When the template is complete, the whole Product Description document can be printed and approved.



Similar documents
When the template is complete, the whole Work Package document can be printed and approved. Saving the Work Package document under its own name

<Project Name> Quality Assurance Plan

Quality Management Plan Template

Quality Center LDAP Guide

<Project Name> Deployment Plan

SharePoint Services: Using Workflows

ISO 14001:2004 EMS Internal Audit Guidance

Create Signature for the Scott County Family Y

Install Guide for Time Matters and Billing Matters 11.0

How to Configure the Windows DNS Server

Uninstallation Guide Funding Information System (FIS)

MobileStatus Server Installation and Configuration Guide

One positive experience I've had in the last 24 hours: Exercise today:

SharePoint 2007 Get started User Guide. Team Sites

Outlook Web App (formerly known as Outlook Web Access)

Quest Soft Token for Windows Mobile User Guide

Sterling Integrator. PGP Server Manager 5.1

STIDistrict SQL 2000 Database Management Plans

Tool Tip. SyAM Management Utilities and Non-Admin Domain Users

Getting Started with Sage One Start

Installing Cobra 4.7

ENC Signature Service

Word 2010: Mail Merge to with Attachments

c360 SharePoint Integration User Guide Microsoft Dynamics CRM 4.0 compatible c360 Solutions, Inc.

Time Tracking for Employees

PayPal Integration Guide

Backing Up CNG SAFE Version 6.0

Client Authenticated SSL Server Setup Guide for Microsoft Windows IIS

User Guide May Using Certificates in Outlook Express

Upgrading Software Using the Online Installer

Windows Firewall Exceptions Configuring Windows Firewall Exceptions for Docusnap

The Purchasing Wizard

Creating and Issuing the Workstation Authentication Certificate Template on the Certification Authority

Back-up Server DOC-OEMSPP-S/2014-BUS-EN-10/12/13

CHAPTER 5 - SAFETY ASSESSMENTS, LOG OF DEFICIENCIES AND CORRECTIVE ACTION PLANS

Application Note - JDSU PathTrak Video Monitoring System Data Backup and Restore Process

Vodafone PC SMS (Software version 4.7.1) User Manual

MS WORD 2007 (PC) Macros and Track Changes Please note the latest Macintosh version of MS Word does not have Macros.

ISO 9001:2008 Internal Audit Guidance

FLOWCHART OF PROJECT EXECUTION

Guide to. Writing formal letters

Lab - Dual Boot - Vista & Windows XP

Click to begin. Maitre'D Full System Backup & Restore

Expedite for Windows Software Development Kit Programming Guide

Using a Remote SQL Server Best Practices

CDOT Workflow ProjectWise Web Access Operations

SCCM Client Checklist for Windows 7

The Windows Vista Recovery Environment

Advanced Solutions of Microsoft Exchange Server 2013

ThinManager and Active Directory

Yubico PIV Management Tools

Creating an Offline Journal Using a Template

ARIBA Contract Management System. User Guide to Accompany Training

STATISTICA VERSION 10 STATISTICA ENTERPRISE SERVER INSTALLATION INSTRUCTIONS

EFT 2012 GETTinG STarTEd GuidE

Creating tables in Microsoft Access 2007


Change Management Plan Template

Microsoft Office Macro Security

Installation of MicroSoft Active Directory

TROUBLESHOOTING INCORRECT REPORTING OF THE WHO CHANGED PARAMETER

Application Note: Upgrading Interceptor software with FTP server on local PC

ACTIVE DIRECTORY DEPLOYMENT

CC4 TEN: Pre-installation instructions for Windows Server networks

1 Intel Smart Connect Technology Installation Guide:

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

Introduction to Zetadocs for NAV

Sharpdesk V3.5. Push Installation Guide for system administrator Version

What is the difference between MAK and KMS activation and how it is used? General Microsoft Volume Activation 2.0 FAQ... 2

DocumentsCorePack for MS CRM 2011 Implementation Guide

How to Setup, Install & Run a Website on your Local Computer. For WordPress - on an Offline Server - WAMP

Upgrading Good Mobile Messaging and Good Mobile Control Servers

Quick Start Guide. DocuSign for Dynamics CRM Online Overview. Published August 2015

TCS-CA. Outlook Express Configuration [VERSION 1.0] U S E R G U I D E

COINS OA Enhancement: Project Management Task Lists

ACCOUNT OPENING FORM Current or Deposit Account - Business

Presentations and PowerPoint

Outlander User Guide. Installation

Training Transcript for Module 9 Plans and ExPlan

Customize tab; click the Accounts category; drag the satellite dish icon to your toolbar.

MaaS360 Cloud Extender

Configuring user provisioning for Amazon Web Services (Amazon Specific)

17 March 2013 NIEM Web Services API Version 1.0 URI:

ACG Commissioning Guideline

Project Management WalkThrough

How to install and use the File Sharing Outlook Plugin

SmartLink for Outlook User Guide

Using Windows Task Scheduler instead of the Backup Express Scheduler

Xerox Multifunction Devices

MaaS360 On-Premises Cloud Extender

Microsoft Word Revising Word Documents Using Markup Tools

Using an Edline Gradebook. EGP Teacher Guide

Mastering Mail Merge. 2 Parts to a Mail Merge. Mail Merge Mailings Ribbon. Mailings Create Envelopes or Labels

HEALTH HOME TRACKING SYSTEM FILE SPECIFICATIONS

Transcription:

HOW TO USE THIS TEMPLATE: Introduction The template reflects the steps set out in the PRINCE2 Method and is designed to prompt the Project Manager and help in the creation of the Product Description. The information for the Product Description will be found within the Controls section of the PRINCE2 Manual. There is also a Product Description for the Product Description at Appendix A of the PRINCE2 Manual. Loading the file This template has been produced using Microsoft Word 97. To use it, load up the file directly from the directory and starting from page 1 follow the prompts (in [...] brackets). Deleting the [...] text When the template is complete, the whole Product Description document can be printed and approved. Prior to printing, you should delete all [...] prompt text. Saving the Product Description document under its own name Save the Product Description document by selecting the SAVE AS command; this will avoid overwriting the standard template. You must specify your own Project Directory. Once your Product Description Document is completed check the document against the following Quality Criteria: Is the purpose clear and consistent with other products? Is the product described to a level of detail sufficient to plan and manage its development? Is the composition of the product more like a requirements specification than a description of the contents/elements of a product?

Is the responsibility for the development of the product consistent with the roles and responsibilities described in the project management team organisation and the Project Quality Plan? Are the quality criteria consistent with the project quality standards, standard checklists and Acceptance Criteria? Can the quality criteria answer the question: How will I know when work on this product is finished as opposed to stopped? Are the types of quality check required able to verify that the product meets its stated quality criteria or not? Have people with the right knowledge and skills written the Product Description?

PROJECT DOCUMENTATION PRODUCT DESCRIPTION Project: Release: Date: Product Title: Identifier: [Unique key, probably allocated by configuration management method used] PRINCE2 Author: Owner:

Client: Document Ref: Version No: Page 2

1 Product Description History 1.1 Document Location This document is only valid on the day it was printed. The source of the document will be found on the project's PC in location 1.2 Revision History Date of this revision: Date of Next revision: Revision date Previous revision date Summary of Changes First issue Changes marked 1.3 Approvals This document requires the following approvals. Signed approval forms are filed in the Management section of the project files. Name Signature Title Date of Issue Version 1.4 Distribution This document has been distributed to: Name Title Date of Issue Version Page 3

2 Table of Contents Page 1 Product Description History 1 1.1 Document Location 1 1.2 Revision History 1.3 Approvals 1.4 Distribution 2 Table of Contents 3 Purpose 4 Composition 5 Derivation 6 Format and Presentation 7 Allocation 8 Quality Criteria 9 Quality Method 10 Quality Check Skills Required Page 4

Post Project Review Plan 3 Purpose [To understand the detailed nature, purpose and function of the product To identify the sources of information or supply of the product To describe the required appearance of the product To identify the level of quality required of the product To enable activities to develop and quality control the product to be identified To define the people or skills required to develop and check the product] 4 Composition [This is a list of the parts of a product. E.g. if the product were a document, this would be a list of the expected chapters or sections] 5 Derivation [What are the source products from which this product is derived? E.g. a design is derived from a specification a product is bought from a supplier a statement of the expected benefits are obtained from the user a product is obtained from another department or team] 6 Format and Presentation [Any standard appearance to which the product must conform] 7 Allocation [The person, group or skill type needed to create this product] 8 Quality Criteria [To what quality specification must the product be produced and what quality measurements will be applied by those inspecting the finished product? This might be a simple reference to one or more common standards that are documented elsewhere or it might be a full explanation of some yardstick to be applied. 9 Quality Method [What kind of quality checking e.g. test, inspection or review, is to be used to check the quality or functionality of the product? Page 5

10 Quality Check Skills Required [Either identification of the people who are to check the quality, an indication of the skills required to do so or a pointer to which area(s) should supply the checking resources. Identification of the actual people may be left until planning the stage in which the quality check is to be done] Page 6