Great Northwestern Railway. Operations Orientation

Similar documents
DC and DCC Operation of Atlas Gold Series HO Scale C424/C425 Diesel Locomotives

The Tech Model Railroad Club Operations Scheme

Jacobsen Declaration Exhibit AY

ACCIDENT/INCIDENT REPORTING REGULATIONS for BC RAILWAYS

Complete Train Control. Run Your Trains, Not Your Track!

Harford County Modular Model Railroad Fall 2014

Econami Digital Sound Decoder Electric Quick Start Guide Software Release 1.3

CERTIFICATION, DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE GUIDELINES for BRITISH COLUMBIA COMMUTER RAILWAYS

*The above steps do not program an address into the decoder/loco, it allows you to acquire an already known address.

GAUGEMASTER PRODIGY EXPRESS

DC and DCC Operation of Atlas Gold Series Diesel Locomotives

INSTRUCTION MANUAL. FOR TECHNICAL ASSISTANCE: VERSION 3.2 ITEM #330

Introduction : Garden Railroad Layout Planning and Design 2

Complete Train Control. Run Your Trains, Not Your Track!

Office of Safety and Compliance

Quick Start Guide. For Bachmann DCC Sound-Equipped Locomotives. Featuring Tsunami DCC Sound Technology by SoundTraxx

Report No INTERSTATE COMMERCE COMMISSION. Washington THE NEW YORK CENTRAL RAILROAD COMPANY LEWISBURG, OHIO JULY 13, 1964

RAILROAD & CO. TrainController Gold and Silver. Version 8. Users Guide

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

Complete Train Control. Run Your Trains, Not Your Track!

ORIGINAL PROTOSOUND (PS1) TROUBLESHOOTING

2010 SECURITY AWARENESS TRAINING

Atlas Master Gold Series FM Train Master Diesel Locomotive

Table 10-1 Travel Times Between Stations OPERATING & MAINTENANCE PLAN

Operator s Manual. DC Users See Page 2. DCC Users See Page 10. Paragon 2. Steam Locomotives RELEASE 1. Paragon 2 02/22/09

Accident / Incident Reporting Guidelines for Provincial Railways

MTH SD70ACe DCC Ready Soundtraxx AT-1000 EMD 710 Sound Decoder Install Revised June 1, 2011

Central Minnesota Freight Plan December 2012

Railroad Accident Brief

Tsunami Summary & Decoder detail Listings

Staying alert A guide to passenger security

The risk of derailment and collision, and safety systems to prevent the risk

National Transportation Safety Board Washington, D.C

RAILROAD & CO. +4DSound. Version 8. Manual

National Transportation Safety Board

Cisco Positive Train Control: Enhancing End-to-End Rail Safety

TAVORMINA & YOUNG, L.L.P. E-NEWS MARCH 2011 USE OF ELECTRONIC DEVICES ON THE RAILROAD

Q&A for New Hours of Service Regulations Affecting Passenger Conductors, Engineers, Hostlers and Assistant Conductors.

Lineside Signal Spacing and Speed Signage

Lineside Signal Spacing and Speed Signage

Southern California International Gateway Project Description

IV. INDUSTRIAL TRACK DESIGN

Department of Transportation, Rail Division Records Retention Schedule Effective Date: June 2003 Table of Contents. Rail Safety...

Model Technology Made Easy

English. Trapeze Rail System.

A comprehensive information system for railway networks

/99 LIONEL. Lionel powered and non-powered F3A diesel locomotive set. featuring. and

FELA Railroad Injuries

RAILROAD & CO. TrainController Silver and Gold. Version 8. Change Description

EMPLOYEE SAFETY PROGRAMS

AEI RAIL NETWORK SERVER User Manual

oxigen system Slot.it oxigen timing RMS installation Dongle driver installation 1/ 11 Race Management Software

RAILROAD ACCIDENT INVESTIGATION REPORT NO THE PENNSYLVANIA RAILROAD COMPANY WEST JEFFERSON, O. AUGUST 4, 1967 DEPARTMENT OF TRANSPORTATION

Defensive Driving While Towing a Trailer By Elizabeth Koncki, Maryland Department of Agriculture

TRIP TICKET SAMPLES Updated May, 2005

Diesel Sound User s Guide

Document Name: Driving Skills. Purpose: To outline necessary driving skills required to maximize driving safety.

Diesel Technical Reference

49 USC CHAPTER 211 HOURS OF SERVICE 2008 ( RSIA

SYMBOL MC9060 HAND HELD TERMINAL USER MANUAL

Transportation Of Students with Special Needs BUS

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI (608) Fax: (608)

Rail Accident Report. Passenger train collision with a road vehicle at Swainsthorpe level crossing, Norfolk 13 November 2005

Contents Technical Information Drivers Cabin Controls Exterior Lighting and Destination Screen Keyboard Controls...

Comprehensive Railroad Liability Coverage

User Manual. Ruth Ivimey-Cook RailSimulator.Com

LocoNet, the Digitrax Difference

SNOW REMOVAL AND ICE CONTROL OPERATIONS MANUAL TABLE OF CONTENTS

Lionel TrainMaster Command Control Crane Car Owner s Manual

Network Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008

AKMD Charge Schedule. Optional Services Catalog Customer Switching and Accessorial Services. Customer Switching.

MEI Structured Mathematics. Practice Comprehension Task - 2. Do trains run late?

1 INTRODUCTION TO TRAIN SIMULATOR FEATURES OF TRAIN SIMULATOR GETTING STARTED... 6

Rail safety statistics August 2014

Transit in the United States 3. Operating Costs and Performance Measures 13. Quality of Transit Service 19. ADA Compliance Bus 28

Movement Planner * System

Title: Integrating Management of Truck and Rail Systems in LA. INTERIM REPORT August 2015

Class 57/0 Pack Manual

SDH166D SoundFX Fits many HO locomotives 2 Selectable Steam & Diesel Sound Schemes Included

Sensor Sensibility Building the Business Case for Incorporating External Sensors as Part of Your Automatic Vehicle Location Solution

The Kansas City Southern Railway Company

Instruction Manual. This Manual covers the use of: SmartSwitch Servo Kit. DCC Stationary Decoder PLEASE READ THESE INSTRUCTIONS FULLY BEFORE USE

Railway Track Design

Transportation. McKinley County Map of Roads. Trucking. Federal Express RAC Transport United Parcel Service Yellow Freight Line

Report on structure and functionalities of the new online energy efficiency screening tool for railways

Trains crossing at Toronto s Old Mill Station 2009 TTC. Train Control

Asset Management Systems Information

Industry Track Inspection

SAN DIEGO POLICE DEPARTMENT RETIRED SENIOR VOLUNTEER PATROL FIELD TRAINING MANUAL NAME I.D.# DIVISION

Touch 2 Touch 2 with Go Touch 2 with Go Plus. Quick reference guide

BLE-T Division 443 Spokane Washington. Engineer s Guide to Agreement Claims

The Shanghai Maglev Route

CS2 System Available for Memory Sticks. New ipad App Main Station Announced

Transcription:

Great Northwestern Railway Operations Orientation

History of the GNW Connects UP/SP Overland Route and the AT&SF Santa Fe Trail - As the C&S Collapsed, GNW purchased the old DSP&P R.O.W. to provide a connection into Denver Set between 1970 and 1980 Strong ties and commonality with the Southern Pacific First and Second Generation Diesels - GNW necessarily utilizes second hand units

Warm Springs District/ New Mexico Division Two Yards Valley Gate and Warm Springs Through trains drop and pickup cars to and from the Warm Springs District at Valley Gate Staging yards represent points east and west

DUCK-UNDER EAST STAGING WEST STAGING The LAYOUT of the Layout WARM SPRINGS CHLORIDE SAND CREEK EL VADO Walkway ABAJO CALIENTE VALLEY GATE - WEST VALLEY GATE - EAST MESA CITY

Operating Positions Valley Gate Yardmaster Handles and oversees all operations in Valley Gate West. Warm Springs Yardmaster Handles and oversees all operations at Warm Springs. Road Engineer 1 and 2 Handles all train movements outside of Valley Gate and Warm Springs. Dispatcher Responsible for the orderly release and control of trains.

Valley Gate Valley Gate is primary gateway for Warm Springs District SP/GNW through trains AT&SF and CRI&P transfers Warm Springs Manifests

Warm Springs Locals are used to deliver and collect cars. Warm Springs marshals cars from surrounding industry. Manifest freights transfer cars to and from Valley Gate.

Road Crews Move trains across district. Through trains from Staging to Staging, dropping cars at Valley Gate as required. Locals out and back from Warm Springs to service industries. GNW operates commute passenger trains; connects with Amtrak.

Car Cars and Waybills All Freight Traffic Moves via CC/WB Reporting Marks and Description Match Car to Card

How To Read A Car Card/Waybill Each Car Card has an associated Waybill. The Waybill identifies the car s destination the destination city and the TIBS location.

Train/Industry Blocking System (TIBS) To simplify car routing and locating industries, the GNW uses the Train/Industry Blocking System. Every city or off layout destination receives a LETTER CODE. Within each city, each possible car destination receives a specific NUMBER code.

TIBS Listing El Vado is TIBS City Letter ID K Cement Retailer is TIBS ID K-3. Therefore, all cars destined for Cement Retailer will have TIBS ID K-3.

Off-Layout Destinations Off-layout destinations are only TIBS Letter ID There are 4 Off-Layout Destinations: East: SP and ATSF West: GNW and CRI&P Waybill is color coded to make it easy to see the destination is off layout.

STAGING Resides Under Mesa City

Using TIBS Group cars with same TIBS designations; letters then numbers. (Called BLOCKING ) Don t need to know every industry destination; locals will get it there. Yards should be blocking all cars.

Spotting Cars/Handling Cards Once car is spotted, place car-card in Set-Out pocket Car-Cards for cars to be picked-up are in Pick-Up pocket

Spotting Cars/Handling Cards IF car cannot be spotted, place car on clear and available track and car-card in HOLD pocket. HOLD indicates car to be spotted when space available.

Non-Revenue Rolling Stock Engine, Caboose and other equipment Follow same Car-Card format Includes loco operation info MU locos CC s bound together with sticky indicating consist address. (Use as LOCO number)

Making UP Trains Cars for a particular destination are collected to form trains. Trains are made up and released on a sequence, the Train List. Scheduled trains are run on a timetable.

Train Packs Car-Cards are collected for a particular destination. The collected cards form the basis of a train. Cards are placed into a pouch called a TRAIN PACK.

More on Train Packs Pouch contains a window that includes Train Card Train Card identifies info for operating that particular train. Train Packs are used ONLY ONCE during an operating session. Every train has a unique number and schedule. There are unique extra packs for extra trains.

Train Card Identifies all relevant info for operating a train: Train Direction and General Description Train Number and Symbol Departure Time Instructions

Dispatching and Control of Trains

The GNW Operating Concept Trains from staging bring cars onto the layout, generally by SP trains. Blocks of cars are dropped or picked up by these trains at Valley Gate. Balance of car movements are made by trains that originate and terminate on the layout.

Release of Trains through TRACK WARRANT AUTHORIZATION Two kinds of track: MAIN LINE and Everything Else Yard Areas Under Yard Master Control Mainline Under Dispatcher Control Need Authorization to Enter and Use Mainline

TRACK WARRANTS Depending on Session, May Be Verbal or Paper Defines Limits of Authorization Authorizations should be read back to assure understanding

Yard Limits Do not need Track Warrant for Movements Within Yard Limits Cannot move into Yard Limits without Yard Master Authorization.

Yard Limits YARD LIMITS DO NOT EXIST AT VALLEY GATE The Main Line Is Under Control of the Dispatcher However, sidings, yard tracks, etc ARE under Valley Gate YM control Mainline Denoted by LIGHT COLOR BALLAST through Valley Gate

Yard Limit EXIST at WARM SPRINGS from El Vado to End-of-Track at Warm Springs. All movements within Warm Springs District are under control of Warm Springs YM. Yard Limits

Industrial Switchers Abajo Caliente has a captive switcher. Limits of operation are to derail. Not permitted to operate on GNW tracks.

TRAIN HANDLING Throttles Sound Techniques

The MRC Prodigy Handheld Easy to Operate Instructions are on back! Press LOCO, type in number, and touch enter to capture a loco. Speed control either by + or - buttons or by knob. Railroad time Direction between + and keys Previous Locos Yard Master throttles are tethered, road throttles are wireless.

Sound Equipped Loco Controls In general: F0 Headlight F1 Bell F2 Long Horn F3 Short Horn F4 Dynamic Brake Sound F5 Gyra Light or Beacon F6 Backup Light F7 Brakes F8 Silence (Mute) F9 Dim (Headlight and B/U Light) STOP Shutdown Also stops loco when moving (See Loco cards for specifics on each engine)

Locomotive Operation Power is on the tracks at all times. Digital Carrier Control (DCC) sends signals over the rails to the loco to command actions. All locos are addressed by their number. All are sound equipped; most are Soundtraxx Tsunami. Refer to Loco Card for commands. All are programmed with momentum! If lights and sound are on, power is getting to the unit.

Momentum Prototype locos weight between 150 and 250 tons they don t start and stop easily. Simulated within the decoders. Road units have more. Slower is better. Plan your moves.

Speed How Fast Is Fast Enough? 25-45 MPH on Mainline Note Signage 10 MPH in yards Speed Table MPH Seconds per 50' 5 6.8 s 10 3.4 s 15 2.3 s 20 1.7 s 25 1.4 s 30 1.1 s 40 0.9 s 50 0.7 s 60 0.6 s

SWITCHING Operations Group Movements Preferably work everything as a trailing point movement. Group all facing point movements and make just one run-around.

Trailing Point

Facing Point

Run Around

Added Elements for Realism Deliberate moves. Plan before working. Group facing/trailing point moves. Slower is better. Other ideas: Time to pump up air in cars. Typ 1 min per car. Think about where your brakeman is, and pause to drop him, pick him up, plan cuts where his is Blow Horn: Before moving, RR crossings, etc. Ring Bell: Stations, engine facilities, grade crossings.

Clean up after switching Return all Switches to the NORMAL or MAINLINE position. Leave Car-Cards in proper locations. Verify Train-Packs that you have correct cards.

GNW Miscellanea No Food or Drinks in the RR Room Water OK Tight Quarters Make Room for each other Bad Order Cars Flag with Pink Slip Set out at first convenient location.

Equipment Handling Avoid handling from sides of locos and rolling stock

Equipment Handling Push from coupler Pickup from Fuel Tank Avoid handling from sides of locos and rolling stock

Same with Rolling Stock

Closing Thoughts. Goal is to simulate a rail transportation system in scale. Operate realistically: Speed is not as much a factor as deliberate and safe movements. Follow prototype practices as much as possible. Have fun!