SECTION 15041 DISINFECTION OF PIPE AND WATER STORAGE FACILITIES



Similar documents
STANDARD OPERATING PROCEDURES FOR ALL WATERMAIN DISTRIBUTION REPAIR & INSTALLATION

Water System Disinfection

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL Testing - General

BULK WATER HAULING GUIDELINES

Dechlorination of Potable and Superchlorinated Water

Amendments to the 2012 International Plumbing Code

Repair and Disinfection of Water Mains Water Protection Program fact sheet

Specifications For Rehabilitation Hudson #1A Hudson #2 Foster Island Well #41

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

Presented By: Fred J. Sánchez Water Quality Operations Supervisor

Section C-1 Pipes and Fittings

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

Design & Construction Standards, Revised January

CHAPTER 26 PLUMBING CODE

Water Quality Contingency Planning Standard EPB 540B

RECOMMENDED PROGRAM FOR WELL AND SEPTIC SYSTEM REAL ESTATE TRANSACTION INSPECTIONS

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

Chapter 5 Water, Plumbing, and Waste

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

RULES OF THE DEPARTMENT OF PUBLIC HEALTH CHAPTER PORTABLE SANITATION CONTRACTORS

SECTION FIRE HYDRANTS

1. Site plans assist the Fire Department to determine where a potential spill can be contained. The detailed site plan shall include the following:

WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS

WESTFIELD WATER RESOURCES DEPARTMENT

What To Do When Your Well is Flooded. Common Sense Steps To Take If Your Well Is Covered by Flood Water

BLADDER SURGE CONTROL SYSTEM

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

The Plumbing Pipeline

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE EMERGENCY (TEMPORARY) TREATED WATER SUPPLIES

Close-Out Documents... 9

NFPA 25 FAQs. 1. When inspecting an old system (60 years or older), when/where does NFPA 25 require a system to be upgraded to present standards?

For a building with a crawl space, see Figure

IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1

SECTION DUCTILE-IRON PIPE AND FITTINGS

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 10 WATER WELL SUPPLY SCOPE OF WORK

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

December 2003 EPB 241B. Some sections are completed, some are partially complete and some are left blank.

(a) Purpose. The purpose is to safeguard potable water supplies by preventing backflow into public water systems.

SECTION 810 SEWER LINE CLEANING

AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

ENVIRONMENTAL HEALTH FACT SHEET NO. 500

MC4-50 Feeding System

SANITARY SEWER SPECIFICATIONS

SECTION FACILITY STORM DRAINAGE PIPING

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

Treatment options for hydrogen sulfide. Testing for hydrogen sulfide

D. Open hydronic systems, including [condenser] [fluid-cooler spray] water, shall have the following water qualities:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

SILICON VALLEY CLEAN WATER. May 2015

SECTION POLYVINYL CHLORIDE (PVC) PIPE

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

Revised April (May) 2015

THE CORPORATION OF THE CITY OF COURTENAY BYLAW NO A bylaw to amend Storm Sewer Bylaw No. 1402, 1986

SECTION ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section Submittals.

PRIVATE WELL SEPARATION

Guidance on applying for approval of installation of a commercial onsite wastewater system

Outdoor Storage of Raw Materials SC-33

ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES

SECTION DUCTILE IRON PIPE AND FITTINGS

Emergency/Disaster Response Plan

Dominic i Barbato Dpt. Of Building and Safety (818) domenico.barbato@lacity.org

CHAPTER MUNICIPAL SEPARATE STORM SEWER SYSTEMS

PNWS-AWWA PRESENTATION May 9, 2013 Spokane, Washington. Water Operations Stormwater Best Management Practices

TABLE OF CONTENT

PLUMBING ROUGH IN INSPECTION

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

Florida Department of Environmental Protection

AN ORDINANCE BY FINANCE EXECUTIVE COMMITTEE

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

Reference Guide for Obtaining Permits and Utility Services For New Construction

The Jockey Pump, an Important Part of a Fire Pump System.

UTILITIES DEPARTMENT

Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents

CHAPTER 11 STORM DRAINAGE

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION GROUND WATER STORAGE TANKS

Assessment Blueprint PHCC Educational Foundation Plumbing Year 2

E-Version SECTION CHLORINATION SYSTEM PART 1 - GENERAL PART 2 - PRODUCT

Design Criteria & Service Goals

DRAFT July, 2006 Page 1 of 18

SECTION EARTH MOVING

SECTION 7 UNDERDRAIN SERVICE

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS

SUMP PUMP. Sump Pump Backup Systems. City of Ann Arbor B A C K U P O P T I O N S. Does everyone need a backup system?

The Plumbing Pipeline

Transcription:

SECTION 15041 DISINFECTION OF PIPE AND WATER STORAGE FACILITIES PART 1 GENERAL 1.01 DESCRIPTION This section describes requirements for disinfection by chlorination of potable water mains, services, pipe appurtenances and connections. 1.02 REFERENCED STANDARDS The publications listed below form part of this specification to the extent referenced and are referred to in the text by the basic designation only. Reference shall be made to the latest edition of said standards unless otherwise called for: AWWA B301 AWWA C651 AWWA C652 Standard for Liquid Chlorine Disinfecting Water Main Tank Disinfection 1.03 RELATED WORK SPECIFIED ELSEWHERE Section 15044 Section 15056 Section 15057 Section 15064 Section 15070 Section 15076 AWWA Standard Methods for the Examination of Water and Waste Water Hydrostatic Testing of Pressure Pipe Ductile Iron Pipe and Fittings Copper Tube, Brass and Bronze Pipe Fittings PVC Pipe (C900) PVC Pipe (C905) CML&C Steel Pipe and Specials 1.04 SERVICE APPLICATION A. All water mains and appurtenances taken out of service for inspection, repairs, or other activity that might lead to contamination shall be disinfected before they are returned to service. B. All new water mains and temporary high lines shall be disinfected prior to connection to the District's existing system. C. All components incorporated into a connection to the District's existing system shall be disinfected prior to installation. 1.05 SUBMITTALS A. A written disinfection and dechlorination plan signed by a certified chlorinator shall be submitted to the District for review and approval prior to starting disinfection operations. JUNE 2012 15041-1

B. A Record of Disinfection shall be provided to the District water quality staff prior to sampling. The Record of Disinfection shall include the time of injection, time length of injection and log of disinfection. Disinfection must be completed by a licensed and certified company. 1.06 DELIVERY, STORAGE AND HANDLING Chlorination and dechlorination shall be performed by competent individuals knowledgeable and experienced in the operation of the necessary application and safety equipment in accordance with applicable Federal, State and Local laws and regulations. The transport, storage and handling of these materials shall be performed in accordance with Code of Federal Regulations (CFR), and the California Occupational and Health Administration (Cal-OSHA) - California Code of Regulations (CCR), Title 8. 1.07 DISINFECTION AND HYDROSTATIC TESTING The specified disinfection of the pipelines shall not be performed concurrently with the hydrostatic testing. Disinfection shall only be performed after lines have been flushed and have passed hydrostatic tests per Section 15044. 1.08 CONNECTION TO EXISTING MAINS Prior to connection to existing mains, disinfection and bacteriological testing shall be performed in accordance with this specification, and hydrostatic testing shall be performed per Section 15044. District authorization for connection to the existing system shall be given only on the basis of acceptable hydrostatic, disinfection and bacteriological test results. PART 2 MATERIALS 2.01 SODIUM HYPOCHLORITE (LIQUID) Sodium hypochlorite is available in liquid form in glass or plastic containers, ranging in size from 1 qt. to 5 Gal. The solution contains approximately 10% to 15% available chlorine. 2.02 GRANULAR HYPOCHLORITE Granular hypochlorite may be used when mixed into a solution containing approximately 10% to 15% available chlorine. When using granular hypochlorite in solution, follow the procedure for sodium hypochlorite solution in this section PART 3 EXECUTION 3.01 GENERAL A. Disinfection of pipelines shall not proceed until all appurtenances and any necessary sample ports have been installed and the District Engineer provides authorization. B. Every effort shall be made to keep the water main and its appurtenances clean and dry during the installation process. C. All piping, valves, fittings, and appurtenances which become contaminated during installation shall be cleaned, rinsed with potable water, and then sprayed or swabbed with a 5% sodium hypochlorite disinfecting solution prior to installation. JUNE 2012 15041-2

D. Water mains under construction that become flooded by storm water, runoff, or ground water shall be cleaned by draining and flushing with metered potable water until clear water is evident. Upon completion, the entire main shall be disinfected using a method approved by the Engineer. 3.02 METHODS A. Sodium Hypochlorite Solution (Liquid) 1. Sodium hypochlorite solution shall be used for cleaning and swabbing piping and appurtenances immediately prior to installation and for disinfecting all components of connections to the District's existing system. 2. Sodium hypochlorite solution may be used for the initial disinfection of newly installed water mains. The solution shall be applied at a terminus of the system to be chlorinated using an injector which can adjust the amount of solution being injected into the piping system. The solution shall be injected at the appropriate concentration to achieve the specified concentration range of chlorine throughout the entire piping system. Where pumping equipment is used in conjunction with an injector, an integral backflow prevention device shall be installed and connected to the potable water supply. 3. Pumping equipment, piping, appurtenances and all other equipment in contact with potable water shall be disinfected prior to use. Water trucks shall not be used for disinfection of pipelines. 4. Sodium hypochlorite solution may also be used to increase the total chlorine residual if the concentration from the initial chlorination of the system is found to be low. The solution shall be added to the system in sufficient amounts at appropriate locations to ensure that the disinfecting solution is present at a concentration within the specified range throughout the piping system. 3.03 PROCEDURE FOR DISINFECTING WATER MAINS AND APPURTENANCES A. The pipeline shall be filled at a rate not to exceed 300 GPM or a velocity of 1 foot per second (156 GPM in an 8-inch pipe), whichever is less. B. Disinfection shall result in an initial total chlorine concentration of 50 ppm to 150 ppm. This concentration shall be evenly distributed throughout the system to be disinfected. C. All valves shall be operated with the disinfection solution present in the pipeline. All appurtenances such as air-vacuum relief valves, blowoffs, hydrants, backflow prevention devices, and water service laterals shall be flushed with the treated water for a sufficient length of time to ensure a chlorine concentration within the specified range in all components of each appurtenance. (Note the limitations for discharge of chlorinated water outlined below.) D. The Contractor will verify the presence of the disinfection solution throughout the system by sampling and testing for acceptable chlorine concentrations at the various appurtenances and/or at the test ports provided by the Contractor. Areas of the system found to be below the specified chlorine concentration level shall receive additional flushing as noted above and/or additional disinfection solution as necessary. (Note the limitations for discharge of JUNE 2012 15041-3

chlorinated water outlined below.) All testing will be done in the presence of the District Engineer. E. The chlorinated water shall be retained in the system for a minimum of 24 hours. The District Engineer will test the total chlorine residual. The system shall contain a total chlorine residual of not less than 80% of the initial total chlorine residual before the 24-hour soaking period began. If the total chlorine residual has decreased more than 20%, the system shall be soaked for an additional 24-hour period. If the total chlorine residual has not deceased after this additional 24-hour period, the system shall be flushed in accordance with the procedure detailed herein. If the total chlorine residual has decreased, the system shall be flushed in accordance with the procedure detailed herein, and shall be redisinfected. F. Following a successful retention period as determined by the District Engineer, the chlorinated water shall be flushed from the system at its extremities and at each appurtenance, using potable water from a source designated by the District Engineer. The minimum water velocity during flushing shall be 3 feet per second or as directed by the District Engineer. Flushing shall continue until the replacement water in the new system is equal in chlorine residual to the potable source of supply as verified by the District Engineer. (Note the limitations for discharge of chlorinated water outlined below.) G. The District will collect water samples and a California State certified drinking water laboratory will perform bacteriological testing, in accordance with paragraph 3.05 below, and provide a certificate of compliance to the District Engineer that the unit tested met the AWWA C651 requirements. 3.04 DISINFECTION OF WATER-STORAGE FACILITIES Disinfection of water storage facilities shall be done in accordance with AWWA C652. 3.05 DISCHARGE OF CHLORINATED WATER A. Indiscriminate onsite disposal or discharge to sewer systems, storm drains, drainage courses or surface waters of chlorinated water is prohibited. B. The environment to which the chlorinated water is to be discharged shall be examined by the Developer, Certified Chlorinator, and the District Engineer. Where necessary, federal, state and local regulatory agencies shall be contacted to determine special provisions for the disposal of chlorinated water. Any discharge of chlorinated water to the environment shall require the neutralizing of the chlorine residual by means of a reducing agent in accordance with AWWA C651, San Diego Regional Water Quality Control Board (SDRWQCB), Standardized Best Management Practices for Portable Water Discharges in Region 9 and the requirements of this specification. C. A chlorine reducing agent shall be applied to the water prior to exiting the piping system. The Certified Chlorinator shall monitor the chlorine residual during the discharge operations. Total residual chlorine limits in these locations, and for the discharge of chlorinated water from the testing of pipelines to surface waters of the San Diego Region are as follows: Total Residual Chlorine Effluent Limitations Instantaneous Maximum - 0.02 ppm JUNE 2012 15041-4

The various methods of dechlorination available can remove residual chlorine to concentrations below standard analytical methods of detection, 0.02 ppm, which will assure compliance with the effluent limit. The Contractor will perform all necessary tests to ensure that the total residual chlorine effluent limitations listed above are met. 3.06 BACTERIOLOGICAL TESTING A. A testing firm will perform bacteriological sampling and testing of all new system installations. The testing methodology employed shall be in accordance with AWA 651. The Certified Labratory will analyze the samples for the presence of coliform bacteria and heterotrophic-type bacteria (heterotrophic plate count). B. The evaluation criteria employed by the District for a passing test sample is as follows: 1. Coliform bacteria: no positive sample 2. Heterotrophic plate count (HPC): 500 colony forming units/mi or less. 3.07 REDISINFECTION If the initial disinfection fails to produce satisfactory bacteriological test results, the pipeline system shall be re-flushed and re-sampled. If the second set of samples does not produce satisfactory results, the pipeline system shall be re-chlorinated, flushed, and re-sampled. The chlorination, flushing, and sampling procedure shall continue until satisfactory results are obtained. Redisinfection and retesting shall be at the Contractor's expense. 3.08 DISINFECTING TIE-INS AND CONNECTIONS Pipes, fittings, valves and all other components incorporated into connections with the District's existing system shall be spray disinfected or swabbed with a liquid chlorine solution in accordance with AWWA C651 and as specified herein. Upon connection to the main, the line shall be flushed as directed by the District Engineer. Disinfection by this method is generally limited to assemblies of 20-feet or less in length. Alternate methods such as "pre-disinfection" prior to installation in accordance with AWWA C651 may be required at the discretion of the District Engineer. END OF SECTION JUNE 2012 15041-5