Procedure for Corrective and Preventative Action. Procedure No. 304



Similar documents
Contents of the ISO 9001:2008 Quality System Checklist

PUBLICATIONS. Introduction

CAPA Issues and Pitfalls

Quality Management System Manual

Contents of the ISO 9001:2000 Quality System Checklist

HONG KONG ENVIRONMENTAL ELECTRICAL APPLIANCE COMPANY. Environmental Procedure

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Surgi Manufacturing Quality Manual

ONTIC UK SUPPLIER QUALITY SURVEY

ISO 9001:2000 AUDIT CHECKLIST

ISO 9001:2008 Requirements Explained - An Adobe PDF File for Use on a Network System

ISO 9001:2000 Gap Analysis Checklist

LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003

ISO 14001:2004 Environmental Management System Manual

Quality Management System Manual ISO9001:2008

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

ISO 9001:2008 Quality Management System Requirements (Third Revision)

Schweppes Australia Head Office Level 5, 111 Cecil Street South Melbourne Victoria

Prepared by: R.M. & P.U. Approved by: Director of Service March, 2004 CONTENTS

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

ISO 9001:2015 Overview of the Revised International Standard

Supplement to the Guide: Nationally Consistent Approval Framework for Workplace Rehabilitation Providers

Module 15: Nonconformance And Corrective And Preventive Action

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

1. Introduction. 2. Performance against service levels 1 THE HIGHLAND COUNCIL. Agenda Item. Resources Committee 26 th March 2003 RES/43/03

ISO 9001 Quality Systems Manual

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

DNV GL Assessment Checklist ISO 9001:2015

QW Enterprises, LLP. Quality Manual

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

This is the software system proposal document for the <name of the project> project sponsored by <name of sponsor>.

Internal Audit Checklist

DOCUMENT AND RECORDS CONTROL PROCEDURE

ISO-9001:2000 Quality Management Systems

CONFORMED COPY. Method Statement Helpdesk Services. Revision History. Revision Date Reviewer Status. 23 March 2007 Project Co Final Version

Installation and Operational Qualification Protocol (Reference: SOP )

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

QUALITY MANAGEMENT SYSTEM Corporate

3 Terms and definitions 3.5 client organization whose management system is being audited for certification purposes

ISO 9001:2008 Audit Checklist

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

Infasme Support. Incident Management Process. [Version 1.0]

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

UNCONTROLLED COPY FOR REFERENCE ONLY

23. The quality management system

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

Rules for the certification of event sustainability management system

GOOD BANKING PRACTICE

FORT RUCKER Environmental Management System Title: Internal Auditing

OH&S Management Systems Audit Checklist (NAT, E3)

ABC COMPANY INC ISO 9001:2000 QUALITY MANUAL

Corrective Actions ISO Coca Cola Company and Michigan State University, original at CC BY SA

Rules for the certification of asset management systems

Environmental nonconformity, corrective & preventive action

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

AS 9100 Rev C Quality Management System Manual. B&A Engineering Systems, Inc Business Park Drive, Suite A-1 Costa Mesa, CA 92626

The Prophotonix (UK) Ltd Quality manual

How To Monitor A Municipality

COMBINE. Part B. Manual for Marine Monitoring in the. Programme of HELCOM. General guidelines on quality assurance for monitoring in the Baltic Sea

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

Unique Identifier: Area of Applicability: Documentation Type: Revision: 1. Total Pages: 11. Next Review Date: September 2015

Certification. Written Documentation

SUPPLIER QUALITY SYSTEM AUDIT

ICH guideline Q10 on pharmaceutical quality system

Row Manufacturing Inc. Quality Manual ISO 9001:2008

GUIDE TO IMPLEMENTING A REGULATORY FOOD SAFETY AUDITOR SYSTEM

QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST

Corrective and Preventive Actions

Quality Systems Manual

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April Authorised by: Managing Director.

HACCP System. Introduction

Customer Support Policy

Medical Cannabis Laboratory Approval Program

VELUX General Quality Requirements

City of Raleigh Public Utilities Department. Wastewater EMS Manual

Camar Aircraft Products Co. QUALITY MANUAL Revision D

ISO 9001 Quality Management Systems Professional

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

Client information note Assessment process Management systems service outline

USACE NAVFAC Sample QA/QC Plan 20 selected pages (out of )

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

Quality management systems

MANAGEMENT SYSTEMS PROCEDURE. Procedure 06: Non-Conformance, Incidents and Complaints

ISO 9001:2008 QUALITY MANUAL. Revision B

FINE LOGISTICS. Quality Manual. Document No.: Revision: A

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q Date: Title. Revision: QUALITY MANUAL PROCEDURE Q September 2014

CAPA Common Pitfalls. Sue Jacobs sue@qmsconsultant.com. Presented by: QMS Consulting, Inc.

Self-Audit Checklist

The following paragraphs, identified to coincide with the OHSAS 18001:2007 numbering system, provide a clause-by-clause summary of the standard.

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

ISO 9001:2008 Quality Manual Clause 3.7.4

Complaints Policy. Complaints Policy. Page 1

ISO 9001:2015 Internal Audit Checklist

SMALL BUSINESS OH&S SELF APPRAISAL

Quality Management System

CENTRIS CONSULTING. Quality Control Manual

Transcription:

Procedure for Corrective and Preventative Action Procedure No. 304 Print Name Title Date Prepared by L. Naughton Quality Assurance 09/04/09 Consultant Reviewed by N.Mooney Assistant Fire and Safety Offficer 09/04/09 Corporate Authorisation Joe Hoare Estates Officer 09/04/09 INTRODUCTION The purpose of this procedure is to define the process of corrective and Preventative action.

Procedure for Corrective and Preventative Action Page 2 of 6 Scope This procedure defined the process for Corrective and preventative, including associated inputs, outputs and respective process steps. Responsibility It is the responsibility of the Department Heads of the Estates Department to ensure that this procedure is implemented. Definitions: Corrective Action Action taken to eliminate the cause of an existing nonconformity or other undesirable situation in order to prevent recurrence. Preventative Action Action taken to eliminate the cause of a potential nonconformity or other undesirable situation in order to prevent occurrence. Non-conformance Non-Conformance is a product or service, which does not conform to requirements. Nonconformity Nonconformity is a process that does not conform, to a quality system requirement. PROCEDURE The following flow chart provides an overview of the Corrective and Preventative action process employed in the Organisation.

Procedure for Corrective and Preventative Action Page 3 of 6 Responsibility Process step Records/ Associated Processes All Personnel 1. Identify C/PAR Originator 2. Document issue C/Par Form Department Heads 3. Assign action log no and responsibility C/Par Form C/PAR Log Assignee 4. Root cause analysis No Assignee 5. Develop / implement solution Assignee/ Department Heads 6. Solution Effective Yes Assignee/ Department Heads 7. Document Solution C/Par Form Department Heads 8. C/PAR summary C/PAR Log Management Team 9. Management Review Mgt Review Procedure No 302 Process Notes Typical inputs for both elements of the process include but are not limited to:

Procedure for Corrective and Preventative Action Page 4 of 6 Corrective Action Customer Complaints Management Review output Preventative Action Customer needs and expectations Management review output 1.0 All Organisation personnel are ultimately responsible for the identification of sources of existing or potential non-conformances. 2.0 The corrective and Preventative action form shall be the mechanism used to document all such issues. The originator shall identify the source of and comprehensively describe the issue and forward to the Department Heads. 3.0 The Department Heads shall assign a action log no and also in conjunction with the originator assign an individual to resolve the issue and an expected / target completion date. The data is used to update the C/PAR Log form. 4.0 The assignee shall determine the root cause of the highlighted issue and use a disciplined problem solving methods where appropriate to bring the issue to resolution. 5.0 Based on the previous analysis the assignee shall develop and implement an appropriate solution. 6.0 The Department Heads and assignee shall periodically review progress of the action being taken. The assignee shall notify the Department Heads when the required actions have been completed. Prior to closing out the action item, the Department Heads shall verify that the action taken was effective in resolving the issue, ensure that the form is completed and subsequently update the C/PAR log. Where appropriate and to the extent possible the assignee shall apply corrective action taken and control implemented, to other similar processes and or products. 7.0 The Department Heads shall prepare an analysis of all the current/ open action items prior to the management review meeting with a view to identifying unfavourable trends. This information will be used as part of the Management Review Process. References: Quality Manual Management Review Procedure no 302

Procedure for Corrective and Preventative Action Page 5 of 6 Appendices Appendix 1 - Corrective and Preventative action form Action log no: Originator:. Date: Department: Dept. Head: 1.Source * Corrective Action Customer Complaints Management Review output Preventative Action Customer needs and expectations Management review output 2.Issue Description * 3.Root Cause Analysis * 4.Action To be Taken * Responsibility Target completion Date:

Procedure for Corrective and Preventative Action Page 6 of 6 5. Verification of Effectiveness * Signed: Close out date: * Attach additional documentation as required. Appendix 2 - C/PAR log form C/PAR no Responsibility Action type C OR PAR Date opened Date closed Time elapsed Current status open/closed