safety

Staying on Your Feet: Fall Prevention for Construction

How to Prevent Slips, Trips, Falls. For the Employees of Cascade County

Guidance on the use of Marquees, Tents and other Temporary Structures

Safe ladder use. Construction Safety Series. When climbing up or down, workers should:

David Hicks Consultants Ltd Industrial Roofing & Cladding Consultants

Programme-Based Engagement (ProBE) for Fall From Heights. Statistics

Work at Height. John Frontczak Construction Manager Facilities Engineering Chevron Corporation. All rights reserved.

CIRCULARS / HSQE BULLETINS

North Dakota State University Slips, Trips, & Falls Program

FALL PROTECTION PROGRAM

HealthandSafetyOntario.ca. Hazards. Introduction. Legislation

68 Metal Industry Guidelines for Safe Work

Slip, Trip & Fall Program Table of Contents

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS

ELEVATED WORK POLICY

Warehousing and storage Keep it safe

Walking Working Surfaces and Fall Protection Program

Church safety solutions

Safety regulations for working at KPN, T-Mobile and Vodafone locations. Working safely at mobile communication locations

SG4:10 Preventing Falls from Scaffolding Collective Fall Prevention.

Slip, Trip & Fall Program Table of Contents

Contractor s Safe Working Agreement

Fall Protection Training Guidebook

Slips, Trips, & Falls. Supervisors Notes

Preventing Falls, Slips and Trips

Working at a height of two metres or more while carrying out general work activities or construction works

Safety in Offices and other General Areas

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

CAER Construction and Environmental Resource

Brief Analysis of Site Accident Cases

Preventing Slips, Trips and Falls. Presented by: Mark Hargett

Transcription:

Working at height - Practical Guidance for Schools N.B. The following guidance is provided as an example of best practice, and should be adapted to suit the specific work being undertaken following a suitable and sufficient risk assessment. See also advice at http://www.hse.gov.uk/pubns/schoolsfall.pdf http://www.hse.gov.uk/pubns/heightsafeleaflet.pdf Action What could go wrong Best practice Putting up displays Whilst using wrong equipment (Table/desk/chair/books) gives way when teacher stands on it. Person using ladder/step ladder over reaches causing ladder to topple over. Pupil walks into ladder causing it to topple over. Person drops display on a teaching assistant. Person falls of step ladder whilst attempting to put up a large awkward display. Install washing line style assembly, using pulleys which can be raised and lowered from ground level. Restrict displays to head height. Consider room layout to ensure that display boards are easily accessible. Displays are prepared as far as possible before putting them up. Staff and persons instructed not to climb on chairs/tables or other furniture to access display boards. Arrangements for safety are discussed and agreed with staff, and recorded as part of staff meeting/briefings. Provide equipment which is suitable for users to enable safe access to display areas (e.g. kick step type stools and properly designed low steps with hand rails). Areas where ladders or other access equipment is to be used is clearly defined by use of signs and barriers used if deemed necessary. All access equipment is suitable for purpose, checked before use and readily available. condition of access equipment. Procedures are in place for damaged access equipment to be removed and further use prohibited. The use of ladders and other access equipment is restricted to those trained and competent in its safe use. Where persons have pre-existing medical conditions or other factors which may affect their ability to use such equipment a separate risk assessment is in place. Encourage staff to wear appropriate footwear (heel-less or low heeled shoes with non-slip soles). Consider the weight, shape or size of the display when working from a step ladder.

Placing or retrieving items stored above head height Opening and closing windows Falls from height during drama lesson Teacher knocked on head by falling items when replacing trays on high shelf. Shelf collapses causing items to fall on person. Whilst using wrong equipment (Table/desk/chair/books) gives way when teacher stands on it whilst retrieving items from shelf. Person falls off ledge whilst opening window. Pupil falls from unprotected window. Poorly maintained window falls out of frame striking person standing underneath. Person falls of desk whilst opening window. Pupil falls from mobile tower scaffold when changing stage lights. Item falls from gantry area onto audience. Stage light falls during adjusting and strikes another person. Person climbs up outside of tower scaffold which overturns and injures them. Scaffold collapses during use due to unsafe erection. Person falls through open trap door. Fall from stage during production. Implement a heavy box low shelf policy. Shelving to be placed at an appropriate height to eliminate the need for ladders, steps or similar access equipment. Review storage so that frequently needed items are easily accessible Loose items must not to be stored in high places. Display HSE leaflets and posters on working at height in staff rooms. Provide proper equipment for the task i.e. step ladders with handrails. Train people in the safe use of equipment. Consider best practices from putting up displays. Install remote means of opening high windows (or mechanical openers). Use long handled window poles. Fit window opening limiters to all windows above ground floor. Ensure windows and doors are maintained in a safe condition. Pupils should not change stage lights. Consideration of installing lighting rigs which can be lowered to ground level to reduce the need for working at height. Teaching staff & volunteers trained in safe use of access equipment through recognised training providers. Cascade training for all people involved on hazard recognition and risk. Code of conduct for staff & pupil behaviour in the drama studio/theatre adopted and published to all who may be involved. Drama department has health and safety policy detailing safe arrangements for adjusting lights, working on gantry and other related activities. Provide equipment which is suitable to the users to enable safe access to theatre/studio areas (e.g. mobile tower access scaffold, stepladders, ladders and mobile elevated working platforms). All access equipment is suitable for purpose, checked before use and readily available.

Physical Education lesson Injury to a teacher when retrieving items from high girders/nets and other structures. Ceiling bolt for trampoline harness is worn through and a pupil falls to the ground. A pupil falls from fixed wall rope which has not been well maintained. Vaulting horse used as platform to remove ball caught in high net. Person falls off climbing wall when inexperienced buddy fails to arrest fall. Pupils gain unauthorised access to high level gym equipment during break time. condition of access equipment. Procedures are in place for damaged access equipment to be removed and further use prohibited. Access equipment is restricted to those competent in its safe use. Where staff, persons or others have pre-existing medical conditions/other factors which may affect their ability to use such equipment a separate risk assessment is in place. Access to backstage/gantry and other areas are restricted at all times and especially when stage is set for production. Gantry areas scaffolds etc have appropriate edge protection and handrails which are subject to frequent documented checks. Create an exclusion zone where necessary beneath areas where work is taking place. Staff are competent to supervise activities and act in accordance with AfPE and national governing body guidance. Use lightweight telescopic pole to remove items from high ledges. Provide equipment which is suitable to the users to enable safe access to high areas (e.g. mobile access tower, mobile elevated working platform) All access equipment/pe equipment is suitable for purpose and checked before use. condition of equipment. Procedures are in place for damaged equipment to be removed and further use prohibited. All equipment is restricted to those competent in its safe use. Where persons have pre-existing medical conditions or other factors which may affect their ability to use such equipment a separate risk assessment is in place. Items trapped at high level (e.g. shuttlecocks) are retrieved periodically (e.g. once per term) during planned maintenance. Code of conduct is in place for person behaviour in the gym/pe department PE department has health and safety policy detailing safe arrangements. All fixed and movable equipment is subject to regular recorded maintenance and testing.

Cleaning Site management and Caretaking duties Cleaner falls from desk when standing on it to access light diffuser. Whilst cleaning air vents cleaner falls from the workbench they were standing on. Cleaner falls from bed during deep clean. Cleaner falls from ladders, steps or similar access equipment while cleaning windows. when standing on wheelie bin to access guttering. Handyman overreaches and falls off a ladder which is not footed or tied during use. Site Manager / Caretaker blown off edge of flat roof when retrieving football. through roof void when walking on joists. from desk when standing on it to access light diffuser. Site Manager / Caretaker drops a hammer whilst fixing a loose gutter striking a person below. Ladder placed on uneven ground slips and caretaker falls. from ladder when carrying a tin of paint to first storey. through fragile roof. Management to undertake a detailed risk assessment prior to any work at height. Staff to follow safe system of work or method statement. Use of high level cleaning equipment e.g. extension poles angled mopsbrushes. Use of specialist contract cleaners to carry out annual deep clean, high level cleaning. Cleaning staff are trained in the use of ladders, steps or similar access equipment. Staff to undertake a detailed risk assessment prior to any work at height Consider weather conditions before planning any outside work. Staff instructed not to climb on furniture, meter cupboards, bins or other inappropriate fixed or mobile structures. Check for environmental hazards e.g. overhead cables, uneven surfaces, wet ground. Arrangements for safety are discussed and agreed. Provide equipment which is suitable to the individual users to enable safe access. All access equipment is suitable for purpose, checked before use and readily available. Consideration should be given to hiring suitable equipment for specific jobs (e.g. mobile elevated work platforms, mobile access tower scaffolds) with staff trained in safe use by equipment supplier. condition of access equipment. Procedures are in place for damaged access equipment to be removed and further use prohibited. Access equipment is restricted to those competent in its safe use. Consider use of fall arrest systems depending on nature of task, equipment and duration. Where persons have pre-existing medical conditions or other factors which may affect their ability to use such equipment a separate risk assessment is in place.

Maintenance and repairs Ladder rung breaks when handyman steps onto it Site Manager / Caretaker electrocuted when fixing window from an aluminium ladder when he came into contact with overhead power cable Contractor falls when working on a ladder which is not secured. Person gains access to scaffold and falls from height. Items fall from roof repair work onto persons below. Incorrectly assembled scaffold collapses injuring contractors, teaching staff and persons. Contractor killed when he falls from edge of roof. Contractor electrocuted when he damages overhead cables when working on ladder. Adequate and appropriate signs are in place to warn of hazards below work area. Ground level area where access route is located is cordoned off to prevent contact with any persons who may be on the premises. Work scheduled to take place when persons/others are not in the immediate area. Site Manager / Caretakers are aware of site specific risks including fragile roofs. All fragile roof areas are clearly labelled. Access equipment is removed and secured when not in use to prevent unauthorised use. Appropriate footwear is worn. Accompanying tools and equipment carried on person are in tool belts or secured appropriately. Items are lifted using the appropriate equipment (e.g. pulleys) and appropriate safe system of work. Use only battery powered tools when working at height. When working on roof, Site Manager / Caretakers to maintain safe distance from roof edge. Pre selection vetting by school to include Health & Safety procedures, training, qualifications and competence. Contractors work is planned before/after school or during holiday periods where possible. School to check contractor method statements to ensure appropriate arrangements are in place for safety including personal protective equipment, fall arrest systems and how the job will be undertaken. Issue site specific guidance e.g. location of fragile roofs, overhead cables/other site hazards to contractor and require signature for receipt of information. School to put into place arrangements with contractor for communication, site access, safe segregation, signage, security and other related issues. Senior management to observe safe working practices of contractor. Communicate any changes in safety arrangements to school staff e.g. changes in access routes.

New Builds including PFI Information, Communication Technology Hot bitumen spills from roof onto persons below during roof repair work. Contractor falls through fragile roof onto persons below. Contractor overbalances on ceiling joist and falls through roof. Young person injured fallowing access to unsecured scaffold. Failure to design out many of the items identified in this document leads to personal injury and increased costs to establishments. Technician overreaches and falls off a ladder which is not footed or tied during use. Technician falls of table while changing projector lamps. While fitting ceiling projector the technician falls while using steps of an unsuitable height. School to seek further advice from technical experts in Education department/other where they have concerns regarding contractor safety issues. Access equipment including ladders to be secured when not in use. At the design stage use the above best practice to eliminate/reduce risks from working at height. Staff to undertake a suitable risk assessment prior to any work at height. Staff to follow agreed safe systems of work. Access equipment is restricted to those competent in its safe use.