1. Enforcement Policy Effective Date This policy is effective immediately and applies to all industrial machinery on any project.



Similar documents
BEFORE THE NORTH CAROLINA BUILDING CODE COUNCIL RALEIGH, NORTH CAROLINA

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2015 H 1 HOUSE BILL 255. Short Title: Building Code Reg. Reform. (Public)

CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

WEST VIRGINIA CODE CHAPTER 21. LABOR ARTICLE 16. REGULATION OF HEATING, VENTILATING AND COOLING WORK.

SECTION THREE CONSTRUCTION CODES

Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms

ADMINISTRATIVE CODE CHAPTER 1

PITT COUNTY BUILDING CODES ENFORCEMENT ORDINANCE

Questions and Answers for Heating and A/C Contractors

Building Permit Application

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

CHAPTER 67.2 RESIDENTIAL BUILDING CODE

Botetourt County, Virginia. Frequently Asked Questions

2013 BUILDING ENERGY EFFICIENCY STANDARDS

SECTION 105 PERMITS. Gas:

Indiana Boiler and Pressure Vessel Safety Section Frequently Asked Questions

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning

Electrical Contractors. and the. New Jersey. Rehabilitation Code

Chapter EDITION. Plumbers Insurance required of certain providers of low-flow showerheads or faucet aerators

CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR PUBLIC SCHOOLS, CHARTER SCHOOLS AND JUNIOR COLLEGES

BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC

Housing Codes for North Carolina As of July 2008

QUESTION: 1- Are the premiums paid by customers to providers for home service contracts only subject to the 2% premium tax and not to sales tax?

Article 10 - ADMINISTRATIVE SECTION

Effective June 27, TEXT (CO Detection Commercial Buildings)

946 CMR: MASSACHUSETTS DEVELOPMENT FINANCE AGENCY 946 CMR 7.00: DEVENS REGIONAL ENTERPRISE ZONE FIRE AND POLICE RULES

Department of Legislative Services Maryland General Assembly 2001 Session

Bold items are particular to the City of Euless

a. A person whose sole function in the work is to perform labor under the supervision or direction of a building contractor.

**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT

RANDOLPH COUNTY CENTRALIZED PERMITTING ORDINANCE

TEXT (CO Detection Commercial Buildings Final) Part 1228 of Title 19 NYCRR is amended by adding a new section , to read as follows:

CHAPTER 7 - OFFICE OF OCCUPATIONAL SAFETY AND HEALTH SUBCHAPTER 7A - GENERAL RULES AND OPERATIONAL PROCEDURES

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2015 SESSION LAW SENATE BILL 446

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

Electrical Plan Design

Gas Fired Water Heater Installation

City of Fort Smith Building Permit Process Frequently Asked Questions

Shed Application Package

Fire Alarm Systems Certification

SUMMARY. Jan 30, Re: Technical Assistance Advisement 01A-009 Sales and Use Tax -- Security Systems Sections , , F.S.

CHARLES COUNTY BOARD OF ELECTRICAL EXAMINERS AND SUPERVISORS RULES AND REGULATIONS

LOCKOUT/TAGOUT (LOTO) SAFETY PROGRAM

ELECTRICIAN TRADE REGULATION

CHAPTER VI ELECTRICAL LICENSING

CHAPTER MECHANICAL CODE HEATING, AIR CONDITIONING, VENTILATING AND REFRIGERATION DIVISION 2 - APPEALS

LANSING COMMUNITY COLLEGE TLC BUILDING SERVER ROOM UPGRADES SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.

Construction Contractors

INSTALLATION OF WATER-CONSERVING PLUMBING FIXTURES SB 407 California Civil Code Section Green Building Standards Code

Plumbing Code Statutes and Regulations February 2011 Labor Standards and Safety Division Mechanical Inspection

North Carolina s Residential Rental Agreement Act

City of Miramar Building Division

2014 Limited Plan Submittal Checklist

Boiler Safety Bureau Strategic Plan

Attachment 5 Electrical Engineering

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

Owner: Phone # Mailing Address: Contractor: Phone # Fax #

SUFFOLK COUNTY CODE OF RULES GOVERNING RESTRICTED LICENSED ELECTRICIAN S

City of Houston Mechanical Code

WHEN IS A PERMIT REQUIRED?

PLAN SUBMITTAL REQUIREMENTS FOR KITCHEN HOOD AND DUCT EXTINGUISHING SYSTEMS

Small Business Permit Service

Carbon Monoxide Detection in Commercial Buildings (

WARRANTY ADDENDUM TO RESIDENTIAL CONSTRUCTION SALE CONTRACT

OREGON ELECTRICAL LAWS OREGON REVISED STATUTE 479

Alarms. Chapter 27 ALARMS. Definitions. Police Alarm System. Alarm System Requirements Alarm System Inspections Alarm Agent Permits

CHAPTER 26 HEATING, AIR CONDITIONING AND REFRIGERATION COMMISSION AND CONTRACTORS

ORDINANCE NO (NEW SERIES) AN ORDINANCE REPEALING AND REENACTING THE COUNTY ELECTRICAL CODE

HERNANDO COUNTY FIRE ALARM GUIDELINES

Arkansas HVAC/R Law. Act 277, Amended by: Act 112 of 1993; Act 442 of 1995; Act 344, 1997; Act 465 of 1999; Act 1563 of 2001 & Act 1712 of 2003

PART 180 HEALTH/LIFE SAFETY CODE FOR PUBLIC SCHOOLS SUBPART A: GENERAL PROVISIONS SUBPART B: REQUIRED QUALIFICATIONS

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

SECTION 105 PERMITS. 2. Fences not over 6 feet (1829 mm) high. 3. Oil derricks.

CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

The Passenger and Freight Elevator Act

ADMINISTRATIVE RULES

2012 NC Rehabilitation Code Effective Date: January 1, 2015

CONTRACTOR REGISTRATION

HP1337, LD 1903, item 1, 123rd Maine State Legislature An Act To Implement the Recommendations of the Working Group Studying Mold in Buildings

STATE OF NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT LABOR STANDARDS & SAFETY ENFORCEMENT DIVISION OF PUBLIC SAFETY

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

ORDINANCE NO

CONSENT ORDER. THIS CAUSE came on for consideration as the result of an agreement between

Overview of Standards for CO Detection Products

MODULAR HOME PURCHASE & CONSTRUCTION AGREEMENT

CHAPTER 34, MUNICIPAL CODE OF THE CITY OF CEDAR RAPIDS, IOWA CEDAR RAPIDS ELECTRICAL CODE

Contract Work Hours and, Safety Standards Act, as Amended

CHAPTER 3. LIFE, ACCIDENT, AND HEALTH INSURANCE AND ANNUITIES Subchapter QQ, Provider Network Contract Registration 28 TAC

ELECTRICAL EMERGENCY SYSTEM PLAN REVIEW OVERVIEW OF CODE REQUIREMENTS

To complete the process for a net metering interconnection, please follow the steps below:

NEW JERSEY ADMINISTRATIVE CODE Copyright 2015 by the New Jersey Office of Administrative Law

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

TOWN OF WOODSIDE. The Town Council introduced the attached draft ordinance at its regular meeting on July 28, 2015.

DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION

PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS

By-law to Regulate Vacant Buildings

Guidelines for doing Mechanical & Electrical work At the University of New Mexico

Transcription:

MECKLENBURG COUNTY Land Use and Environmental Services Agency Code Enforcement Department Directive on Industrial Machinery: field and office procedures related to SB 490/NCGS 143-138(b) 1. Enforcement Policy Effective Date This policy is effective immediately and applies to all industrial machinery on any project. 2. General Assembly Law Change On August 31, 2007 the NC General Assembly passed Senate Bill 490, a law which amended GS 143-138(b) (copy attached), AN ACT to clarify that Industrial Machinery is not subject to regulation under the Building Code. Mecklenburg County interprets this law to apply to all industrial machinery as defined in NEC 2005 Article 670.2, and part of a process producing a product, but not to other machinery. The new law effectively limits the enforcement jurisdiction with respect to industrial machinery, and consequently this enforcement policy outlines how we will proceed in our work within the limits of the new law described by SB 490(8.31.07). 3. Owner s declaration of equipment use and process description Owner s may claim applicability of NCGS 143-138(b) by describing the physical characteristics of the equipment itself (size, weight, electrical nameplate data, and proposed location if within a building or space) and the step or procedure it provides for in the production process. This summary will be signed by the owner or officer of the business and maintained in the County s project records for future reference. The Department will notify the customer of any exceptions taken to the list, which is equipment we do not believe qualifies as industrial machinery. 3.1 Appeal process Owners may appeal the Department s decision on any exceptions taken to their industrial machinery list. The Department s appeal process is described at: http:www.charmeck.org/departments/luesa/codeenforcement/code+interpretations/appeal+process.htm 4. For this Department Directive industrial machinery is defined as: A) From NC GS 143-138(b), industrial machinery means equipment and machinery used in a system of operations for the explicit purpose of producing a product. The term does not include equipment that is permanently attached to or a component part of a building and related to general building services such as ventilation, heating and cooling, plumbing, fire suppression or prevention, and general electrical transmission. B) From NEC 670.2: Industrial Machinery (Machine). A power driven machine (or group of machines working together in a coordinated manner), not portable by hand while working, that is used to process material by cutting; forming; pressure; electrical, thermal, or optical techniques; lamination; or a combination of these processes. It can include associated equipment used to transfer material or tooling, including fixtures, to assemble/disassemble, to inspect or test, or to package. (The associated electrical equipment, including the logic controller(s) and associated software or logic together with the machine actuators and sensors, are considered as part of the industrial machine.) C) NEC 670.2 further identifies Industrial Manufacturing System. A systematic array of one or more industrial machines that is not portable by hand and includes any associated material handling, manipulating, gauging, measuring, or inspection equipment. Note: care must be taken to assure that machinery/equipment truly fits the above definition of industrial machinery.

Page 2 of 5 4.1 Department definition of producing a product Producing a product is key to understanding the above definitions of industrial machinery as well as creating a benchmark of what is or is not covered by the legislation and subsequently exempt from listing and labeling requirements (L&L). For the purposes of this Directive, we use the following: Producing a product is to modify or create a material or substance, that results in something tangible that is then used to produce something else, or it is sold at market. Based on the foregoing definitions of industrial machinery and assuming the machinery is part of an industrial process, these are some reference examples of producing a product ; 4.1.1. These machines produce a product: A) Freestanding large knitting machines B) Extruders C) Manufacturing assembly lines D) Steel fabrication line process components E) Casting lines or process components F) Tooling machinery part of a line producing a product G) Equipment used in moving raw materials in support of a line producing a product I) material handling machinery, finishing machinery, and boilers, pressure vessels, furnaces, ovens and the like used exclusively for the manufacturing process J) Production by the use of industrial machinery to modify a material or substance by cutting; forming; pressure; electrical, thermal or optical techniques; or a combination of these processes. 4.1.2. The following are not considered an industrial machine or process A) Any process or production line, open to use by the public B) Restaurant food service C) Repair work such as auto body, automobile, electronics or appliances D) Healthcare diagnostic equipment E) Maintenance equipment F) Dry-cleaning establishments 5. Inspectors will enforce the following: 5.1 For industrial machinery not in place at final inspection: the inspector will apply code requirements to and inspect the building system wiring to the service point for the machine, which may be a junction box, panelboard, disconnect switch, terminal box, or similar connection point. 5.2 For industrial machinery in place at final inspection: the inspector will inspect as described above in item 5.1, and in addition, will inspect the final connection of the factory-installed industrial machinery wiring to the building electrical system, including wire size and ground connection, etc. A) Inspecting the final connection may mean connection to a building system power distribution box, a separate utility service distribution, or it may be the direct connection of building power to the equipment, in which case the inspectors work with regard to the industrial equipment ends at this connection point. B) In doing so, the inspector should apply the requirements contained in NEC including Article 670, with regard to machine nameplate data, clearances, as well as supply conductors and over current protection. C) As referenced in NC GS 143-138(b), the inspector may refer a piece of industrial machinery to the NC Department of Labor (NCDOL) but they shall not hold up the certificate of occupancy based solely on that concern. 5.3 For stand alone projects (not part of a master permit): the inspector will inspect as described in items 5.1 and 5.2, and in addition when equipment is installed in an existing facility with no building system alteration, or after the CO is issued an electrical permit will be required so that the inspectors may check the connection to the existing building systems (as noted in 5.2 above). If placement of the machinery creates a violation. of other NC Building Codes (building, mechanical, plumbing, fire), permits shall be obtained to correct the violation. Building systems alterations to accommodate the machinery shall be permitted as usual. 6. The Limits of Inspector s Authority 2

Page 3 of 5 For industrial machinery described in the foregoing items 3, 4, or 4.1, the inspector will not require any of the following: A) Listing or labeling by a third party testing agency of the industrial machinery, either shop or field B) Inspection of the industrial machinery by a design professional or other 3rd party inspection entity C) Product safety inspection of the industrial machinery. Note: for clarification of terminology see the requirements of Article 10 Section 10 of the NC Electrical Code, Administrative Section 6.1 Field Procedure for determination of industrial machinery A) Field inspectors shall notify the owner s contractor of the Department Directive, if they receive a request to exempt a piece of equipment as industrial machinery. B) Field inspectors shall request the owner s declaration (described in part 3) from the owner s contractor. C) Upon receipt of the owner s declaration, the initial determination of acceptance or exceptions taken is to be made by the field inspector. D) If the field inspector is unsure of a piece of equipment, or if the owner disagrees with the determination, the inspector will contact the Electrical Codes Administrator or the Electrical Team Manager to assist in making the determination. In either case, the inspector, Electrical Codes Administrator or Electrical Team Manager will visit the project to make a final determination. F) If the Department takes exception to the owner s list, that determination may be appealed as noted in part 3.1. G) If the electrical inspector observes an industrial machinery installation which the inspector considers unsafe, the inspector has the option of advising the owner (or owner s electrical contractor) and OSHA. 7. Commercial plan review responsibilities Where projects indicate industrial machinery on the permit application construction documents, electrical commercial plan review staff will stamp a minimum of one electrical drawing as follows. The evaluation of industrial machinery is not a part of plan review or inspections per NC State General Statute 143-138(b) and the Mecklenburg County Code Enforcement Department neither has nor accepts any responsibility for the industrial machinery or its affects on the electrical system. 8. Owner Responsibility This law is a significant change from past practice. Owners and installers of industrial machinery are responsible for the machinery and its safe connection to the building system. The County, the Code Enforcement Department and its staff accept no responsibility for industrial machinery. Owners will be provided with a statement from the Department, prior to issuance of the electrical Certificate of Compliance or Certificate of Occupancy informing them of the same. 9. Other State regulations regarding industrial equipment: It should be noted that the statute does not exempt industrial machinery/equipment from federal regulation 29 CFR 1910.303. The NC Department of Labor has requirements which may apply to any industrial machinery installations. Customers may obtain clarification of these requirements by contacting Kevin Beauregard, the Assistant Deputy Commissioner for the NCDOL at Kevin.beauregard@nclabor.com or go to www.nclabor.com. Additional contacts: Tim Childers (Western Bureau Chief) (336) 776-4420; Tom Hayes (Eastern Bureau Chief) (919) 779-8512; OSHA - 919-807-2796 / 919-662-4309 / 800-NC-LABOR (800-625-2267) 10. Department contacts James N. Bartl, AIA, Director of Code Enforcement (980-314-3090) james.bartl@mecklenburgcountync.gov Gary Mullis, Electrical Code Administrator (980-314-3098) gary.mullis@mecklenburgcountync.gov (Rev: 4/11/2016) 3

Page 4 of 5 FREQUENTLY ASKED QUESTIONS (FAQ) Industrial Machinery Policy (1) What is Industrial Machinery? Response: Equipment and Machinery used in a system of operations for the explicit purpose of producing a product. This term does not include equipment that is permanently attached to or a component part of a building and related to general building services such as ventilation, heating and cooling, plumbing, fire suppression or prevention, and general electrical transmission. See Section 4 of the Mecklenburg County Land Use and Environmental Services Agency Department Directive on Industrial Machinery for the full details of the definition of Industrial Machinery. (2) What information is needed in a declaration statement? Response: The name of the job or company, the address, the permit or project number from our office, the physical characteristics (size, weight, location etc.), the electrical nameplate data of the Machinery, any photos or cut sheets of the Machinery, and a description of the production process (from raw materials in, through, final product out). (3) Does the inspector assume that all Machinery and equipment is non-industrial and therefore subject to listing and labeling requirements unless the owner submits a declaration statement per paragraph 3? Response: Normally the inspector classifies the equipment as non-industrial; many things make up the determination of Industrial Machinery or equipment. Like what does the machine do, what does it produce, and many other factors. The owner shall provide the declaration statement for the equipment. (4) If the field inspector classifies my equipment as Industrial Machinery am required to still submit the owner s declaration? Response: Yes, the owner s declaration is one of the inspectors determining factors and is required for each exemption. (5) Is it possible for an owner to submit a declaration well in advance of an inspection in order to get a determination from the Department, and if necessary, go through the appeal process described in Part 3.1 before Machinery is actually put on the floor? Response: Yes, this information may be submitted during the plan review stage of the project. However this does not guarantee a full determination can be made. A field evaluation may be needed for full determination. Also, if the information provided deviates from the actual field conditions this determination may change. This is consistent with any other code interpretations made by our Department. This will allow the owner additional time to navigate the appeals process. (6) Can the department withhold a CO if the owner does not submit a declaration statement requesting exemption of Machinery? Response: Yes, the declaration is a part of the process for full determination of Industrial Machinery. (7) Can the department withhold a CO if there is an ongoing dispute that is under appeal per Part 3.1? 4

Page 5 of 5 Response: If the dispute involves a determination by our Department that the equipment is or is not Industrial Machinery then the equipment is not permitted to be used, and the CO or TCO may not be issued unless ordered by a court of law or the North Carolina Department of Insurance. (8) Are there any other circumstances relating to "Industrial Machinery" under which a CO can be withheld? Response: No, for Industrial Machinery, however, code violations of other areas of the project that supply power to this Machinery such as improper disconnects, improper wiring methods, grounding issues, over current protection, classified areas, and location of the machine or other items may result in a CO or TCO not being issued. (9) Does the SB 490 also exempt me from meeting other code requirements for my building? Response: No, all other requirements of the North Carolina building codes have to be complied with such as egress, ventilation, fire suppression, floor load requirements, electrical service, feeder and branch circuit, handicap requirements and all other building codes issues. (10) If my Industrial Machinery is exempt by North Carolina SB 490 do the OSHA requirements still apply to my equipment? Response: Yes, Federal & State OSHA regulations requires all electrical Machinery to be approved by a Nationally Recognized Testing Laboratory (NRTL), and apply to your entire operation including the Machinery exempted by Senate Bill 490 and you could receive huge fines for unlisted equipment. (11) If my Machinery or equipment is exempt by Senate Bill 490 may I do my own connection of the equipment to the electrical system? Response: No, this work has to be performed by a licensed electrical contractor; however there are some exceptions to this law. (12) Are permits required for the installation of the Machinery or equipment if I move them in after the CO is issued? Response: Yes, a permit for the electrical connection or other connections to the building system requires permits no matter when the Machinery or equipment is installed. (13) During the initial inspection, does the field inspector have the authority to classify a piece of Machinery as "Industrial" per the definitions contained in part 4? Response: Yes, the field inspector has the authority to make a preliminary determination on a piece of Machinery as "Industrial Machinery" however; a final determination can t be made until the owner provides the declaration statement for the equipment. 5