Fixed vs. Variable Costs



Similar documents
The Cost of Production

Chapter 5 Revenue & Cost Analysis

Engineering Economics ECIV 5245

COST & BREAKEVEN ANALYSIS

1.040 Project Management

What is a cost? What is an expense?

Review of Production and Cost Concepts

Econ 101: Principles of Microeconomics

CE2451 Engineering Economics & Cost Analysis. Objectives of this course

Q = ak L + bk L. 2. The properties of a short-run cubic production function ( Q = AL + BL )

Chapter 03.00F Physical Problem for Nonlinear Equations Industrial Engineering

11.3 BREAK-EVEN ANALYSIS. Fixed and Variable Costs

REVIEW FOR FINAL EXAM, ACCT-2302 (SAC)

UC Berkeley Haas School of Business Economic Analysis for Business Decisions (EWMBA 201A) Fall 2013

Chapter 10. What is capital budgeting? Topics. The Basics of Capital Budgeting: Evaluating Cash Flows

Break-Even Point and Cost-Volume-Profit Analysis

- centred on human factors (ie. ergonomics, desire to have a new computer system) - Are there unused computer terminals in the company now?

The final grade will be determined as follows:

Variable Costs. Breakeven Analysis. Examples of Variable Costs. Variable Costs. Mixed

Incremental Analysis and Decision-making Costs

CHAPTER 9: PURE COMPETITION

Financial Analysis, Modeling, and Forecasting Techniques

Cost Concepts and Design Economics The A380 Superjumbo s Breakeven Point

1.1 Introduction. Chapter 1: Feasibility Studies: An Overview

Stocker Grazing or Grow Yard Feeder Cattle Profit Projection Calculator Users Manual and Definitions

Understanding Depreciation, Fixed, and Variable Costs

Chapter 011 Project Analysis and Evaluation

Identifying Relevant Costs

ESTIMATION OF PROJECT COSTS AND BENEFITS

FINANCE Ed McKillip Director of Finance Main Line Health

Chapter 5 The Production Process and Costs

Learning Objectives. After reading Chapter 11 and working the problems for Chapter 11 in the textbook and in this Workbook, you should be able to:

Cost Concepts and Behavior

SHORT-TERM DECISION MAKING DIFFERENTIAL (INCREMENTAL) ANALYSIS

Production Functions and Cost of Production

Part Three. Cost Behavior Analysis

27Forecasting cash flows 27Activity 27.1 open-ended question.

Finance for Cultural Organisations Lecture 9. Capital Budgeting: Project Analysis and Evaluation

EVALUATING CAPITAL INVESTMENTS IN AGRIBUSINESS

Chapter. Project Analysis and Evaluation. McGraw-Hill/Irwin. Copyright 2006 by The McGraw-Hill Companies, Inc. All rights reserved.

Practical decisions facing urban planners

Example Summary of how to calculate Six Sigma Savings:

The relevant cost for producing the product is as follows: The total cost to purchase the units is $120,000 (i.e., $60 per unit).

Workbook 2 Overheads

The Circular Flow of Income and Expenditure

Chapter 6 Competitive Markets

Production and Inventory Management

Cost OVERVIEW. WSG6 7/7/03 4:36 PM Page 79. Copyright 2003 by Academic Press. All rights of reproduction in any form reserved.

Microeconomics Topic 6: Be able to explain and calculate average and marginal cost to make production decisions.

3.1 Solving Systems Using Tables and Graphs

Project Cost Overrun Review Process Improvement

ACC 121 PRINCIPLES OF MANAGERIAL ACCOUNTING

Part 7. Capital Budgeting

COST CLASSIFICATION AND COST BEHAVIOR INTRODUCTION

RAPID REVIEW Chapter Content

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

Chapter 7: The Costs of Production QUESTIONS FOR REVIEW

Planning and Analysis Tools of Transportation Demand and Investment Development of Formal Transportation Planning Process

Understanding, Allocating, and Controlling Overhead Costs

ENHANCING THE USEFULNESS OF CVP ANALYSIS AS AN OPERATING AND STRATEGIC TOOL

CHAPTER 17 DIVISIONAL PERFORMANCE EVALUATION

Cadena de suministro. Mtro. William H. Delano Frier

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question on the accompanying scantron.

Replacement Heifers Costs and Return Calculation Decision Aids

Information About Financial Statements for Intrastate Household Goods Movers

Product Mix as a Framing Exercise: The Role of Cost Allocation. Anil Arya The Ohio State University. Jonathan Glover Carnegie Mellon University

D) Marginal revenue is the rate at which total revenue changes with respect to changes in output.

Chapter 22 The Cost of Production Extra Multiple Choice Questions for Review

Accounting 610 6A Relevant Costs and Operational Decisions Page 1

The Short-Run Macro Model. The Short-Run Macro Model. The Short-Run Macro Model

BUSINESS TOOLS. Understanding Financial Ratios and Benchmarks. Quick Definitions:

INDIRECT INFERENCE (prepared for: The New Palgrave Dictionary of Economics, Second Edition)

Construction Planning, Equipment, and Methods

AGENDA: MANAGERIAL ACCOUNTING AND COST CONCEPTS

BADM 527, Fall Midterm Exam 2. Multiple Choice: 3 points each. Answer the questions on the separate bubble sheet. NAME

Practice Multiple Choice Questions Answers are bolded. Explanations to come soon!!

Calculating Your Milk Production Costs and Using the Results to Manage Your Expenses

Chapter 4 Public Perspective: Economic, Environmental and Social Concerns

Management Accounting and Decision-Making

Management Accounting 2 nd Year Examination

MARKET ANALYSIS FOR REAL ESTATE

Final Draft Final Report on

Managerial Accounting Prof. Dr. Vardaraj Bapat Department of School of Management Indian Institute of Technology, Bombay

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

21 : Theory of Cost 1

Budgetary Planning. Managerial Accounting Fifth Edition Weygandt Kimmel Kieso. Page 9-2

Transit Cost Analysis

COST THEORY. I What costs matter? A Opportunity Costs

Engineering Economics: Comparing Financial Characteristics of Design Options

Chapter 9. The IS-LM/AD-AS Model: A General Framework for Macroeconomic Analysis Pearson Addison-Wesley. All rights reserved

14.01 Principles of Microeconomics, Fall 2007 Chia-Hui Chen October 15, Lecture 13. Cost Function

Refinery Planning & Scheduling - Plan the Act. Act the Plan.

SALES FORCE SIZING & PORTFOLIO OPTIMIZATION. David Wood, PhD, Senior Principal Rajnish Kumar, Senior Manager

The fact is that 90% of business strategies are not implemented through operations as intended. Overview

At the end of Chapter 14, you will be able to answer the following:

Project Cost Management.

11 PERFECT COMPETITION. Chapter. Competition

Transcription:

Fixed vs. Variable s 1.11 Project Evaluation Terminology Carl D. Martland Fixed s Unaffected by changes in activity level over a feasible range of operations for a given capacity or capability over a reasonable time period For greater changes in activity levels, or for shutdowns, the fixed cost can of course vary Examples: insurance, rent, CEO salary Variable s Vary with the level of activity Examples: construction labor, fuel costs, supplies Incremental s Added costs for increment of activity Fixed, Variable, and Incremental s Total (V) = Fixed + f(volume) Avg. (V) = Fixed /V + f(volume)/v 2 15 A Simple, Linear Function: TC = a + bv = 5 + V, 1 <V<1 FC VC TC Incremental (V,V1) = f(v1) - f(v) 1 TC Marginal (V) = d(total )/dv = f'(v) 5 VC FC (Assuming we in fact have a differentiable function for variable costs!) 1 2 3 5 6 7 8 9 1 7 6 5 4 3 2 1 A Simple, Linear Function: Avg = a/v + b = 5/V + 1 Marginal (V)= d(tc)dv = b = 1 Marginal Average Average Marginal 1 2 3 5 6 7 8 9 1 Classic Tradeoff: Can we afford higher fixed costs in order to get lower variable costs? Breakeven point B is where TC1 = TC2 18 16 1 12 1 8 6 TC2 = 95 + V/2 B TC = 5 + V TC Base TC High Tech 1 2 3 5 6 7 8 9 1 11 12 Carl D. Martland Page 1

Breakeven If b1 < b and a1 > a, then there is a volume V* where the total costs are equal: a + b(v*) = a1 + b1 (*) V* = (a1-a)/(b-b1) = FC/Reduction in VC If VC savings are minor, or if the increase in fixed costs is high, then you need higher volume to justify the high fixed cost option. Which Site is Best for Asphalt Mixing Plant? Cheaper (A) or Closer (B)? (Example 2-2, EE, pp. 27-28) Site A Site B Hauling Distance 6 miles 4.3 miles Hauling Expense $1.15/cu. yd.-mi. $1.15/cu. yd.-mi Monthly Rental $1,/mo. $5,/mo. Set up $15, $25, Flagman $96/day Total 5, cu. yds. 5, cu. yds. Time 4 months (85 days) 4 mo. (85 days) Which Site is Best for Asphalt Mixing Plant? (Example 2-2, EE, pp. 27-28) Site A Site B Rental 4 mo x $1/mo 4 mo x $5,/mo Setup $15, $25, Flagman 85 days x $96/day = $816 Total FC $19, $53, Transport /Cu. Yd. 6 mi x $1.15/mi 4.3 mi x $1.15/mi Transport, total $345, $247,25 Total $364, $3,41 Breakeven Vol. = ($53,16-19,)/(1.7 x $1.15) = 17,473 cu yd Comments on Breakeven Analysis YOU (the contractor) know YOUR cost and YOUR technology You (the analyst) can build an algebraic expression to represent YOUR costs You can substitue variables to reflect options and technologies available You can find breakeven points quite readily Hints of other problems Need for flagman suggests there may be congestion Is your haulage cost model correct? Does higher rent suggest a tonier neighborhood where you may be regarded as a nuisance? More Comments - CEE Projects Typical major projects reduce both marginal and average costs per unit of capacity Will there be sufficient demand to allow prices that cover average costs? In general, smaller projects will be better at low volumes until poor service and congestion hurt performance Non-Linear Functions Avg = C(V)/V Marginal = dc/dv Incremental = (C(V1) - C(V))/(V1-V) 45 35 3 25 Base Large Project If marginal cost exceeds average cost, then average costs are rising 2 15 Carl D. Martland Page 2

Some Other Terminology Opportunity A key economic concept! What else could be done with these resources? Sunk Expenditures that cannot be recovered and that are common to all options and therefore can be ignored ("focus on the differences") Direct, Indirect, and Standard s Direct - easily related to a measurable activity or output Excavation cost/cu. yd. Indirect (or overhead or burden) -ther costs related to the overall operation Utilities, marketing, property tax Standard costs - used in budgeting, estimating & control Even More Terminology Recurring vs. Non-recurring costs Recurring - repetitive; could be fixed or variable Non-recurring - typically the one-time expense of getting started vs. Expense "Expense" is a specific cash or other expenditure that can be followed in the accounting system Depreciation is a non-cash expense - according to tax rules Repayment of principal on a loan is definitely cash, but not a current expense item "" can refer to non-financial matters, such as lost time, aggravation, or pollution Lifecycle - A Key Concept for CEE Project Lifecycle - Greatest Potential For Lifecycle Savings is in Design! Annual Expense 9 8 7 6 5 3 2 1 Design -1 Construct Owner and developer Expand Operate Time Owner, users, and abutters Decommission Salvage Owner and abutters Annual Expense 9 8 7 6 5 3 2 1 Design -1 Construct Still possible to make some modifications in design or materials Easy to modify design and materials Expand Operate Time Limited ability to modify infrastructure or operation Decommission Salvage Few options - cost already incurred Basic Economic Concepts- Differing Perspectives of Economists and Engineers Production functions Economists either assume this is known or try to estimate a very aggregate model based upon actual performance Engineers are constantly trying to "improve productivity", i.e. find better ways to use resources to produce more or better goods and services functions Both use total, average, variable, and marginal costs; engineers go into much greater detail than economists Short-run and long-run cost functions Economists typically focus on effects of volume and prices Engineers typically focus on costs and capacity Duality of production and cost functions Production Function The production function describes the technology of a system, i.e. the maximum output that will be given by a given set of inputs. This can be expressed by a simple (but not very descriptive!) equation: F(q,x;θ) = where F = some as yet unspecified functional relationship q = vector of outputs x = vector of inputs θ = vector of service quality factors (if not included in q) Carl D. Martland Page 3

Using a Production Function If we have the prices of the inputs, then we can find the most efficient (i.e. minimum cost) way to produce a given level of output If we have an excellent understanding of the production function, then we can predict what resources will be needed to provide different levels of output Even if we only have a rather aggregate understanding of the production function, we may still be able to understand how resource requirements will change at different levels of production (e.g. are there economies of scale, scope or density?) Duality of Production Functions and Functions We can study productivity and other issues by considering either the production function or the cost function With a production function and output prices, we can find the best use of a given level of inputs Maximize production subject to resource constraints With a cost function, we can find the least cost means of producing a given level of output Minimize cost subject to providing the desired level of output Since costs are easier to observe than technological possibilities, much economic research and most managerial decisions deal with cost functions rather than production functions Engineers are often immersed in technology, which in effect is the production function, as they seek better ways of providing a service Functions Minimum cost for producing output q given Production function Supply relationships for inputs (i.e. prices for the required inputs as a function of the volume and location of the inputs required) A special case: linear costs, where wi is the cost of each input xi C(q,w;θ) = Σ wix xi = min( Σ wixi) s.t. P(q,w;θ) = Long-Run & Short-Run s Long-run costs All inputs can vary to get the optimal cost Because of time delays in reaching equilibrium and the high costs of changing transportation infrastructure, this may be a rather idealized concept in many systems! Short-run costs Some (possibly many) inputs are fixed The short-run cost function assumes that the optimal combination of the optional inputs are used together with the fixed inputs Methods of Estimating s Accounting Allocate expense categories to services provided using: Detailed cost data from accounting systems Activity data from operating MIS Engineering Knowledge of technology (possibly new technology) and operating capabilities Prices of inputs Econometric Knowledge of total costs for a varied set of firms or conditions Aggregate data representing inputs and system characteristics Engineering s Engineers need to examine the costs of different technologies and operating strategies, so historical costs may not be relevant When pushing the limits of technology (e.g. heavy axle loads or congested highways), it is necessary to include some science in the cost models Engineering models can go to any required level of detail, so long as there is some scientfic or historical evidence available Most researchers work with some sort of engineering models as they examine the performance of complex systems Carl D. Martland Page 4

Accounting s Every company and organization will have some sort of accounting system to keep track of expenses by (very detailed) categories These costs can readily (and possibly correctly or at least reasonably) be allocated to various activities, such as: number of shipments number of terminal movements vehicle-miles This allows a quick way to estimate the average costs associated with each activity, which can be used to build a cost model (which can be quite useful even though they tend to be disparaged by both engineers and economists!) Refinements can reflect which elements of expense are fixed and which are variable Econometric Models Deal with the complexity problem by assuming a simplified, more aggregate cost model Calibrate using available data Structure so that it can be calibrated using standard regression analysis Structure so that its parameters are in themselves interesting, e.g. the marginal product of labor Focus on specific parameters of interest in current policy debates Engineering : Elements to Consider = Owner's + User's + Externalities Summary: Comparison of ing Methods Main Uses Strengths Weaknesses Construction Maintenance Operations Insurance Taxes Utilities Efficiency of working space Access time Amenities Safety Land Use Air quality Noise Water quality Aesthetics Risks Accounting Engineering Statistical Internal costing systems, Planning Investment planning Technology assesment, Service design, Strategic planning Public policy research, Pricing strategy, Strategic planning Actual data Consistent with MIS Can deal with new technologies, operating practice, or networks Can estimate eonomic parameters; Minor data requirements Limited to historical experience and technologies; Limited by structure of MIS May not match history Analysis may be "idealized" Limited to historical conditions; not meaningful to managers Carl D. Martland Page 5