Economic Highlights (In US$ unless otherwise indicated)

Similar documents
Detour Gold Provides New Life of Mine Plan for Detour Lake

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

NEVADA COPPER FILES INTEGRATED FEASIBILITY STUDY ON SEDAR

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

AVINO SILVER & GOLD MINES LTD.

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

(NYSE-MKT:XRA, TSX:XRC,

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

Abacus Mining & Exploration Corporation (an exploration stage company) Condensed Interim Financial Statements March 31, 2013.

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME

On February 3, 2016 the Company announced the appointment of Ms. Joyce Ngo as Interim Chief Financial Officer.

BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE

Savannah North Scoping Study Looking into the future 3 February 2016

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

Brian Groves CEO & Director

Abacus Mining & Exploration Corporation (an exploration stage company) Condensed Interim Financial Statements September 30, 2013.

Copper and Gold at Our Core

Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade

WILLAMAX PROJECT. TSX-V: DVN Reach us at Developing B.C. mining assets to create profitable gold production.

Candelaria and Ojos del Salado Chile

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

Yellowhead Mining Inc. (TSX-V: YMI) - Positive Feasibility Study Demonstrates Strong Economics

Galahad Gold plc (Galahad)

Aurvista Gold Plans Significant Exploration Program at Douay

Press Release 30 th October 2015

Focusing on Near Term Production and Exploration in Quebec

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

CREAM MINERALS LTD. Suite Granville Street Vancouver, B.C. V6C 3P1

Corporate Presentation November 2015 TSX: ORA

Corporate Presentation October 2015

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

NOVEMBER January 2013

NGEX ANNOUNCES POSITIVE RESULT OF PRELIMINARY ECONOMIC ASSESSMENT AND AN UPDATED MINERAL RESOURCE ESTIMATE FOR ITS LOS HELADOS PROJECT

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

MANAGEMENT DISCUSSION AND ANALYSIS FOR THE THREE MONTHS ENDED MAY 31, 2014

2016 TD Securities Mining Conference January 2016 TSX: LUN OMX: LUMI

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

Copper and Gold at Our Core

News Release. Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX)

CANADA S INTERMEDIATE GOLD PRODUCER

ALCYONE REPORTS JORC SILVER RESOURCES

FORWARD LOOKING STATEMENTS

Pebble Copper Gold Molybdenum Project Alaska, USA. A First World & Top Class Mining Asset

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

Sabina Gold & Silver Corp.

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

China Gold International Resources Corp. Ltd.

For personal use only

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

Lydianinternational.co.uk TSX:LYD. Corporate Presentation June

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).

Financial and Operating Highlights through and subsequent to March 31, 2016: Completion of Flow-Through Share Financing

SILVERCORP INTERCEPTS HIGH GRADE SILVER LEAD ZINC MINERALIZATION AT THE TLP MINE, YING MINING DISTRICT, HENAN PROVINCE, CHINA

TASEKO ANNOUNCES SECOND QUARTER RESULTS FOR FISCAL 2007

STARCORE INTERNATIONAL MINES LTD. TSX:SAM

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb TORONTO

Acquisition of Rice Lake. December 2015

Investor Presentation

Press Release 29 th January 2016

FORWARD-LOOKING STATEMENTS

January Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea. November 2010

Cannon Big Pit Given the Green Light

Lalor Project Base Metal Zones and Gold Mineralization January 2009

Cash Flowing Today and Positioned for the Next Cycle

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

Antapaccay Precious Metals Stream

News Release. n j. NovaCopper Releases Year End Results and Continues to Focus on Adding Long Term Value

Endeavour Management Presentation

NEWS RELEASE. Centerra Gold 2015 Year-End Reserve and Resource Update

Mako Project, Eastern Senegal Completion of Scoping Study

Update on Heap Leach potential of the Murchison gold project

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

Reservoir Minerals Reports Further High Grade Copper-Gold Drill Intercepts from the Upper Zone of the Cukaru Peki Deposit, Serbia

TD Securities Mining Conference JANUARY 26-27, Developing the third-largest copper mine

Nevada Focused, Discovery Driven. TSX V. RPM OTCQX: RPMGF

Barkerville Gold Mines Investor presentation q Mines are found in the shadows of headframes

Positioned for Production: Exploring for Growth

Golden Band Resources Inc.

Certain information regarding the Company including management's assessment of future plans and operations, may constitute forward-looking statements

ABACUS MINING & EXPLORATION CORP. Management Discussion & Analysis FORM F1. For the Period Ending. September 30, (Amended and Restated)

Unprecedented Opportunities in Final Frontier of B.C. s Golden Triangle. Exploration and mineral resource development

C o r p o r a t e P r e s e n t a t i o n A u g u s t

Developing an Open Pit Gold Project in Brazil. Corporate Presentation September 2015 TSX: BSX

NexGen Commences 35,000 m Summer Drill Program at Rook I and Advances Project Development Activities

AGNICO-EAGLE MINES LIMITED

The last great Canadian gold mining camp controlled by a junior mining company.

First Quarter 2015 Investor Conference Call May 7, 2015

Resources Rising Stars

CNSX: TV

Armadale Capital Plc Armadale or the Company Robust Project Demonstrated by Mpokoto Feasibility Study HIGHLIGHTS

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

Red Mountain Project British Columbia s Next High-Grade Gold Mine. February 2015

Ivanhoe Mines announces an accelerated infill drilling program at the Kamoa copper project s Kakula Discovery in the D.R. Congo

Amerigo Announces 2011 Financial Results

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

Disclaimer. Issued by Crazy Horse Resources Inc., of Suite West Pender Street, Vancouver, British Columbia V6C 1H2, Canada.

Highlights of selected high-grade mineralized zones exposed in drift tunnels include:

Transcription:

TSX.V TSX Venture Exchange Symbol: AME Suite 615-800 West Pender Street Vancouver, B.C. V6C 2V6 Canada Tel: 604.682.0301 Fax: 604.682.0307 email: info@amemining.com website: www.amemining.com Abacus announces positive feasibility study update on Ajax Cu-Au-Ag project in B.C. Vancouver, BC January 13, 2016. Abacus Mining & Exploration Corporation ( Abacus or the Company ) (TSXV:AME) is pleased to announce the results of an updated Feasibility Study (the updated FS ) for the Ajax copper-gold-silver deposit located south of the City of Kamloops, B.C. The Ajax Project is 100% owned by KGHM Ajax Mining Inc. ( KGHM Ajax ), a joint venture company owned by Abacus (20%) and KGHM Polska Miedz SA (KGHM) (80%). The updated FS supersedes the Feasibility Study of January 6, 2012 and incorporates an updated reserve and significantly updated engineering. The updated FS was prepared in accordance with Canadian National Instrument 43-101 by a consortium of independent consultants under the direction of M3 Engineering and Technology Corp., a recognized global provider of design and construction services. Several significant changes were introduced to the project scope and layout which yielded positive economic, processing and environmental parameters for the Ajax Project. Economic Highlights (In US$ unless otherwise indicated) Total proven and probable mineral reserves of 426 million tonnes containing 2.7 billion lbs Cu, 2.6 million oz Au, and 5.3 million oz Ag, at an average life of mine (LOM) head grade of 0.29% Cu, 0.19 g/t Au and 0.39 g/t Ag.* 18 year mine life at an average nominal processing rate of 65,000 tonnes per day (t/d) at an overall stripping ratio of 2.65:1 Average annual production of copper and gold in concentrate of 58,000 tonnes Cu and 125,000 oz Au Average mine operating costs of $1.50/t; average process operating costs of $4.31/t Initial capital expenditures of $1.307 billion Pre-tax NPV (8%) = $429.4 M Pre-tax NPV (5%) = $872.5 M Pre-Tax IRR 13.4%; payback (years) 6.5 *Based on LOM metal prices of Cu: US$3.21/lb, Au: US$1,200/oz, Ag: US$17/oz The NI 43-101 technical report entitled "Ajax NI 43-101 Feasibility Study Update Technical Report" prepared by the Qualified Persons mentioned in this report will be filed on Sedar (www.sedar.com) and the Company s website (www.amemining.com) within 45 days of this release.

Key changes from the January 2012 Feasibility Study include: Project site relocation from the north to the south side of the mine pit Change in tailings technology to thickened tailings Change in mining plans from 60,000 t/d to 65,000 t/d, and the replacement of the in-pit semi-mobile crushing stations with a single, fixed primary crushing station Addition of a fine ore stockpile Adjustments to the site water management plan to accommodate facility relocation and tailings storage facility redesign Further definition of mineral resources and mineral reserves Mine Plan The proposed mine plan is a conventional truck-and-shovel, open-pit operation. The pit design has been developed to comprise seven phases. The longest spans of the pit will be approximately 2.7 km in an east-west direction and approximately 1.3 km in a north-south direction. The mine plan incorporates a revised throughput from 60,000 t/d to 65,000 t/d, an updated block model that includes increased geological interpretations, recent drilling results and metallurgical testwork, outcomes of three trade-off studies, and updated economic factors. The mine plan is based on the extraction of 426 Mt of ore containing 0.29% Cu, 0.19 g/t Au and 0.39 g/t Ag. This compares to the 2012 Feasibility Study of a reported 503 Mt of reserves containing 0.27% copper and 0.17 g/t of gold. Mine life is calculated to be 18 years at an average nominal processing rate of 65,000 t/d and an overall stripping ratio of 2.65:1, waste to ore. Based on the contained metal content of 1.2 Mt (2.7 billion lbs) of copper, 2.6 million oz of gold and 5.3 million oz of silver, average annual production is estimated to be 58,000 tonnes of copper and 125,000 ounces of gold in concentrate. FINANCIAL HIGHLIGHTS (In US$ unless otherwise indicated) Financial Results using 5% and 8% discount rate with KGHM price deck* Financial Indicators before Taxes NPV @ 5% $872.5 M NPV @ 8% $429.4 M IRR % 13.4% Payback (years) 6.5 Financial Indicators after Taxes NPV @ 5% $543.0 M NPV @ 8% $215.6 M IRR % 11.1% Payback (years) 6.7 *Based on LOM long term metal prices of Cu (with higher short term Cu prices): US$3.21/lb, Au: US$1,200/oz Ag: US$16/oz

Initial Capital Expenditures Capital expenditures, estimated at US$1.307 billion, reflect changes to the general arrangement of the Project whereby the facilities have been moved farther from the Kamloops community, several important technological changes aimed at increasing metals recovery during processing, decreasing operating costs and reducing the environmental impact (e.g. changes in preliminary milling and ore transport systems, technological solutions at the processing plant and in the tailings storage system). The C1 cash cost has been calculated at US$1.37/lb. Mine construction is expected to take 2.5 years. Mine $279.4 Process $910.1 G&A $85.3 Subtotal $1,274.8 Capitalized Mill Turnover $32.4 Note 1. Numbers in millions US$. Total $1,307.2 Operating Costs The LOM mine operations costs were calculated to average $1.50 per tonne mined. Area Unit Cost ($/t mined) Drilling 0.07 Blasting 0.20 Loading 0.19 Hauling 0.66 Support 0.17 Mine General 0.22 Total Cost 1.50 1 Note 1. Numbers may not add due to rounding. The process operating costs were calculated to average $4.31 per tonne ore. Area US$/tonne ore Maintenance 0.68 Supplies 1.72 Consumables 0.95 Outside Service 0.19 Salaries & Wages 0.64 Taxes 0.12 Total 4.31 1 Note 1. Numbers may not add due to rounding. Mineral Resources The Mineral Resource Estimate was generated using drill hole sample assay results and an interpretation of the geologic model. The mineral resource database is a sub-set of the Ajax database and consists of 208,050 metres of drilling in 665 drill holes. The spatial distribution of Au-Ag in relation to Cu shows a reasonably strong correlation among the three metals, allowing Cu-Au-Ag to be grouped in mineralized domains. The Mineral Resource Estimate is summarized as follows:

Mineral Resource Summary NSR Cut-off of US $7.10/t Ajax Project Classification Tonnage (Mt) Cu (%) Au (g/t) Ag (g/t) Measured (M) 148 0.28 0.18 0.37 Indicated (I) 420 0.25 0.18 0.35 M + I 568 0.26 0.18 0.35 Inferred 29 0.13 0.09 0.17 Notes: 1. CIM Definitions were followed for Mineral Resources. 2. Mineral resources are estimated at an NSR cut-off of $7.10. 3. Mineral resources are estimated at US$4.00/lb Cu, US$1800/oz Au, and US$26/oz Ag. 4. Inferred blocks were included in generating pit shell. 5. Mineral resources are reported inclusive of mineral reserves. 6. Tonnages and grades are rounded to reflect the accuracy of the estimate, and numbers may not add due to rounding. 7. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral Reserves To estimate the mineral reserves, mining and milling parameters along with modifying factors such as mining dilution and mining losses were used. Pit slope design and pit wall depressurization recommendations for the proposed Ajax open pit were incorporated. Mining and processing costs per tonne were estimated and process recoveries were included in the NSR calculation for each of the six common metallurgical zones. The Mineral Reserve Estimate is summarized as follows: Confidence Category Ajax Project Mineral Reserves Estimate NSR Cut-off of US$7.10/t ROM (Mt) Average ROM Grades Cu (%) Au (g/t) Ag (g/t) Copper (Mlb) Contained Metal Gold (koz) Silver (koz) Proven Mineral Reserves 130 0.30 0.19 0.40 875 791 1,677 Probable Mineral 296 0.28 0.19 0.38 1,818 1,813 3,615 Reserves Proven & Probable Mineral 426 0.29 0.19 0.39 2,693 2,605 5,292 Reserves Notes: 1. CIM Definitions were followed for Mineral Reserves. 2. Mineral Reserves are estimated at an NSR cut-off of $7.10. 3. Mineral Reserves are estimated at initial fluctuating Cu price with US$3.21/lb Cu long term, US$1200/oz Au, and US$17/oz Ag. 4. Inferred blocks were included in generating the pit shell. 5. Process recoveries for the six common metallurgical zones are included in the NSR estimation. 6. Tonnages and grades are rounded to reflect the accuracy of the estimate, and numbers may not add due to rounding. Infrastructure The Ajax Project is situated approximately 3 km south of the City of Kamloops, B.C. The project will be accessed from the Coquihalla Highway via a reconstructed Inks Lake Interchange and upgraded mine access road along the historic haul road, crossing Lac Le Jeune Road to the main gate east of Jacko Lake. Fresh water to the mine site will be pumped from Kamloops Lake to the Project site. The majority of the water used in the process will be reclaimed from the tailing storage facility. Power will be supplied to the site by a single-circuit 230 kv transmission line from BC Hydro s Jacko Lake substation, located approximately 12 km from the Project site. Environmental and Permitting The Environmental Assessment Application/Environmental Impact Statement (the Application/ EIS ) for the Ajax copper-gold-silver Project was submitted provincially to the British Columbia Environmental Assessment Office and federally to the Canadian Environmental Assessment Agency for screening review on September 14, 2015. The

studies contained in the Application/EIS demonstrate the extent to which the Ajax mine has been designed to mitigate potential environmental impacts, while providing the maximum benefit to the community. As of November 24, 2015 the Application/EIS had passed through the screening review process by both the B.C. Environmental Assessment Office and the Canadian Environmental Assessment Agency and was determined to be acceptable for detailed technical review. KGHM Ajax has since been preparing the document for formal submission. Following formal submission of the Application/EIS, the British Columbia Environmental Assessment Office and the Canadian Environmental Assessment Agency will hold a joint public commenting period. During this period, a number of open houses and other initiatives are planned to enhance understanding of the contents of the Application/EIS, including plain language summaries and fact sheets of key studies. Technical Report The NI 43-101 technical report entitled "Ajax NI 43-101 Feasibility Study Update Technical Report" prepared by the Qualified Persons is expected to be filed on Sedar (www.sedar.com) and the Company s website (www.amemining.com) within 45 days of this release. In the opinion of the QPs, knowledge of the deposit settings, lithologies, and structural and alteration controls on mineralization is sufficient to support Mineral Resource and Mineral Reserve estimates. The exploration programs completed to date are appropriate to the style of the deposits and prospects within the Project. In the opinion of the QPs, sample collection, preparation, analytical and QA/QC data from the Abacus and KGHM Ajax drilling programs were appropriate and meet industry standards. The QPs consider that a reasonable level of verification has been completed during the audits undertaken in 2008-2009, 2010, 2011 and 2014 by MDA, and that no material issues would have been left unidentified from the audit programs undertaken. The data verification programs undertaken on the data collected from the Project adequately support the geological interpretations, the analytical and database quality, and therefore support the use of the data in mineral resource estimation. In the opinion of the QPs, estimations of mineral resources for the Project conform to industry best practices and meet the requirements of CIM (2010). An economic Lerchs- Grossman (LG) pit shell was used to constrain the estimate and develop a mine design, and appropriate modifying factors were applied to convert Measured and Indicated Mineral Resources to Proven and Probable Mineral Reserves. The following Qualified Persons have reviewed and approved the scientific, technical, and economic information contained in this news release. Keith Dagel, PE and Daniel Roth, PE, P.Eng. of M3 Engineering & Technology Capital cost, operating costs, and economics Sean Ennis, P.Eng of Norwest Tailings and water management and mine rock storage facilities Danny Tolmer, P.Eng of Golder Associates Mining and Mineral Reserves Derek Chubb, P.Eng of ERM Environmental permitting Christopher J. Wild, P.Eng of KGHM Mineral resource estimation Claus Stoiber, P.Eng of KGHM- Mineral Processing and Metallurgical Testing Julian Watson, MAusIMM CP (Geotech), RPEQ of KGHM Geotechnical

On Behalf of the Board, ABACUS MINING & EXPLORATION CORPORATION Michael McInnis Chairman, President & CEO About Abacus Abacus is a mineral exploration and mine development company with a 20% interest in the Ajax Project located at the historic Ajax-Afton site southwest of Kamloops, B.C. The Ajax Project is a proposed copper-gold open-pit mine currently in the submission stage of a provincial and federal environmental assessment process. Through KGHM Ajax Mining Inc., a joint venture company between Abacus (20%) and KGHM Polska Miedz S.A. (KGHM) (80%), the mine is being funded in large part by KGHM and operated by its wholly-owned subsidiary, KGHM International Ltd. For the latest reports and information on the Ajax Project, please refer to the Company s website at www.amemining.com. Forward-Looking Information This release includes certain statements that are deemed forward-looking statements. All statements in this release, other than statements of historical facts, that address events or developments that Abacus expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words expects, plans, anticipates, believes, intends, estimates, projects, potential and similar expressions, or that events or conditions will, would, may, could or should occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include changes to commodity prices, mine and metallurgical recovery, operating and capital costs, foreign exchange rates, ability to obtain required permits on a timely basis, exploitation and exploration successes, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.