About Escalators. About Escalators. 1 of 7



Similar documents
-maq NCE Technology 26 6/06/08 17:11 Page 1 NCE T echnology

Assessment of Elevator and Escalator Maintenance & Repair Program Final Elevator Audit Submission Bethesda Station - Escalator A09X04 (Station)

The KONE Motala 2000 platform lift suits the architecture of any building, thanks to the wide range of car and shaft design options.

Escalator incidents occur frequently at airports (some airports experience several per month).

Freedom unlimited. Orinoco moving walkways.

It starts with a commitment to environmentally friendly solutions: Innovative products and services that reduce cost and energy usage.

Extracts from BUILDING REGULATIONS

Cheshunt Fabrications Ltd

Bringing good things ahead

Walking and Working Surface Checklist:

Schindler Escalator Safety: State of the Art Enjoying a Safe Ride on Schindler Escalators

Simplified Steel Stair Design for Commercial and Institutional Buildings

Fredriksons conveyor systems handle goods with a width from 20 mm up to 600 mm.

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

ThyssenKrupp Company Name

OPTIONAL INFORMATION GUARDING FLOORS, STAIRS, AND OTHER OPENINGS SELF INSPECTION CHECKLIST

SAFE ACCESS, LADDERS, FLOOR & WALL OPENINGS, STAIRS AND RAILING SYSTEMS

Schindler 6400 NA A complete modernization solution for mid-rise elevators

General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

ABOUT US... With a continued investment in machinery, the company now produces the following:

Skyrise. Engineered to meet the highest of challenges. The Skyrise system delivers:

Safe ladder use. Construction Safety Series. When climbing up or down, workers should:

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS

Handrail & Balustrade Solutions. when only the best will do...

Number of Sides Required to Have a Handrail

CAT FLEXPORT TIRES. Designed to perform from the ground up.

KONE solutions for airports

Stair Layout Guide. Taking You To The Next Level E. 6 th Street Sandwich IL

GET A GRIP TO AVOID INJURIES

The Impact of the new Directive 2014/33/EU and Standard EN81-20 on New Lifts

ALUMINIUM LADDERS. A load capacity of up to 100kg. A load capacity of up to 115kg. Page 12 Page 13 Page 14. Page 11

Schindler 3100 Simple and practical. Our passenger elevator for small residential buildings really gets you moving.

UK Distributor & Stockist of OMNI CUBED Product Range

Firefighter Physical Ability Test

Residential Deck Safety, Construction, and Repair

50 St Mary Axe London EC3

Escalators and Moving Walks for Public Transport When moving masses means individual comfort. Schindler Escalators and Moving Walks

KONE elevators for commercial buildings

AUSTRALIAN HUMAN RIGHTS COMMISSION NOTICE OF DECISION ON APPLICATION FOR TEMPORARY EXEMPTIONS: AUSTRALASIAN RAILWAY ASSOCIATION

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

General Safety. Always do a risk assessment.

COMMONLY USED RESIDENTIAL BUILDING CODES

F.A.C.E. INVESTIGATION REPORT

An Information Booklet STAIRLIFTS AND HOMELIFTS

San Diego Convention Center Floor Plans

CHAPTER 3 PROJECT CONTROL

Escalators and Moving Walks for Public Transport When moving masses means individual comfort. Schindler Escalators and Moving Walks

TEMPO LOW-LEVEL ORDER PICKERS PPL/PPF/PPD/PPC FOR INTENSIVE ORDER-PICKING FROM GROUND LEVEL AND LEVEL 1

WEEKLY SAFETY MEETING

V1504 Vertical Platform Lift OWNER S MANUAL

Slips, Trips and Falls

Certification: Building Plans Examiner. Exam ID: B3

Switch. Building technology for the real world.

Basics of planning for escalators and moving walks.

Portage Guide Birth to Six Preschool Indicator 7 Child Outcomes Crosswalk. Outcome 2 Acquisition & Use of Knowledge & Skills

OWNER S MANUAL Table Tennis Table Patent Pending

OptiMiziNg the use Of SpacE KONE MaxiSpace

How to Install UnderDeck The Original.

- 2 - IMPORTANT SAFETY REMINDERS

Portable Ladder Safety

RAILWAY CATENARY SYSTEMS. Components and Systems for the Electrification of Railway Lines. ibemo

V1504 Vertical Platform Lift OWNER S MANUAL

Fixed and Portable Ladders- A Guide to OSHA Rules

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

Adjustments for the Active Pneumatic Vibration Isolation Table during Final Installation (File version 6)

Mobile Home Pre-Inspection Checklist

De Beers Canada Inc. OP 050 SLIPS, TRIPS, FALLS AND PEDESTRIAN SAFETY - SURFACE

WALKING-WORKING SURFACES (SLIPS, TRIPS, AND FALLS)

e Brochure of Caliber Tech Solutions Pvt. Ltd.

3D Laser Scanning for Manufacturing Facilities Developing the Business Case. By Bill Campbell Founder, Digital Dimensions 360, LLC

Position Description Questionnaire

Slip, Trip & Fall Program Table of Contents

Lift and Escalator Installations

Automated underground transportation of cargo

Residential Decks. Planning and Development Services Department

CITY OF TORONTO. BY-LAW No

CONFER ABOVE GROUND CURVE STEP / ABOVE GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL

RESIDENTIAL ROOF TRUSS INSTALLATION PROCEDURES

FUNDAMENTALS OF LANDSCAPE TECHNOLOGY GSD Harvard University Graduate School of Design Department of Landscape Architecture Fall 2006

Automatic Door Selection Guide

Guidance on loft conversions in two-storey houses

TurboCAD Architectural

AIR COMPRESSORS come with an inflating pistol and gauge for tyre inflation as well as additional accessories for use around the home.

Lesson 5: School Bus Safety

OPTIONS Living Collection and Prime Series

BEST PRACTICES RESEARCH INSERT COMPANY LOGO HERE

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

This material was produced under grant number SH F-48 Occupational Safety and Health Administration, U.S. Department of Labor.

BUILDING PERMIT SPECIFICATIONS

Slip, Trip & Fall Program Table of Contents

ON BEHALF OF E DRY & N PASK JOINT LPA RECEIVERS AS AGENT WITHOUT PERSONAL LIABILITY PHOENIX HOUSE 1-7 UNION STREET SUNDERLAND SR1 3BT

Work Smart - Not Hard with a Blue Giant Lift Table

I N T E R N A T I O N A L R E S I D E N T I A L CO D E

Transcription:

About Escalators Part of the urban landscape Visit any large department store, shopping mall, metro station, airport or stadium anywhere in the world and you are sure to find escalators carrying people quickly and safely to their destination. The escalator has become an integral part of the urban landscape. While passenger elevators were in common use since the 1870s, it was not until 1899 that the Otis Elevator Company introduced the world s first commercially successful moving stairs. Otis Elevator Company has been safely and efficiently moving people for 150 years. Otis is the world s largest manufacturer of elevators, escalators, moving walks and people movers. With 1.2 million installations, 61,000 employees, and operations in more than 200 countries, it s safe to say that the world rides on Otis. About Escalators 1 of 7

The rise of the modern escalator Although there had been several attempts to design and build moving stairway systems prior to 1899, none proved safe or practical enough to come into general use. It was not until that year when the Otis Elevator Company built the first step-type escalator that the idea became commercially feasable. This original Otis design remains the basis for the escalator as we know it today. The word escalator was coined by combining the Latin word for steps scala with the word elevator. The term remained a registered trademark of the company until 1950, when the U.S. Patent Office ruled it was in the public domain since escalator had become the generic name for a moving stairway. The Paris Exposition of 1900 featured the first step-type escalator for public use. Early step-type tread at the beginning of the rise. About Escalators 2 of 7

1 Finding a safer solution Designing a safe transition point where passengers step on and off the escalator was one of the major problems in creating a successful moving stairway. A number of methods had been attempted before Otis solved the problem. 1. Escalators came into use in the public transportation systems of both New York and London soon after their introduction. 2. V-shunt assembly 3. Early comb plate design 4. Top landing at R.H. Macy s department store, New York City 2 In one earlier design, as the moving steps reached the upper landing, they disappeared under a V shunt. The purpose of the shunt was to literally shove passengers off the stairs and onto the landing. This required them to take an awkward sidestep with one foot while the other foot was still traveling forward. This called for considerable concentration and coordination on the part of the passengers a difficult enough feat at the best of times, much less when one was burdened with parcels or attending small children. Another alternative was a system that employed a series of comblike prongs that lifted the passengers feet off the treads when they reached the top. The prongs were designed to mesh with the tread cleats at the end of the ascending and descending runs. This was an improvement over the awkward V shunt system, but the 30 40 cm (12-16 in) prongs still posed a hazard. Passengers were tempted to leap over the approaching prongs rather than risk being scooped off. Neither the awkward V shunt system nor the pronged-comb solution was practical for the majority of users. Otis solved the problem of the transition point by combining the moving tread with a much safer comb and cleat design that reduced the prongs to a safer, tapered length. At this point, escalator sales began their steady climb. In its first year with the newly designed escalator, Otis sold more units than it had in the previous 20 combined. Its time had finally come. 3 4 About Escalators 3 of 7

The pursuit of innovation Otis, in its tradition of innovation, has continued to refine the escalator since it pioneered its introduction. Handrails Early escalators had solid rubber handrails driven by metal chains. The chains traveled in a lubricated steel channel. The result was that passengers often wound up with oil-stained hands or gloves. Otis replaced this design with a tension-driven rubber and canvas handrail that was guided in a simple unlubricated channel. Later, Otis refined this design by introducing pinch-resistant handrails to prevent the possibility of passengers fingers from getting caught. Another Otis innovation was to extend the handrails 40 cm (16 in) beyond the point where the steps disappear at the landings. This simple design improvement dramatically increased escalator safety. The extended handrail permitted passengers to grasp the rail and steady themselves before stepping onto the moving stairs. It also aided them when stepping off. The extended design improved safety by making it difficult for hands to get caught at the point where the handrail disappears into the guide box. Handrail ergonomics is an important measure of ride quality. Today, Otis employs rigorous engineering and quality control to ensure the precise synchronization of the step and handrail assemblies, improving both safety and comfort. Machine Handrail Balustrade Comb Plate Step Skirt Panel Landing Floor Plate Handrail Guide Box About Escalators 4 of 7

continued The pursuit of innovation Steps and landings Early escalators had wooden steps. Otis changed to cleat-type diecast metal steps in the 1930s. Later, it introduced narrow-gauge step-type cleats. At the landing, the early comb prongs were 30 40 cm (12 16 in). Today, they are only 19 mm (3/4 in) long. Modern cleated risers are designed to prevent the pinching hazard when the steps move back into the platform at the top landings. More recently, Otis introduced an innovative deflector device that features nylon bristles to gently guide passengers away from the gap between the skirt panel and the moving tread, adding a measurable degree of safety. Under-step lighting and directional markers were also added to the landings to alert passengers to the transition point. 1 Speeds Many of the early escalator sales were made to major department stores, installed for the convenience of their customers. These escalators traveled at speeds that ranged from between 24 30 meters (80-100 ft) per minute. Otis standardized the rate to 27 meters (90 ft) per minute, fast enough to provide rapid travel from one level to another while still being leisurely enough for customers in a department store to survey the merchandise on the sales floor. Today, most Otis escalators operate at a speed of 30 meters (100 ft) per minute. This is still slow enough to allow easy transition while serving the demand for rapid conveyance. 2 3 5 4 1. Detail of modern handrail assembly 6 2. Glass balustrade showing extended handrail design 3. Tapered handrail entry box 4. Illuminated transition point 5. Lighted directional indicator 6. Deflector brushes About Escalators 5 of 7

Safety, quality and reliability Otis was founded on the principle of safety. Today, Otis has one of the best safety records in the vertical transportation industry. The company works constantly to improve the safety of existing products and to implement new, safer technologies. Otis emphasizes a corporate policy of safety first and implements standardized procedures to ensure that every installation and service task is performed the safest way every time. Otis products undergo stringent quality and safety testing to ensure the performance, safety and reliability of the entire line of products. We perform more than 20 advanced tests on every piece of Otis equipment, including tests that mimic worst-case operating conditions and ones that simulates the rough ride our products might have during the journey from Otis facilities to installation sites worldwide. To ensure that its tradition of quality continues, Otis employs a rigorous Product Development Process (PDP) to guarantee that design and quality standards are met. Every new product receives its own PASSPORT to the marketplace. With PASSPORT, the entire team from project managers to senior executives signs off on product quality each step of the way. All major components are tested under the strict supervision of our engineers to ensure a 20-year life expectancy between overhauls. In most cases, each escalator is completely assembled and tested before it is permitted to leave the factory. PDP is another testament to our commitment to quality and safety. Side view of escalator truss and step assembly Handrail assembly procedure About Escalators 6 of 7

The escalator today an array of options Otis wrote history with the introduction of the escalator in 1899. Today, it continues to improve the product through ongoing innovation. Space-savings Newer truss designs take up less space than previous systems. Increased standard rises of up to 10 meters (33 ft), versus an industry convention of 6 meters (20 ft), allow for multiple applications with the same look, without the need for costly custom design. Moving walks are widely used in integrated airport and metro transportation systems Modular design A modular approach allows each installation to be tailored to meet specific architectural requirements. Balustrades and exterior cladding, ranging from conventionally painted metal to stainless steel and glass, can be fully customized to complement the design of any building. Lighting options provide a further means of expression to enhance the installation s overall look. The result is a streamlined appearance that can be incorporated more easily into a building s design scheme. Ride quality New handrail drive systems are aimed at providing a significant improvement in ride quality in terms of both vibration and noise. The relationship of handrail to tread speed is carefully calibrated to further improve ride quality. Noise and vibration levels are carefully monitored in a test chamber to ensure the smoothest, quietest ride possible. Enhanced noise reduction packages are used in extremely quiet applications. Otis will continue to anticipate the future by focusing the resources of its worldwide research and development teams on the search for solutions as building technologies evolve and new issues emerge. Escalator installation in X-configuration, particularly suited for mall and atrium settings About Escalators 7 of 7