Value Stream Mapping Basics



Similar documents
Lean Thinking Part I

Lean Healthcare Simulation Segment I: Baseline Performance

At the end of this module, you should be able to:

Value Stream Mapping

Introduction to Lean Healthcare

Map the Value Stream

Teaching Lean Thinking Principles Through Hands-On Simulation

The Book of Value Stream Maps I

The Tools of Lean - Value Stream Mapping

Metrics-Based Process Mapping (MBPM)

Process Mapping Guidelines

Table of Contents. Glossary. Copyright 2006 Robert E, Shank

How To Compare Six Sigma, Lean and the Theory of Constraints

Solutions for Improving Clinic Flow and Reducing Delays. Assessing Existing Clinic Flow Creating Flow Stations Unscheduled Patient Arrivals

REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL

Machining Operations- Cycle Time

VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the

LEAN AGILE POCKET GUIDE

MDM AS A PROCESS MAPPING TOOL IN LEAN CONSTRUCTION

Lessons all can learn from Lean Car Dealers

Visual Controls / Cycle Tracking: Lean Management Standards gemba worksheet Location Shift Date

Lean Management. KAIZEN Training of Trainers. KAIZEN Facilitators Guide Page to.

APPLICATION OF LEAN MANUFACTURING TO IMPROVE THE PERFORMANCE OF HEALTH CARE SECTOR IN LIBYA

LEAN Office & Business Processes Participant Handout Value Stream Mapping

Best of Everything ITIL, CMMI & Lean Six Sigma

Continuous Improvement in Government: Applying LEAN Principles

PHYSICIAN USER EMR QUICK REFERENCE MANUAL

PERSPECTIVES ON LEAN SIX SIGMA IN HEALTHCARE: WE, THE PATIENT LEAN SIX SIGMA IMPROVES PATIENT CARE QUALITY AND BUSINESS PERFORMANCE

TPMG. Lean. Transformation In Healthcare. Consulting. Improving patient outcomes and satisfaction while driving down the cost of care!

Creating the Lean and Efficient Medical Practice

The Need for Lean Training

times, lower costs, improved quality, and increased customer satisfaction. ABSTRACT

Course Outline UCLA Extension Department of Engineering, Information Systems & Technical Management

Understanding Lean Principles that Dramatically Impact Process Performance

Seeing the Whole Value Stream. Dan Jones, Chairman, Lean Enterprise Academy & Jim Womack, Senior Advisor, LEI November 29, 2011

Improve Profitability by Improving Processes. Presented by: Frank D. Cohen, MBB, MPA Senior Analyst MIT Solutions, Inc.

Home Screen Once logged in, the user is presented with a home screen that displays all items needing his/her attention. Those include: Appointments

Lean Specialist Certification Program

Leveraging Patient Access as a Catalyst for Comprehensive Redesign & Change Management

UTILIZAÇÃO DA LEAN METODOLOGIA. Desmistificando Aplicações Reais Para CME. Apresentado por John Kimsey

Using the Lean Model for Performance Improvement

LEAN TOOLS FOR CQI. Value Stream Mapping. Lorelei Kurimski, MS Performance Excellence Consultant State Hygienic Laboratory at The University of Iowa

A GUIDE TO PROCESS MAPPING AND IMPROVEMENT

IMPACT OF PROCESS VARIABILITY ON LEAN MANUFACTURING SYSTEMS

Creating a Pull System in a Push Dominated Environment

2013 Virginia Mason Medical Center

THE LEAN TRANSFORMATION MODEL FOR THE EDUCATION SYSTEM

A Book Review: Lean Thinking by Womack and Jones

Lean Six Sigma. Shail Sood

Purchasing Success for the Service Sector: Using Lean & Six Sigma.

Business Process Optimization w/ Innovative Results

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

USE OF THE VALUE STREAM MAPPING TOOL FOR WASTE REDUCTION IN MANUFACTURING. CASE STUDY FOR BREAD MANUFACTURING IN ZIMBABWE.

Lean Training Ideas for TECOM. The Marine Corps needs more training time. Industry best practices can improve our training pipeline.

APPLICATION OF LEAN PRINCIPLES & PRACTICES IN CONSTRUCTION MANAGEMENT

Lean Management Standards: Manufacturing

Implementing Automation after Making Lean Improvements

Lean Six Sigma Black Belt Body of Knowledge

How To Improve Your Workflows

Lean Six Sigma Black Belt-EngineRoom

Overview of Lean at URMC

Lean Test Management. Ban Waste,Gain Efficiency. Bob van de Burgt Professional Testing

IDEA OF ADAPTATION VALUE STREAM MAPPING METHOD TO THE CONDITIONS OF THE MINING INDUSTRY

Lean Management and the Role of Lean Leadership

Single Manufacturing Site with. Extended Manufacturing Site(s)

Energy Conservation for a Paint Company Using Lean Manufacturing Technique

A Guide to Process Mapping

Measuring Patient Flow in Urgent Care

CHAPTER 05 STRATEGIC CAPACITY PLANNING FOR PRODUCTS AND SERVICES

Quality Improvement Primers. Change Concepts and Ideas

Intake / Admissions Processes

The Tie Between the Speaker & the Topic

Developing a Formidable Business / Continuous Improvement Methodology in Africa. By: Frederick O Popoola

Greening Our Future By Educating Tomorrow s Workforce. Module 2: Lean Manufacturing and the Environment

Improving NPI Effectiveness using Lean Thinking. Webinar 6 th October 2015

Lean Manufacturing and Six Sigma

ARTICLE IN PRESS. LeanThinking. journalhomepage: Redesinging an Automotive Assembly Line Through Lean Strategy

MEANING & SIGNIFICANCE OF STATISTICAL PROCESS CONTROL [SPC] Presented by, JAYA VARATHAN B SANKARAN S SARAVANAN J THANGAVEL S

Clinic Name and Location: 4. Clinic has specific written protocols or guidelines for treatment of TB:

Process Mapping and Process- Based Internal Audits

Srikanth (Sri) Poranki, Ph.D., CSS-Black-Belt Director, Performance Improvement Dept. Quality & Patient Safety UHSH

Leadership at all levels Key Success Factor in Lean Paradigm Shift

Access Online. Transaction Approval Process User Guide. Approver. Version 1.4

Triage Call Reduction in the OB GYN Clinic A Lean Six Sigma Green Belt Project

LEAN, SIX SIGMA, AND ERP:

The improvement of HR management by using Lean

ezee Absolute Release Notes

Application of Lean to Healthcare Processes:

SC21 Manufacturing Excellence. Process Overview

Lean Six Sigma Lean 201 Introduction. TECH QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY

Getting Started with Quality Companion

Benefits from a Lean Manufacturing Implementation Presented to the 2010 TIA Technical Conference

Implementation of Lean Six Sigma Principles: Making Data Cleansing Lean

Transcription:

Value Stream Mapping Basics

Learning Objectives At the end of this module, you will be able to: Sketch a basic value stream map Demonstrate basic value stream analysis Recognize steps for process improvement using value stream mapping and analysis VSM Basics V7.6 - Slide 2

Hot Dog Stand Process Map $ $ Image by MIT OpenCourseWare. 11 - Clean up 1- Take order 9 - Deliver to customer 8 - Add beverage Yes No 7 Order OK? 6 Out order Yes 10 - Set up 2 In order 3 - Get order Cook dogs 4 - Put in bun, wrap, add fruit 5 Another dog? No How can Sasha and Andy improve their productivity to meet growing customer demand? VSM Basics V7.6 - Slide 3

Five Lean Thinking Fundamentals Specify value: Value is defined by customer in terms of specific products and services Identify the value stream: Map out all end-to-end linked actions, processes and functions necessary for transforming inputs to outputs to identify and eliminate waste Make value flow continuously: Having eliminated waste, make remaining value-creating steps flow Let customers pull value: Customer s pull cascades all the way back to the lowest level supplier, enabling just-intime production Pursue perfection: Pursue continuous process of improvement striving for perfection Ref: James Womack and Daniel T. Jones, Lean Thinking (New York: Simon & Schuster, 1996). VSM Basics V7.6 - Slide 4

Value Stream Map (VSM) A tool used to improve a process by identifying added value and eliminating waste A process map that follows the value creation process strap yourself to the product (or service) and see where you go A process map with data added Times: processing, wait, cycle Quality: number of rejects Inventory Resources Number of people Space Distance traveled Whatever else is useful for analyzing the process VSM Basics V7.6 - Slide 5

Steps for Creating a VSM 1. Define customer value and the process Walk the process to identify tasks and flows Identify value-added and waste process steps 2. Create the current state VSM Gather data on resources, time, quality for each step 3. Analyze map to determine opportunities for improvement Identify bottlenecks and other flow impediments Brainstorm actions to eliminate waste and add value 4. Create a future-state map to visualize the desired and realistic next state 5. Create action plans to move toward future state VSM Basics V7.6 - Slide 6

Step 1: S&A Customer Value and Process Map Current Demand 50 customers 100 hot dogs Customer Value $ Image by MIT OpenCourseWare. $ Good food Faster service 11 - Clean up 1- Take order 9 - Deliver to customer 8 - Add beverage Yes No 7 Order OK? 6 Out order Yes 10 - Set up 2 In order 3 - Get order Cook dogs 4 - Put in bun, wrap, add fruit 5 Another dog? No This process map follows the value creation process Value/waste assessed at each process step VSM Basics V7.6 - Slide 7

$ Step 2: Add Data $ T = 60 sec Qual = 100% 1- Take order T = 30 sec Qual = 100% 9 - Deliver to customer Image by MIT OpenCourseWare. T = 10 sec Qual = 100% 8 - Add beverage Yes No 10% T = 11 sec Qual = 90% 7 Order OK? T = 48 sec Qual = 100% 11 - Clean up 6 Out order Yes T = 33 sec 10 - Set up T = 48 sec Qual = 100% 2 In order T = 30 sec 3 - Get order Cook dogs T = 110 sec 4 - Put in bun, wrap, add fruit T = 44 sec 5 Another dog? No T = 22 sec Qual = 100% Qual = 100% Display of relevant data completes basic VSM Images by MIT OpenCourseWare. VSM Basics V7.6 - Slide 8

S&A Takt And Cycle Times Current demand 50 customers Open from 10AM - 2PM Available time Takt time = Customer demand = 4hrs 60min/hr = 4.8min = 288 sec 50 customers Cycle time (summed from previous data) = 7.4 min = 446 sec Valid alternate calculation assume setup/cleanup is done when things are slow 10 - Set up 11 - Clean up Available time Takt time = Customer demand = 4hrs 50min/hr = 4.0min = 240 sec 50 customers Cycle time (excluding set up & clean up) = 5.8 min = 350 sec Cycle time > takt time, but two workers can demand be met? VSM Basics V7.6 - Slide 9

Step 3: Value Stream Analysis Sasha Andy Image by MIT OpenCourseWare. Image by MIT OpenCourseWare. With your team, take 15 minutes to Calculate the total Value added time Non value added time Wait time Calculate the total touch time that Sasha and Andy spend on a single order Be ready to report your answers to the class VSM Basics V7.6 - Slide 10

Utilization and Capacity VAT is only slightly over 50% Opportunities for improvement Available time = 4 hours = 240 min Worktime: Touch time per order X number of orders Sasha s tasks: /60 min X 50 cust. = min Andy s tasks: /60 min X 50 cust = min Utilization: Worktime / time available Sasha s: ( min / 240 min) X 100% = % Andy s: ( min / 240 min) X 100% = % Capacity: Time available / touch time per order Andy working at 100% = (240min X 60) / sec = VSM Basics V7.6 - Slide 11

Utilization and Capacity VAT is only slightly over 50% Opportunities for improvement Available time = 4 hours = 240 min Worktime: Touch time per order X number of orders Sasha s tasks: 159 /60 min X 50 cust. = 133 min Andy s tasks: 224 /60 min X 50 cust = 187 min Utilization: Worktime / time available Sasha s: ( min 133 / 240 min) X 100% = % 55 Andy s: ( min 187 / 240 min) X 100% = % 78 Capacity: Time available / touch time per order Andy working at 100% = (240min X 60) / sec 224 = 64 We will consider complications like varying orders or irregularly spaced customers in the Variation Module VSM Basics V7.6 - Slide 12

Summary - S&A Value Stream Analysis (VSA) Current production (50 customers) is a little below current capacity (64 customers) of Andy and Sasha Process improvement needed to meet growing demand Andy and Sasha are both underutilized But utilization is not balanced between them Cycle time of 7.43 min per customer (or even 5.8 min) too long Should be able to shorten cycle time to meet demands of customers for faster service Bottom Line Sasha and Andy should implement process improvement for week 3 to meet growing demand! VSM Basics V7.6 - Slide 13

Improvement Brainstorm Sasha Andy Image by MIT OpenCourseWare. Image by MIT OpenCourseWare. Help Sasha and Andy figure what to improve How can utilization be improved? How can cycle time be reduced? What has to be done to serve 75 customers? What has to be done to serve 100 customers? VSM Basics V7.6 - Slide 14

Brainstorm Bursts $ $ Image by MIT OpenCourseWare. 11 - Clean up 1- Take order 10 - Set up 2 In Order 9 - Deliver to customer 3 - Get order Cook dogs 8 - Add beverage Yes Balance Work NVA Inspection No 7 Order OK? 4 - Put in bun, wrap, add fruit 6 Out Order Yes 5 NVA Another dog? No Inspection VSM Basics V7.6 - Slide 15

Steps for Creating a VSM 1. Define customer value 2. Create a current state map Walk the process to identify tasks and flows Gather data on resources, time, quality for each 3. Analyze map to determine opportunities for improvement Identify value-added and waste Brainstorm actions to eliminate waste and add value 4. Create future-state map to visualize the desired state 5. Create action plans to move towards future-state VSM Basics V7.6 - Slide 16

Why is VSM a Useful Tool? Helps visualize interactions and flows Shows linkages between information and product flows Provides a common language for talking about a process Helps to identify: the constraint(s) - any resource whose capacity is less than customer demand; wastes as well as their sources Adapted from: M. Rother and J. Shook, Learning to See, Lean Enterprise Institute, 1998 VSM Basics V7.6 - Slide 17

Tips for Creating a VSM Involve entire team Actually walk the process - follow the material and information through the process, starting at the beginning Use Post-it notes and butcher paper Use symbols or icons that are meaningful to the process but common enough to be understood by all involved VSM Basics V7.6 - Slide 18

Industrial Strength Example Jefferson Healthcare Clinic - Current State Map OVERALL CLINIC DATA - Blocked Hours 67/day Enterprise Receive call & Send registration packet Reception Reg Pkt V1 Wait for pt to return packet Request Med History records Reception EXTERNAL PROVIDERS Med History Enterprise Receive Med History & Call to Schedule Wait for ex prov to return info Reception EMR Input Med History Reception - Cost per visit - $125.39 - Avg. Pts per hour - 1.83 - Available hours per day 67 ROS V1 - Contact Hours 59/day - Utilization 88% Phone call Phone call Visit Clinic PATIENT EXTERNAL PHARMACIES PATIENT DATA - Volumes - 131 visit/day - Market share - Hospital 46.7% - Cancel by reason - see chart A - Payor mix commercial 38% - Satisfaction overall 74.4 - Volume by Diagnosis See chart B - Schedule on 1 st call 0% - # of Pts on panel 5997 Reg Pkt Enterprise V2 Obtain Demographics mini-reg & Send packet Reception - Days out for first 3 rd visit 3.75 - Days out by provider - See C Enterprise Call patient to schedule Reception Hot Document delays 2% EMR Input Med History Reception ROS V1 2.2 Enterprise Check-in patient for visit Reception Interface 19.1 Phone call EMR Room & perform vitals, etc. RN Med list 31.2 EMR Orders See patient MD, PA Salmon reminder (PTFP) Scripts Routing Slips Educ. 4.4 EMR Check-out patient Referral Coordinator Referrals Discharge Walk to hospital 4.8 walk or return Scripts Discharge MediTech Register for Ancillary Services Hospital Registration Discharge Rad film Interface 14.0 MediTech HOSPTIAL Ancillary Services L/T 1.6 9.7 20.7 2.1 2.3 3.1 C/T - Schedule on 1 st call 0% - # of Pts on panel - 5998 - No shows 2% - On-time starts 37% - Referral volume 14.5 % - Volumes by service 13.0% - Days out for first 3 rd visit 2.00 - On-time starts 37% - Time by diagnosis Chart D - Lead-time by service - varies - Days out by provider- see chart C - Document delays 12% - Volume by hour Chart E Enterprise Pre-reg, Schedule, & Send packet Reception Reg Pkt V2 EMR ROS V2 Input Med History following Check-in Reception LEGEND = PTFP Scheduling = Hospital Services = OPC Scheduling = Patient - Schedule on 1 st call 100% - Document delays 30% = JMPG Scheduling = Patient on schedule - # of Pts on panel 5886 - Days out for new visit - 15.01 = Clinic flow (all sites) - Days out by provider See Chart C Days out for first 3 rd visit 1.16 Courtesy of Jefferson Healthcare, Port Townsend, WA. Used with Permission. VSM Basics V7.6 - Slide 19

Additional Graphic Elements Organization Swim Lanes organize tasks by time and organization Time Castle Wall shows task and wait times WT WT TT TT TT WT SUMS WT TT Many ways to clarify the process and present data in easy-to-understand form Courtesy of Jefferson Healthcare, Port Townsend, WA. Used with Permission. VSM Basics V7.6 - Slide 20

More Information Courtesy of Lean Enterprise Institute. Used with permission. VSM Basics V7.6 - Slide 21

Reading List Jimmerson, C., Value Stream Mapping for Healthcare Made Easy, Productivity Press, New York, NY, 2010 McManus, H., Product Development Value Stream Mapping (PDVSM Manual), Release 1.0, Sept 2005. Lean Advancement Initiative. Rother, M. and Shook, J. Learning to See, v1.2, The Lean Enterprise Institute, Cambridge, MA June 1999 VSM Basics V7.6 - Slide 22

Acknowledgements Contributors Sharon Johnson Worcester Polytechnic Inst. Jose Macedo Cal Poly San Luis Obispo Hugh McManus Metis Design Ted Mayeshiba USC Earll Murman MIT VSM Basics V7.6 - Slide 23

MIT OpenCourseWare http://ocw.mit.edu 16.660J / ESD.62J / 16.853 Introduction to Lean Six Sigma Methods IAP 2012 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms.